Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission phases”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

High Energy Astronomy Observatory, Mission C, Phase A. Volume 3: Appendices

Technical data, and experiment and spacecraft alternatives are presented in support of the HEAO-C, whose primary objective is a detailed study of the more interesting high energy sources, using grazing incidence X-ray telescopes and a spacecraft pointing accuracy of + or - 1 arc minute. The analyses presented cover the mission analysis and launch vehicle; thermal control trade studies and supporting analyses; attitude sensing and control analyses; electrical systems; and reliability analysis. The alternate experiments which were considered are listed, and the advantages and disadvantages of several alternate observatory configurations are assessed.

Source record↗

On-orbit servicing for USAF space missions: A phased development approach

On-orbit servicing has been studied for years by the U.S. Air Force Space Systems Division--which recently cosponsored the Space Assembly, Maintenance, and Servicing Study with NASA and SDIO; but an Air force servicing program has yet to emerge. The Air Force has a limited set of servicing requirements, and the practices of 'pipelining' (incremental improvements to a space vehicle series) and orbital sparing provide many similar benefits. It is postulated that an Air Force Program will be initiated in response to a new critical mission requirement that calls for a spacecraft with the operational character of a Servicer, which will evolve into a servicing program. Such a requirement may be emerging. The Air Force organizations charged with on-orbit test safety for the Department of Defense are concerned with the hazard from uncontrolled reentry of low Earth orbit test spacecraft, which are increasing in number. Analysis and observations of actual reentries show that debris reaches the Earth's surface. A phased development of a system to remove these spacecraft from orbit can evolve into a servicing program.

Shanney, Bill↗

Space Shuttle flight crew/computer interface simulation studies.

An approach to achieving an optimized set of crew/computer interface requirements on the Space Shuttle program is described. It consists of defining the mission phases and crew timelines, developing a functional description of the crew/computer interface displays and controls software, conducting real-time simulations using pilot evaluation of the interface displays and controls, and developing a set of crew/computer functional requirements specifications. The simulator is a two-man crew station which includes three CRTs with keyboards for simulating the crew/computer interface. The programs simulate the mission phases and the flight hardware, including the flight computer and CRT displays.

Callihan, J. C.↗

Natural environment considerations for Shuttle system development support

Natural environments were determined for each of the Shuttle mission phases as a guide to design and operational decisions. The phases were categorized as mission planning, prelaunch, launch/ascent, booster recovery, on-orbit, and descent and landing. The wind criteria included magnitude/height, gust factors, turbulence spectra, wind shear, and vector properties for all flight and ground phases. A maximum design risk of 1 percent was permitted for the windiest two weeks the Shuttle would have to stay on the pad at either KSC or Vandenberg. The ascent wind profile was determined with the Jimsphere Vector Wind profiles, which cover the wind speeds, shears, gusts, and turbulence up to 18 km altitude. The models used to define the environmental situations of the Shuttle comprised wind, thermodynamic, space, lightning, sea state, mission analysis, and ET ice data base formulations.

Vaughan, W. W.↗

Evacuated Airship for Mars Missions: NIAC Phase I, 2017

An evacuated or vacuum airship relies on the same principle of buoyancy used by standard balloons. However, unlike a balloon which uses a lighter than air gas to displace air and provide lift, the vacuum airship leverages a rigid structure to maintain a vacuum and displace air, thereby providing buoyancy. This method is similar to how a ship uses a rigid structure to displace water and fill the space with air; an evacuated airship uses the same mechanism, except air is displaced and the space remains vacant. Using this method, the evacuated airship is capable of utilizing the full potential of the displaced mass of air, which has interesting implications in the Martian atmosphere. Unlike other aerial vehicles, which are at a disadvantage in Martian atmospheric conditions, the evacuated airship benefits from the Martian atmosphere by virtue of the temperature and molecular composition. As a result, the evacuated airship offers an unprecedented payload capacity and, if implemented, may be used to transport current and future scientific instruments, other vehicles, rovers, and possibly even human habitations. A standard dirigible or balloon for Mars would have a severely limited span of operation and a very narrow field of study, nearly exclusively the atmosphere, but a vacuum airship can be used as a long term tool for many different missions: transportation, ground study, communications, atmospheric study, etcetera, thereby making it a far more economically sensible choice

Clarke, John-Paul↗

Tracking and data system support for the Mariner Mars 1971 mission. Prelaunch phase through first trajectory correction maneuver, volume 1

The DSN command system provided the capability to enter commands in a computer at the deep space stations for transmission to the spacecraft. The high-rate telemetry system operated at 16,200 bits/sec. This system will permit return to DSS 14 of full-resolution television pictures from the spacecraft tape recorder, plus the other science experiment data, during the two playback periods of each Goldstone pass planned for each corresponding orbit. Other features included 4800 bits/sec modem high-speed data lines from all deep space stations to Space Flight Operations Facility (SFOF) and the Goddard Space Flight Center, as well as 50,000 bits/sec wideband data lines from DSS 14 to the SFOF, thus providing the capability for data flow of two 16,200 bits/sec high-rate telemetry data streams in real time. The TDS performed prelaunch training and testing and provided support for the Mariner Mars 1971/Mission Operations System training and testing. The facilities of the ETR, DSS 71, and stations of the MSFN provided flight support coverage at launch and during the near-earth phase. The DSSs 12, 14, 41, and 51 of the DSN provided the deep space phase support from 30 May 1971 through 4 June 1971.

Laeser, R. P.↗

Apollo experience report: Abort planning

Definition of a practical return-to-earth abort capability was required for each phase of an Apollo mission. A description of the basic development of the complex Apollo abort plan is presented. The process by which the return-to-earth abort plan was developed and the constraining factors that must be included in any abort procedure are also discussed. Special emphasis is given to the description of crew warning and escape methods for each mission phase.

Hyle, C. T.↗

Grand Tour outer planet missions definition phase. Part 2: Minutes of meetings and official correspondence

A variety of imaging systems proposed for use aboard the Outer Planet Grand Tour Explorer are discussed and evaluated in terms of optimal resolution capability and efficient time utilization. It is pointed out that the planetary and satellite alignments at the time of encounter dictate a high degree of adaptability and versatility in order to provide sufficient image enhancement over earth-based techniques. Data compression methods are also evaluated according to the same criteria.

Belton, M. J. S.↗

Integrated payload and mission planning, phase 3. Volume 2: Logic/Methodology for preliminary grouping of spacelab and mixed cargo payloads

The logic and methodology for a preliminary grouping of Spacelab and mixed-cargo payloads is proposed in a form that can be readily coded into a computer program by NASA. The logic developed for this preliminary cargo grouping analysis is summarized. Principal input data include the NASA Payload Model, payload descriptive data, Orbiter and Spacelab capabilities, and NASA guidelines and constraints. The first step in the process is a launch interval selection in which the time interval for payload grouping is identified. Logic flow steps are then taken to group payloads and define flight configurations based on criteria that includes dedication, volume, area, orbital parameters, pointing, g-level, mass, center of gravity, energy, power, and crew time.

Rodgers, T. E.↗

Flight dynamics facility operational orbit determination support for the ocean topography experiment

The Ocean Topography Experiment (TOPEX/POSEIDON) mission is designed to determine the topography of the Earth's sea surface across a 3 yr period, beginning with launch in June 1992. The Goddard Space Flight Center Dynamics Facility has the capability to operationally receive and process Tracking and Data Relay Satellite System (TDRSS) tracking data. Because these data will be used to support orbit determination (OD) aspects of the TOPEX mission, the Dynamics Facility was designated to perform TOPEX operational OD. The scientific data require stringent OD accuracy in navigating the TOPEX spacecraft. The OD accuracy requirements fall into two categories: (1) on orbit free flight; and (2) maneuver. The maneuver OD accuracy requirements are of two types; premaneuver planning and postmaneuver evaluation. Analysis using the Orbit Determination Error Analysis System (ODEAS) covariance software has shown that, during the first postlaunch mission phase of the TOPEX mission, some postmaneuver evaluation OD accuracy requirements cannot be met. ODEAS results also show that the most difficult requirements to meet are those that determine the change in the components of velocity for postmaneuver evaluation.

Bolvin, D. T.↗

Human Mars Surface Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B. Chappell↗

Human Mars Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B Chappell↗