At least 127 records · Page 7

Utah FORGE: Stress Logging Data

This spreadsheet consist of data and graphs from deep well 58-32 stress testing from 6900 - 7500 ft depth. Measured stress data were used to correct logging predictions of in situ stress. Stress plots shows pore pressure (measured during the injection testing), the total vertical in situ stress (determined from the density logging) and the total maximum and minimum horizontal stresses. The horizontal stresses were determined from the DSI (Dipole Sonic Imager) and corrected to match the direct measurements.

15 GEOTHERMAL ENERGY↗

Evaluation of Control Strategies to Effectively Meet 70-90% Mercury Reduction on an Eastern Bituminous Coal Cyclone Boiler with SCR

This is the final site report for testing conducted at Public Service of New Hampshire's (PSNH) Merrimack Unit 2 (MK2). This project was funded through the DOE/NETL Innovations for Existing Plants program. It was a Phase III project with the goal to develop mercury control technologies that can achieve 50-70% mercury capture at costs 25-50% less than baseline estimates of $50,000-$70,000/lb of mercury removed. While results from testing at Merrimack indicate that the DOE goal was partially achieved, further improvements in the process are recommended. Merrimack burned a test blend of eastern bituminous and Venezuelan coals, for a target coal sulfur content of 1.2%, in its 335-MW Unit 2. The blend ratio is approximately a 50/50 split between the two coals. Various sorbent injection tests were conducted on the flue gas stream either in front of the air preheater (APH) or in between the two in-series ESPs. Initial mercury control evaluations indicated that, without SO3 control, the sorbent concentration required to achieve 50% control would not be feasible, either economically or within constraints specific to the maximum reasonable particle loading to the ESP. Subsequently, with SO{sub 3} control via trona injection upstream of the APH, economically feasible mercury removal rates could be achieved with PAC injection, excepting balance-of-plant concerns. The results are summarized along with the impacts of the dual injection process on the air heater, ESP operation, and particulate emissions.

01 COAL, LIGNITE, AND PEAT↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Field testing of modular borehole monitoring with simultaneous distributed acoustic sensing and geophone vertical seismic profiles at Citronelle, Alabama: Field testing of MBM

A modular borehole monitoring concept has been implemented to provide a suite of well-based monitoring tools that can be deployed cost effectively in a flexible and robust package. The initial modular borehole monitoring system was deployed as part of a CO 2 injection test operated by the Southeast Regional Carbon Sequestration Partnership near Citronelle, Alabama. The Citronelle modular monitoring system transmits electrical power and signals, fibre-optic light pulses, and fluids between the surface and a reservoir. Additionally, a separate multi-conductor tubing-encapsulated line was used for borehole geophones, including a specialized clamp for casing clamping with tubing deployment. The deployment of geophones and fibre-optic cables allowed comparison testing of distributed acoustic sensing. We designed a large source effort (>64 sweeps per source point) to test fibre-optic vertical seismic profile and acquired data in 2013. The native measurement in the specific distributed acoustic sensing unit used (an iDAS from Silixa Ltd) is described as a localized strain rate. Following a processing flow of adaptive noise reduction and rebalancing the signal to dimensionless strain, improvement from repeated stacking of the source was observed. Conversion of the rebalanced strain signal to equivalent velocity units, via a scaling by local apparent velocity, allows quantitative comparison of distributed acoustic sensing and geophone data in units of velocity. We see a very good match of uncorrelated time series in both amplitude and phase, demonstrating that velocity-converted distributed acoustic sensing data can be analyzed equivalent to vertical geophones. We show that distributed acoustic sensing data, when averaged over an interval comparable to typical geophone spacing, can obtain signal-to-noise ratios of 18 dB to 24 dB below clamped geophones, a result that is variable with noise spectral amplitude because the noise characteristics are not identical. With vertical seismic profile processing, we demonstrate the effectiveness of downgoing deconvolution from the large spatial sampling of distributed acoustic sensing data, along with improved upgoing reflection quality. finally, we conclude that the extra source effort currently needed for tubing-deployed distributed acoustic sensing vertical seismic profile, as part of a modular monitoring system, is well compensated by the extra spatial sampling and lower deployment cost as compared with conventional borehole geophones.

58 GEOSCIENCES↗

Tools and techniques for estimating high intensity RF effects

Tools and techniques for estimating and measuring coupling and component disturbance for avionics and electronic controls are described. A finite-difference-time-domain (FD-TD) modeling code, TSAR, used to predict coupling is described. This code can quickly generate a mesh model to represent the test object. Some recent applications as well as the advantages and limitations of using such a code are described. Facilities and techniques for making low-power coupling measurements and for making direct injection test measurements of device disturbance are also described. Some scaling laws for coupling and device effects are presented. A method for extrapolating these low-power test results to high-power full-system effects are presented.

Zacharias, Richard L.↗

Potential Damage to Flight Hardware from MIL-STD-462 CS02 Setup

The MIL-STD-462 CS02 conducted susceptibility test setup, performed during electromagnetic compatibility (EMC) testing, consists of an audio transformer with the secondary used as an inductor and a large capacitor. Together, these two components form an L-type low-pass filter to minimize the injected test signal input into the power source. Some flight hardware power input configurations are not compatible with this setup and break into oscillation when powered up. This can damage flight hardware and caused a catastrophic failure to an item tested in the Goddard Space Flight Center (GSFC) Large EMC Test Facility.

Harris, Patrick K.↗

Potential Damage to Flight Hardware from MIL-STD-462 CS02 Setup

The MIL-STD-462 CS02 conducted susceptibility test setup includes an audio transformer, with the secondary used as an inductor, and a large capacitor. Together, these two components form an L-type low-pass filter to minimize the injected test signal input into the power source. Some flight hardware power input configurations are not compatible with this setup and break into oscillation when powered up. This, in turn, can damage flight hardware. Such an oscillation resulted in the catastrophic failure of an item tested in the Goddard Space Flight Center (GSFC) Large electromagnetic compatibility (EMC) Test Facility.

Harris, Patrick K.↗

Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (Final Report)

This document presents final technical findings for the project Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (FE0031782). The project is part of the U.S. Department of Energy Oil and Gas Program to develop and advance technologies that can significantly improve the recovery efficiencies of unconventional oil and gas resources. The overall objective of this project is to improve the ultimate recovery from unconventional oil and gas (UOG) resources in the United States by developing a method for using unrefined natural gas liquids (NGLs) as treatment fluids to improve hydrocarbon production. Horizontal extended-lateral drilling coupled with high volume hydraulic fracturing has significantly increased production from UOG resources in the U.S. However, the recovery efficiency is low compared to the estimated oil and gas in place. Recent data indicate that less than 10% of the oil in the liquid-rich UOG reservoirs is produced. Alternative completion methods using NGLs could increase production (Battelle, 2016; Wan et al., 2013; Wan, 2013; Downey et al, 2021); however, field validation tests are needed to develop an approach that is economical, efficient, and compatible in the UOG setting to advance towards commercial deployment. This project aims to develop and field test a method to improve recovery of oil resources in UOG shale plays by using Y-Grade NGLs, or a similar combination of NGLs, as treatment fluids. Refined NGLs have been used as a hydraulic treatment fluid in UOG plays for decades and are shown to be particularly effective because their miscibility with oil allows oil to flow more freely; however, the use of Y-Grade (unrefined) NGLs has not been studied. The use of Y-Grade NGLs would be advantageous over refined NGLs because Y-Grade NGLs do not require infrastructure or investment in refining and are already being produced from many UOG reservoirs. The concept was tested and monitored in the field at a commercial well site owned by project partner Hopco, Ltd. The project team, which consists of multiple oil and gas operators, Linde Gas North America LLC (Linde) and the Ohio Division of Geological Survey (ODGS), has extensive experience with oil and gas production in the Appalachian basin and the ability to work together quickly to solve technical issues and research needs. A key part of the proposed work was the use of existing wells for field testing and monitoring. A total of four wells (three vertical and one horizontal) were available for this project. One of the vertical wells was utilized as the test well for the NGL treatment test. A nearby vertical well was used for microseismic monitoring. The remaining vertical well and the horizontal well provided a baseline for typical UOG production in the oil window of the Utica/Point Pleasant (UPP). Major technical tasks of the project include characterization of the geotechnical properties of the UPP with an emphasis on the field site; design and planning for the NGLs testing; field testing and monitoring; analysis and integration of field data; and economic and resource/reserve assessment. The Shoman monitoring well and Doughty NGL treatment well were successfully plugged back during September-October 2020 in preparation for treatment and monitoring. A nitrogen diagnostic fracture injection test (DFIT) was completed on the Doughty well on July 22, 2021, consisting of 133,000 scf (91 Bbl.) of nitrogen. A nitrogen foam frac was completed in the Utica-Point Pleasant interval on August 17, 2021 with funding from outside sources. A microseismic monitoring array was installed in the Shoman well and monitored microseismic activity during the Doughty well frac job. Y-Grade NGL injection commenced on August 26, 2021. A total of 215 Bbl. was injected but the job was shut down due to a small leak on the suction hose on the pump truck. The Y-Grade treatment resumed on August 27, 2021 and an additional 726 Bbl. of Y-Grade NGL was injected at a well head pressure of 3850 psi. Total volume of injected Y-Grade over the two days of injection was 941 Bbl. The well was shut-in for 17 days following injection to allow the Y-Grade NGLs to soak on the formation. Y-Grade treatment flow back commenced on 9/13/2021 on a weekly basis. Production data, including surface pressures, oil, nitrogen, natural gas, and flow times was measured and recorded. Periodic gas samples were collected and analyzed to determine composition of flowback gas. As of July 2022, the treatment well had produced 726 Bbl of oil and 2,888 mcf gas. In August 2022, tubing and packer in the well were removed and a pump was installed to enhance oil recovery. Currently, the operator is producing the well about 2 days a week for a few hours. The performance of the NGL treatment test was evaluated based on reservoir simulations of the treatment process, processing of well testing data, analysis of micro seismic monitoring data, and production data analysis. This analysis suggested that oil production in the small test would continue through 2025. Upscaling the treatment to a horizontal Utica Point-Pleasant well would allow more oil recovery, but the process would involve more investment, services, and operational support. An economic analysis was conducted for scenarios aimed at upscaling the NGL treatment process for more typical horizontal UPP wells in the Appalachian Basin.

02 PETROLEUM↗

PROBING TRAPPIST-1-LIKE SYSTEMS WITH K2

The search for small planets orbiting late M dwarfs holds the promise of detecting Earth-size planets for which their atmospheres could be characterized within the next decade. The recent discovery of TRAPPIST-1 entertains hope that these systems are common around hosts located at the bottom of the main sequence. In this Letter, we investigate the ability of the repurposed Kepler mission ( K2 ) to probe planetary systems similar to TRAPPIST-1. We perform a consistent data analysis of 189 spectroscopically confirmed M5.5 to M9 late M dwarfs from Campaigns 1–6 to search for planet candidates and inject transit signals with properties matching TRAPPIST-1b and c. We find no transiting planet candidates across our K2 sample. Our injection tests show that K2 is able to recover both TRAPPIST-1 planets for 10% of the sample only, mainly because of the inefficient throughput at red wavelengths resulting in Poisson-limited performance for these targets. Increasing injected planetary radii to match GJ 1214b’s size yields a recovery rate of 70%. The strength of K2 is its ability to probe a large number of cool hosts across the different campaigns, out of which the recovery rate of 10% may turn into bona fide detections of TRAPPIST-1-like systems within the next two years.

79 ASTRONOMY AND ASTROPHYSICS↗

ISS EVA80 EMU Water in the Helmet Failure and Associated Analytical Response

On March 23rd, 2022, during Extra-Vehicular Activity (EVA) 80 aboard the International Space Station (ISS) crew identified an 8-10-inch diameter thin film of water in the pressure bubble of the suit during repress. This launched an investigation to determine the cause of the water in the helmet as well as short- and long-term mitigation efforts to enable return to EVA as quickly as possible. The investigation analysis efforts in combination with hardware inspection and testing determined the most likely cause of the water in the helmet to be sublimator carryover as a result of high latent loading put on the system. In parallel with this investigation, efforts were being made to mitigate any future water in the helmet events. The short-term mitigation strategy developed is to install absorbent material in the pressure bubble to capture water as it enters the helmet before it can impact the astronauts. This hardware is referred to as the Helmet Absorption Band (HAB) and Helmet Absorption Pad – Extender (HAP-E). Longer-term mitigation strategies include a device to capture small water events before entering the helmet by installing a water capture system in the vent loop of the Extravehicular Mobility Unit (EMU). This effort is coined the T2 Water Capture System. Additionally, developing an on-orbit sublimator challenge test which will be able to verify sublimator performance before and after EVAs. The sublimator is the hardware which condenses water vapor and removes it from the vent loop, and this hardware is referred to as the EMU Moisture Injection Test System (EMITS). Based on the investigation and short-term water capture solutions the ISS Program decided to return to nominal EVAs on October 7, 2022. With the addition of the long-term mitigation strategies, the team hopes to be able to prevent any future water in the helmet events.

Veronica Lee Pizor↗

A Type–Curve Approach for Evaluating Aquifer Properties by Interpreting Shallow Strain Measured During Well Tests

Strains occur at shallow depths in response to pressure changes during well tests in an underlying aquifer, and recent developments in instrumentation have made it feasible to measure essentially the full strain tensor. Simulations using poroelastic analyses indicate that shallow normal strains are approximately proportional to the logarithm of time when a well is injecting into or pumping from a deep aquifer or reservoir. The drawdown is also a linear function of log time, as shown by the classic Cooper-Jacob type-curve analysis. The time when the semilog straight line intercepts the zero-strain axis is similar to the time determined from the Cooper-Jacob pressure analysis, and it can be used to estimate hydraulic diffusivity, suggesting that horizontal strain data can be used directly to estimate aquifer properties. This approach was validated using measurements from shallow (30-m deep) borehole strainmeters during an injection test at a 530-m-deep sandstone aquifer/reservoir in Oklahoma. The results show intercept times for the shallow normal strain data are essentially the same as for deep pressure data from an equivalent radial distance. The slopes of the semilog plots of the pressure and the strain increase at the same time, suggesting that they both respond to a lateral aquifer boundary. Significantly, though, strain was measured at shallow depths while the pressure data were measured at 530-m depth. This suggests that strain data from shallow depths could be an effective way to improve the characterization of an underlying aquifer.

54 ENVIRONMENTAL SCIENCES↗

Robust In-Situ Strain Measurements to Monitor CO 2 Storage

The goal of this project was to develop and demonstrate robust instrumentation to monitor the in-situ strain tensor in order to improve the reliability and security of CO 2 storage in geologic formations. We met the original goals of the project and the major overarching accomplishment is the advancement of strain tensor monitoring from an intriguing concept to a commercially available technology with a solid foundation of novel instruments supported by theoretical analyses and validation experiments. The main accomplishments of the project are summarized below. We designed, built and evaluated nine new optical fiber strainmeters and tiltmeters using Michelson interferometers to measure deformation with ultra-high resolution at both shallow and deep point locations in the subsurface. These are the robust strainmeters that motivated the title of the project. We designed, built and evaluated a novel method of measuring distributed strain in optical fibers with nanostrain resolution, and cm-scale location, and sampling into the seismic band. The new method is called Coherence-length-gated Microwave Photonics Interfereometry (CMPI). CMPI technology has advantages over existing commercial DAS and DSS methods. We developed and demonstrated capabilities to deploy instruments in the field and used them to measure strain caused by ambient signals like barometric pressure and tides, as well as induced signals like surface loading and pore pressure changes from pumping tests. We deployed a working strainmeter at 1,700 ft depth, slightly above an active reservoir. This is to our knowledge the greatest depth a strainmeter has been deployed and the techniques we used can readily be extended to greater depths. Optical fiber borehole tensor strainmeter techology was advanced from a TRL 4 at the start, to a TRL of 7 at the conclusion of the project. The project included advances in simulations and theoretical analyses. We developed and demonstrated a computational workflow that uses machine learning to reduce the computational requirements and make it practical to use Bayesian inversion to solve large numerical poroelastic analyses needed to interpret strain tensor field data. We evaluated the strain tensor fields and time series that would be caused by leaks of CO 2 or other fluids from reservoirs. These simulations demonstrated that signals from leaks could be measured with instruments developed for the project, opening a potentially new method for ensuring storage security. We showed that strains in caprock can be used to estimate pressure in a reservoir. This avoids the need to drill monitoring wells into the reservoir, and it expands the capabilities of monitoring in the caprock. The project includes a derivation and application of a novel analytical solution to the strains in the vicinity of a pressurized poroelastic inclusion. This solution explains field data measured during injeciton tests at the North Avant Field, and it will simplify future interpretation of strain tensor data. The project included a broad range of experiments, and of the most significant is the characterization of the strain tensor at an array three strainmeters during six injection tests at the North Avant Field, Oklahoma. This demonstrated repeatability of the strain signal measured by the new instruments developed for the project, and it showed similarities between the strain signal at shallow depths and pressure in the underlying reservoir. We also demonstrated that useful strain data can be measured at reservoir depths. This confirms that strain tensor data can be measured throughout the caprock over a reservoir. The project demonstrated the feasibility of using the strain tensor and distributed strain measured in caprock during a variety of different well tests where the pumping rate was constant, sinusoidal and positive, or a periodic square wave with zero net rate. This further strengthens the validity of using strain data to characterize reservoirs and aquifers. We also demonstrated that strain caused be fluctuations of air pressure and water pressure in the vadose zone can be measured and interpreted, suggesting that high resolution distributed strain measurements hold promise for monitoring the vadose zone. The project partially supported nine graduate students in the Environmental Engineering, Hydrogeology, Electrical Engineering programs at Clemson University. The research was described in nine journal papers, 23 talks and conference abstracts. Additional journal papers are in preparation. A new company called Tensora was started to provide strainmeter technology for commercial applications.

01 COAL, LIGNITE, AND PEAT↗

Development of a Process for a High Capacity Arc Heater Production of Silicon for Solar Arrays

A program was established to develop a high temperature silicon production process using existing electric arc heater technology. Silicon tetrachloride and a reductant (sodium) are injected into an arc heated mixture of hydrogen and argon. Under these high temperature conditions, a very rapid reaction is expected to occur and proceed essentially to completion, yielding silicon and gaseous sodium chloride. Techniques for high temperature separation and collection were developed. Included in this report are: test system preparation; testing; injection techniques; kinetics; reaction demonstration; conclusions; and the project status.

Reed, W. H.↗

September 2008 monitoring results for Centralia, Kansas.

In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under a KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twice yearly (for a recommended period of two years) for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The sampling in September 2007 represented the fifth and final monitoring event performed under the two-year twice yearly monitoring program (Argonne 2006a,b, 2007a, 2008a). The results from the two-year monitoring program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 Risk-Based Screening Level of 5 {micro}g/L for this compound in a broad groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC in situ chemical reduction technology, that was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the proposed interim measure occurred in December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009). The KDHE has requested that sitewide monitoring continue at Centralia until a final remedy has been implemented and a comprehensive program of performance and compliance monitoring has been established for this site (KDHE 2008a). The groundwater sampling events at Centralia in March 2008 (Argonne 2008b) and September 2008 were performed in response to this request. The present report documents the results of groundwater sampling conducted in September 2008, in the network of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for extended monitoring of the groundwater contamination at Centralia (KDHE 2005a,b). Sampling of additional piezometers specifically installed to monitor the progress of the interim measure pilot test (PMP1-PMP9; Figure 1.2) was also performed in September 2008; the results of these analyses are reported and discussed separately (Argonne 2009).

54 ENVIRONMENTAL SCIENCES↗

Experiments and Simulation of a Borehole in Salt to Understand Heat, Brine, and Vapor Migration - 19192

Disposition of heat-generating nuclear waste (HGNW) remains a continuing technical and sociopolitical challenge. Numerous concepts for HGNW management have been proposed and examined internationally, including an extensive focus on geologic disposal. One proposed geologic material is salt because of its low permeability and viscoplastic deformation that causes self-repair of damage done to the salt by waste emplacement activities. Evaluating the safety and technical challenges of storing HGNW in a salt repository is an ongoing process involving experiments and supporting numerical simulation. Currently an experiment is underway at the Waste Isolation Pilot Plant (WIPP) to explore how the presence of a heat generating source affects phenomena such as brine migration, vapor transport, and mechanical changes to the bedded salt. A sub-horizontal heated borehole test is in progress in the underground at the WIPP that includes a centrally located 10.2 cm diameter borehole with an adjustable heater surrounded with smaller diameter boreholes instrumented with thermocouples. The central borehole contains an inflatable packer, heating block, brine sampler, and constantly flowing nitrogen gas circulation system. Air-injection tests performed in the central borehole provide pressure measurements that are used to constrain permeability of the system. The steady-state temperatures, as well as the rise and fall of temperature when the heater is cycled on and off, have been measured for up to 60 days. In the borehole, dry nitrogen gas circulation evaporates water and outflows to a desiccant container where water mass is measured daily during the experiment to quantify vapor removal. Although this test is a 'shake-down' for a planned second round of fresh borehole testing, we have gathered a rich dataset. These data allow us to build simulations using the Finite Element Heat and Mass transfer code (FEHM) to evaluate the experimental results, determine field-scale parameters, and identify code improvements to reproduce important physical processes that may not be accounted for at present. A 3-D numerical mesh, built using LaGrit software (lagrit.lanl.gov; Miller et al., 2007), includes increasing resolution around the central borehole. Modeling of the experiment allows for determining the local thermal conductivity and permeability of any damaged bedded salt around the borehole, where damage from drilling may change the permeability, porosity and saturation conditions, by parameter testing and inverse methods. Additionally, assumptions about brine and vapor flow and transport are being tested by comparing measured and simulated results. The combination of experimental data and model results provide additional data to help support the safety case for safe and effective HGNW disposition in bedded salt formations. Initial results from this experiment show that water flow into the borehole is within previous experimental results. Further, we have found that the design of the heater block is restricting energy to flow into the rock salt. Thus, this test has proven useful in design of the next generation experiment where infrared heating may be used to bypass issues caused by air gaps located around the current stainless steel block heater. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Key Learnings from Hydraulic Fracturing Test Site - 2 (HFTS-2), Delaware Basin

Hydraulic fractures (HF) play a dominant role in oil and gas production from unconventional reservoirs, fracture characteristics, geometry, and extent are generally not well known and are typically inferred from various monitoring methods or subsurface models. The Hydraulic Fracturing Test Site-2 (HFTS-2) is a field-based research experiment performed in the Wolfcamp formation of the Permian (Delaware) Basin. HFTS-2, a unique joint industry program (JIP) that brings together government, academia, and industry, focused on field data acquisition and interpretation. The project has built a comprehensive HF research dataset that includes microseismic (MS), 1,500 ft of core, diagnostic formation injection tests (DFIT), fluid characterization, advanced logs, geochemistry, downhole gauges, varying completions, and permanent fiber optic (FO) cable in vertical and horizontal wells. These data were integrated and used to characterize HF geometry/dimensions and resulting depletion profiles, gain insights for completion design, and achieve a better understanding of parent well depletion effects on child well performance. The analysis and integration of the comprehensive HFTS-2 diagnostics dataset provide insights for optimal well placement and completions and improves understanding about the effects of parent well depletion. Furthermore, this dataset can be used to blind test and develop subsurface workflows for unconventional resources. Key learnings from HFTS-2 and the new technologies tested can easily be transferred to other unconventional plays.

58 GEOSCIENCES↗

Toward Transpulmonary Chemoembolization with Degradable Starch Microspheres: Systematic Analysis of Local and Systemic Effects in a Porcine Model

Purpose: To investigate local and systemic effects of transpulmonary chemoembolization (TPCE) with degradable starch microspheres (DSM) and doxorubicin. The long-term goal is to establish DSM-TPCE as a treatment option for pulmonary malignancies. Materials and Methods: Nine pigs underwent TPCE of either the right or left lower lobe pulmonary artery (LLPA) and bland embolization (TPE) of the contralateral LLPA. Before the procedures, macroaggregated albumin (MAA) particles were injected into both LLPAs, to exclude systemic shunting. Pulmonary arterial pressure, heart rate and oxygenation were recorded immediately before and at 1, 3, 5 and 10 min after treatment. To investigate possible nontarget embolization, animals underwent cerebral MRI (cMRI). We killed the animals after a contrast-enhanced chest computed tomography (CT) and performed a pathologic examination at 12 h (3), 24 h (3) and 72 h (3) after treatment. Results: All experiments were technically successful. Mean injected DSM dose until stasis was similar in TPCE and TPE (4.3 ± 1.4 vs. 4.0 ± 1.4 mL). Pulmonary arterial pressure increased significantly 3 min after treatment (TPE: 17 ± 5 vs. 27 ± 7 mmHg; TPCE: 22 ± 6 vs. 36 ± 8 mmHg). No significant changes in heart rate or peripheral oxygenation levels occurred. We observed no evidence of structural lung damage or permanent perfusion disruption on CT. MAA test injection and cMRI revealed no shunting or nontarget embolization. The pathologic assessment revealed nonspecific local inflammation of the lung parenchyma. Conclusion: In this large-animal model, TPCE and TPE appear feasible and safe. We observed a mild increase in pulmonary arterial pressure. Nontarget embolization did not occur. TPCE, as well as TPE, did not cause structural damage to the normal lung parenchyma.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Risk Assessment using Certification Framework (SECARB Phase III Work Product 3.1.1b)

The Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III 1.5 million tonne CO 2 sequestration project is taking place on the eastern side of an oilfield in southwestern Mississippi in the so-called High Volume Injection Test area (HiVIT). The source of CO 2 for the project is the natural CO 2 reservoir at Jackson Dome, Mississippi. We apply the Certification Framework (CF) approach to assess the risk of CO 2 and brine leakage from the deep reservoir to various compartments where impacts could occur. The large depth (~10,000 ft, 3,050 m) of the Tuscaloosa Formation reservoir, presence of extensive thick marine mudstone confining zone, and well-known geology, among other factors, tend to minimize the likelihood of leakage. On the other hand, the large number of plugged and abandoned (P&A) wells provides potential flow paths for leakage upward to potable aquifers and potentially to the ground surface. A review of site characteristics relevant to leakage risk, simulation of the CO 2 injection, and modeling of performance of P&A wells is presented to demonstrate the application of the Certification Framework (CF) for leakage risk assessment in the context of an enhance Oil Recovery (EOR) project.

02 PETROLEUM↗