Saturn orbit insertion mission plan for Cassini

The Cassini mission will be launched in April 1996 and will arrive at Saturn in December 2002. Upon arrival, a large maneuver near Saturn periapsis called Saturn Orbit Insertion (SOI) will reduce the energy of the spacecraft and result in capture into Saturn orbit. SOI is one of the most critical events of the entire mission. Therefore it is prudent to determine what resources must be dedicated to assure successful execution of SOI and what operational resources can be provided to satisfy SOI science objective. To prolong undisturbed science observations near the periapsis, a delayed SOI burn strategy has been developed. To examine potential resource conflicts between science and engineering activities, key considerations such as power and data storage capability have been evaluated. Other constraints such as turning the spacecraft to burn attitude and slewing platforms for science have also been examined. Although there are many constraints and the spacecraft resources are limited, a reasonable amount of science can still be carried out prior to and during the SOI burn.

Chang, Ya-Pei Holden↗

Dawn Maneuver Design Performance at Vesta

The Dawn spacecraft orbited the asteroid Vesta from July 16, 2011 to September 5, 2012, successfully accomplishing the four planned science orbits and two planned rotational characterization orbits. The lowest-altitude science orbit lasted four months, with 20 planned orbit maintenance maneuvers. Navigation results from Vesta demonstrate that the navigation plan was sufficient to achieve orbit delivery accuracy requirements. This paper compares the flown Dawn trajectory against the planned trajectory and expected maneuver dispersions. Understanding the effectiveness of the Vesta maneuver design plan is a key component of planning for operations at Ceres, the next destination for the Dawn mission.

Ion Propulsion↗

Interactive orbital proximity operations planning system instruction and training guide

This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

Grunwald, Arthur J.↗

Approach to rapid mission design and planning

Methods and techniques are described for implementation in automated computer systems to assess parametric data, capabilities, requirements and constraints for planning earth orbit missions. Mission planning and design procedures are defined using two types of typical missions as examples. These missions were the high energy Astronomical Observatory Satellite missions, and Small Applications Technology Satellite missions.

Green, W. G.↗

Space shuttle orbiter fracture control plan

The criteria are presented for preventing space shuttle structural failure associated with crack initiation or propagation during fabrication, test, handling, and the operational life of the vehicle. The criteria discussed include: engineering responsibilities, assurance management, production, operation and test, procurement, critical parts selection, design, and structural analysis.

Space Division↗

Determining highly elliptical earth orbits with VLBI and Delta-VLBI

This paper shows the feasibility of using Very Long Baseline Interferometric (VLBI) data acquired by the Deep Space Network to navigate highly elliptical earth orbiting satellites. The planned mission orbit of the Ion Release Module of the Active Magnetospheric Particle Tracer Explorers is used as a reference for developing strategies and provides the first opportunity for a possible flight demonstration with a spacecraft in a highly elliptical orbit. The navigation accuracy improvements achievable with VLBI and Delta-VLBI data types are determined for comparison with the capabilities of a reference Doppler strategy. The results show that strategies using wideband Delta-VLBI measurements taken near periapse perform best, determining apoapse position to an order of magnitude better than conventional Doppler, while also substantially reducing the required antenna support.

Frauenholz, R. B.↗

Space Telescope maintenance and refurbishment

The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

Trucks, H. F.↗

Space Shuttle Orbiter Fracture Control Plan

The criteria are presented for preventing space shuttle structural failure associated with crack initiation or propagation during fabrication, test, handling, and the operational life of the vehicle. The criteria discussed include: engineering responsibilities, assurance management, production, operation and test, procurement, critical parts selection, design, and structural analysis.

Fracture control↗

Space Station polar orbiting platform - Mission analysis and planning

The Space Station Polar Orbiting Platform will be a serviceable spacecraft supporting a range of missions. The planning and analysis of these missions is investigated. The subjects of STS compatibility, rendezvous strategy, and requisite launch windows are addressed. General, as well as, two specific cases are detailed with respect to their incremental velocity requirements.

Miller, P. A.↗

Activity Planning for a Lunar Orbital Mission

This paper describes a challenging, real-world planning problem within the context of a NASA mission called LADEE (Lunar Atmospheric Dust Environment Explorer). LADEEs science phase was performed in an equatorial, retrograde orbit around the Moon. The science observations were constrained with respect to key points in the spacecrafts orbit. We present the approach taken to reduce the complexity of the activity planning task in order to effectively perform it within the time pressures imposed by the mission requirements. One key aspect of this approach is the design of the activity planning process based on principles of problem decomposition and planning abstraction levels. The second key aspect is the mixed-initiative system developed for this task, called LASS (LADEE Activity Scheduling System). The primary challenge for LASS was representing and managing the orbit-based science constraints, given their dynamic nature due to the continually updated orbit determination solution.

Bresina, John L.↗