Search NASA⌕ Search

SEARCH · Search NASA

Results for “installation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Installation of a second superconducting wiggler at SAGA-LS

The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of the vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.

43 PARTICLE ACCELERATORS↗

Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligence activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.

14 SOLAR ENERGY↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

PV Installation Labor Market Analysis and PV JEDI Tool Developments (Presentation)

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primaryresearch on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers' and other solar stakeholders' understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skillpreferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

14 SOLAR ENERGY↗

Installer Badges Toolkit and Visualization Resources

NREL staff (Jal Desai and Cory Chovanec) will introduce the U.S. Department of Energy Weatherization Assistance Program (DOE WAP) Installer Badges Toolkit. The presentation will cover topics such as how this toolkit can be customized and implemented in a program, the potential benefits of using the Badges, and lessons learned from other implementers. This session will also engage participants to share their experiences regarding their existing training and how they are bringing their workforce up to speed in their building envelope-related programs. The Installer Badges Toolkit consists of 25 Badges, each representing different energy efficiency tasks that an installer could perform on a home. Each Badge defines the desired outcome, criteria to verify the work, applicable material requirements, and references to DOE's Standard Work Specifications (SWS) or other relevant standards. Workers earn Badges by completing each task and receiving approval from a qualified supervisor. The Badges provide a consistent approach to training by ensuring that installers are learning the same skills nationwide. Organizations can also customize the Toolkit by choosing only those Badges that are relevant to their program. NREL staff will also showcase new visualization resources like the Single-family and manufactured home job aids and the Single-family 3D house tool.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

Opportunities for installed combined heat and power (CHP) to increase grid flexibility in the U.S.

Increasing use of renewable energy requires sufficient grid flexibility to address uncertainty and variability in electricity generation. Previous studies suggest that combined heat and power (CHP) systems may support grid flexibility but they do not consider operating hours. In this paper, we used CHP operating data and determined annual and monthly availability of the installed CHP capacity from various sectors (e.g., utility, independent power producer, commercial, and industrial) in all seven U.S. independent system operators (ISOs) and regional transmission organizations (RTOs). Also, we estimated hourly CHP availability installed in five facility types (i.e., hospitals, universities, hotels, offices, and manufacturing) in the state of New York. The results show that regardless of ISO/RTO, sector, or season, more than 40% of the installed CHP capacity (0.7–8.7 GW) was not fully utilized in 2019; the results are similar for 2018. This available CHP capacity accounted for up to 9% of the ISO/RTO's peak electric demand, which may yield cost savings up to $16 billion by avoiding installation costs of new natural gas combustion or combined-cycle turbines. To exploit the available CHP capacity to enhance grid flexibility, we recommend different policy implications including flexible contract lengths between CHP owners and grid operators, improved market designs, and simplified interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The roles of learning mechanisms in services: Evidence from US residential solar installations

Non-hardware costs are majority of the cost of producing solar photovoltaic (PV) electricity. Here we use matched data on patents and over 125,000 residential PV installations to estimate the effects of three learning mechanisms in reducing PV costs: learning by doing, searching, and interacting. While previous work in this area has focused predominantly on learning by doing, we find that learning by searching and interacting are also significant mechanisms to facilitate non-hardware cost reductions. Including these two mechanisms reduces the effect of learning by doing in explaining non-hardware cost reductions by 43%. Our results suggest that prior work may overemphasize the role of learning by doing and the policies that help generate learning by doing. Analysis of the supplier-network between installers and their suppliers shows that concentrated supplier networks are associated with lower non-hardware costs, although there are key differences between installer-panel and installer-inverter manufacturer networks. An important implication is that policies for reducing non-hardware costs need to take a more complete view of how different learning mechanisms engender cost reductions. They should particularly consider the important role of learning in supplier networks in cost reductions—an effect that until now has largely been missing in analyses of solar non-hardware costs.

14 SOLAR ENERGY↗

Cryogenics and purification systems of the ICARUS T600 detector installation at Fermilab

This paper describes the cryogenic and purification systems of the ICARUS T600 detector in its present implementation at the Fermi National Laboratory, Illinois, U.S.A. The ICARUS T600 detector is made of four large Time Projection Chambers, installed in two separate containers of about 275 m 3 each. The detector uses liquid argon both as target and as active medium. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions and the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector was previously operated in Italy, at the INFN Gran Sasso Underground Laboratory (LNGS), in a three-year run on the CERN to LNGS Long Baseline Neutrino Beam. For its operation on the Booster and NuMI neutrino beams at Fermilab, for the search of sterile neutrinos and measurements of neutrino-argon cross sections, the detector was moved from Gran Sasso to CERN for the upgrades required for operation at shallow depth with high intensity neutrino beams. The liquid argon containers, the thermal insulation and all the cryogenic equipment have been completely re-designed and rebuilt, following the schemes of the previous installation in Gran Sasso. The detector and all the equipment have been transported to Fermilab, where they have been installed, tested and recently put into operation. The work described in this paper has been conducted as a joint responsibility of CERN and Fermilab with the supervision provided by the ICARUS Collaboration. Design, installation, testing, commissioning and operation are the result of a common effort of CERN, Fermilab and INFN groups.

Cryogenic detectors↗

Net Zero Energy Analysis Approach for Military Installations

Net zero energy is a concept of energy self-sufficiency based on minimized demand and use of local renewable energy resources. A net zero energy military installation is defined as: 'A military installation that produces as much energy on-site from renewable energy generation or through the on-site use of renewable fuels, as it consumes in its buildings, facilities, and fleet vehicles.' [1] TheNational Renewable Energy Laboratory (NREL) developed a comprehensive, first-of-its-kind strategy for evaluating a military installation's potential to achieve net zero energy status, including an assessment of baseline energy use, energy use reduction opportunities from efficiency or behavior changes, renewable energy generation opportunities, electrical systems analysis of renewableinterconnection, microgrid potential, and transportation energy savings. This paper describes NREL's net zero energy assessment strategy and provides a planning guide for other organizations interested in evaluating net zero potential. We also present case studies and describe lessons learned from NREL's net zero energy assessments at seven installations, including the importance of enforcing and funding mandates, providing leadership support, collecting accurate data, and selecting appropriate technologies. Finally, we evaluate whether the net zero concept is a useful framework for analyzing an energy strategy and a reasonable goal.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Full Scale 3D Computational Model of the Industrial -Scale Coal Fired Boiler Performance for Temperature Sensor Installation Guidance

Abstract Nearly 30% of the electricity is generated by using coal as the primary fuel in the US. One of the major concerns in coal-fired power plants is the failure of boiler tubes that leads to unscheduled maintenance and has a huge economical and societal impact. High temperature flue gas along with ash pass over the boiler tubes, which over time leads to tube failure. Therefore, developing temperature sensors for harsh environments and install them for temperature sensing and boiler tube lifetime prediction is an urgent need. On the side of sensor development, the location of the sensor installation is important for stable sensing performance and easy calibration. In this study, computational fluid dynamics and heat transfer modeling are adopted to establish a full-scale 3-dimensional model of a coal-fired boiler to investigate the flue gas temperature distribution within the boiler and identify the proper locations for sensor installation. We proposed three criteria to select the temperature sensor installation location: (1) select the boiler tube panel away from the sidewalls, (2) select the boiler tube section closer to the top wall of the boiler; and (3) select the boiler tube on the back of the boiler panel (not directly facing the flue gas flow). In these regions, the flue gas temperature is stable, providing an ideal environment for stable temperature sensing and calibration.

Gupta, Tanuj↗

Installation and imaging of thousands of minirhizotrons to phenotype root systems of field-grown plants

Roots are vital to plant performance because they acquire resources from the soil and provide anchorage. However, it remains difficult to assess root system size and distribution because roots are inaccessible in the soil. Existing methods to phenotype entire root systems range from slow, often destructive, methods applied to relatively small numbers of plants in the field to rapid methods that can be applied to large numbers of plants in controlled environment conditions. Much has been learned recently by extensive sampling of the root crown portion of field-grown plants. But, information on large-scale genetic and environmental variation in the size and distribution of root systems in the field remains a key knowledge gap. Minirhizotrons are the only established, non-destructive technology that can address this need in a standard field trial. Prior experiments have used only modest numbers of minirhizotrons, which has limited testing to small numbers of genotypes or environmental conditions. This study addressed the need for methods to install and collect images from thousands of minirhizotrons and thereby help break the phenotyping bottleneck in the field. Over three growing seasons, methods were developed and refined to install and collect images from up to 3038 minirhizotrons per experiment. Modifications were made to four tractors and hydraulic soil corers mounted to them. High quality installation was achieved at an average rate of up to 84.4 minirhizotron tubes per tractor per day. A set of four commercially available minirhizotron camera systems were each transported by wheelbarrow to allow collection of images of mature maize root systems at an average rate of up to 65.3 tubes per day per camera. This resulted in over 300,000 images being collected in as little as 11 days for a single experiment. The scale of minirhizotron installation was increased by two orders of magnitude by simultaneously using four tractor-mounted, hydraulic soil corers with modifications to ensure high quality, rapid operation. Image collection can be achieved at the corresponding scale using commercially available minirhizotron camera systems. Along with recent advances in image analysis, these advances will allow use of minirhizotrons at unprecedented scale to address key knowledge gaps regarding genetic and environmental effects on root system size and distribution in the field.

54 ENVIRONMENTAL SCIENCES↗

3D vertical seismic profile acquired with distributed acoustic sensing on tubing installation: A case study from the CO2CRC Otway Project

Distributed acoustic sensing (DAS) can revolutionize the seismic industry by using fiber-optic cables installed permanently to acquire on-demand vertical seismic profile (VSP) data at fine spatial sampling. With this, DAS can solve some of the issues associated with conventional seismic sensors. Studies have successfully demonstrated the use of DAS on cemented fibers for monitoring applications; however, such applications on tubing-deployed fibers are relatively uncommon. Application of tubing-deployed fibers is especially useful for preexisting wells, where there is no opportunity to install a fiber behind the casing. In the CO2CRC Otway Project, we acquired a 3D DAS VSP using a standard fiber-optic cable installed on the production tubing of the injector well. We aim to analyze the quality of the 3D DAS VSP on tubing, as well as discuss lessons learned from the current DAS deployment. We find the limitations associated with the DAS on tubing, as well as ways to improve the quality of the data sets for future surveys at Otway. Due to the reduced coupling and the long fiber length (approximately 20 km), the raw DAS records indicate a high level of noise relative to the signal. Despite the limitations, the migrated 3D DAS VSP data recorded by cable installed on tubing are able to image interfaces beyond the injection depth. Furthermore, we determine that the signal-to-noise ratio might be improved by reducing the fiber length.

3D↗

Solar Installation Labor Market Analysis

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primaryresearch on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers' and other solar stakeholders' understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skillpreferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

14 SOLAR ENERGY↗

Structural Code Considerations for Solar Rooftop Installations

Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

Dwyer, Stephen F.↗

Solar, Install, Mount, Production, Labor, Equipment Balance of Systems

The GTRI led project team in partnership with the DOE, universities, and numerous industry leaders, have advanced the mission of the DOE EERE, the Solar Energy Technologies Program, and the SunShot Initiative by accelerating the research, development, and demonstration of solar PV technologies that provide Extreme Balance of Systems Cost Reductions (BOS-X). The research produced 132 design concepts, resulting in 19 invention disclosures, five patent applications, four 90% pre-commercial designs, and three licensed technologies. Technology practice rights were obtained by an industry partner, and a new solar commercial start-up company was launched in Atlanta as a result of this project. Innovations in residential, commercial, and utility scale balance of systems technologies were realized through an unprecedented multi-disciplinary university/industry partnership with over 50 students and 24 faculty members that produced 18 technical publications, a PhD thesis, and two commercially deployed operating prototypes. The technical effectiveness and economic feasibility of the multidisciplinary systems based approach executed by the project team was realized through 1) a comprehensive evaluation of industry, regulatory, and public stakeholder requirements; 2) numerous industry/student/faculty engagements in design studios, technical conferences, and at solar PV installation sites; 3) time and motion studies with domain experts that provided technical data and costs for each phase and component of the solar PV installation processes; 4) extensive wind tunnel and systems engineering modeling; and 5) design, construction, and demonstration of the selected technologies in the field at high profile sites in Atlanta. The SIMPLE BOS project has benefitted the public in the following ways: • Workforce development: The launch of a start-up company to commercialize the DOE funded SIMPLE BoS designs has directly created 9 new jobs in the State of Georgia. As of November 2014, the Georgia solar industry employs 2,890 solar workers, representing a 12.8% growth in employment over 2013 (Solar Jobs Census, 2014). • Growth of the solar industry: The DOE SIMPLE BoS SunShot Award to GTARC accelerated the growth of the solar industry in Georgia, due to the national publicity of the award and the engagement of numerous solar PV manufacturers, designers, and installers on the SIMPLE BoS project. In 2011 less than 50 megawatts of solar PV capacity existed in Georgia; by 2016 Georgia may reach nearly 800 MW of total approved solar capacity with the 2012 Georgia Power Advanced Solar Initiative. • Technical outreach and publications: Georgia Tech has participated in numerous technical symposiums, technology demonstrations, campus solar PV tours, and produced 18 publications for the solar industry and general public. • Cost reductions for consumers: The SIMPLE BoS pre-commercial systems and discoveries enable cost reductions of 50% or more in labor and materials for residential, commercial and utility scale PV installations.

14 SOLAR ENERGY↗

Multi-static Serial LiDAR for Surveillance and Identification of Marine Life at MHK Installations

Final Report for project DE-EE0006787: Multi-static Serial LiDAR for Surveillance and Identification of Marine Life at MHK Installations. This project developed and tested an optical monitoring system prototype that will be suitable for marine and hydrokinetic (MHK) full project lifecycle observation (baseline, commissioning, and decommissioning), with automated real-time classification of marine animals. This system can be deployed to collect pre-installation baseline species observations at a proposed deployment site with minimal post-processing overhead. To satisfy deployed MHK project species of concern (e.g. Endangered Species Act-listed) monitoring requirements, the system provides automated tracking and notification of the presence of managed animals within established perimeters of MHK equipment and provides high resolution imagery of their behavior through a wide range of conditions. During a project’s decommissioning stage, the system can remain installed to provide resource managers with post-installation data. Our technology, known as an Unobtrusive Multi-static Serial LiDAR Imager (UMSLI), is a technology transfer of underwater distributed LiDAR imaging technology that preserves the advantages of traditional optical and acoustic solutions while overcoming associated disadvantages for MHK environmental monitoring applications. This new approach is a purposefully-designed, reconfigurable adaptation of an existing technology that can be easily mounted on or around different classes of MHK equipment. The system uses low average power red (638nm) laser illumination to be invisible and eye-safe to marine animals and is compact and cost effective. The equipment is designed for long term, maintenance-free operations, to inherently generate a sparse primary dataset that only includes detected anomalies (animal presence information), and to allow robust real-time automated animal classification/identification with a low data bandwidth requirement. Advantages of the technology over others currently being used or being considered for MHK monitoring include: Unlike a conventional camera, the depth of field is near-infinite and limited by attenuation (approximately 5-8 m) rather than focal properties of a lens; Operation in an adaptive mode which can project a sparse grid of pulses with higher peak power for longer range detection (>10 meters) and track animals within a zone of interest with high resolution imagery for identification of marine life at closer range (<5m); System detection limit and Signal-to-Noise-Ratio is superior to a camera, due to rejection of both backscattering component and ambient solar background; Multiple wide-angle pulsed laser illuminators and bucket detectors can be flexibly configured to cover a 4pi steradian (i.e. omnidirectional) scene volume, while also retrieving 3D features of animal targets from timing information; Process and classification framework centered around a novel active learning and incremental classification classifier that enables accurate identification of a variety of marine animals automatically; A two-tiered monitoring architecture and invisible watermarking-based data archiving and retrieving approach ensures significant data reduction while preserving high fidelity monitoring. A methodology to train and optimize the classifier for target species of concern to optimize site monitoring effectiveness. This technological innovation addresses a high priority regulatory requirement to observe marine life interaction near MHK projects. Our solution improves resource manager confidence that any interactions between marine animals and equipment are observed in a cost-effective and automated manner. Without EERE funding, this novel application of multi-static LiDAR would not have been available to the MHK community for environmental monitoring.

16 TIDAL AND WAVE POWER↗

State and Local Policy Impacts on the Residential Solar PV Installation Industry

This study explores the effects of state and local policies on local residential solar PV installation industries. The results show that state and local policies affect the number of installers that compete in local PV markets, the relative sizes of those installers, and the market shares of high-volume national-scale installers. Understanding these effects could improve PV policy analysis and yield insights into how to achieve multiple PV policy objectives.

14 SOLAR ENERGY↗