MSFC Skylab crew systems mission evaluation
For abstract, see N74-32315.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
For abstract, see N74-32315.
The reported study represents an extension of an investigation by Harrison et al. (1976). Based on the results of sampling studies, two 98 deg inclined orbits coupled with a 56 deg inclination orbit appear to satisfy the science requirements on both regional and zonal scales. The NOAA sun-synchronous satellites in the TIROS-N series could adequately cover the high latitudes and a satellite having an inclination of 56 deg could provide sampling in the mid and low latitude areas where variations in radiation energetics are most dynamic. Attention is given to studies of time and space coverage, zonal evaluations, a regional analysis, and statistics describing the regional variations of cloud cover. A table is presented with data concerning the uncertainty of monthly mean reflected irradiance due to cloud variability for selected northern hemisphere regions.
Potential mission opportunities outlined and illustrated are missile defense; space defense; command, control, and communications; defense suppression; force support; space transportation; and orbital support.
The second flight of Challenger was another exceptional flight in that 11 major objectives were accomplished. The TELESAT-F and PALAPA-B1 were deployed exactly on time. The SPAS-01 attached and detached operations went extremely well despite some heating problems with the SPAS. The OSTA-2 experiments for the Material Experiments Assembly and Material Wissenschaftliche Autone Unter Schwerelosigkeit were activated as planned with no indications of anomalies, and the MLR and CFES experiment packages in the middeck area were operated by the crew as planned. Ninety-six percent (56 of 58) of the assigned flight test objectives were completed. The turnaround time was accomplished in the least time to date (only 99.5 hours) and the return to KSC was completed with a total of only 5 days loss of program time.
As a result of the new Space Policy, the NASA technology program has been called upon to a provide a solid base of national capabilities and talent to serve NASA's civil space program, commercial, and other space sector interests. This paper describes the new technology program structure and its characteristics, traces its origin and evolution, and projects the likely near- and far-term strategic steps. It addresses the alternative 'push-pull' approaches to technology development, the readiness levels to which the technology needs to be developed for effective technology transfer, and the focused technology programs currently being implemented to satisfy the needs of future space systems.
and Accreditation (VV&A) session audience, a snapshot review of the Exploration Space Mission Directorate s (ESMD) investigation into implementation of a modeling and simulation (M&S) VV&A program. The presentation provides some legacy ESMD reference material, including information on the then-current organizational structure, and M&S (Simulation Based Acquisition (SBA)) focus contained therein, to provide a context for the proposed M&S VV&A approach. This reference material briefly highlights the SBA goals and objectives, and outlines FY05 M&S development and implementation consistent with the Subjective Assessment, Constructive Assessment, Operator-in-the-Loop Assessment, Hardware-in-the-Loop Assessment, and In Service Operations Assessment M&S construct, the NASA Exploration Information Ontology Model (NExIOM) data model, and integration with the Windchill-based Integrated Collaborative Environment (ICE). The presentation then addresses the ESMD team s initial conclusions regarding an M&S VV&A program, summarizes the general VV&A implementation approach anticipated, and outlines some of the recognized VV&A program challenges, all within a broader context of the overarching Integrated Modeling and Simulation (IM&S) environment at both the ESMD and Agency (NASA) levels. The presentation concludes with a status on the current M&S organization s progress to date relative to the recommended IM&S implementation activity. The overall presentation was focused to provide, for the Verification, Validation,
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Guidance, Navigation, and Control (GN&C) Technical Discipline Team (TDT) sponsored Dr. J. Russell Carpenter, a Navigation and Rendezvous Subject Matter Expert (SME) from NASA's Goddard Space Flight Center (GSFC), to provide support to the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) rendezvous and docking flight test that was conducted in 2007. When that DARPA OE mission was completed, Mr. Neil Dennehy, NASA Technical Fellow for GN&C, requested Dr. Carpenter document his findings (lessons learned) and recommendations for future rendezvous missions resulting from his OE support experience. This report captures lessons specifically from anomalies that occurred during one of OE's unmated operations.
No abstract available
No abstract available
No abstract available
This paper briefly describes the nanometer-class metrology system used in this testbed to estimate the length and orientation of the science baseline vector, which cannot be measured directly. The focus is on the mathematical inversion problem that results and its solution.