Lessons from Adaptive Level One Accelerator (ALOA) System Implementation

The Adaptive Level One Accelerator (ALOA) system was developed as part of the Earth Science Data and Information System (ESDIS) project. The reconfigurable computing technologies were investigated for Level 1 satellite telemetry data processing to achieve computing acceleration and cost reduction for the next-generation Level 1 data processing systems. The MODIS instrument calibration algorithm was implemented using reconfigurable a computer. The system development process and the lessons learned throughout the design cycle are summarized in this paper.

Patel, Umesh D.↗

Secure Remote Access Issues in a Control Center Environment

The ISS finally reached an operational state and exists for local and remote users. Onboard payload systems are managed by the Huntsville Operations Support Center (HOSC). Users access HOSC systems by internet protocols in support of daily operations, preflight simulation, and test. In support of this diverse user community, a modem security architecture has been implemented. The architecture has evolved over time from an isolated but open system to a system which supports local and remote access to the ISS over broad geographic regions. This has been accomplished through the use of an evolved security strategy, PKI, and custom design. Through this paper, descriptions of the migration process and the lessons learned are presented. This will include product decision criteria, rationale, and the use of commodity products in the end architecture. This paper will also stress the need for interoperability of various products and the effects of seemingly insignificant details.

Pitts, Lee↗

Secure Payload Access to the International Space Station

The ISS finally reached an operational state and exists for local and remote users. Onboard payload systems are managed by the Huntsville Operations Support Center (HOSC). Users access HOSC systems by internet protocols in support of daily operations, preflight simulation, and test. In support of this diverse user community, a modem security architecture has been implemented. The architecture has evolved over time from an isolated but open system to a system which supports local and remote access to the ISS over broad geographic regions. This has been accomplished through the use of an evolved security strategy, PKI, and custom design. Through this paper, descriptions of the migration process and the lessons learned are presented. This will include product decision criteria, rationale, and the use of commodity products in the end architecture. This paper will also stress the need for interoperability of various products and the effects of seemingly insignificant details.

Pitts, R. Lee↗

Identifying, Assessing, and Mitigating Risk of Single-Point Inspections on the Space Shuttle Reusable Solid Rocket Motor

In the production of each Space Shuttle Reusable Solid Rocket Motor (RSRM), over 100,000 inspections are performed. ATK Thiokol Inc. reviewed these inspections to ensure a robust inspection system is maintained. The principal effort within this endeavor was the systematic identification and evaluation of inspections considered to be single-point. Single-point inspections are those accomplished on components, materials, and tooling by only one person, involving no other check. The purpose was to more accurately characterize risk and ultimately address and/or mitigate risk associated with single-point inspections. After the initial review of all inspections and identification/assessment of single-point inspections, review teams applied risk prioritization methodology similar to that used in a Process Failure Modes Effects Analysis to derive a Risk Prioritization Number for each single-point inspection. After the prioritization of risk, all single-point inspection points determined to have significant risk were provided either with risk-mitigating actions or rationale for acceptance. This effort gave confidence to the RSRM program that the correct inspections are being accomplished, that there is appropriate justification for those that remain as single-point inspections, and that risk mitigation was applied to further reduce risk of higher risk single-point inspections. This paper examines the process, results, and lessons learned in identifying, assessing, and mitigating risk associated with single-point inspections accomplished in the production of the Space Shuttle RSRM.

Greenhalgh, Phillip O.↗

Toward a Benchmark for Multi-Threaded Testing Tools

Looking for intermittent bugs is a problem that has been getting prominence in testing. Multi-threaded code is becoming very common, mostly on the server side. As there is no silver bullet solution, research focuses on a variety of partial solutions. We outline a road map for combining the research on the different disciplines of testing multi-threaded programs and on evaluating its quality. The project goals are to create a benchmark that can be used to evaluate different solutions, to create a framework with open API's that enables combining techniques in the multithreading domain, and to create a focus for the research in this area around which a community of people who try to solve similar problems with different techniques, could congregate. The benchmark, apart from containing programs with documented bugs, includes other artifacts, such as traces, that are used for evaluating some of the technologies. We have started creating such a bench mrk and detail the lesson learned in the process. The framework will enable technology developers, for example, race detectors, to concentrate on their components and use other ready made components, (e.g., instrumentor) to create a testing solution.

Eytani, Yaniv↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences From The Space Technology 5 Project

This brief presentation describes the mechanical and electrical integration activities and environmental testing challenges of the Space Technology 5 (ST5) Project. Lessons learned during this process are highlighted, including performing mechanical activities serially to gain efficiency through repetition and performing electrical activities based on the level of subsystem expertise available.

Sauerwein, Timothy A.↗

Space Shuttle Day-of-Launch Trajectory Design Operations

A top priority of any launch vehicle is to insert as much mass into the desired orbit as possible. This requirement must be traded against vehicle capability in terms of dynamic control, thermal constraints, and structural margins. The vehicle is certified to specific structural limits which will yield certain performance characteristics of mass to orbit. Some limits cannot be certified generically and must be checked with each mission design. The most sensitive limits require an assessment on the day-of-launch. To further minimize vehicle loads while maximizing vehicle performance, a day-of-launch trajectory can be designed. This design is optimized according to that day s wind and atmospheric conditions, which increase the probability of launch. The day-of-launch trajectory design and verification process is critical to the vehicle s safety. The Day-Of-Launch I-Load Update (DOLILU) is the process by which the National Aeronautics and Space Administration's (NASA) Space Shuttle Program tailors the vehicle steering commands to fit that day s environmental conditions and then rigorously verifies the integrated vehicle trajectory s loads, controls, and performance. This process has been successfully used for almost twenty years and shares many of the same elements with other launch vehicles that execute a day-of-launch trajectory design or day-of-launch trajectory verification. Weather balloon data is gathered at the launch site and transmitted to the Johnson Space Center s Mission Control. The vehicle s first stage trajectory is then adjusted to the measured wind and atmosphere data. The resultant trajectory must satisfy loads and controls constraints. Additionally, these assessments statistically protect for non-observed dispersions. One such dispersion is the change in the wind from the last measured balloon to launch time. This process is started in the hours before launch and is repeated several times as the launch count proceeds. Should the trajectory design not meet all constraint criteria, Shuttle would be No-Go for launch. This Shuttle methodology is very similar to other unmanned launch vehicles. By extension, this method would likely be employed for any future NASA launch vehicle. This paper will review the Shuttle s day-of-launch trajectory optimization and verification operations as an example of a more generic application of day-of-launch design and validation. With Shuttle s retirement, it is fitting to document the current state of this critical process and capture lessons learned to benefit current and future launch vehicle endeavors.

Harrington, Brian E.↗

Ares I-X Range Safety Simulation Verification and Analysis Independent Validation and Verification

NASA s Ares I-X vehicle launched on a suborbital test flight from the Eastern Range in Florida on October 28, 2009. To obtain approval for launch, a range safety final flight data package was generated to meet the data requirements defined in the Air Force Space Command Manual 91-710 Volume 2. The delivery included products such as a nominal trajectory, trajectory envelopes, stage disposal data and footprints, and a malfunction turn analysis. The Air Force s 45th Space Wing uses these products to ensure public and launch area safety. Due to the criticality of these data, an independent validation and verification effort was undertaken to ensure data quality and adherence to requirements. As a result, the product package was delivered with the confidence that independent organizations using separate simulation software generated data to meet the range requirements and yielded consistent results. This document captures Ares I-X final flight data package verification and validation analysis, including the methodology used to validate and verify simulation inputs, execution, and results and presents lessons learned during the process

Merry, Carl M.↗

Early Formulation Model-centric Engineering on Nasa's Europa Mission Concept Study

By leveraging the existing Model-Based Systems Engineering (MBSE) infrastructure at JPL and adding a modest investment, the Europa Mission Concept Study made striking advances in mission concept capture and analysis. This effort has reaffirmed the importance of architecting and successfully harnessed the synergistic relationship of system modeling to mission architecting. It clearly demonstrated that MBSE can provide greater agility than traditional systems engineering methods. This paper will describe the successful application of MBSE in the dynamic environment of early mission formulation, the significant results produced and lessons learned in the process.

science mission afforability↗

MOPITT Mechanisms 16 Years In-Orbit Operation on TERRA

The 16th anniversary of the launch of NASA's Terra Spacecraft was marked on December 18, 2015, with the Measurements of Pollution in the Troposphere (MOPITT) instrument being a successful contributor to the NASA EOS flagship. MOPITT has been enabled by a large suite of mechanisms, allowing the instrument to perform long-duration monitoring of atmospheric carbon monoxide, providing global measurements of this important greenhouse gas for 16 years. Mechanisms have been successfully employed for scanning, cooling of detectors, and to optically modulate the gas path length within the instrument by means of pressure and gas cell length variation. The instrument utilizes these devices to perform correlation spectroscopy, enabling measurements with vertical resolution from the nadir view, and has thereby furthered understanding of source and global transport effects of carbon monoxide. Given the design requirement for a 5.25-year lifetime, the stability and performance of the majority of mechanisms have far surpassed design goals. With 16 continuously operating mechanisms in service on MOPITT, including 12 rotating mechanisms and 4 with linear drive elements, the instrument was an ambitious undertaking. The long life requirements combined with demands for cleanliness and optical stability made for difficult design choices including that of the selection of new lubrication processes. Observations and lessons learned with regards to many aspects of the mechanisms and associated monitoring devices are discussed here. Mechanism behaviors are described, including anomalies, long-term drive current/power, fill pressure, vibration and cold-tip temperature trends. The effectiveness of particular lubrication formulations and the screening method implemented is discussed in relation to continuous rotating mechanisms and stepper motors, which have exceeded 15 billon rotations and 2.5 billion steps respectively. Aspects of gas cell hermeticity, optical cleanliness, heater problems and SEU effects on accelerometers are also discussed.

Gibson, Andrew S.↗

Flight Crew Integration (FCI) ISS Crew Comments Database & Products Summary

This Crew Debrief Data provides support for design and development of vehicles, hardware, requirements, procedures, processes, issue resolution, lessons learned, consolidation and trending for current Programs; and much of the data is also used to support development of future Programs.

Schuh, Susan↗

Bridging the Engineering and Medicine Gap

A primary challenge NASA faces is communication between the disparate entities of engineers and human system experts in life sciences. Clear communication is critical for exploration mission success from the perspective of both risk analysis and data handling. The engineering community uses probabilistic risk assessment (PRA) models to inform their own risk analysis and has extensive experience managing mission data, but does not always fully consider human systems integration (HSI). The medical community, as a part of HSI, has been working 1) to develop a suite of tools to express medical risk in quantitative terms that are relatable to the engineering approaches commonly in use, and 2) to manage and integrate HSI data with engineering data. This talk will review the development of the Integrated Medical Model as an early attempt to bridge the communication gap between the medical and engineering communities in the language of PRA. This will also address data communication between the two entities in the context of data management considerations of the Medical Data Architecture. Lessons learned from these processes will help identify important elements to consider in future communication and integration of these two groups.

Walton, M.↗

Design and Development of CubeSat Solar Array Deployment Mechanisms Using Shape Memory Alloys

The Advanced eLectrical Bus (ALBus) project is a technology demonstration mission of a 3U CubeSat with an advanced, digitally controlled electrical power system capability and the novel use of Shape Memory Alloy (SMA) technology for reliable solar array (SA) deployable mechanisms. The ALBus CubeSat deploys four SAs in addition to the body-mounted arrays on each side of the CubeSat. A goal of the mission is to utilize the SMAs being developed at the NASA Glenn Research Center to deploy these SAs. The use of SMAs allows for the ability to test and reset the flight deployment mechanism prior to flight, which reduces the risk of in orbit deployment failures common to CubeSats. As a result, an SMA-driven Retention and Release (R&R) mechanism and an SMA-driven hinge were designed, developed, and integrated for flight. This paper summarizes the development of these mechanisms, types and functionalities of the SMAs used, as well as the lessons learned throughout the process.

cubesat↗

Design and Development of CubeSat Solar Array Deployment Mechanisms Using Shape Memory Alloys

The Advanced eLectrical Bus (ALBus) project is a technology demonstration mission of a 3-U CubeSat with an advanced, digitally controlled electrical power system capability and the novel use of Shape Memory Alloy (SMA) technology for reliable solar array deployable mechanisms. The ALBus cubesat has a need to deploy four solar arrays in addition to the body-mounted arrays on each side of the cubesat. A goal of the mission is to utilize the SMAs being developed at the NASA Glenn Research Center to deploy these solar arrays. The use of SMAs allows for the ability to test and reset the flight deployment mechanism prior to flight which reduces the risk of on orbit deployment failures common on cubesats. As a result, an SMA driven Retention and Release mechanism and an SMA driven hinge was designed, developed, and being prepared for flight. This paper summarized the development of these mechanisms, types and functionalities of SMAs used, and lessons learned throughout the process.

solar array deployment↗

TPSAS-NF1676L-35202-DND

On March 20th, 2019, the National Aeronautics and Space Administration (NASA) and the Sistema de la Integración Centroamericana (SICA, Central American Integration System) issued a joint statement sharing their mutual desire to make Earth observations and remote sensing data and products more readily available to SICA member countries to inform their decision making. Regional capacity building in the use of Earth observations was one of the many opportunities for collaboration highlighted in this joint statement. As an initial capacity building effort, NASA deployed a series of feasibility projects through the DEVELOP Program to engage emerging and transitioning professionals with SICA member state partner agencies. The initial projects in summer 2019 addressed landslides in the Dominican Republic, near-coastal flooding in Guatemala and El Salvador, and environmental challenges to the Mesoamerican Reef off the coast of Belize. Additional projects were planned for fall 2019 with the objective of impacting environmental challenges for the remaining SICA member states. This presentation will summarize the results of projects conducted to date, address the lessons learned in the process of rapid engagement with regional entities, and consider how the partnership may evolve over time.

Kenton Ross↗

Enhanced UAS Availability via Vehicle to Vehicle Routing Scaled Experiments

The safe integration of modern unmanned aerial systems into the national airspace requires the ability to be able to confirm that the vehicles are working as planned. This means the availability of the vehicle and latency of the communication is critical. These requirements, along with a complex and multifaceted environment as well as the unmanned air traffic management framework, present a unique optimization problem. In this paper, we articulate our envisioned problem space and create a scaled-down version to test the functional feasibility of utilizing the vehicle to vehicle communication as a secondary communication assurance mechanism. We present our framework, experimental approach, and some lessons learned through the process.

Nicholas B Cramer↗

The Cassini Grand Finale Mission: Planning for a New Mission Environment

The Cassini F-Ring & Proximal Orbits (FRPO) is a new and unique mission; to ensure the highest priority science gets implemented, the POST (Proximal Orbit Science Team) was created to pre-allocate the time around periapse for all 22 proximal orbits. The F-ring orbits, and proximal time outside of POST, were handled similar to Cassini’s Solstice Mission using the Pre-Integrated Event (PIE) process. The new and unique properties of the spacecraft’s trajectory required much forethought to be flown safely while still planning for the most and best science return possible. Some ring-plane crossings (RPX) will be protected against dust impacts by turning the high gain antenna (HGA) to the dust RAM direction (HGA2RAM). If on the first proximal RPX higher than expected dust readings are seen then the Project Office may choose to require more (all) subsequent RPX to be HGA2RAM, implemented via a real-time command overlay for uplinked sequences. The pointing uncertainties will be larger than usual after the final targeted flyby; some of the process changes to address this include adding extra orbit trim maneuvers (OTMs) (fuel permitting) to resync to the reference trajectory and reduce pointing uncertainties; and movable blocks of commands to be used for some periapses where atmospheric drag may cause large timing shifts Changes made for FRPO to address perceptions that these sequences will be hard to implement include requiring early pointing designs (during integration) for certain types of observations, requiring teams to check early on that they can turn to and from their observation attitude, and that their attitude is safe, and adjusting the Implementation process to give more time for science observation designers. This paper will discuss these process changes and lessons learned so far.

Ray, Trina↗

Behavioral Health and Performance Operations and Research in Human Spaceflight

There are two distinct functions of the Behavioral Health and Performance (BHP) specialists at NASA Johnson Space Center (JSC), with a shared goal of promoting optimal performance during all mission phases, beginning with selection to the NASA Astronaut Corps through training for and completing a spaceflight mission. The BHP Operations team is active in areas such as selection, training, routine behavioral healthcare services, and work-rest schedule. The BHP Laboratory is engaged in research in space and analog platforms to address the risks and other challenges associated with future deep space missions. Their research focuses on topics that align with the NASA Human Research Program’s Human Factors Behavioral Performance Element goals. This panel will provide details of recent work by BHP Operations and the BHP Laboratory at NASA JSC, and will demonstrate their shared goals, and contributions toward, optimizing performance and maintaining the behavioral health and well-being of astronauts during all mission phases.In 2020-2021, NASA engaged another astronaut applicant screening process to identify its 23rd group of astronaut candidates. The BHP Operations team completed a significant amount of work to evaluate applicants and provide valuable input to the Astronaut Selection Board and the Aerospace Medical Board. One presentation will provide an overview of the work completed by BHP; and one presentation will discuss a critical competency important for successful job performance of the astronauts – Team Orientation. The former will summarize aspects of BHP’s Select-in and Select-out process and provide lessons learned for future selection cycles; the latter will briefly discuss the competencies of BHP’s applicant screening work, with focus on the importance of Team Orientation and the challenges of its measure. A third presentation will provide an overview of BHP’s current fatigue management work with astronauts and mission-critical operators at JSC (e.g., flight directors, pilots), and provide a look at the direction these fatigue management services may take in future exploration missions. Two other presentations will focus on the research completed by the BHP Lab to measure in a standardized way the critical aspects of behavioral health and well-being. One of the presentations will provide an overview of the Exploration Measures being collected during all space and analog missions, and the importance these objective measures have for future research and operations. The final presentation will summarize analyses completed with these measures, as they have been harmonized across both ISS and Analog missions.

Gary Beven↗