Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission applications”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Mariner 10 mission analysis - Application of a black art

A major accomplishment of the mission analysis performed for Mariner 10 was the selection of a trajectory which optimized science return from the mission. The analysis utilized simple, unweighted 'science value functions' which allowed the relative values of each candidate trajectory, for each of the seven science experiments, to be calculated. A total relative value for each trajectory was determined by a simple averaging process and sensitivities were revealed by multiplying individual values. This showed a clear scientific preference for launching in early November and was used to support deferral of the launch from early October to November 3, 1973.

Shirley, D. L.↗

Civil tiltrotor missions and applications

In 1983, an FAA-sponsored National Rotorcraft Program sought to identify improvements to the national interurban transportation networks and determined that conventional helicopters did not have the potential to satisfy requirements because of a lack of capacity, high operational costs, and high noise levels. Tiltrotors, it was felt offered a better potential to improve interurban air transport service. In 1985, the FAA proposed a joint civil tiltrotor study with NASA and DOD that would capitalize on development of the military V-22 tiltrotor and document the potential of the commercial tiltrotor transport market. The results of a study on the mission and application of a civil tiltrotor is presented. This study addresses national issues and includes a market summary. A technical summary provides information on six design configurations and potential risk areas are identified. The development of a National Plan for a tiltrotor transportation system is recommended including civil tiltrotor technology development, infrastructure planning and development, a flight technology demonstration plan, and near term actions.

Clay, Bill↗

SP-100 missions overview

This paper reviews both general and specific mission applications for an SP-100 nuclear power subsystem sized for the 10-kWe to 1000-kWe power range. Military applications are treated in a general manner. Four civil mission applications are treated in more detail. Market projection and mission performance data as a function of power are shown.

Wallace, Richard A.↗

Primary lithium battery technology and its application to NASA missions

A description is given of the components, overall cell reactions, and performance characteristics of promising new ambient temperature lithium primary systems based on the Li-V205, Li-SO2, and Li-SOC12 couples. Development status of these systems is described in regard to availability and uncertainties in the areas of safety and selected performance characteristics. Studies show that use of lithium batteries would enhance a variety of missions and applications by decreasing power sytems weight and thereby increasing payload weight. In addition, the lithium batteries could enhance cost effectiveness of the missions.

Frank, H. A.↗

Closed-drift thruster investigations

Recent data obtained from a second generation closed-drift thruster design, employing Hall current acceleration is outlined. This type device is emphasized for electric propulsion for geocentric mission applications. Because geocentric mission profiles are best achieved with a specific impulse range of 1000 to 2000 s, closed-drift thrusters are well suited for this application, permitting time payload compromises intermediate of those possible with either electrothermal or electrostatic devices. A discussion is presented of the potential advantages of using a 1000 to 2000 s device for one way orbit raising of nonpower payloads. Because closed-drift thruster operation is not space charge limited, and requires only one power circuit for steady state operation, their application is technically advantageous. Beam, plasma and thrust characteristics are detailed for a range of operating conditions.

Robinson, Raymond S.↗

Space Operations Center system analysis study extension. Volume 4, book 1: SOC system analysis report

The Space Operations Center (SOC) orbital space station missions are analyzed. Telecommunications missions, space science, Earth sensing, and space testing missions, research and applications missions, defense missions, and satellite servicing missions are modeled and mission needs discussed. The satellite servicing missions are analyzed in detail, including construction and servicing equipment requirements, mission needs and benefits, differential drag characteristics of co-orbiting satellites, and satellite servicing transportation requirements.

Source record↗

Advanced automation for space missions

A NASA/ASEE Summer Study conducted at the University of Santa Clara in 1980 examined the feasibility of using advanced artificial intelligence and automation technologies in future NASA space missions. Four candidate applications missions were considered: (1) An intelligent earth-sensing information system, (2) an autonomous space exploration system, (3) an automated space manufacturing facility, and (4) a self-replicating, growing lunar factory. The study assessed the various artificial intelligence and machine technologies which must be developed if such sophisticated missions are to become feasible by century's end.

Freitas, R. A., Jr.↗

Problems and concepts of space station guidance, navigation, and control

The Space Station System is defined as a network of space and ground assets which work together to support a variety of missions including commercial missions, science and applications missions, and technology development missions. The elements of the Space Station System include a Space Station Base, Space Platforms, Free Flyers, a Teleoperator Manuevering System (TMS), Orbital Transfer Vehicles (OTV), Orbiter Berthing Equipment, and Ground Support Equipment and Facilities. Guidance, navigation, and control (GNC) subsystem requirements are considered along with configuration trades.

Guha, A. K.↗

Lessons Learned During Implementation and Early Operations of the DS1 Beacon Monitor Experiment

A new approach to mission operations will be flight validated on NASA's New Millennium Program Deep Space One (DS1) mission which launched in October 1998. The Beacon Monitor Operations Technology is aimed at decreasing the total volume of downlinked engineering telemetry by reducing the frequency of downlink and the volume of data received per pass. Cost savings are achieved by reducing the amount of routine telemetry processing and analysis performed by ground staff. The technology is required for upcoming NASA missions to Pluto, Europa, and possibly some other missions. With beacon monitoring, the spacecraft will assess its own health and will transmit one of four beacon messages each representing a unique frequency tone to inform the ground how urgent it is to track the spacecraft for telemetry. If all conditions are nominal, the tone provides periodic assurance to ground personnel that the mission is proceeding as planned without having to receive and analyze downlinked telemetry. If there is a problem, the tone will indicate that tracking is required and the resulting telemetry will contain a concise summary of what has occurred since the last telemetry pass. The primary components of the technology are a tone monitoring technology, AI-based software for onboard engineering data summarization, and a ground response system. In addition, there is a ground visualization system for telemetry summaries. This paper includes a description of the Beacon monitor concept, the trade-offs with adapting that concept as a technology experiment, the current state of the resulting implementation on DS1, and our lessons learned during the initial checkout phase of the mission. Applicability to future missions is also included.

Sherwood, Rob↗

Guidelines for Verification Strategies to Minimize RISK Based on Mission Environment, -Application and -Lifetime (MEAL)

There is a trend of compromising verification testing to address the cost and schedule constraints, which poses a high-risk posture for programs/projects. Current and emerging aerospace scientific and/or human exploration programs continue to pose new technological challenges. These technological challenges combined with finite budgets and truncated schedules are forcing designers, scientists, engineers, and managers to push technologies to their physical limits. In addition, budget and schedule pressures challenge how those technologies/missions are verified. A clear understanding of the different verification processes is needed to ensure the proper verification of the technology within the mission (i.e., capabilities, advantages, and limitations). The goal of verification is to prove through test, analysis, inspection, and/or demonstration that a product provides its required function while meeting the performance requirements. It is important that verification yield understanding of representative performance under worst-case conditions so that margins to failure can be evaluated for proposed applications. The capabilities, advantages, and limitations of the testing and inspection performed at each level are different, and the risk incurred by omitting a verification step depends on the level of integration as well as Mission, Environment, Application and Lifetime (MEAL). This paper focuses on verification processes. The goal of the verification process is to ensure the given avionics technology could be safely implemented on the given MEAL consistent with the program/project risk posture.

Gonzalez, Oscar↗

Fast Track NTR Systems Assessment for NASA's First Lunar Outpost Scenario

Integrated systems and mission study results are presented which quantify the rationale and benefits for developing and using nuclear thermal rocket (NTR) technology for returning humans to the moon in the early 2000's. At present, the Exploration Program Office (ExPO) is considering chemical propulsion for its 'First Lunar Outpost' (FLO) mission, and NTR propulsion for the more demanding Mars missions to follow. The use of an NTR-based lunar transfer stage, capable of evolving to Mars mission applications, could result in an accelerated schedule, reduced cost approach to moon/Mars exploration. Lunar mission applications would also provide valuable operational experience and serve as a 'proving ground' for NTR engine and stage technologies. In terms of performance benefits, studies indicate that an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to trans-lunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 199 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.8 m length, and 68 t LH2 capacity. The NTR utilizes a 'graphite' fuel form consisting of coated UC2 particles in a graphite substrate, and has a specific impulse capability of approximately 870 s, and an engine thrust-to-weight ratio of approximately 4.8. The NTR stage and its piloted FLO lander has a total length of approximately 38 m and can be launched by a single Saturn V-derived heavy lift launch vehicle (HLLV) in the 200 to 250 t-class range. The paper summarizes NASA's First Lunar Outpost scenario, describes characteristics for representative engine/stage configurations, and examines the impact on engine selection and vehicle design resulting from a consideration of alternative NTR fuel forms and lunar mission profiles.

Borowski, Stanley K.↗

Status of Solar Sail Propulsion: Moving Toward an Interstellar Probe

NASA's In-Space Propulsion Technology Program has developed the first-generation of solar sail propulsion systems sufficient to accomplish inner solar system science and exploration missions. These first-generation solar sails, when operational, will range in size from 40 meters to well over 100 meters in diameter and have an areal density of less than 13 grams-per-square meter. A rigorous, multiyear technology development effort culminated last year in the testing of two different 20-meter solar sail systems under thermal vacuum conditions. This effort provided a number of significant insights into the optimal design and expected performance of solar sails as well as an understanding of the methods and costs of building and using them. In a separate effort, solar sail orbital analysis tools for mission design were developed and tested. Laboratory simulations of the effects of long-term space radiation exposure were also conducted on two candidate solar sail materials. Detailed radiation and charging environments were defined for mission trajectories outside the protection of the earth's magnetosphere, in the solar wind environment. These were used in other analytical tools to prove the adequacy of sail design features for accommodating the harsh space environment. Preceding, and in conjunction with these technology efforts, NASA sponsored several mission application studies for solar sails, including one that would use an evolved sail capability to support humanity's first mission into nearby interstellar space. The proposed mission is called the Interstellar Probe. The Interstellar Probe might be accomplished in several ways. A 200-meter sail, with an areal density approaching 1 gram-per-square meter, could accelerate a robotic probe to the very edge of the solar system in just under 20 years from launch. A sail using the technology just demonstrated could make the same mission, but take significantly longer. Conventional chemical propulsion systems would require even longer flight times. Spinner sails of the type being explored by the Japanese may also be a good option, but the level of maturity in that technology is not clear. While the technology to support a 200-meter, ultralightweight sail mission is not yet in hand, the recent NASA investments in solar sail technology are an essential first step toward making it a reality. This paper will describe the status of solar sail propulsion within NASA, near-term solar sail mission applications, and the plan to advance the technology to the point where the Interstellar Probe mission can be flown.

Johnson, Les↗

Highly Available Nuclear Power for Mission-Critical Applications

Some energy consumers require power on an anytime, all-year-round basis with a high level of certainty, including defense installations, isolated communities, and some industrial processes. For these customers, interruptions in electricity or heat can mean substantial financial loss or even loss of life. In the absence of grid-scale energy storage, a high level of power availability can be accomplished only through the robustness and redundancy of power generators. The NuScale small modular reactor design is well suited to provide highly available power because of several features related to both the nuclear steam supply system and the overall plant design. In analogy to Redundant Array of Independent Disks (RAID) systems used to provide highly reliable data storage, a NuScale plant can assure sustained power generation by virtue of its Redundant Array of Integral Reactors (RAIR).This paper describes the NuScale RAIR plant features and summarizes the results of a rigorous analysis of RAIR availability as a function of power or, conversely, the RAIR plant output power as a function of power availability. The analysis utilized the Matrix Laboratory code (MATLAB) and included probability distributions for the frequency and duration of module outages due to planned and unplanned events. Further, the study evaluated the impact of implementing turbine bypass rather than module shutdown and using one or more modules to supply house loads in the case of loss of off-site power (LOOP). Availability results are presented for a 12-module RAIR plant with and without turbine bypass enabled during a LOOP and for different possible connections to the off-site power distribution grid and dedicated service loads. Results indicate that a very high level of availability can be achieved at relatively high power output levels, regardless of turbine bypass and dedicated load connection, compared to the operating fleet.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Applications for Mission Operations Using Multi-agent Model-based Instructional Systems with Virtual Environments

This viewgraph presentation provides an overview of past and possible future applications for artifical intelligence (AI) in astronaut instruction and training. AI systems have been used in training simulation for the Hubble Space Telescope repair, the International Space Station, and operations simulation for the Mars Exploration Rovers. In the future, robots such as may work as partners with astronauts on missions such as planetary exploration and extravehicular activities.

Clancey, William J.↗

An Internet Protocol-Based Software System for Real-Time, Closed-Loop, Multi-Spacecraft Mission Simulation Applications

The paper will provide an overview of the web-based distributed simulation software system developed for end-to-end, multi-spacecraft mission design, analysis, and test at the NASA Goddard Space Flight Center (GSFC). This software system was developed for an internal research and development (IR&D) activity at GSFC called the Distributed Space Systems (DSS) Distributed Synthesis Environment (DSE). The long-term goal of the DSS-DSE is to integrate existing GSFC stand-alone test beds, models, and simulation systems to create a "hands on", end-to-end simulation environment for mission design, trade studies and simulations. The short-term goal of the DSE was therefore to develop the system architecture, and then to prototype the core software simulation capability based on a distributed computing approach, with demonstrations of some key capabilities by the end of Fiscal Year 2002 (FY02). To achieve the DSS-DSE IR&D objective, the team adopted a reference model and mission upon which FY02 capabilities were developed. The software was prototyped according to the reference model, and demonstrations were conducted for the reference mission to validate interfaces, concepts, etc. The reference model, illustrated in Fig. 1, included both space and ground elements, with functional capabilities such as spacecraft dynamics and control, science data collection, space-to-space and space-to-ground communications, mission operations, science operations, and data processing, archival and distribution addressed.

Davis, George↗