Search NASA⌕ Search

SEARCH · Search NASA

Results for “lift modulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

OpTIIX: An ISS-Based Testbed Paving the Roadmap Toward a Next Generation Large Aperture UV/Optical Space Telescope

The next generation large aperture UV/Optical space telescope will need a diameter substantially larger than even that of JWST in order to address some of the most compelling unanswered scientific quests. These quests include understanding the earliest phases of the Universe and detecting life on exo-planets by studying spectra of their atmospheres. Such 8-16 meter telescopes face severe challenges in terms of cost and complexity and are unlikely to be affordable unless a new paradigm is adopted for their design and construction. The conventional approach is to use monolithic or preassembled segmented mirrors requiring complicated and risky deployments and relying on future heavy-lift vehicles, large fairings and complex geometry. The new paradigm is to launch component modules on relatively small vehicles and then perform in-orbit robotic assembly of those modules. The Optical Testbed and Integration on ISS eXperiment (OpTIIX) is designed to demonstrate, at low cost by leveraging the infrastructure provided by ISS, telescope assembly technologies and end-to-end optical system technologies. The use of ISS as a testbed permits the concentration of resources on reducing the technical risks associated with robotically integrating the components. These include laser metrology and wavefront sensing and control (WFS&C) systems, an imaging instrument, lightweight, low-cost deformable primary mirror segments and the secondary mirror. These elements are then aligned to a diffraction-limited optical system in space. The capability to assemble the optical system and remove and replace components via the existing ISS robotic systems like the Special Purpose Dexterous Manipulator (SPDM), or by the ISS flight crew, allows for future experimentation, as well as repair.

Carpenter, Kenneth G.↗

Minimum fuel trajectory for the aerospace-plane

An overall trajectory for a single-stage-to-orbit vehicle with an initial weight of 234 tons is calculated, and four different propulsion models including turbojet, ramjet, scramjet, and rocket are considered. First, the atmospheric flight in the thicker atmosphere is discussed with emphasis on trajectory optimization, optimization problem, aerodynamic problem, propulsion model, and initial conditions. The performance of turbojet and ramjet-scramjet engines is analyzed; and then the flight to orbit is assessed from the optimization point of view. It is shown that roll modulation saves little during the trajectory, and the combined application of airbreathing propulsion and aerodynamic lift is suggested.

Breakwell, John V.↗

Design tradeoffs on engine-integrated hypersonic vehicles

Two classes of airbreathing hypersonic vehicle concepts, one for primarily cruise missions and the other for accelerator type missions, are presented. Both are designed with waverider airframes and hydrogen-fueled scramjet engine modules. Cruise configurations are optimized for the product of I(sp) and L/D while matching lift to weight and thrust to drag at some equivalence ratio. Accelerator configurations are optimized for effective specific impulse while matching lift to weight at an equivalence ratio of one. The method and computer code developed to optimize the configurations are discussed. The features and design tradeoffs for each class of vehicles are described. Recently available weight estimates for all-body waveriders have had a significant impact on the integrated configurations. Mach 8 vehicles at 40 km altitude optimized with the cruise objective function have L/Ds of 2.55 to 2.92 and I(sp)s of 2850 to 2940 sec. A Mach 14 vehicle at 40-km altitude optimized with the accelerator objective function has an I(sp) sub eff of 189 sec, and a Mach 10 vehicle an I(sp) sub eff of 880 sec.

O'Neill, Mary Kae L.↗

The impact of launch vehicle constraints on U.S. Space Station design and operations

The assembly of the Space Station is examined in terms of user and operational requirements. The Space Shuttle/Space Station interface is analyzed. The effect of the changing space transportation environment on the Space Station assembly requirements and the lift capabilities of the Shuttle are investigated. Consideration is given to crew replacement and the Shuttle launch rate; the use of the advanced solid rocket motor to increase the lifting capability of the Shuttle to 52,000 lbs; and the use of ELVs for launching modules of the Space Station.

Ambrus, Judith H.↗

First Cut

Lockheed Martin and a Northrop Grumman/Boeing team expect the Crew Exploration Vehicle proposals they submitted last week to change, given the new top-down push at NASA to close the gap between space shuttle retirement and launch of the new crew carrier. Still, delivery of the proposals gives a first glimpse of at least one of the concepts for a space shuttle replacement. Instead of the ballistic capsule approach put forward in some early CEV concept work, Lockheed Martin proposed a lifting body shape with a two-stage thermal protection system, coupled with a cylindrical mission module to give crews of four to six extra room on trips to the Moon, and a trans-Earth injection module (TEIM) for the return powered-at least in the first cut-by a couple of Pratt & Whitney RL10 rocket engines.

Morring, Frank, Jr.↗

Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are underway with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex S.↗

NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex↗

Quantifying physical parameterization uncertainties associated with land-atmosphere interactions in the WRF model over Amazon

The Weather Research and Forecasting (WRF) model can be used to diagnose regional land-atmosphere (L-A) coupling strength in the absence of sufficient observations but subjected to uncertainties associated with model physical parameterizations. In this study, we propose a framework to quantify and reduce model physical parameterization uncertainties associated with surface fluxes and L-A coupling. An ensemble of WRF simulations with different physical schemes is used to simulate surface fluxes and land-atmosphere coupling strength over the Amazon region. The physical parameterizations investigated include cloud microphysics (MP), land surface processes (LSM), planetary boundary layer (PBL), surface layer (SL), and cumulus (CU). We perform 120 ensemble simulations using the WRF model and different combinations of six MPs, three LSMs, six PBLs and SLs and three CUs. The measurements from the GoAMAZON field campaign and satellite data are used to evaluate model performance. A Multi-way analysis of variance (ANOVA) approach is applied to quantify the relative importance of different physics processes on L-A coupling. The Tukey’s test is used to sort schemes that have no significant differences into one group. The suite of physics that result in the best simulations of the corresponding variables are selected based on the Taylor skill score. Results show that the relative importance of processes and their interaction vary with the variables of interest. For example, CU was the most important process in modulating soil moisture, 2 m-humidity, latent heat, and net radiation. LSM showed dominant effects on 2 m-temperature and also has the largest impact on sensible heat and the lifting condensation level. The best physical parameterization ensembles show much narrower ranges of the variables of interest than the priori ensemble. Results of this study show the roles of different physical processes in modulating L-A interactions, quantify model uncertainties from physical processes, and provide insights for improving the model physics parameterizations.

Wang, Chen↗

Base Flow Investigation of the Apollo AS-202 Command Module

In recent years, both Europe and the US are developing hypersonic research and operational vehicles. These include (re)entry capsules (both ballistic and lifting) and lifting bodies such as ExoMars, EXPERT, ARV, CEV and IXV. The research programs are meant to enable technology and engineering capabilities to support during the next decade the development of affordable (possibly reusable) space transportation systems as well as hypersonic weapons systems for time critical targets. These programs have a broad range of goals, ranging from the qualification of thermal protection systems, the assessment of RCS performances, the development of GNC algorithms, to the full demonstration of the performance and operability of the integrated vehicles. Since the aerothermodynamic characteristics influence nearly all elements of the vehicle design, the accurate prediction of the aerothermal environment is a prerequisite for the design of efficient hypersonic systems. Significant uncertainties in the prediction of the hypersonic aerodynamic and the aerothermal loads can lead to conservative margins in the design of the vehicle including its Outer Mould Line (OML), thermal protection system, structure, and required control system robustness. The current level of aerothermal prediction uncertainties results therefore in reduced vehicle performances (e.g., sub-optimal payload to mass ratio, increased operational constraints). On the other hand, present computational capabilities enable the simulation of three dimensional flow fields with complex thermo-chemical models over complete trajectories and ease the validation of these tools by, e.g., reconstruction of detailed wind tunnel tests performed under identified and controlled conditions (flow properties and vehicle attitude in particular). These controlled conditions are typically difficult to achieve when performing in flight measurements which in turn results in large associated measurement uncertainties. Similar problems arise when attempting to rebuild measurements performed in "hot" ground facilities, where the difficulty level is increased by the addition of the free-flow characterization itself. The implementation of ever more sophisticated thermochemical models is no obvious cure to the aforementioned problems since their effect is often overwhelmed by the large measurement uncertainties incurred in both flight and ground high enthalpy facilities. Concurrent to the previous considerations, a major contributor to the overall vehicle mass of re-entry vehicles is the afterbody thermal protection system. This is due to the large acreage (equal or bigger than that of the forebody) to be protected. The present predictive capabilities for base flows are comparatively lower than those for windward flowfields and offer therefore a substantial potential for improving the design of future re-entry vehicles. To that end, it is essential to address the accuracy of high fidelity CFD tools exercised in the US and EU, which motivates a thorough investigation of the present status of hypersonic flight afterbody heating. This paper addresses the predictive capabilities of after body flow fields of re-entry vehicles investigated in the frame of the NATO/RTO - RTG-043 Task Group and is structured as follows: First, the verification of base flow topologies on the basis of available wind-tunnel results performed under controlled supersonic conditions (i.e., cold flows devoid of reactive effects) is performed. Such tests address the detailed characterization of the base flow with particular emphasis on separation/reattachment and their relation to Mach number effects. The tests have been performed on an Apollo-like re-entry capsule configuration. Second, the tools validated in the frame of the previous effort are exercised and appraised against flight-test data collected during the Apollo AS-202 re-entry.

Walpot, Louis M. G.↗

Design of a welded joint for robotic, on-orbit assembly of space trusses

In the future, some spacecraft will be so large that they must be assembled on-orbit. These spacecraft will be used for such tasks as manned missions to Mars or used as orbiting platforms for monitoring the Earth or observing the universe. Some large spacecraft will probably consist of planar truss structures to which will be attached special purpose, self-contained modules. The modules will most likely be taken to orbit fully outfitted and ready for use in heavy-lift launch vehicles. The truss members will also similarly be taken to orbit, but most unassembled. The truss structures will need to be assembled robotically because of the high costs and risks of extra-vehicular activities. Some missions will involve very large loads. To date, very few structures of any kind have been constructed in space. Two relatively simple trusses were assembled in the Space Shuttle bay in late 1985. Here the development of a design of a welded joint for on-orbit, robotic truss assembly is described. Mechanical joints for this application have been considered previously. Welded joints have the advantage of allowing the truss members to carry fluids for active cooling or other purposes. In addition, welded joints can be made more efficient structurally than mechanical joints. Also, welded joints require little maintenance (will not shake loose), and have no slop which would cause the structure to shudder under load reversal. The disadvantages of welded joints are that a more sophisticated assembly robot is required, weld flaws may be difficult to detect on-orbit, the welding process is hazardous, and welding introduces contamination to the environment. In addition, welded joints provide less structural damping than do mechanical joints. Welding on-orbit was first investigated aboard a Soyuz-6 mission in 1969 and then during a Skylab electron beam welding experiment in 1973. A hand held electron beam welding apparatus is currently being prepared for use on the MIR space station. Presently, Marshall Space Flight Center is evaluating processes appropriate for on-orbit welding. A low gravity environment has been found to have very minor effects on the welding processes appropriate for this application. This is based on tests run on-orbit as well as low gravity environments achieved by flying aircraft in parabolic trajectories. It appears that a modified form of gas tungsten arc welding (GTAW) will be most appropriate for welding together structures on-oribt. The process has been modified to work in a vacuum by providing gas to the arc zone by means of a hollow tungsten electrode with special shielding. A commercial tube welding head has been successfully modified for use on-orbit with a gas leakage rate of approximately 2.5 liters/min. To develop as realistic a joint as possible, a specific truss structure was selected on which to base the design. The structure considered was based on the 120 foot diameter aerobrake tetrahedral truss structure. The truss members were assumed to consist of graphite/epoxy tubes. Also, it was assumed that the nodes were constructed of 2219-T87 aluminum alloy. The magnitude of the member load assumed for design purposes was 100 kips.

Rule, William K.↗

NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present Missions

The United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.

Dumbacher, Daniel L.↗

Validation of Artemis I Aerothermal Design Models Using Developmental Flight Instrumentation

The inaugural flight of the Space Launch System (SLS) Block 1 launch vehicle, Artemis I, occurred on November 16, 2022, and featured a full suite of Developmental Flight Instrumentation (DFI) that provided aerothermodynamic measurements to assess thermal design and substantiate aerothermodynamic models. The Block 1 launch vehicle aerothermal instrumentation consisted of approximately 277 aerothermal gauges mounted throughout the Orion Multi-Purpose Crew Vehicle (MPCV), Integrated Spacecraft and Payload Element (ISPE), Core Stage (CS) and Solid Rocket Boosters (SRB) and an additional 179 thermal gauges on the Orion Crew Module (CM). Instrumentation included calorimeters, radiometers, pressure transducers, gas temperature probes, and thermocouples. Data was collected from lift-off through CS Main Engine Cut-Off (MECO). The flight data was invaluable for determining aerothermal model performance and developing flight-derived aerothermal environments for flight reconstruction thermal analysis and future SLS aerothermal models. The data offered critical insights into the aerothermodynamic conditions experienced during the launch and ascent of the SLS vehicle. This study compares the flight derived environments to pre-existing design models. The aerothermal models were constructed using MINIVER, the aerothermal engineering code which predicts aerodynamic heating and acts as an integration tool for incorporating databases from computational fluid dynamics (CFD) simulations and wind tunnel test data. The comparisons reveal the fidelity of the design models, highlighting areas where the design models accurately predicted flight conditions and instances where deviations were observed. Preliminary results suggest that while the design models largely aligned with the observed flight data, there were unique observations that reflected needed areas of model refinement. Aerothermal flight data from Artemis I for the SLS Block 1 vehicle will be further utilized to enhance the accuracy of Block 1B and Block 2 aerothermal models, ensuring improved safety and performance for subsequent Artemis missions.

aerothermodynamics↗

Validation of Artemis I Aerothermal Design Models Using Developmental Flight Instrumentation

The inaugural flight of the Space Launch System (SLS) Block 1 launch vehicle, Artemis I, occurred on November 16, 2022, and featured a full suite of Developmental Flight Instrumentation (DFI) that provided aerothermodynamic measurements to assess thermal design and substantiate aerothermodynamic models. The Block 1 launch vehicle aerothermal instrumentation consisted of approximately 277 aerothermal gauges mounted throughout the Orion Multi-Purpose Crew Vehicle (MPCV), Integrated Spacecraft and Payload Element (ISPE), Core Stage (CS) and Solid Rocket Boosters (SRB) and an additional 179 thermal gauges on the Orion Crew Module (CM). Instrumentation included calorimeters, radiometers, pressure transducers, gas temperature probes, and thermocouples. Data was collected from lift-off through CS Main Engine Cut-Off (MECO). The flight data was invaluable for determining aerothermal model performance and developing flight-derived aerothermal environments for flight reconstruction thermal analysis and future SLS aerothermal models. The data offered critical insights into the aerothermodynamic conditions experienced during the launch and ascent of the SLS vehicle. This study compares the flight derived environments to pre-existing design models. The aerothermal models were constructed using MINIVER, the aerothermal engineering code which predicts aerodynamic heating and acts as an integration tool for incorporating databases from computational fluid dynamics (CFD) simulations and wind tunnel test data. The comparisons reveal the fidelity of the design models, highlighting areas where the design models accurately predicted flight conditions and instances where deviations were observed. Preliminary results suggest that while the design models largely aligned with the observed flight data, there were unique observations that reflected needed areas of model refinement. Aerothermal flight data from Artemis I for the SLS Block 1 vehicle will be further utilized to enhance the accuracy of Block 1B and Block 2 aerothermal models, ensuring improved safety and performance for subsequent Artemis missions.

aerothermodynamics↗

Mars Aerocapture Analysis For MESUR/Mars-Pathfinder Aeroshells Using Un-modulated Control in Low L/D Configurations

Aerocapture scenarios are examined to determine the feasibility of using MESUR/Mars Pathfinder aeroshell designs to capture spacecraft aerodynamically into Mars orbit. Using lift over drag (L/D) ratios up to 0.3, entry trajectories were simulated over a range of entry vehicle masses and entry velocities. Entry corridor widths were calculated for undershoot and overshoot trajectories yielding Mars parking orbits having periods from 2 to 20 hours. For entries with L/D = 0.3, entry corridor widths of about 1.2 degrees are possible over entry velocities from 5.5 to 9.0 km/sec. The design constraints for an aeroshell used for orbital aerocapture are less severe than a ballistic entry for a surface lander mission such as Mars Pathfinder, because the aerothermodynamic heating and deceleration loads are smaller. The mass savings from aerocapture orbit insertion versus propulsive insertion into Mars orbit could result in significantly reducing program costs and increasing mission capabilities.

Wercinski, Paul F.↗

III-V Solar Cells with Novel Epitaxial Lift-off Architectures for Extended Substrate Reuse for Low-cost Manufacturing

The highest solar cell efficiencies have been achieved with III-V photovoltaics (PV). Still, the use of III-V materials in terrestrial applications has been very limited, mainly because of their high cost. The high cost is primarily due to the expensive Ge or GaAs wafers which could amount up to one-half of the total module cost! A prominent approach to reduce the impact of the high cost of substrates used for III-V PV is through re-use of the wafer substrates by Epitaxial Lift-Off (ELO). Typically, using a sacrificial layer such as AlAs, the device part of the cell is lifted off, leaving behind the substrate for re-use for fabrication of the next device. While conversion efficiency as high as 29.1% has been achieved by ELO method, chemical mechanical polishing (CMP) of the substrate is required which significantly adds to the overall solar cell cost. In this project, we have developed a novel ELO architecture for single junction gallium arsenide (GaAs) solar cells that will not require CMP of the substrate for re-use. Multiple reuses of GaAs wafers have been demonstrated with no CMP, without degradation in solar cell efficiency. Also, the solar cells have been successfully lifted off and transferred to inexpensive substrates with less than 2% change in efficiency. By elimination of the CMP process, which is the highest cost component of III-V solar cells made by conventional ELO method (~$10/W), and decreasing the substrate cost by multiple re-uses, the developed technology could be a leap forward in significantly reducing the cost of III-V photovoltaics.

14 SOLAR ENERGY↗

An experimental investigation of flow-induced oscillations of the Bruel and Kjaer in-flow microphone

One source contributing to wind tunnel background noise is microphone self-noise. An experiment was conducted to investigate the flow-induced acoustic oscillations of Bruel & Kjaer (B&K) in-flow microphones. The results strongly suggest the B&K microphone cavity behaves more like an open cavity. Their cavity acoustic oscillations are likely caused by strong interactions between the cavity shear layer and the cavity trailing edge. But the results also suggest that cavity shear layer oscillations could be coupled with cavity acoustic resonance to generate tones. Detailed flow velocity measurements over the cavity screen have shown inflection points in the mean velocity profiles and high disturbance and spectral intensities in the vicinity of the cavity trailing edge. These results are the evidence for strong interactions between cavity shear layer oscillations and the cavity trailing edge. They also suggest that beside acoustic signals, the microphone inside the cavity has likely recorded hydrodynamic pressure oscillations, too. The results also suggest that the forebody shape does not have a direct effect on cavity oscillations. For the FITE (Flow Induced Tone Eliminator) microphone, it is probably the forebody length and the resulting boundary layer turbulence that have made it work. Turbulence might have thickened the boundary layer at the separation point, weakened the shear layer vortices, or lifted them to miss impinging on the cavity trailing edge. In addition, the study shows that the cavity screen can modulate the oscillation frequency but not the cavity acoustic oscillation mechanisms.

Fields, Richard S., Jr.↗