Search NASA⌕ Search

SEARCH · Search NASA

Results for “managing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager↗

Implementation of Information Management System for Radiation Safety of Personnel at the Russian Northwest Center for Radioactive Waste Management 'SevRAO' - 13131

The report is an overview of the information-analytical system designed to assure radiation safety of workers. The system was implemented in the Northwest Radioactive Waste Management Center 'SevRAO' (which is a branch of the Federal State Unitary Enterprise 'Radioactive Waste Management Enterprise RosRAO'). The center is located in the Northwest Russia. In respect to 'SevRAO', the Federal Medical-Biological Agency is the regulatory body, which deals with issues of radiation control. The main document to regulate radiation control is 'Reference levels of radiation factors in radioactive wastes management center'. This document contains about 250 parameters. We have developed a software tool to simplify control of these parameters. The software includes: input interface, the database, dose calculating module and analytical block. Input interface is used to enter radiation environment data. Dose calculating module calculates the dose on the route. Analytical block optimizes and analyzes radiation situation maps. Much attention is paid to the GUI and graphical representation of results. The operator can enter the route at the industrial site or watch the fluctuations of the dose rate field on the map. Most of the results are presented in a visual form. Here we present some analytical tasks, such as comparison of the dose rate in some point with control levels at this point, to be solved for the purpose of radiation safety control. The program helps to identify points making the largest contribution to the collective dose of the personnel. The tool can automatically calculate the route with the lowest dose, compare and choose the best route. The program uses several options to visualize the radiation environment at the industrial site. This system will be useful for radiation monitoring services during the operation, planning of works and development of scenarios. The paper presents some applications of this system on real data over three years - from March 2009 to February 2012. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

New Cap Design Expands Capacity of DOE Environmental Management Waste Management Facility (EMWMF) Oak Ridge, Tennessee - 19185

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. Onsite waste disposal is a key component of DoE's cleanup strategy. Less expensive onsite disposal allows remaining funding to be used to accelerate cleanup activities. The initial cover design was intended to be revised and updated as the Environmental Management Waste Management Facility (EMWMF) neared closure. However, accelerating review and modification of the design resulted in additional waste disposal volume that will extend the life of the EMWMF. Two design modifications were implemented: 1) reducing the final cover thickness from 14 ft to 11 ft while maintaining protectiveness, and 2) changing the height of the landfill by reducing the width of the top deck. These two design changes resulted in an additional 130,000 cubic yards of landfill capacity for Oak Ridge Reservation (ORR) demolition and remediation waste and extended the expected life of the EMWMF by approximately 2 years. The addition of more inexpensive onsite waste disposal capacity will continue to facilitate cost-effective cleanup activities at the ORR. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aging Management using Proactive Management of Materials Degradation

The U.S. Nuclear Regulatory Commission (NRC) has undertaken a program to lay the technical foundations for defining proactive actions to manage degradation of materials in light water reactors (LWRs). The current focus is existing plants; however, if applied to new construction, there is potential to better monitor and manage plants throughout their life cycle. This paper discusses the NRC’s Proactive Management of Materials Degradation (PMMD) program and its application to nuclear power plant structures, systems, and components (SSC).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Development of a Smart Distribution Grid Testbed for Integrated Information Management Systems

This paper presents a smart distribution grid testbed to test or compare designs of integrated information management systems (I2MSs). An I2MS extracts and synthesizes information from a wide range of data sources to detect abnormal system behaviors, identify possible causes, assess the system status, and provide grid operators with response suggestions. The objective of the testbed is to provide a modeling environment with sufficient data sources for the I2MS design. The testbed includes five information layers and a physical layer; it generates multi-layer chronological data based on actual measurement playbacks or simulated data sets produced by the physical layer. The testbed models random hardware failures, human errors, extreme weather events, and deliberate tampering attempts to allow users to evaluate the performance of different I2MS designs. Initial results of I2MS performance tests showed that the testbed created a close-to-real-world environment that allowed key performance metrics of the I2MS to be evaluated.

99 GENERAL AND MISCELLANEOUS↗

AGING MANAGEMENT USING PROACTIVE MANAGEMENT OF MATERIALS DEGRADATION

The U.S. Nuclear Regulatory Commission (NRC) has undertaken a program to lay the technical foundations for defining proactive actions to manage degradation of materials in light water reactors. The current focus is existing plants; however, if applied to new construction, there is potential to better monitor and manage plants throughout their life cycle. This paper discusses the NRC's Proactive Management of Materials Degradation program and its application to nuclear power plant structures, systems, and components.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Job Life Cycle Management Libraries for CMS Workflow Management Projects

Scientific analysis and simulation requires the processing and generation of millions of data samples. These tasks are often comprised of multiple smaller tasks divided over multiple (computing) sites. This paper discusses the Compact Muon Solenoi d (CMS) workflow infrastructure, and specifically the Python based workflow library which is used for so called task lifecycle management. The CMS workflow infrastructure consists of three layers: high level specification of the various tasks based on inp ut/output data sets, life cycle management of task instances derived from the high level specification and execution management. The workflow library is the result of a convergence of three CMS sub projects that respectively deal with scientific analysis, simulation and real time data aggregation from the experiment. This will reduce duplication and hence development and maintenance costs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Advance Liquid Metal Reactor Discrete Dynamic Event Tree/Bayesian Network Analysis and Incident Management Guidelines (Risk Management for Sodium Fast Reactors)

Accident management is an important component to maintaining risk at acceptable levels for all complex systems, such as nuclear power plants. With the introduction of self-correcting, or inherently safe, reactor designs the focus has shifted from management by operators to allowing the system's design to manage the accident. Inherently and passively safe designs are laudable, but nonetheless extreme boundary conditions can interfere with the design attributes which facilitate inherent safety, thus resulting in unanticipated and undesirable end states. This report examines an inherently safe and small sodium fast reactor experiencing a beyond design basis seismic event with the intent of exploring two issues: (1) can human intervention either improve or worsen the potential end states and (2) can a Bayesian Network be constructed to infer the state of the reactor to inform.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Implementation Strategy for a Distribution Management System

Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to common barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

[NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 3:] Technical communications in aeronautics: Results of an exploratory study. An analysis of profit managers' and nonprofit managers' responses

Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Five assumptions were established for the analysis. Profit and nonprofit managers in the aerospace community were found to have different technical communications practices for one of the five assumptions tested. It was, therefore, concluded that profit and nonprofit managers in the aerospace community do not have different technical communications practices.

Pinelli, Thomas E.↗

Managing systems faults on the commercial flight deck: Analysis of pilots' organization and prioritization of fault management information

In rare instances, flight crews of commercial aircraft must manage complex systems faults in addition to all their normal flight tasks. Pilot errors in fault management have been attributed, at least in part, to an incomplete or inaccurate awareness of the fault situation. The current study is part of a program aimed at assuring that the types of information potentially available from an intelligent fault management aiding concept developed at NASA Langley called 'Faultfinde' (see Abbott, Schutte, Palmer, and Ricks, 1987) are an asset rather than a liability: additional information should improve pilot performance and aircraft safety, but it should not confuse, distract, overload, mislead, or generally exacerbate already difficult circumstances.

Rogers, William H.↗

Earth-Mars Telecommunications and Information Management System (TIMS): Antenna Visibility Determination, Network Simulation, and Management Models

This report presents the results of our research on Earth-Mars Telecommunications and Information Management System (TIMS) network modeling and unattended network operations. The primary focus of our research is to investigate the feasibility of the TIMS architecture, which links the Earth-based Mars Operations Control Center, Science Data Processing Facility, Mars Network Management Center, and the Deep Space Network of antennae to the relay satellites and other communication network elements based in the Mars region. The investigation was enhanced by developing Build 3 of the TIMS network modeling and simulation model. The results of several 'what-if' scenarios are reported along with reports on upgraded antenna visibility determination software and unattended network management prototype.

Odubiyi, Jide↗

X-33/RLV System Health Management/ Vehicle Health Management

To reduce operations cost, the RLV must include the following elements: highly reliable, robust subsystems designed for simple repair access with a simplified servicing infrastructure and incorporating expedited decision making about faults and anomalies. A key component for the Single Stage to Orbit (SSTO) RLV System used to meet these objectives is System Health Management (SHM). SHM deals with the vehicle component- Vehicle Health Management (VHM), the ground processing associated with the fleet (GVHM) and the Ground Infrastructure Health Management (GIHM). The objective is to provide an automated collection and paperless health decision, maintenance and logistics system. Many critical technologies are necessary to make the SHM (and more specifically VHM) practical, reliable and cost effective. Sanders is leading the design, development and integration of the SHM system for RLV and X-33 SHM (a sub-scale, sub-orbit Advanced Technology Demonstrator). This paper will present the X-33 SHM design which forms the baseline for RLV SHM. This paper will also discuss other applications of these technologies.

Garbos, Raymond J.↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Performance Management: Should We Manage to a Single Data Point? A NASA/Goddard Space Flight Center Perspective

With today's changing environment, meeting project commitments can be challenging. The Flight Projects Directorate at NASA's Goddard Space Flight Center (GSFC) has a portfolio of over 60 missions in various stages of the space flight life cycle. Numerous methods and approaches are used to monitor and track project performance and utilization of tools can provide valuable information to help manage missions. However, challenges can arise when these approaches are viewed as the sole data point for assessing the project status. At GSFC, performance management metric-based tools have provided insightful information for evaluating the programmatic health of space projects. These tools have provided the awareness and foresight desired to effectively manage and meet commitments, which is tremendously beneficial on the road to achieving mission success.

Peters, Wanda↗

Air Traffic Management Technology Demonstration-1 (ATD-1) Avionics Phase 2 Flight Test Training for Interval Management

Prior to the successful flight test validation of a new avionics prototype, participants from Boeing, Honeywell, and United Airlines underwent group training at NASA Langley Research Center. New prototype software for an algorithm which enables greater efficiency in high-density airspace, called Interval Management, was to be incorporated into Electronic Flight Bags and placed in the cockpit for pilot usage. The goals of the training were to teach the flight test pilots how to operate the new software, establish techniques to simultaneously position three aircraft prior to each test scenario, and ensure a common communication protocol among team members when coordinating the position of aircraft for the next scenario. The multi-tiered interactive training regimen consisted of a process that continually built upon previous foundational material. The primary learning elements were 1) a portable computer-based trainer that was provided to the pilots prior to classroom training sessions, 2) classroom learning, 3) full mock-up simulator training, and 4) refresher training just prior to the flight test. Each part of the regimen was designed to repeat and build upon the previous element. The purpose of this Technical Memorandum is to inform the aviation industry how flight training for Interval Management was conducted at Langley Research Center in order to reduce overall development costs of future Interval Management training programs. Secondly, the paper provides insight regarding the decision-making process when attempting to conduct a flight test.

Roper, Roy D.↗

Managing Spacecraft Risk With Space Environments Testing Via Process Safety Management At The NASA Neil A. Armstrong Test Facility

The NASA Glenn Research Center’s Neil A. Armstrong Test Facility (GRC-ATF) is home to several unique, world class aerospace test facilities, including the In-Space Propulsion (ISP) Facility. The ISP Facility is NASA’s largest chamber designed to store and transfer large quantities of liquid hydrogen and liquid oxygen; and is designed to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of aerospace hardware, Cryogenic Fluid Management (CFM) systems and other In-Space propulsion programs. The U.S. Occupational Safety and Health Administration’s (OSHA) Process Safety Management (PSM) of Highly Hazardous Chemicals Standard (29 CFR 1910.119) is an analytical tool focused on preventing the release of chemicals and other energy sources. In a short timeframe, GRC-ATF was required to restore a PSM Program at the Facility. Although the summarized work is specific to the ground testing of rockets and space vehicles, the ISP Facility is used to verify system level requirements, some of these are safety requirements, and thus key to managing risks in space.

Safety↗