Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch vehicle systems performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Space Launch System Implementation of Adaptive Augmenting Control

Given the complex structural dynamics, challenging ascent performance requirements, and rigorous flight certification constraints owing to its manned capability, the NASA Space Launch System (SLS) launch vehicle requires a proven thrust vector control algorithm design with highly optimized parameters to provide stable and high-performance flight. On its development path to Preliminary Design Review (PDR), the SLS flight control system has been challenged by significant vehicle flexibility, aerodynamics, and sloshing propellant. While the design has been able to meet all robust stability criteria, it has done so with little excess margin. Through significant development work, an Adaptive Augmenting Control (AAC) algorithm has been shown to extend the envelope of failures and flight anomalies the SLS control system can accommodate while maintaining a direct link to flight control stability criteria such as classical gain and phase margin. In this paper, the work performed to mature the AAC algorithm as a baseline component of the SLS flight control system is presented. The progress to date has brought the algorithm design to the PDR level of maturity. The algorithm has been extended to augment the full SLS digital 3-axis autopilot, including existing load-relief elements, and the necessary steps for integration with the production flight software prototype have been implemented. Several updates which have been made to the adaptive algorithm to increase its performance, decrease its sensitivity to expected external commands, and safeguard against limitations in the digital implementation are discussed with illustrating results. Monte Carlo simulations and selected stressing case results are also shown to demonstrate the algorithm's ability to increase the robustness of the integrated SLS flight control system.

Wall, John H.↗

PIV Measurements of the CEV Hot Abort Motor Plume for CFD Validation

NASA s next manned launch platform for missions to the moon and Mars are the Orion and Ares systems. Many critical aspects of the launch system performance are being verified using computational fluid dynamics (CFD) predictions. The Orion Launch Abort Vehicle (LAV) consists of a tower mounted tractor rocket tasked with carrying the Crew Module (CM) safely away from the launch vehicle in the event of a catastrophic failure during the vehicle s ascent. Some of the predictions involving the launch abort system flow fields produced conflicting results, which required further investigation through ground test experiments. Ground tests were performed to acquire data from a hot supersonic jet in cross-flow for the purpose of validating CFD turbulence modeling relevant to the Orion Launch Abort Vehicle (LAV). Both 2-component axial plane Particle Image Velocimetry (PIV) and 3-component cross-stream Stereo Particle Image Velocimetry (SPIV) measurements were obtained on a model of an Abort Motor (AM). Actual flight conditions could not be simulated on the ground, so the highest temperature and pressure conditions that could be safely used in the test facility (nozzle pressure ratio 28.5 and a nozzle temperature ratio of 3) were used for the validation tests. These conditions are significantly different from those of the flight vehicle, but were sufficiently high enough to begin addressing turbulence modeling issues that predicated the need for the validation tests.

Wernet, Mark↗

Space Launch System Implementation of Adaptive Augmenting Control

Given the complex structural dynamics, challenging ascent performance requirements, and rigorous flight certification constraints owing to its manned capability, the NASA Space Launch System (SLS) launch vehicle requires a proven thrust vector control algorithm design with highly optimized parameters to robustly demonstrate stable and high performance flight. On its development path to preliminary design review (PDR), the stability of the SLS flight control system has been challenged by significant vehicle flexibility, aerodynamics, and sloshing propellant dynamics. While the design has been able to meet all robust stability criteria, it has done so with little excess margin. Through significant development work, an adaptive augmenting control (AAC) algorithm previously presented by Orr and VanZwieten, has been shown to extend the envelope of failures and flight anomalies for which the SLS control system can accommodate while maintaining a direct link to flight control stability criteria (e.g. gain & phase margin). In this paper, the work performed to mature the AAC algorithm as a baseline component of the SLS flight control system is presented. The progress to date has brought the algorithm design to the PDR level of maturity. The algorithm has been extended to augment the SLS digital 3-axis autopilot, including existing load-relief elements, and necessary steps for integration with the production flight software prototype have been implemented. Several updates to the adaptive algorithm to increase its performance, decrease its sensitivity to expected external commands, and safeguard against limitations in the digital implementation are discussed with illustrating results. Monte Carlo simulations and selected stressing case results are shown to demonstrate the algorithm's ability to increase the robustness of the integrated SLS flight control system.

VanZwieten, Tannen S.↗

Application of System Operational Effectiveness Methodology to Space Launch Vehicle Development and Operations

The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.

Watson, Michael D.↗

Flight Performance Feasibility Studies for the Max Launch Abort System

In 2007, the NASA Engineering and Safety Center (NESC) initiated the Max Launch Abort System Project to explore crew escape system concepts designed to be fully encapsulated within an aerodynamic fairing and smoothly integrated onto a launch vehicle. One objective of this design was to develop a more compact launch escape vehicle that eliminated the need for an escape tower, as was used in the Mercury and Apollo escape systems and what is planned for the Orion Multi-Purpose Crew Vehicle (MPCV). The benefits for the launch vehicle of eliminating a tower from the escape vehicle design include lower structural weights, reduced bending moments during atmospheric flight, and a decrease in induced aero-acoustic loads. This paper discusses the development of encapsulated, towerless launch escape vehicle concepts, especially as it pertains to the flight performance and systems analysis trade studies conducted to establish mission feasibility and assess system-level performance. Two different towerless escape vehicle designs are discussed in depth: one with allpropulsive control using liquid attitude control thrusters, and a second employing deployable aft swept grid fins to provide passive stability during coast. Simulation results are presented for a range of nominal and off-nominal escape conditions.

Tarabini, Paul V.↗

Viking balloon launched decelerator tests

The Viking Project utilized a 16.2M diameter disk-gap-band parachute to successfully land two research spacecraft on the surface of Mars during the summer of 1976. Unique specifications were imposed upon both the decelerator system and the balloon systems which were employed to provide a high altitude launch platform for a rocket powered test vehicle. The performance and stability of the balloon system and the predictability of the test vehicle trajectory offered interesting challenges. Descriptions of the development work for suitable materials, fabrication techniques and peculiarities, and testing requirements for both the decelerator and balloon systems will be presented.

Timmons, J. D.↗

The Malemute development program

The Malemute vehicle systems are two-stage systems based on utilizing a new high performance upper stage motor with two existing military boosters. The Malmute development program is described relative to program structure, preliminary design, vehicle subsystems, and the Malemute motor. Two vehicle systems, the Nike-Malemute and Terrier-Malemute, were developed which are capable of transporting comparatively large diameter (16 in.) 200-lb payloads to altitudes of 500 and 700 km, respectively. These vehicles provide relatively low-cost transportation with two-stage reliability and launch simplicity. Flight tests of both vehicle systems revealed their performance capabilities, with the Terrier-Malemute system involving a unique Malemute motor spin sensitivity problem. It is suggested that the vehicles can be successfully flown by lowering the burnout spin rate.

Bolster, W. J.↗

Dynamical Modeling and Control Simulation of a Large Flexible Launch Vehicle

This paper presents dynamical models of a large flexible launch vehicle. A complete set of coupled dynamical models of propulsion, aerodynamics, guidance and control, structural dynamics, fuel sloshing, and thrust vector control dynamics are described. Such dynamical models are used to validate NASA s SAVANT Simulink-based program which is being used for the preliminary flight control systems analysis and design of NASA s Ares-1 Crew Launch Vehicle. SAVANT simulation results for validating the performance and stability of an ascent phase autopilot system of Ares-1 are also presented.

Du, Wei↗

A feedback control for the advanced launch system

A robust feedback algorithm is presented for a near-minimum-fuel ascent of a two-stage launch vehicle operating in the equatorial plane. The development of the algorithm is based on the ideas of neighboring optimal control and can be derived into three phases. In phase 1, the formalism of optimal control is employed to calculate fuel-optimal ascent trajectories for a simple point-mass model. In phase 2, these trajectories are used to numerically calculate gain functions of time for the control(s), the total flight time, and possibly, for other variables of interest. In phase 3, these gains are used to determine feedback expressions for the controls associated with a more realistic model of a launch vehicle. With the Advanced Launch System in mind, all calculations are performed on a two-stage vehicle with fixed thrust history, but this restriction is by no means important for the approach taken. Performance and robustness of the algorithm is found to be excellent.

Seywald, Hans↗

An Agile-Like Approach to Hardware Development: The Ejectable Data Recorder (EDR) for Orion's Ascent Abort 2 (AA-2) Test Flight

On July 2, 2019, the Ascent Abort 2 (AA-2) Flight Test Vehicle was launched from Cape Canaveral, with the goal of demonstrating the performance of Orion’s Launch Abort System (LAS) and collecting data from hundreds of sensors throughout the vehicle. The data collected during this test flight is of paramount importance, as it will be used to certify the Orion vehicle for human spaceflight. Originally, the data was to be downlinked via a single string network of antennas on the LAS, with the associated risk of potential data dropouts, as well as loss of data once the LAS was jettisoned. Thus, additional antennas were added onto the crew module (CM) to support data downlink post-LAS jettison, a buffer rebroadcast capability was added to fill in any gaps in data downlink transmissions, and an ejectable data recorder (EDR) subsystem was added to the CM as a redundant measure to collect all the instrumentation data. The EDR subsystem was added to the project about one year after the project commenced, which significantly reduced the available development time when compared with the other subsystems of the AA-2 Test Flight. The project was further accelerated by six months, around the critical design review gate. Due to the schedule compression challenge and the fact that the EDR subsystem was a backup system and not flight critical, the EDR subsystem was further challenged to find a new and more efficient way to develop hardware. Thus, the EDR subsystem experimented with different management and systems engineering processes, team sizes, communication methods, and tools. Some examples are novel uses of SharePoint as a Data-centric Project Management & Systems Engineering environment, a continuous testing approach through the lifecycle, and a Skunkworks approach to managing the team. The EDR subsystem blended Commercial Off The Shelf (COTS) hardware with in-house developed hardware and software to create a novel data retrieval capability. The capability evolved rapidly through a hardware in the loop simulation environment that enabled incremental component updates for not only the EDR subsystem but across the entire Crew Module. This paper will present an overview of how the EDR subsystem was managed and compare it to an Agile approach to managing projects. The paper will further provide a recommended approach to future Agile-like hardware development that incorporates lessons learned from the EDR experience.

Agile↗

NASA Crew Launch Vehicle Overview

The US. Vision for Space Exploration, announced January 2004, outlines the National Aeronautics and Space Administration s (NASA) strategic goals and objectives. These include: 1) Flying the Shuttle as safely as possible until its retirement, not later than 2010. 2) Bringing a new Crew Exploration Vehicle (CEV) into service as soon as possible after Shuttle retirement. 3) Developing a balanced overall program of science, exploration, and aeronautics at NASA, consistent with the redirection of the human spaceflight program to focus on exploration. 4) Completing the International Space Station (ISS) in a manner consistent with international partner commitments and the needs of human exploration. 5) Encouraging the pursuit of appropriate partnerships with the emerging commercial space sector. 6) Establishing a lunar return program having the maximum possible utility for later missions to Mars and other destinations. Following the confirmation of the new NASA Administrator in April 2005, the Agency commissioned a team of aerospace subject matter experts from government and industry to perform the Exploration Systems Architecture Study (ESAS), which provided in-depth information for selecting the follow-on launch vehicle designs to enable these goals, The ESAS team analyzed a number of potential launch systems, with a focus on: (1) a human-rated launch vehicle for crew transport and (2) a heavy lift launch vehicle (HLLV) to carry cargo. After several months of intense study utilizing technical performance, budget, and schedule objectives, the results showed that the optimum architecture to meet the challenge of safe, reliable crew transport is a two-stage variant of the Space Shuttle propulsion system - utilizing the reusable Solid Rocket Booster (SRB) as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit. The CEV that this new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. The HLLV system will utilize the Shuttle External Tank combined with SRBs. The focus of this paper is on the CLV system, giving an overview of plans and progress to date.

Dumbacher, Daniel L.↗

Planetary mission applications for space storable propulsion

This paper presents the results of a study to compare space-storable with earth-storable spacecraft propulsion systems, space-storable with solid kick stages, and several space-storable development options on the basis of benefits received for cost expenditures required. The results show that, for a launch vehicle with performance less than that of Shuttle/Centaur, space-storable spacecraft propulsion offers an incremental benefit/cost ratio between 1.0 and 5.5 when compared to earth-storable systems for three of the four missions considered. In the case of VOIR 83, positive benefits were apparent only for a specific launch vehicle-spacecraft propulsion combination. A space-storable propulsion system operating at thrust of 600 lbf, 355 units of specific impulse, and with blowdown pressurization, represents the best choice for the JO 81 mission on a Titan/Centaur if only spacecraft propulsion modifications are considered. For still higher performance, a new solid-propellant kick stage with space-storable spacecraft propulsion is preferred over a system which uses space-storable propellants for both the kick stage and the spacecraft system.

Chase, R. L.↗

Titan III Feasibility for HL-20 Prototype Missions

A set of studies was performed to investigate the feasibility of using the Titan III launch vehicle to launch an unmanned prototype HL-20 personnel launch system and, potentially, operational HL-20 missions. The launch of an HL-20 spacecraft on a Titan III poses a unique set of concerns, primarily because the lifting body vehicle is carried on top of the Titan vehicle without a fairing. The Titan III/HL-20 feasibility study addressed the primary vehicle issues of performance, aerodynamics, loads, control and stability, launch availability, and vehicle configuration for the launch of an unmanned HL-20 prototype vehicle. Titan launch operations, launch site systems, and facilities were assessed to determine HL-20 operations compatibility. Additional studies determined the potential launch opportunity and window capabilities of the Titan III for the operational HL-20 mission and the existing Titan III's reliability. The feasibility study determined that the Titan III system, with minor changes, is compatible with the HL-20 vehicle and mission. It could provide nearly daily launch windows for a rendezvous with Space Station Freedom. Titan III reliability, when combined with the HL-20 launch escape system, provides a sufficiently high probability of crew survival to support its consideration as the primary vehicle for HL-20 operational missions.

Benson, Scott W.↗

Technology Demonstration Missions

Technology Demonstration Missions (TDM) is in its third year of execution, being initiated in 2010 and baselined in January of 2012. There are 11 projects that NASA Marshall Space Flight Center (MSFC) has contributed to or led: (1) Evolvable Cryogenics (eCryo): Cyrogenic Propellant Storage and Transfer Engineering Development Unit (EDU), a proof of manufacturability effort, used to enhance knowledge and technology related to handling cryogenic propellants, specifically liquid hydrogen. (2) Composites for Exploration Upper Stage (CEUS): Design, build, test, and address flight certification of a large composite shell suitable for the second stage of the Space Launch System (SLS). (3) Deep Space Atomic Clock (DSAC): Spaceflight to demo small, low-mass atomic clock that can provide unprecedented stability for deep space navigation. (4) Green Propellant Infusion Mission (GPIM): Demo of high-performance, green propellant propulsion system suitable for Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA)-class spacecraft. (5) Human Exploration Telerobotics (HET): Demonstrating how telerobotics, remote control of a variety of robotic systems, can take routine, highly repetitive, dangerous or long-duration tasks out of human hands. (6) Laser Communication Relay Demo (LCRD): Demo to advance optical communications technology toward infusion into deep space and near Earth operational systems, while growing the capabilities of industry sources. (7) Low Density Supersonic Decelerator (LDSD): Demo new supersonic inflatable decelerator and parachute technologies to enable Mars landings of larger payloads with greater precision at a wider range of altitudes. (8) Mars Science Laboratory (MSL) Entry Descent & Landing Instrumentation (MEDLI): Demo of embedded sensors embedded in the MSL heat shield, designed to record the heat and atmospheric pressure experienced during the spacecraft's high-speed, hot entry in the Martian atmosphere. (9) Solar Electric Propulsion (SEP): 50-kW class spacecraft that uses flexible blanket solar arrays for power generation and an electric propulsion system that delivers payload from low-Earth orbit to higher orbits. (10) Solar Sail Demonstration (SSD): Demo to validate sail deployment techniques for solar sails that are propelled by the pressure of sunlight. (11) Terrestrial HIAD Orbit Reentry (THOR): Demo of a 3.7-m Hypersonic Inflatable Aerodynamic Decelerator (HIAD) entry vehicle to test second generation aerothermal performance and modeling.

McDougal, John↗

Preliminary Performance Analyses of the Constellation Program ARES 1 Crew Launch Vehicle

By the time NASA's Exploration Systems Architecture Study (ESAS) report had been released to the public in December 2005, engineers at NASA's Marshall Space Flight Center had already initiated the first of a series of detailed design analysis cycles (DACs) for the Constellation Program Crew Launch Vehicle (CLV), which has been given the name Ares I. As a major component of the Constellation Architecture, the CLV's initial role will be to deliver crew and cargo aboard the newly conceived Crew Exploration Vehicle (CEV) to a staging orbit for eventual rendezvous with the International Space Station (ISS). However, the long-term goal and design focus of the CLV will be to provide launch services for a crewed CEV in support of lunar exploration missions. Key to the success of the CLV design effort and an integral part of each DAC is a detailed performance analysis tailored to assess nominal and dispersed performance of the vehicle, to determine performance sensitivities, and to generate design-driving dispersed trajectories. Results of these analyses provide valuable design information to the program for the current design as well as provide feedback to engineers on how to adjust the current design in order to maintain program goals. This paper presents a condensed subset of the CLV performance analyses performed during the CLV DAC-1 cycle. Deterministic studies include development of the CLV DAC-1 reference trajectories, identification of vehicle stage impact footprints, an assessment of launch window impacts to payload performance, and the computation of select CLV payload partials. Dispersion studies include definition of input uncertainties, Monte Carlo analysis of trajectory performance parameters based on input dispersions, assessment of CLV flight performance reserve (FPR), assessment of orbital insertion accuracy, and an assessment of bending load indicators due to dispersions in vehicle angle of attack and side slip angle. A short discussion of the various customers for the dispersion results, along with results and ramifications of each study, are also provided.

Phillips, Mark↗

Trajectory Analysis

The Systems Analysis Branch performs trajectory and systems analysis for next-generation launch vehicle and space transportation technologies. Currently the branch is supporting the Project Prometheus with analysis of nuclear electric and nuclear thermal propulsion missions to a variety of destinations. Within Project Prometheus a proposed mission to Jupiter and three of the planet sized icy moons that orbit it is developing. The Jupiter Icy Moons Orbiter (JIMO) as the project is being called will enable detailed scientific investigation of Jupiter's moons Callisto, Ganymede, and Europa. These moons were choose to orbit for intensive study in particular because they are each believed to have water, energy, and organic material. The JIMO mission will utilize nuclear fission power and electric propulsion in order to allow the spacecraft to orbit the moons at close range for long durations of time. My assignment this summer was to assist in developing a trajectory analysis for the spacecraft system the Jupiter Icy Moons Orbiter by rewriting an inefficient Excel file into a more efficient FORTRAN program. This program has been created for use planning the trajectory of the Jupiter Icy Moons Orbiter Mission. The program uses a database of thousands of data points representing flight time, burn time, thrust, mass of the propellant used, final mass of the spacecraft, ratio of finals mass to initial mass, and change in velocity that a spacecraft experiences during each phase in the Jupiter Icy Moons Orbiter Mission. The trajectory program is capable of taking a specific user entered specific impulse (isp), final mass fraction, and thrust (P(sub J)/m0) and through the use of cubic splines to fit specific data curves, the program can locate the exact flight time linked to the user specified values of specific impulse and final over initial mass fraction. Currently, the database used by the program to calculate flight times for a given thrust is only for isps in the range of 2000 to 9000 seconds. Although the program is specific to the Jupiter Icy Moons Orbiter mission, it can be easily modified to fit any mission with a propulsion system expected isp range between 2000 and 9000 seconds. This program performs the same tasks as the old Excel file but in a more timely fashion. Finally, this FORTRAN program will replace the Excel file as the tool used to calculate trajectory properties in missions and will provide valuable data to mission analysts for years to come.

Burke, Laura M.↗

ELaNa - Educational Launch of Nanosatellite Providing Routine RideShare Opportunities

Since the creation of the NASA CubeSat Launch Initiative (NCSLI), the need for CubeSat rideshares has dramatically increased. After only three releases of the initiative, a total of 66 CubeSats now await launch opportunities. So, how is this challenge being resolved? NASA's Launch Services Program (LSP) has studied how to integrate PPODs on Athena, Atlas V, and Delta IV launch vehicles and has been instrumental in developing several carrier systems to support CubeSats as rideshares on NASA missions. In support of the first two ELaNa missions the Poly-Picosatellite Orbital Deployer (P-POD) was adapted for use on a Taurus XL (ELaNa I) and a Delta n (ELaNa III). Four P-PODs, which contained a total eight CubeSats, were used on these first ELaNa missions. Next up is ELaNa VI, which will launch on an Atlas V in August 2012. The four ELaNa VI CubeSats, in three P-PODs, are awaiting launch, having been integrated in the NPSCuLite. To increase rideshare capabilities, the Launch Services Program (LSP) is working to integrate P-PODs on Falcon 9 missions. The proposed Falcon 9 manifest will provide greater opportunities for the CubeSat community. For years, the standard CubeSat size was 1 U to 3U. As the desire to include more science in each cube grows, so does the standard CubeSat size. No longer is a 1 U, 1.5U, 2U or 3U CubeSat the only option available; the new CubeSat standard will include 6U and possibly even 12U. With each increase in CubeSat size, the CubeSat community is pushing the capability of the current P-POD design. Not only is the carrier system affected, but integration to the Launch Vehicle is also a concern. The development of a system to accommodate not only the 3U P-POD but also carriers for larger CubeSats is ongoing. LSP considers payloads in the lkg to 180 kg range rideshare or small/secondary payloads. As new and emerging small payloads are developed, rideshare opportunities and carrier systems need to be identified and secured. The development of a rideshare carrier system is not always cost effective. Sometimes a launch vehicle with an excellent performance record appears to be a great rideshare candidate however, after completing a feasibility study, LSP may determine that the cost of the rideshare carrier system is too great and, due to budget constraints, the development cannot go forward. With the current budget environment, one cost effective way to secure rideshare opportunities is to look for synergy with other government organizations that share the same interest.

Skrobot, Garrett Lee↗

Marshall Space Flight Center Faculty Fellowship Program

The 2018 Marshall Faculty Fellowship Program involved 16 faculty in the laboratories and departments at Marshall Space Flight Center. These faculty engineers and scientists worked with NASA collaborators on NASA projects, bringing new perspectives and solutions to bear. This Technical Memorandum is a compilation of the research reports of the 2018 Marshall Faculty Fellowship program, along with the Program Announcement (Appendix A) and the Program Description (Appendix B). The research affected the following five areas: (1) Materials (2) Propulsion (3) Spacecraft systems (4) Vehicle systems (5) Space science The materials investigations includes Lunar Regolith for habitats, friction stir welding, and composite joints. Propulsion studies included cryogenic tank pressurization, transmitted torque in a cryogenic environment, and condensation in presence of noncondensables, Europa Lander Deorbit Stage, and catalyst development for a hybrid rocket. Spacecraft systems include wireless sensor networks and printed electronic inks. Vehicle systems studies were performed on Mars ascent vehicle analysis, architecture models, and Space Launch System manual steering. Space science studies included planetary lava flow. Our goal is to continue the Marshall Faculty Fellowship Program funded by Center internal project offices. Faculty Fellows in this 2018 program represented the following minority-serving institutions: Alabama A&M University, Southern University, Delgado Community College, and Dillard University.

Six, N. F.↗