Search NASA⌕ Search

SEARCH · Search NASA

Results for “linear accelerator (linac)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

ORBITAL ANGULAR MOMENTUM BEAMS RESEARCH USING A FREE-ELECTRON LASER OSCILLATOR

We present a Fixed-Field-Alternating (FFA) permanent magnet racetrack electron accelerator with energy range between 10-60 GeV for the future LHeC. Electron beam is brought back to the linac by the single beam line without requiring electric power REDUCING estimated wall power of 100 MW in the present LHeC design to a negligible power for arcs as the permanent magnets are used. The design is based on experience from the very successful commissioning of the Cornell University and Brookhaven National Laboratory Energy Recovery Test Accelerator ? ?CBETA?. The proposal supports sustainability efforts for LHeC by making a 'green' accelerator. It is an energy recovery linac with 99.9% energy efficiency and reduces the power consumption by using small permanent magnets. The FFA non-linear gradient design is a racetrack shape, where, as in the CBETA, the arcs are matched by adiabatic transition to the two (LHeC) or multiple straight sections. Two 10 GeV superconducting linacs are placed on both sides of the Interaction Region (IR) significantly reducing the power of synchrotron radiation loss.

Trbojevic, D.↗

Design Criteria for High-Gradient Radio-Frequency Linacs

This article will review methods used at the SLAC National Accelerator Laboratory and other world accelerator laboratories to design high-gradient normal conducting accelerating structures. A quest for compact radio-frequency linacs fueled decades of studies toward a higher accelerating gradient. A major phenomena limiting the increase of the gradient is vacuum radio-frequency breakdown; therefore, this paper will address the breakdown physics and discuss approaches that reduce the breakdown probability. This discussion will cover both the electrical design and fabrication technology of the accelerating structures to achieve practical operating accelerating gradients in excess of 100 MV/m. Most of the data described here were obtained during the development of 11 GHz linacs for electron–positron linear colliders, so extrapolation of the results to other frequencies should be performed cautiously.

Dolgashev, Valery A. (ORCID:0000000166715402)↗

C$^3$ Demonstration Research and Development Plan

C$^3$ is an opportunity to realize an e$^+$e$^-$ collider for the study of the Higgs boson at $\sqrt{s} = 250$ GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C$^3$ is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C$^3$ is the main linac. This white paper presents the staged approach towards a facility to demonstrate C$^3$ technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The white paper also includes discussion on the approach for technology industrialization, related HEP R&D activities that are enabled by C$^3$ R&D, infrastructure requirements and siting options.

43 PARTICLE ACCELERATORS↗

Bridging the gap of storage ring light sources and linac-driven free-electron lasers

High-gain free-electron lasers (FELs) are driven by short, high-charge density electron beams as only produced at dedicated single pass or recirculating linear accelerators. We describe new conceptual, technical, and modeling solutions to produce subpicosecond, up to ~100 μJ-energy extreme ultra-violet and soft x-ray FEL pulses at high- and tunable repetition rates, from diffraction-limited storage ring light source. In contrast to previously proposed schemes, we show that lasing can be simultaneous to the standard multibunch radiation emission from short insertion devices, and that it can be obtained with limited impact on the storage ring infrastructure. By virtue of the high-average power but moderate pulse energy, the storage ring-driven high-gain FEL would open the door to unprecedented accuracy in time-resolved spectroscopic analysis of matter in the linear response regime, in addition to inelastic scattering experiments.

43 PARTICLE ACCELERATORS↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

Mixed gain detector configurations for time-resolved X-ray solution scattering

X-ray detection at X-ray free-electron lasers is challenging in part due to the XFEL's extremely short and intense X-ray pulses. Experimental measurements are further complicated by the large fluctuations inherent to the self-amplified spontaneous emission process producing the X-rays. At the Linac Coherent Light Source the ePix10ka2M detector offers multiple gain modes, and auto-ranging between these, to increase the dynamic range while retaining low noise. For diffuse scattering techniques, such as time-resolved X-ray solution scattering, where the shape of the scattering pattern largely does not change between exposures, a fixed mix of different gain modes offers many of the same advantages as auto-ranging. We find that configuring individual ASICs in separate gain modes does not impact the intensity linearity of the gain response and has a limited effect on the effective dynamic range in regions with different gain mode settings while avoiding the complexities of auto-ranging. Small (<5%) non-linear gain contributions arise when pixels on the same ASIC are configured in different gain modes. We present a configuration scheme that is designed to select the optimal mixed gain configuration to minimize effects of saturation in the high-/medium-gain region, while maximizing the number of pixels with higher gain to improve the signal-to-noise ratio.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Mitigation of Beam Losses in LANSCE Linear Accelerator

Suppression of beam losses is essential for successful operation of high-intensity accelerator facility. The LANSCE accelerator started routine operation in 1972 as a 0.8 MW average proton beam power facility for meson physics research, and delivered highpower beam for a quarter century. The accelerator currently delivers 100 MeV proton beam to Isotope Production Facility (IPF) and 800 MeV H- beams to various experimental areas. The accelerator is equipped with two independent injectors for H + and H - beams, merging at the entrance of a 201.25 MHz Drift Tube Linac (DTL). The DTL performs acceleration up to the energy of 100 MeV. After the DTL, the Transition Region beamline directs a 100 MeV proton beam to the Isotope Production Facility, while the H - beam is accelerated up to the final energy of 800 MeV in an 805- MHz Coupled Cavity Linac. The H - beams, created with different time structure by a lowenergy chopper, are distributed in the Switch Yard (SY) to four experimental areas: the Lujan Neutron Scattering Center equipped with a Proton Storage Ring (PSR), the Weapons Neutron Research facility (WNR), the Proton Radiography facility (pRad), and the Ultra-Cold Neutron facility (UCN). Multi-beam operation requires careful control of accelerator tune to minimize beam losses. In this paper we review main effects affecting beam losses in LANSCE linear accelerator and discuss methods to reduce them.

43 PARTICLE ACCELERATORS↗

Beam Loss Assessment Through Use of Photomultiplier Tubes

Modern accelerators aim to deliver maximal beam current at stable energy with minimal beam loss. Environmental changes, among other factors, can result in increased beam loss and decreased beam throughput, prompting daily retuning of the accelerator. The compact nature of the oldest part of the linear accelerator limits the available beam instrumentation, making beam loss assessment and tuning difficult. Thus, additional devices for beam loss monitoring must be considered. Photomultiplier tube-based beam loss monitors (BLMs) were installed along the Fermilab drift tube Linac to assess beam loss. Due to noise, the data from the installed photomultiplier tubes was difficult to assess. After noise reduction and signal analysis, it was found that the signals produced by the photomultiplier tubes in response to beam loss were consistent for a given configuration and therefore a reasonable measure of beam loss. This project lays groundwork for future work in beam loss assessment using photomultiplier tubes, with the automation of the process developed in this project being the next step in this effort.

Waggoner, Alexander↗

Exploring Causes of Beam Loss at CEBAF

At Jefferson Lab, the Continuous Electron Beam Accelerator (CEBAF) features a unique design with two linear accelerators and two arc sections allowing for multiple turns of the electron beam, as well as four experimental end stations. This topology leads to increased beam losses, especially in the spreader and recombiner regions connecting the arcs to the linacs and in the extraction regions connecting the experimental end stations to the accelerator. These losses result in equipment activation and operational interruptions. Recent upgrades to the facility’s diagnostic systems, including the addition of xenon ion chambers, have provided higher-resolution data regarding these loss events. Building on this improved observational capability, we are developing a simulation framework using optics codes and the Geant4-based BDSIM to model beam extinction and halo formation in these regions. This work aims to correlate simulation results with experimental data to isolate the causes of beam loss and inform future machine tuning strategies. We present a summary of conclusions drawn from recent operational studies and outline a plan to model the beam loss and validate the simulations.

Matthews, C. [Old Dominion Univ., Norfolk, VA (Uni↗

Results of the first implementation of RF phase signature matching at LANSCE

The LINAC at the Los Alamos Neutron Science Center (LANSCE) has been utilizing the Delta-t method to match the RF cavities to the design acceleration parameters since its commissioning in 1972. The differences in time-of-flight between two subsequent Beam Position and Phase Monitors (BPPMs) are measured with both accelerated and drifting beams, depending on the whether the module is set to on or off. The algorithm optimizes the module amplitude and phase via iterative measurements if the initial phase is in the vicinity of the design value. With an upgrade to a faster readout system, a scan over the whole RF cavity phase range requires relatively less time than the classical optimization procedure. The Phase Scan Signature Matching (PSSM) method provides a time-efficient method that ensures the phase selection lands on the bunching side and empowers future analyses to build module-specific models. The PSSM also utilizes a direct model to determine the correct amplitude to sub-percent level instead of using linearized matrices. Furthermore, lacking a reliable energy measurement method in the LINAC, we measure the beam phases at two downstream locations to increase the precision of energy measurements. In this letter, we also discuss the sensitivities of PSSM, error propagation, and the implementation results for the 2019 and 2020 beam cycles.

47 OTHER INSTRUMENTATION↗

The Impact of High-Dimensional Phase Space Correlations on the Beam Dynamics in a Linear Accelerator

Hadron beams develop intensity-dependent transverse-longitudinal correlations within radio-frequency quadrupole (RFQ) accelerating structures. These correlations are only visible in six-dimensional phase space and are destroyed by reconstructions from low-dimensional projections. In this work, we estimate the effect of artificial decorrelation on the beam dynamics in the Spallation Neutron Source (SNS) linac and Beam Test Facility (BTF). We show that the evolution of a realistic initial distribution and its decorrelated twin converge during the early acceleration stages; thus, low-dimensional projections are probably sufficient for detailed predictions in high-power linacs.

Hoover, Austin↗

Characterization and alignment of a resonant cavity beam position monitor for the Compact LInear Collider (CLIC) project at CERN

Beam diagnostic devices are essential tools to sense the properties of the beam in particle accelerators. Beam Position Monitors (BPMs) are used to detect the transverse beam spatial coordinates. A large number of high-resolution resonant cavity BPMs, operating at 14GHz, are proposed to monitor the orbit of the two main beam linacs of the CLIC project. This paper discusses innovative calibration techniques on a dedicated test bench in the frame of the PACMAN project. The particular location of the electromagnetic center of the resonant cavity BPM is detected utilizing a stretched-wire measurement approach. Measurements, RF characterization and final fiducialization of the BPM electrical offset are treated with details. Initial studies through EM simulations of the cavity BPM are covered. The presented experimental results prove the feasibility of the alignment methodology with nanometric resolution.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of the Advanced Rare Isotope Separator ARIS at FRIB

The Facility for Rare Isotope Beams (FRIB) at Michigan State University (MSU) consists of a newly constructed linear accelerator and fragment separator that are designed for enhanced production rates of rare isotopes for use in research and other societal applications. Recent activities through to August 2022 took place to commission the Advanced Rare Isotope Separator (ARIS) and carry out the first experiments. This followed commissioning of the newly constructed linac that is designed to provide orders of magnitude higher beam power than the previously coupled cyclotrons. This required that more advanced target, beam dump, and collimation systems of the new separator be designed and constructed to sustain unprecedented conditions by heavy ion beams. Commissioning with ~1 kW beams began recently and results from activities that began in late 2021 are reported here. Comparisons between the previous and current facilities are provided.

43 PARTICLE ACCELERATORS↗

AI-Enabled Operations at Fermi Complex: Multivariate Time Series Prediction for Outage Prediction and Diagnosis

The Main Control Room of the Fermilab accelerator complex continuously gathers extensive time-series data from thousands of sensors monitoring the beam. However, unplanned events such as trips or voltage fluctuations often result in beam outages, causing operational downtime. This downtime not only consumes operator effort in diagnosing and addressing the issue but also leads to unnecessary energy consumption by idle machines awaiting beam restoration. The current threshold-based alarm system is reactive and faces challenges including frequent false alarms and inconsistent outage-cause labeling. To address these limitations, we propose an AI-enabled framework that leverages predictive analytics and automated labeling. Using data from $2,703$ Linac devices and $80$ operator-labeled outages, we evaluate state-of-the-art deep learning architectures, including recurrent, attention-based, and linear models, for beam outage prediction. Additionally, we assess a Random Forest-based labeling system for providing consistent, confidence-scored outage annotations. Our findings highlight the strengths and weaknesses of these architectures for beam outage prediction and identify critical gaps that must be addressed to fully harness AI for transitioning downtime handling from reactive to predictive, ultimately reducing downtime and improving decision-making in accelerator management.

Jain, Milan [PNL, Richland] (ORCID:000000021676111↗

Exploratory splitter bend system designs for FFA@CEBAF

An upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility (JLAB) is anticipated to provide an electron beam of over 20 GeV using the existing superconducting-RF linear accelerator and new fixed-field alternating (FFA) gradient recirculation arcs made up of Halbach-style permanent magnets. In the current design, the FFA arcs will carry six beams with energies of approximately 11, 13, 16, 18, 20, and 22 GeV which will require horizontal splitter lines to match the beam from the preceding linac. In this paper, we describe two alternative splitter beamline designs that are tuned to match the beam's Twiss parameters, R56, time-of-flight, bend-plane offset, and dispersion into the FFA cells.

Accelerator Physics↗

The Ghost Collider: An Innovative Higgs Factory

The Ghost Collider is an innovative proposal for a 550 GeV centre-of-mass, 275 GeV per beam linear collid-er with four interaction regions, each with the design luminosity. The primary innovation is the use of “ghost bunches” containing equal numbers of electrons and posi-trons so they are electrically neutral. In the linacs, energy is transferred between electrons and positrons in the same bunch, decelerating one type of particle and using the energy to accelerate the other: a new class of Energy Re-covery Linacs. At the interaction points, collisions be-tween two neutral ghost bunches occurs with weakened electromagnetic interaction such as the beam-beam effect or disruption, ensuring that the particles and their energy can be recycled with minimal loss. Four “serial IPs” are incorporated, where chromatic errors produced in one IP are cancelled in the following IP. The neutral beam insta-bility at the IP is also addressed. All interaction points have the nominal luminosity per IP of 2.8 x 1034 cm-2s-1 for a facility luminosity of 1.1 x1035 cm-2s-1 @ 100 MW electrical power for the RF systems. The result is a totally original concept for an electron-positron collider.

Hutton, A. [Thomas Jefferson National Accelerator ↗

Development of High-efficiency and Cost-effective Forged Ingot Niobium Technology for Science Frontiers and Accelerator Applications

Development of Forged Ingot Niobium Technology: Worlds science frontier programs and SRF accelerator applications demand high performance and cost-effective SRF accelerator technology [1-8]. Fine-grain (FG) and Large-grain (LG) ingot niobium technologies have been very well developed and implemented in all the present-day accelerator projects. However, forged ingot niobium technology which is the focus of this development proposal will be much more cost-effective and expected to have several technical advantages. FG niobium sheet production is very complex involving more than ten processing steps making them prone to contamination. As a result, they are very expensive to produce and require stringent QA procedure to be ready for SRF cavity production. The accelerating cavity process steps are also numerous and require strict procedures in order to achieve high accelerating gradients and quality factors needed for science frontier programs. LG niobium disc production, directly sliced from the ingot, is relatively simple and straight forward to keep surface cleanness. The disc production cost is significantly low compared to FG niobium sheet production. However, there are (some) draw backs due to non-homogeneity of the grain boundary distribution, resulting in non-uniform mechanical properties and complex cavity fabrication, although the LG cavities achieve the expected high-gradient performance goals with lower cost. Medium-grain (MG) niobium disk production may be realized with a new approach/process, the disc directly sliced from the forged ingot, involves a simpler process steps contributing major production cost reduction [9]. These discs are expected to be superior as they tend to be homogenous with uniform sub millimeter grains and mechanical properties. We are eagerly looking forward to developing the forged ingot niobium SRF accelerator technology for the benefit of the world-wide science frontier programs, green energy subcritical nuclear energy systems and a wide variety of industrial applications including the production of radio isotopes and nuclear transmutation applications. Measurement of thermal characteristics of the forged ingot niobium: Measurement of the thermal diffusivity, D, of superconducting MG niobium is important to be understood in comparison with FG sheet and LG disc, as well as that of advanced composite material of Nb3Sn film sputtered on forged ingot Nb, which will be determined using transient pump-probe thermo-modulation [10,11]. Transient thermo-modulation is based on using an ultrafast laser pulse to heat the superconducting materials by a few K, then a synchronized laser pulse probes the reflectance of the heated material. For thin films on a substrate (e.g, 100-nm Nb3Sn on Nb), it takes <100 ps for the heat to reach the substrate by diffusion. Therefore, an ultrafast method is needed to probe D of the studied material. D will be measured from room temperature to liquid helium temperatures. Fundamental Research: The increase of rf loss in SRF cavities is related to trapping of residual magnetic field during the cavity cool-down. The study suggested that the micro structure plays the role in flux trapping sensitivity. The research includes the flux trapping and expulsion study as forged ingot niobium goes through several mechanical deformations, crystallization leading to the optimal SRF cavity performance. Furthermore, the cavity made from FG, MG, and LG sheet/disc will be compared to understand the optimal re-crystallization temperature that cavity needed to be heat treated which minimize the flux trapping and increase SRF cavity performance. References: 1. S. Belomestnykh, Overview of recent SRF developments for ERLs, presented at the SRF 2015, Whistler, BC, Canada (2015). 2. A. Yamamoto, M. Yamanaka and G. Myneni, Ingot Nb based SRF Technology for the International Linear Collider, in Science and Technology of Ingot Niobium for Superconducting Radio Frequency Applications, AIP Conf. Proc. 1687, 030005-1 ? 03005-6, 2015 3. Report of the Workshop on Energy and Environmental Applications of Accelerators, DOE Workshop Report. https://science.osti.gov/-/media/hep/pdf/Reports/2020/CASM_WorkshopReport.pdf? la=en&hash=AEB0B318ED0436B1C5FF4EE0FDD6DEB84C2F15B2 4. G. Ciovati, et al., Design of a cw, low-energy, high-power superconducting linac for environmental applications, Phys. Rev. Accel. Beams 21, 091601 (2018). 5. P. Dhakal, et al., Effect of high temperature heat treatments on the quality factor of a large-grain superconducting radio-frequency niobium cavity, Phys. Rev. ST Accel. Beams 16, 042001 (2013). 6. P. Kneisel et al., Review of ingot niobium as a material for superconducting radio frequency accelerating cavities, Nuclear Instruments and Methods in Physics Research A 774, 133 (2015). 7. G. Ciovati, P. Dhakal, and G. R, Myneni, Superconducting radio-frequency cavities made from medium and low-purity niobium ingots, Supercond. Sci. Technol. 29, 064002 (2016). 8. M. Drury et al., commissioning of the prototype C75 cavities in a CEBAF cryomodule, in Proc. of IPAC 2018, Vancouver, BC, Canada (2018) 9. Feasibility of forged-ingot niobium disc and SRF cavity fabrication technology recently demonstrated in cooperation of ATI, BSCE, and KEK (2020). 10. Hani E. Elsayed-Ali, ?Measurements of heat transport in thin films by ultrafast laser-based techniques,? 3rd International Conference on Thermal Issues in Emerging Technologies Theory and Applications, Cairo, Egypt, pp. 347 ? 350 (2010). DOI: 10.1109/ThETA17616.2010 11. W. M. G. Ibrahim, H. E. Elsayed-Ali, M. Schinn, and C. A. Bonner, Jr., ?Ultrafast investigation of electron dynamics in multilayer metals,? Int. J. Heat and Mass Transfer, 47(10?11), 2261?2268 (2004).

Myneni, G.↗