288 records · Page 7

Optimization of the FRIB beam dump: a hybrid genetic algorithm and reinforcement learning approach

The operational envelope of high-power-density systems, such as particle accelerators and advanced nuclear energy systems, is critically constrained by the need to manage extreme thermal loads. To address this, we present a novel hybrid optimization framework combining a genetic algorithm (GA) with a soft actor-critic (SAC) deep reinforcement learning agent. This framework was applied to a practical high-heat-flux problem: redesigning the beam dump at the Facility for Rare Isotope Beams (FRIB) for a power upgrade from 20 kW to 50 kW. The resulting design, validated by three-dimensional conjugate heat transfer simulations, suppresses hazardous hot spots and yields a markedly more uniform temperature distribution. This provides a robust operating margin, increasing the average power-handling capability by 72% relative to the current design, demonstrating the framework’s potential to solve complex thermal management challenges in both accelerator technology and advanced nuclear systems.

Accelerator

Heliostat sizing methodology for concentrating solar thermal industrial process heat projects

This study presents a method to obtain a heliostat size that minimizes the levelized cost of heat (LCOH) of a heliostat-based concentrating solar thermal system for applications of solar heating for industrial processes at operating temperatures from 565 to 1550°C. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model to supplement the previously developed cost models, which we update to reflect current pricing trends. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWh th . Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the LCOH, producing a characteristic U-shaped trend with a robust near-optimal window of 7-20 m 2 ; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats being deployed at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Advanced LiFSI-LiPF6 Electrolyte for Wide-Temperature and Thermally Stable Lithium-Ion Batteries

A new optimized LiFSI–LiPF6 dual-salt controlled-solvation electrolyte (E-DS) is demonstrated to enable practical graphite||LiNi0.8Mn0.1Co0.1O2 cells (˜4.0 mAh cm?²) to achieve exceptional performance and safety under extreme conditions. By optimizing anion coordination with the smaller, more dissociating FSI? anion, the E-DS forms ultrathin, dense, and inorganic-rich electrode/electrolyte interphases that dramatically suppress solvent decomposition, transition-metal dissolution, and surface reconstruction compared to the conventional LiPF6/carbonate electrolyte. Consequently, E-DS cells deliver >78% capacity retention after 300 cycles at 60 °C, retain fast discharging capacity at 30 °C, and operate effectively at -20 °C. Most strikingly, fully charged full cells with E-DS, even under overcharging to 4.8 V, show a lower heat evolution in stable formulations — transforming a traditionally unstable high-voltage/high-temperature configuration into an intrinsically safe state. This work establishes a new benchmark for carbonate-containing electrolytes, simultaneously achieving high energy density, fast-discharging capability, wide-temperature operation (-20 to 60 °C), and outstanding thermal safety in nickel-rich lithium-ion batteries.

electrode/electrolyte interphase

Polynomial-time preparation of low-temperature Gibbs states for two-dimensional toric code

In this work, we propose a polynomial-time algorithm for preparing the Gibbs state of the two-dimensional toric code Hamiltonian at any temperature, starting from any initial state, significantly improving upon prior estimates that suggested exponential scaling with inverse temperature. We prove that fast mixing at low temperature for the two-dimensional toric code can be achieved by augmenting local jump operators with simple global jump operators, which enable efficient transitions between logical sectors. To establish tight lower bounds on the spectral gap, we introduce a new reduction method that eventually maps the problem to estimating the spectral gap of a perturbed graph Laplacian on a stair graph. Our proof also shows that the Lindblad dynamics with a digitally implemented low-temperature local Davies generator is able to efficiently drive the quantum state toward the ground state manifold.

97 MATHEMATICS AND COMPUTING

Correlating Impacts of Injected Fuels on Carbon Emissions in Blast Furnace with Computational Fluid Dynamics Modeling

A major challenge for steelmaking is the reduction of CO 2 emissions. In this regard, the blast furnace (BF) is critical due to the high associated CO 2 levels. This investigation assesses the impact of tuyere‐injected fuels on BF CO 2 emissions. Specifically, computational fluid dynamics results obtained previously at Purdue University Northwest are analyzed to obtain CO 2 emissions when natural gas (NG), syngas, hydrogen, or hydrogen/NG are injected. CO 2 emissions are compared with those produced when 95 kg of NG/thm is injected. Among these scenarios, the largest CO 2 reduction occurs when 102 kg of syngas/thm (COG feedstock #1) is injected at 973 K, reducing CO 2 by 190.6 kg thm −1 . The largest CO 2 reduction obtained with NG occurs when 130 kg thm −1 is injected at 600 K, reducing emissions by 65 kg thm −1 . H 2 injection also reduces CO 2 , but requires careful adjusting to reach stable operation. For instance, injecting 35 kg of H 2 /thm reduces CO 2 by 52 kg thm −1 . Increasing gaseous injection rates can significantly reduce CO 2 emissions, with fuel preheating providing an addendum, but high injection rates can lead to unstable operation. Furthermore, results show a correlation between CO 2 emissions and average temperature of shaft region for multiple fuels and injection conditions.

Metallurgy & Metallurgical Engineering

Challenge of Fielding Experiments at the Annular Core Research Reactor

Conference is the annual Test, Research &Training Reactors (TRTR) meeting. Typically attended by dozens of research reactor operators, educators, trainers, maintenance & service contractors Also, members of the Nuclear Regulatory Commission (NRC) attend. Presentation highlights ACRRs capability and the process used to submit and approve experimental activities. This presentation is adapted from my previous presentation to the Material Test and Research conference, SAND2025-1775526.

Martin, Lonnie E. [Sandia National Laboratories (S

Challenges for Megawatt-Scale Artificial Intelligence Rack Infrastructure

As artificial intelligence (AI) computing densities continue to increase, industry is pursuing megawatt-scale rack architectures that require tightly coordinated advances in electrical power delivery, thermal management, operations, and infrastructure integration. This document summarizes the primary technical challenges for achieving this target.

Nawaz, Kashif [ORNL] (ORCID:0000000251612491)

Optimizing Renewable Ammonia Production for a Sustainable Fertilizer Supply Chain Transition

Local renewable ammonia production using electrolytic hydrogen is an emerging approach to alleviate emissions attributed to synthetic nitrogen fertilizer production while also insulating against fluctuations in fertilizer prices and mitigating transportation costs and emissions. However, replacing ammonia currently produced using fossil fuels will not be immediate. To this end, we develop a supply chain transition model, which first optimizes the design and hourly operation of new renewable ammonia facilities to minimize production costs and then optimizes the annual installation timing, production scale, and location of these new renewable facilities along with ammonia transportation to meet county resolution demands. The objective is to augment and eventually replace conventional ammonia market imports in an economically competitive manner. We performed a case study for Minnesota's ammonia supply chain and found that a full transition to in-state renewable production by 2032 is optimal. This is incentivized by the U.S. federal government's clean hydrogen production credits. This transition results in 99 % reduction in carbon intensity along with stable supply costs below $475 per metric tonne. New renewable production facilities are an order of magnitude smaller than existing conventional plants. They use both wind and solar resources and operate dynamically to minimize expensive battery and hydrogen storage capacities.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

A stable high-humidity bubbler design to supply steam for solid oxide electrolysis cells

A stable steam supply is required for the operation of solid oxide electrolysis cells. Heated water bubblers are the most common method due to the simplicity and inherent safety of the method, however, several design challenges hinder effective implementation. Here, a stable and validated bubbler design is presented, capable of achieving very high steam concentrations, relatively high flow rates, and continuous operation. A piping and instrumentation diagram and bill of materials are provided to enable easy duplication. Critical design parameters are discussed, including safety considerations and materials requirements, which are applicable to any bubbler design. The practical implementation of bubblers is also presented, including methods to prevent condensation instability and reduce backpressure to achieve a stable steam supply. The 3″ x 6″ (7.6 cm × 15.2 cm) bubbler achieves up to 98% steam balance hydrogen at 200 sccm and up to 1 slpm at 96% steam.

08 - HYDROGEN

Powering Large Loads: Solutions Across Transmission, Utility, and Facility Scales

This report synthesizes current strategies for accommodating large load growth through a review of publicly available technical literature and media insights around the United States (U.S.). Solutions are organized across three implementation scales (transmission, utility, and facility) and categorized according to common implementation pathways (including structural expansion, operations and efficiency, upgrades, and planning and policy).

Valdez, Raquel Lynn [Sandia National Laboratories

Robust Heat-Flux Sensors for Coal-Fired Boiler Extreme Environments

In this project, robust heat-flux measurement systems were developed. The heat-flux sensors utilize thermoelectric effects to directly transduce the heat-flux inputs to analog electrical voltage signals. They were constructed from dedicated materials that can withstand temperatures of at least 1000°C and maintain adequate performance at these conditions for prolonged periods of time. The proposed approaches took into account numerous considerations, including system cost, sensor head resilience, sensor footprint, data accuracy, response time, and maintenance requirements. Through modern thermoelectric materials design, methodical materials selection and rigorous testing in materials characterization labs and medium-scale fire research facilities, we have demonstrated functioning laboratory prototypes, upon which one could base industrial heat-flux sensing platforms capable of operating in the challenging high-temperature, corrosive environments of the boilers of coal-fired power plants. A distributed sensor array for heat-flux measurements throughout the furnace water-wall, the superheater area and the economizer coils can provide critical data for the power plant control systems to increase efficiency, improve safety and reduce down times. For example, the combined heat-flux sensor/control systems can contribute to the optimization of burner and boiler operations under flexible loads, the optimization of heat-exchange conditions and overall reduction of heat rate and emissions, the prediction of imminent overheating conditions, and the optimization of the soot-blowing protocols.

20 FOSSIL-FUELED POWER PLANTS

Optimizing Porous Transport Layer Porosity for Proton Exchange Membrane Water Electrolysis

An empirical model is presented that describes anode-side losses related to porous transport layer (PTL) morphology in proton exchange membrane water electrolysis (PEMWE). The model is based on an advanced voltage breakdown analysis that links various overpotentials to PTL morphology. Custom Ti PTLs, spanning uncommonly low porosities (22 - 31%), were fabricated and analyzed with X-ray CT to obtain pore and particle size distributions. Particle size distributions were consistent across samples with an average particle diameter of 12.0?..mu..m, whereas average pore diameters ranged from 6.0 to 7.0?..mu..m. The PTLs were tested in standard PEMWE cell assemblies with anode catalyst loadings of 0.1 mgIr cm-2 to obtain polarization curves, electrochemical impedance spectra, and augmented Tafel analysis. The PTL-dependent anode side losses were deconvoluted and assigned to excess utilization, concentration, ion transport resistance, and electrical contact resistance overpotentials. The data and model reveal an optimal 20 - 28% PTL porosity region where utilization and contact resistance overpotentials are minimized without triggering concentration and ion transport losses related to water deprivation. The optimal PTL porosity depends on the operating current density and is demonstrated at realistic PEMWE water flow rates to establish PTL design guidance for operation at scale.

08 HYDROGEN

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING

Sensitivity Analysis of Numerical Modeling Input Parameters on Wind Turbine Loads in Deterministic Transient Load Cases

Aero-hydro-elastic-servo numerical models used to design and analyze wind turbines are based on thousands of variable input parameters that dictate the inflow, aerodynamic, structural, and control characteristics of the system as well as sea state, hydrodynamic, and mooring characteristics for fixed-bottom and floating offshore wind turbines. Each of these parameters has some level of uncertainty, which can significantly impact the predicted loads. Understanding the uncertainty in the inputs is critical to understanding the uncertainty in the outputs. This work demonstrates a screening technique to identify which parameters ultimate loads are most sensitive to so that more focus can be given to quantifying the possible range of those parameters. This technique has been demonstrated previously for different turbine and load case types and is extended here for a floating offshore wind turbine in design load cases with transient events both in the inflow and operations. Each load case features a deterministic gust, including variations in wind speed, direction, and shear. Load cases are considered with an operating turbine as well as with prescribed fault, startup, and shutdown procedures. The study found that key input parameters with a large impact on loads include the length of the gust, the magnitude of direction change and speed in the gust, the initial wind speed, and the shape of the gust profile.

17 WIND ENERGY

High‐Performance Rechargeable Lithium‐Chlorine Batteries with ALD Conformal Starburst Porous Graphene Positive Electrodes

Abstract Rechargeable alkali metal‐chlorine batteries are emerging as a promising high‐energy‐density solution. However, they confront significant challenges, including the primary issue stemming from the weak binding affinity of cathode materials for Cl 2 , which leads to a sluggish and inadequate supply of Cl 2 during the redox reactions, resulting in a shortened cycle life and low Coulombic efficiency (CE), particularly when operating at ultrahigh specific capacity outputs. Herein, an Al 2 O 3 ‐skinned heterostructured starburst porous graphene with conformal metasurfaces (Al 2 O 3 @rGO) is reported, crafted from a hierarchical porous starburst graphene arranged in a unique layered structure by the PTFE microemulsion skin effect, leveraging subsequent fluidized bed atomic layer deposition (FBALD) of Al 2 O 3 groups. Al 2 O 3 @rGO features superhydrophilicity, effective adsorption, fast kinetics from stable dynamic respiratory interface, high electrical and thermal conductivity anisotropy, intelligent thermal management and safe operation over a wide temperature range. Consequently, the Li‐Cl 2 @Al 2 O 3 @rGO battery achieves an ultrahigh discharge specific capacity of 5000 mAh g −1 at ≈100% CE, and even delivers stable cycling over 200 cycles with 2000 mAh g −1 at an average CE of 99.8% under low temperature environment of ‐40 °C. The scalable heterostructure approach offers a sustainable perspective of the development of functionalized metamaterials and metasurfaces for next‐generation safe and energy‐dense batteries and broader applications.

Chemistry

An Assessment of the Nevada Test Site for Low-Level Waste Management

This report presents a summary of description information, facilities, and operating practices at the Nevada Test Site. It is concluded that NTS is not only a feasible location for surface and near-surface storage of low-level wastes, but also a potential site for underground storage of higher level wastes.

052002* -- Nuclear Fuels-- Waste Disposal & Storag