Search NASA⌕ Search

SEARCH · Search NASA

Results for “large pilot plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

DECOVALEX-2023: Task E Final Report

This is the Task E final report for DECOVALEX-2023. Task E is focused on understanding thermal, two-phase hydrological, and mechanical (TH2M) processes, especially related to predicting brine migration in the excavation damaged zone around a heated excavation in salt. Salt is attractive as a disposal medium for radioactive waste because it is self-healing and is essentially impermeable and essentially non-porous in the far field (away from excavations). Investigation of the short-term (days to years) near-field (centimeters to tens of meters) behavior of salt is important for radioactive waste disposal because this early period strongly controls the amount of brine in a salt repository. Brine leads to corrosion of waste forms and waste packages, and possible dissolution of radionuclides with brine transport being a potential transport vector to the accessible environment. The main test case used in Task E is the ongoing Brine Availability Test in Salt (BATS) heater test located underground at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, USA. The Task was divided into a series of Steps. Step 0 was an introduction to processes in salt, that included matching historical unheated brine inflow data from boreholes at WIPP and matching temperature observations during BATS heater test 1a. Step 1 included validation of models against a thermo-poroelastic analytical solution relevant to heated boreholes in salt, and two-phase flow around an excavation in salt. Step 2 required all the individual components covered in steps 0 and 1 to come together to match observed brine inflow behavior during the BATS 1a heater test. There were a range of approaches from the teams, from mechanistic to prescriptive. Given the uncertainties in the problem, some teams used one- or two-dimensional models of the processes, while other teams included more geometrical complexity in three-dimensional models. The key learning points from Task E have been: • Heat conduction through salt typically requires non-linear thermal conductivity (as a function of temperature), but most models do a good job matching observations, given appropriate adjustments to the applied power and some thermocouple locations. • Thermal pressurization requires coupled thermal-hydrological-mechanical (THM) responses that consider the thermal expansion of the fluid and solid phases. • Initialization of two-phase flow models around a borehole or excavation in salt are more realistically represented as “wetting up”, rather than “drying down” (i.e., the initial state after excavation is mostly dry, rather than mostly wet). • The BATS 1a heater test includes a significant release of brine after the end of heating, which requires a large increase in permeability to recreate. Task E has been a great learning experience for all the teams involved, and feedback from the modeling teams has led to changes in the design of follow-on BATS experiments, which are now ongoing underground at WIPP. There was a balance throughout the task between freedom to model phenomena how each team saw fit, and prescriptiveness in problem design to bring the modeling teams closer together to allow attribution of smaller differences between models to different modeling choices. The modeling approaches seem to go through two phases: an early phase of discovery or testing, and a later phase of refinement and improvement. In future modeling efforts, different field data could be used (e.g., BATS 2) and more time should be included in the processes for teams to make multiple model refinement or even significant changes to their conceptual model or setup, based on lessons learned from the modeling exercise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Million Worker Study

Radiation health issues have been an important aspect of DOE's Worker Safety and Health programs. The goal is to ensure that workers are adequately protected from the various radiological hazards associated with DOE sites and operations. Since the early 1940’s DOE has supported the conduct of epidemiologic studies of practically every DOE (AEC) facility and collected these data, now managed by the Oak Ridge Associated Universities (ORAU), in remarkable detail. In the early 2000s, the Office of Health, Safety and Security authorized access to specific DOE worker datasets. Shortly thereafter, the DOE Office of Science provided funds for a pilot study that confirmed the feasibility of the Million Worker Study (MWS), and then additional resources were provided (with other agencies) to extend the follow-up of many populations, not just DOE workers, but also atomic veterans, industrial radiographers, nuclear power plant workers and medical radiation workers (the Million Persons Study (MPS)). This proposal was a continuation of support provided by DOE, specifically to extend the follow-up of the worker populations at the Mallinckrodt Chemical Works (MCW) and Los Alamos National Laboratory (LANL). The work addresses DOE’s interest in clarifying the health risks of their workers as well as contributing knowledge on radiation risks that is relevant today with regard to compensation schemes. The findings are also important for the US public in light of the increased population exposure to medical imaging, environmental circumstances such as hydraulic fracturing, increased exposures during high altitude flights, and with regard to nuclear accidents such as Fukushima and possible terrorist events. Furthermore, it is important to consider reducing the uncertainty in current risk estimates by developing risk coefficients based on healthy American workers who are more representative of U.S. workers and the general public than 1945 Japanese survivors of the atomic bombs living in a war-torn country which experienced deprivation, malnourishment, and increased rates of infections and other diseases. But more importantly, it is important to learn whether radiation exposures received gradually over time (e.g., years) are more or less effective in causing health effects, cancer in particular, than if the radiation dose is received all at once in a fraction of a second as experienced by the Japanese atomic bomb survivors. Finally, the ability to evaluate and combine large populations with intakes of radionuclides such as uranium, radium, plutonium, americium and polonium will provide new quantitative knowledge on human health effects that hitherto has not been possible. This cost-efficient study has built on the investments made and foundations laid by investigators and government agencies, including DOE, over the past 30-40 years, which have established early worker cohorts that can now provide answers to questions on the lifetime human health risks associated with low-level radiation exposures. Collaborating institutions included: International Epidemiology Institute, Oak Ridge Associated Universities, Oak Ridge National Laboratory, Los Alamos National Laboratory, Landauer, Inc., and Vanderbilt University. Follow-up of these two populations and the integration of them with the many other cohorts (now a total of 31) in the MPS continues under a separate DOE grant (DE-AU0000046).

61 RADIATION PROTECTION AND DOSIMETRY↗

AI-Enabled Robots for Automated Nondestructive Evaluation and Repair of Power Plant Boilers. Final Report

Boiler failure could cause loss of life and safety issues, cost hundreds of thousands of dollars in equipment repairs, property damage and production losses, and drive up the cost of electric power. Boiler maintenance is challenging and risky for inspectors working on scaffolding in confined hazardous spaces inside of a boiler and sometimes the space is hard to access. The operation is also time-consuming due to the large area of vertical structures for inspection and the tremendous effort needed for scaffolding. Recently, the use of robotics (e.g., drones and crawlers) in power plants for maintenance is growing rapidly. However, the existing robotics solutions show two notable technological gaps: no live repair capability, and no Artificial Intelligence (AI) for smart autonomy. The objective of this project is to develop an integrated autonomous robotic platform that is equipped with compact non-destructive evaluation (NDE) sensors to perform live inspection, operates onboard repair devices to perform live repair, and uses AI for intelligent data fusion and predictive analysis for automated and smart spatiotemporal inspection, analysis and repair of the furnace walls in coal-fired boilers. The approach to achieve the objective includes developing NDE sensors with signal processing techniques, designing and evaluating repair devices for robots based on fusion and solid-state technologies, and an autonomous robotic platform that can attach to and navigate on boiler furnace walls using magnetic drive tracks. The robot is also powered by AI to automate data gathering (e.g., 3D mapping and damage localization) and predictive analysis. This project has advanced the state-of-the-art by providing technological breakthroughs including compact NDE and repair tools for robots, AI capabilities for smart autonomy, and a robotic platform for automated boiler maintenance. This project has great potential to result in significant benefits including limiting or eliminating the need to send operators to assess difficult-to-access or hazardous areas, enabling automated live inspection and repair, avoiding time consuming scaffolding (especially for partial maintenance during unplanned outage), collecting comprehensive and well-organized data smartly, and avoiding or limiting the need for onsite or remote piloting technicians. The impacts can be tremendous in terms of the time and cost savings, reducing the risk for human operators, and increasing boiler reliability, usability, and efficiency. In addition, by developing the new technologies on the autonomous inspection and repair robot, by involving multiple undergraduate and graduate students working together with the faculty members on this project, and by generating knowledge and building up collaborations with industrial partners, this effort will significantly update the education capabilities, support long-term fundamental research, and maintain the leadership of Colorado School of Mines and Michigan State University in energy fields.

20 FOSSIL-FUELED POWER PLANTS↗

Investigation and Analysis of Dolomite Dissolution in Variable Strength Systems Relevant to the WIPP

The Waste Isolation Pilot Plant (WIPP) was opened in 1999 as a solution to the long-term disposal of the nation's nuclear defense-generated transuranic (TRU) waste. The salt beds were recommended as the ideal location because they are free from flowing fresh water, easily mined, impermeable, and geologically stable. However, for performance assessment modeling, release scenarios must be considered. The most likely release scenario was determined to be human intrusion leading to direct and/or long-term brine release (US DOE 1995, US DOE 1996, Perkins et al., 1999). The focus of this research is the Rustler formation because it is located above the WIPP and is the most transmissive layer (Perkins et al., 1999). Objective: To determine the effect of chelating ligands ( e.g. EDTA) on dissolution of dolomite in high ionic strength systems. Do brines impact dolomite dissolution and how is it affected by EDTA binding with cations? By varying the ionic strengths, different brine conditions can be simulated similar to those in and around the Culebra member and evaluate trends of dissolved Ca and Mg in the aqueous phase from the quantified data. Conclusions: <2% of dolomite dissolved over one week at pH 8.5. Greater dissolution occurred at higher ionic strength and in the presence of NaCl with approximately 0.4 vs. 0.9% of Mg removed from dolomite in 0.1 and 1.0 M Na. Further, 0.3 vs. 0.9% of Mg was removed from dolomite in 1.0 M IS CaCl{sub 2} versus NaCl. EDTA increased dissolution of dolomite at low ionic strength due to its strong complexation affinity for Ca/Mg with slightly greater removal of Ca than Mg. Significant differences were not observed at high ionic strength due to the presence of large concentrations of competing cations (Na, Ca, Mg). Slightly higher concentrations of Ca were removed from dolomite than Mg after one week, suggesting either incongruent dissolution or release through ion exchange of Ca from trace mineral impurities. Further, when EDTA was present, it may have increased Ca removal due to its greater complexation for Ca than Mg. Environmental Implications: High ionic strength brines and low ionic strength solutions with organic ligands increase dissolution of dolomite. Due to the long half-lives of radionuclides in the TRU waste, it may be important to consider the long term impact of dolomite dissolution for potential release scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Testing of a Modular Oxygen Production System Using Oxygen Binding Adsorbents (Final Report)

In this project, RTI and Air Liquide have focused on the development of innovative oxygen separation materials and technologies based on reversibly binding of oxygen to enable smaller and cheaper air separations. In alignment with that object the team has had multiple achievements to advance the technology including: Synthesized and characterized novel M-CoSalen (RTIO2Sorb-1) material which showed a dynamic oxygen adsorption capacity in excess of 1wt%. Developed synthesis routes for RTIO2Sorb-1 with commercially relevant techniques and produced batches of 0.25kg and over 4 kg of total synthesis. Synthesized and characterized extrudate forms of the RTIO2Sorb-1 with relevant crush strength and maintained dynamic oxygen adsorption capacity in near 1wt%. Developed techniques for forming structured beds in fiber shapes with conventional materials. Developed a model for O 2 sorption processes to analyze various bed configurations and cycle parameters. Studied classic O 2 solid sorbents reported in the literature to learn oxygen binding mechanisms. Design a 10 kg/day O 2 VPSA pilot system with 2 or 4-bed operation. Completed a techno-economic analysis based on the experimental results and modeling. The overall objective of the project was to design, fabricate, and test a modular O 2 production system and perform a techno-economic analysis (TEA) after testing to determine the cost-benefit of the advanced modular air separation system. The goals of this technology development project were to achieve a bed-size factor (BSF) of less than 600 lb-adsorbent/TPD O 2 (ton/day O 2 ) (as compared with the state-of-the-art BSF of 850), and O 2 -purity greater than 95% at a cost that is projected to be equivalent or lower than the current state of the art (SOTA), commercially available large-scale cryogenic air separation systems. To achieve these goals and objective, the project team executed on (1) oxygen binding adsorbent optimization and scale up, (2) adsorbent material formation process studies to form the adsorbent material into structured beds for rapid pressure swing adsorption (PSA) cycles with low pressure drop, fast mass transfer, and low attrition, (3) cycle development studies to optimize the PSA process, and (4) develop simulation tools for rapid cycle modeling and numerical evaluation/optimization.

20 FOSSIL-FUELED POWER PLANTS↗

High Performance Solvent for NGCC Flue Gas CO 2 Capture (Final Technical Report)

Amine-based solvent absorption is the most mature and reliable technology for large scale CO 2 capture, dating back to the 1930s when monoethanolamine (MEA) was used to treat acid gases from oil refineries. However, while strategic advancements have optimized the CO2 capture process, the cost of capture remains high, where current estimates suggest that CO 2 capture costs are around $\$$72/tonne of CO 2 . To address this, solvent development and optimization have become a focus of current research. This project sought to develop a high-performance solvent to reduce the overall cost of CO 2 capture from NGCC flue gas. Here, solvent optimization focused on: (1) reducing the energy required for CO 2 desorption in a reboiler, (2) improving CO 2 absorption and desorption reaction kinetics, (3) improving solvent stability, and (4) reducing environmental impacts. Susteon has developed and evaluated a promoted solvent, Sustenol™, for NGCC flue gas CO 2 capture. The optimized Sustenol™ also shows a higher dynamic CO 2 absorption capacity of ~0.5 mol CO2 /mol amine compared to 0.25 mol CO2 /mol amine for 30 wt% MEA. Additionally, the solvent is oxidatively, thermally and hydrothermally stable, which leads to lower solvent loss and emissions. These advancements have resulted in a solvent regeneration energy of 2.16 GJ/tonne of CO 2 which is >30% lower than current state-of-the-art commercial and emerging solvents. Combined with empirical data from the bench and pilot scale testing, this preliminary TEA study indicated the cost of CO 2 capture by Sustenol™ for 97% CO 2 removal at $\$$54/tonne and for 90% removal at $\$$49/tonne, with a pathway to achieve $\$$45/tonne of CO 2 with continued process and solvent advancements. Susteon has developed a technology roadmap to reduce the cost of CO 2 capture to <$\$$45/tonne for NGCC flue gas. Susteon plans to derisk this technology for commercial deployment through comprehensive solvent degradation testing, long-term testing in a pilot plant at 5 tonne CO2 /day and demonstration scale testing at 100 tonne CO2 /day with NGCC flue gas and engineering design studies to qualify Sustenol™ as a drop-in replacement solvent.

03 NATURAL GAS↗

Evaluation of Techniques for Vegetation Removal from UAV-Based Photogrammetric DSM near WIPP Land Withdrawal Act Boundary, NM

The Waste Isolation Pilot Plant is located within New Mexico's karst landscape and is the United States' only deep geologic radioactive waste repository which isolates transuranic waste from defense activities underground in a bedded salt formation. Characteristic karst topography in this region is made up of material (such as limestone) that can be dissolved by water over a long period of time, and includes features such as springs, surface streams, sinking streams, caves, and sinkholes. Karst features can potentially impact the integrity of the waste repository in the future and compromise WIPP's performance, particularly when coupled with incompatible land-use activities within the Land Withdrawal Act (LWA) boundary as well as increased water withdrawals outside the LWA. In order to better capture the ground surface topography to support hydrology modeling efforts, the U.S. DOE has enlisted FIU to develop a high-resolution digital elevation model (DEM). In a previous field study, a high-resolution digital surface model (DSM) of an adjacent representative site, Basin 6, was developed by photogrammetry using aerial images captured with unmanned aerial vehicles. The DSM generated was based on point clouds representing the entire landscapes, including points of terrain, vegetation and infrastructure. These above-ground features need to be removed to create a DSM/DEM with good representation of the bare ground. In recent years, many techniques including both pre- and post-processing of DSMs, were developed for vegetation removal with varied success. This research focuses on applying and comparing various vegetation removal methods using point clouds generated of the Basin 6 pilot study area. The 3D RGB-based point cloud classification using Python scripts was a modification of the procedure by Themistocleous (2019). The method using Liblas classifies the point cloud three-dimensionally, whereas the method by Themistocleous (2019) is two-dimensional. The preliminary result of the method using Liblas, however, still had a large amount of vegetation remaining compared to the Pix4D Machine Learning method. The vegetation layer remains highly visible in the DEMs processed using the vegetation indices as opposed to the Pix4D Machine Learning method, which produces a DEM where mostly bare ground is seen. Further modifications to the input parameters are required to improve the vegetation vs. bare ground classification using this approach. The next step will be to improve the method using Liblas and to also test other vegetation removal methods found in the literature review to compare them against the two described here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Use of Silver Chloride Injection in Remediation of Iodine-129 by In Situ Capture as Silver Iodide at the F-Area Seepage Basin - 20225

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. As part of operations, the F-Area Seepage Basins operated until 1988 for the disposition of deionized acidic wastewater from the F Separations Facility. The wastewater contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The seepage basins were closed in 1988 and backfilled and capped by 1991. The groundwater emanating from beneath the closed and capped seepage basins is acidic and contains elevated levels of both chemical and radiological contaminants. Releases from the groundwater plumes sourced from the F-Area Seepage Basins have impacted the water quality of Fourmile Branch, which is a small tributary to the Savannah River, a regional water source. A large pump-and-treat system was constructed in 1997 and operated until 2003 in an attempt to capture the releases to Fourmile Branch. The system in F Area and a similar system in H Area were expensive (∼$1.3 M/month) to operate and produced large quantities of radioactive waste, with concentrations of I- 129 too high to be disposed of at the SRS. In 2004, SRS replaced pump-and-treat with a funnel and gate system that along with operation of a base injection system at the gates reduces the flux of contaminants to the wetlands adjacent to Fourmile Branch. The alkaline solution injected into the aquifer neutralizes the acidic plume and immobilizes many of the cationic constituents. However, base injection is not effective in managing the release of iodine-129, an anionic contaminant. To address iodine-129 SRS and the Savannah River National Laboratory developed an in situ technology that uses ultra-fine ground silver chloride (AgCl) as an injectable capture medium for the sequestration of iodine-129. The AgCl amendment has a very small particle size and is designed to be injected into the contaminated aquifer to capture iodine-129. Dissolved iodine-129 forms a stable and highly insoluble solid (silver iodide) upon contact with AgCl. Laboratory studies, a field scale pilot test (2009), and three deployments (2011, 2015 and 2019) of AgCl have been successfully performed at the F-Area Seepage Basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efficient ECCD non-inductive plasma current start-up, ramp-up, and sustainment for an ST fusion reactor

The elimination of the need for an Ohmic heating solenoid may be the most impactful design driver for the realization of economical compact fusion tokamak reactor systems. However, this would require fully non-inductive start-up and current ramp-up from zero plasma current and low electron temperature of sub-keV to the full plasma current of ~10–15 MA at 20–30 keV electron temperature. To address this challenge, an efficient solenoid-free start-up and ramp-up scenario utilizing a low-field-side-launched extraordinary mode at the fundamental electron cyclotron harmonic frequency (X–I) is proposed, which has more than two orders of magnitude higher electron cyclotron current drive (ECCD) efficiency than the conventional ECCD for the sub-keV start-up regime. A time dependent model was developed to simulate the start-up scenarios. For the Spherical Tokamak Advanced Reactor (STAR) (Menard et al 2023 Next-Step Low-Aspect-Ratio Tokamak Design Studies (IAEA)), it was found that to fully non-inductively ramp-up to 15 MA, it would take about 25 MW of EC power at 170 GHz. Because of the relatively large plasma volume of STAR, radiation losses must be considered. It is important to make sure that high Z impurities are kept sufficiently low during the early current start-up phase where the temperature is sub-keV range. Since the initial current ramp up takes place at a factor of ten lower density compared to the sustained regimes, it is important to transition into a higher bootstrap fraction discharge at lower density to minimize the ECCD power requirement during the densification. For the sustainment phase an array of eight gyrotron launchers with a total of about 60 MW of fundamental O-mode was found to be sufficient to provide the required axis-peaked external current drive. High efficiencies between 19–57 kA MW –1 were found with optimal aiming, and these were resilient to small changes in aiming angles and density and temperature profiles.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Analytical Modeling of Biomass Transport and Feeding Systems

The processing of biomass solids in a biorefinery consists of pretreatment, enzyme hydrolysis / concurrent fermentation of sugars to ethanol, product recovery, and drying. Sustainable operation requires a front end that transforms wet solids into a pumpable slurry. Otherwise the biorefinery will suffer unscheduled shut-downs and inefficient operation due to solids that obstruct pumps and other equipment and resist mixing in a bioreactor. Downtime in pioneer biorefineries due to interruptions from materials handling problems has been 50% or more, leading to unsustainable manufacturing processes. This work addresses new technology, predictive computational models, and definition of operational conditions that result in formation of slurries of corn stover at up to 300 g/L using low enzyme loadings (1 to 3 FPU cellulase/g) before the biomass (corn stover) enters the pretreatment step. A team of researchers from Purdue University, Idaho National Laboratory (INL), Forest Concepts, AdvanceBio, Argonne National Laboratory, and DOE BETO have combined their knowledge in agricultural and biological engineering, bioprocess engineering, mechanical engineering, chemical engineering, agricultural economics, materials engineering and enzyme and microbial technology to address the challenge of making lignocellulose flow. This team effort has resulted in the development and validation of conditions that employ low levels of commercial enzyme in an agitated bioreactor to which corn stover pellets are added resulting in formation of slurries at high solids loadings, before pretreatment. This approach overcomes challenges caused by handling of dry, particulate biomass materials at the front end of the biorefinery. The subsequent materials handling issues cause obstruction at pumps, pipes and valves. Formation of high loadings slurries with low yield stress, as reported here, significantly decreases the potential for process interruption and enhances plant operability. Key advances in the knowledge of how slurry formation occurs is reported here and in recently published journal papers. We found that pellets are needed to achieve high solids loading, and that commercial enzymes are effective in forming slurries of corn stover particles from pellets that have not been pretreated. Our work has resulted in models that predict solids behavior for formation of compressed solids and pellets that in turn facilitate slurries made of high concentrations of corn stover particles. A computational model was developed that gives mechanistic insights into properties of particles and mixing process that gives the slurry rheology needed to facilitate pumping. Hence, the corn stover may be pumped into a pretreatment reactor in place of auguring in solids against high pressure which is a root cause of interruptions at the front end of a biorefinery. Subsequent mixing in enzyme and microbial bioreactors results in conversion of lignocellulose to sugars in a biorefinery in agitated bioreactors, with flows in and out of the vessels being less likely to be interrupted due to plugging or materials handling problems. The obtained data coupled to process models, techno-economic assessment (TEA) and Life Cycle Analysis (LCA) were used to assess whether this approach is practical. These results are based on a foundation of laboratory characterization and pilot runs. The NREL biochemical sugar model was utilized to carry out techno-economic analysis of enzyme catalyzed liquefaction followed by enzyme hydrolysis. The minimum sugar selling price was between 17.5 and 18.3 ¢/pound or about the same as calculated by the NREL model for dilute acid pretreatment followed by enzyme hydrolysis. Life cycle analysis (LCA) based on Argonne’s Greet Model showed the enzyme catalyzed route had the lowest greenhouse gas emissions of the three combinations studied (i.e., enzyme, enzyme mimetic, and enzyme + mimetic combined). GHG emissions for enzyme-based corn stover liquefaction step, alone, were about 21 g CO 2 -equivalent/kg of liquefied slurry. We believe this approach will further enhance operability of a pioneer biorefinery, and bring large-scale conversion of lignocellulosic biomass to low carbon footprint biofuels closer to implementation.

09 BIOMASS FUELS↗