Nuts and Bolts - Techniques for Genesis Sample Curation

The Genesis curation staff at NASA Johnson Space Center provides samples and data for analysis to the scientific community, following allocation approval by the Genesis Oversight Committee, a sub-committee of CAPTEM (Curation Analysis Planning Team for Extraterrestrial Materials). We are often asked by investigators within the scientific community how we choose samples to best fit the requirements of the request. Here we will demonstrate our techniques for characterizing samples and satisfying allocation requests. Even with a systematic approach, every allocation is unique. We are also providing updated status of the cataloging and characterization of solar wind collectors as of January 2011. The collection consists of 3721 inventoried samples consisting of a single fragment, or multiple fragments containerized or pressed between post-it notes, jars or vials of various sizes.

Burkett, Patti J.↗

Evolving the Technical Infrastructure of the Planetary Data System for the 21st Century

The Planetary Data System (PDS) was established in 1989 as a distributed system to assure scientific oversight. Initially the PDS followed guidelines recommended by the National Academies Committee on Data Management and Computation (CODMAC, 1982) and placed emphasis on archiving validated datasets. But overtime user demands, supported by increased computing capabilities and communication methods, have placed increasing demands on the PDS. The PDS must add additional services to better enable scientific analysis within distributed environments and to ensure that those services integrate with existing systems and data. To face these challenges the Planetary Data System (PDS) must modernize its architecture and technical implementation. The PDS 2010 project addresses these challenges. As part of this project, the PDS has three fundamental project goals that include: (1) Providing more efficient client delivery of data by data providers to the PDS (2) Enabling a stable, long-term usable planetary science data archive (3) Enabling services for the data consumer to find, access and use the data they require in contemporary data formats. In order to achieve these goals, the PDS 2010 project is upgrading both the technical infrastructure and the data standards to support increased efficiency in data delivery as well as usability of the PDS. Efforts are underway to interface with missions as early as possible and to streamline the preparation and delivery of data to the PDS. Likewise, the PDS is working to define and plan for data services that will help researchers to perform analysis in cost-constrained environments. This presentation will cover the PDS 2010 project including the goals, data standards and technical implementation plans that are underway within the Planetary Data System. It will discuss the plans for moving from the current system, version PDS 3, to version PDS 4.

Beebe, Reta F.↗

Workmanship Standards Personnel Training and Certification Explained

This slide presentation reviews the standards that NASA requires for workmanship and discusses the rationale and the NASA-STD-8739.x standard series. The training and certification of inspectors and operators is to guarantee that workmanship is qualified for NASA applications. The NASA workmanship standard documents review the standards for: Polymeric Applications, Surface Mount Technology, Soldered Electrical Connections, Crimp, Cable and Harnesses, Fiber Optic Terminations, including ANSI and IPC standards for Electrostatic Discharge Safety, Space Applications Electronic Hardware and Requirements for Soldered Electrical and Electronic Assemblies. It also reviews the certification requirements for appropriate personnel. It also reviews the various levels of trainers for the various requirements. There is also a review of calibration requirements for training equipment. Some variations on the curriculum are allowed. NASA requires operators and inspectors to be certified by their employer to ensure that oversight is being performed.

Plante, Jeannette F.↗

Field Evaluations Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) Avoid duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. To achieve a substrate condition suitable for the application of a coating system, both new and old (in-situ) substrates must undergo some type of surface preparation and/or depainting operation to ensure adhesion of the new coating system. The level of cleanliness or anchor profile desired is typically a function of the type of coating to be applied and the specification being adhered to. In high performance environments, cleanliness and surface profile requirements for carbon steel (the dominant substrate for facilities, structures and equipment) dictates the use of abrasive media. Many of the abrasive media currently used across NASA and Air Force Space Command (AFSPC) installations generate large quantities of fugitive particulate emissions and waste. The high quantities of airborne dust and waste generated from these operations pose significant environmental concern. Efforts to contain emissions and the reduce quantity of waste generated have significant implications on project cost; this is often a deterrent to engaging in maintenance activities. In response to recent technological developments and NASA's and AFSPC's need to undertake environmentally conscious corrosion prevention projects, a review of the industry needs to be undertaken to evaluate surface preparation technologies (materials and processes) for embrace. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and AFSPC installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Field Evaluations Test Plan defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP. The field evaluations will be performed at Stennis Space Center, Mississippi, under the oversight of the Project Engineer. Additional field evaluations may be performed at other NASA centers or AFSPC facilities.

Lewis, Pattie↗

Ares I-X Range Safety Analyses Overview

Ares I-X was the first test flight of NASA's Constellation Program's Ares I Crew Launch Vehicle designed to provide manned access to low Earth orbit. As a one-time test flight, the Air Force's 45th Space Wing required a series of Range Safety analysis data products to be developed for the specified launch date and mission trajectory prior to granting flight approval on the Eastern Range. The range safety data package is required to ensure that the public, launch area, and launch complex personnel and resources are provided with an acceptable level of safety and that all aspects of prelaunch and launch operations adhere to applicable public laws. The analysis data products, defined in the Air Force Space Command Manual 91-710, Volume 2, consisted of a nominal trajectory, three sigma trajectory envelopes, stage impact footprints, acoustic intensity contours, trajectory turn angles resulting from potential vehicle malfunctions (including flight software failures), characterization of potential debris, and debris impact footprints. These data products were developed under the auspices of the Constellation's Program Launch Constellation Range Safety Panel and its Range Safety Trajectory Working Group with the intent of beginning the framework for the operational vehicle data products and providing programmatic review and oversight. A multi-center NASA team in conjunction with the 45th Space Wing, collaborated within the Trajectory Working Group forum to define the data product development processes, performed the analyses necessary to generate the data products, and performed independent verification and validation of the data products. This paper outlines the Range Safety data requirements and provides an overview of the processes established to develop both the data products and the individual analyses used to develop the data products, and it summarizes the results of the analyses required for the Ares I-X launch.

Starr, Brett R.↗

Ares I-X Range Safety Flight Envelope Analysis

Ares I-X was the first test flight of NASA's Constellation Program's Ares I Crew Launch Vehicle designed to provide manned access to low Earth orbit. As a one-time test flight, the Air Force's 45th Space Wing required a series of Range Safety analysis data products to be developed for the specified launch date and mission trajectory prior to granting flight approval on the Eastern Range. The range safety data package is required to ensure that the public, launch area, and launch complex personnel and resources are provided with an acceptable level of safety and that all aspects of prelaunch and launch operations adhere to applicable public laws. The analysis data products, defined in the Air Force Space Command Manual 91-710, Volume 2, consisted of a nominal trajectory, three sigma trajectory envelopes, stage impact footprints, acoustic intensity contours, trajectory turn angles resulting from potential vehicle malfunctions (including flight software failures), characterization of potential debris, and debris impact footprints. These data products were developed under the auspices of the Constellation's Program Launch Constellation Range Safety Panel and its Range Safety Trajectory Working Group with the intent of beginning the framework for the operational vehicle data products and providing programmatic review and oversight. A multi-center NASA team in conjunction with the 45th Space Wing, collaborated within the Trajectory Working Group forum to define the data product development processes, performed the analyses necessary to generate the data products, and performed independent verification and validation of the data products. This paper outlines the Range Safety data requirements and provides an overview of the processes established to develop both the data products and the individual analyses used to develop the data products, and it summarizes the results of the analyses required for the Ares I-X launch.

Starr, Brett R.↗

Space Studies Board Annual Report, 2003

The Space Studies Board is a unit of the NRC's Division on Engineering and Physical Sciences (DEPS), and it reports to the Division for oversight. DEPS is one of six major program units of the NRC through which the institution conducts its operations on behalf of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine. Within DEPS there are a total of 14 boards that cover a broad range of physical science and engineering disciplines and mission areas. Members of the DEPS Committee on Engineering and Physical Sciences provide advice on Board membership and advise on proposed new projects to be undertaken by the Board or its committees. Every 3 years the DEPS Committee also reviews the overall operations of each of its boards. The last review of the SSB was in 2001. The Board meets three times per year to review the activities of its committees and task groups and to be briefed on and discuss major space policy issues. An internal executive committee composed of seven at-large members of the Board meets at least once a year and may convene via conference call at other times to plan for SSB activities and to advise the chair between meetings. All projects proposed to be conducted by standing committees or ad hoctask groups must first be reviewed and approved by the Board or its executive committee, and the Board monitors the progress of the projects throughout the course of the studies.

National Aeronautics and Space Administration(NASA↗

The Second International Celestial Reference Frame (ICRF2)

The ICRF2 catalog was constructed by the IERS/IVS Working Group with oversight by the IAU Working Group. Derived using data from August 1979 through March 2009, it is a great improvement over the original ICRF with 3414 extragalactic radio source positions, a noise floor of 40 microarcsec, and axis stability of 10 microarcsec. Significant refinements were made in the selection of defining sources, modeling, and the integration of CRF, TRF, and EOP. The adoption of the ICRF2 was approved by the IAU in Resolution B3 at the XXVII IAU General Assembly and became effective 1 January 2010.

Ma, Chopo↗

Development of Human System Integration at NASA

Human Systems Integration seeks to design systems around the capabilities and limitations of the humans which use and interact with the system, ensuring greater efficiency of use, reduced error rates, and less rework in the design, manufacturing and operational deployment of hardware and software. One of the primary goals of HSI is to get the human factors practitioner involved early in the design process. In doing so, the aim is to reduce future budget costs and resources in redesign and training. By the preliminary design phase of a project nearly 80% of the total cost of the project is locked in. Potential design changes recommended by evaluations past this point will have little effect due to lack of funding or a huge cost in terms of resources to make changes. Three key concepts define an effective HSI program. First, systems are comprised of hardware, software, and the human, all of which operate within an environment. Too often, engineers and developers fail to consider the human capacity or requirements as part of the system. This leads to poor task allocation within the system. To promote ideal task allocation, it is critical that the human element be considered early in system development. Poor design, or designs that do not adequately consider the human component, could negatively affect physical or mental performance, as well as, social behavior. Second, successful HSI depends upon integration and collaboration of all the domains that represent acquisition efforts. Too often, these domains exist as independent disciplines due to the location of expertise within the service structure. Proper implementation of HSI through participation would help to integrate these domains and disciplines to leverage and apply their interdependencies to attain an optimal design. Via this process domain interests can be integrated to perform effective HSI through trade-offs and collaboration. This provides a common basis upon which to make knowledgeable decisions. Finally, HSI must be considered early in the requirements development phase of system design and acquisition. This will provide the best opportunity to maximize return on investment (ROI) and system performance. HSI requirements must be developed in conjunction with capability ]based requirements generation through functional. HSI requirements will drive HSI metrics and embed HSI issues within the system design. After a system is designed, implementation of HSI oversights can be very expensive. An HSI program should be included as an integral part of a total system approach to vehicle and habitat development. This would include, but not limited to, workstation design, D&C development, volumetric analysis, training, operations, and human -robotic interaction. HSI is a necessary process for Human Space Flight programs to meet the Agency Human ]System standards and thus mitigate human risks to acceptable levels. NASA has been involved in HSI planning, procedures development, process, and implementation for many years, and has been building several internal and publicly accessible products to facilitate HSI fs inclusion in the NASA Systems Engineering Lifecycle. Some of these products include: NASA STD 3001 Volumes 1 and 2, Human Integration Design Handbook, NASA HSI Implementation Plan, NASA HSI Implementation Plan Templates, NASA HSI Implementation Handbook, and a 2 ]hour short course on HSI delivered as part of the NASA Space and Life Sciences Directorate Academy. These products have been created leveraging industry best practices and lessons learned from other Federal Government agencies.

Whitmore, Mihriban↗

20 K Helium Refrigeration System for NASA-JSC Chamber-A

A new 20 K helium refrigerator installed at NASA Johnson Space Center's Space Environment Simulation Laboratory (SESL) was successfully commissioned and tested in 2012. The refrigerator is used to create a deep space environment within SESL s Chamber A to perform ground testing of the James Webb Space Telescope. The chamber previously and currently still has helium cryopumping panels (CPP) and LN2 shrouds used to create Low Earth Orbit environments. Now with the new refrigerator and new helium shrouds (45 x 65 ) the chamber can create a deep space environment. The process design, system analysis, specification development, and commissioning oversight were performed by the cryogenics department at Jefferson Labs, while the contracts and system installation was performed by the ESC group at JSC. Commissioning data indicate a inverse coefficient of performance better than 70 W/W for a 18 KW load at 20 K (accounting for liquid nitrogen precooling power) that remains essentially constant down to 1/3 of this load. Even at 10 percent of the maximum capacity, the performance is better than 140 W/W at 20K. The refrigerator exceeded all design goals and demonstrated the ability to support a wide load range from 10kW at 15 K to 100 kW at 100K. The refrigerator is capable of operating at any load temperature from 15K to ambient with tight temperature stability. The new shroud (36 tons of aluminum) can be cooled from room temperature to 20 K in 24 hours. This paper will outline the process design and commissioning results.

Homan, J.↗

A Lunar L2-Farside Exploration and Science Mission Concept with the ORion Multi-Purpose Crew Vehicle and a Teleoperated Lander/Rover

A novel concept is presented in this paper for a human mission to the lunar L2 (Lagrange) point that would be a proving ground for future exploration missions to deep space while also overseeing scientifically important investigations. In an L2 halo orbit above the lunar farside, the astronauts would travel 15% farther from Earth than did the Apollo astronauts and spend almost three times longer in deep space. Such missions would validate the Orion MPCV's life support systems, would demonstrate the high-speed re-entry capability needed for return from deep space, and would measure astronauts' radiation dose from cosmic rays and solar flares to verify that Orion would provide sufficient protection, as it is designed to do. On this proposed mission, the astronauts would teleoperate landers and rovers on the unexplored lunar farside, which would obtain samples from the geologically interesting farside and deploy a low radio frequency telescope. Sampling the South Pole-Aitkin basin (one of the oldest impact basins in the solar system) is a key science objective of the 2011 Planetary Science Decadal Survey. Observations of the Universe's first stars/galaxies at low radio frequencies are a priority of the 2010 Astronomy & Astrophysics Decadal Survey. Such telerobotic oversight would also demonstrate capability for human and robotic cooperation on future, more complex deep space missions.

Orion Multi-Purpose Crew Vehicle (MPCV)↗

Mission Assurance Modeling and Simulation: A Cyber Security Roadmap

This paper proposes a cyber security modeling and simulation roadmap to enhance mission assurance governance and establish risk reduction processes within constrained budgets. The term mission assurance stems from risk management work by Carnegie Mellon's Software Engineering Institute in the late 19905. By 2010, the Defense Information Systems Agency revised its cyber strategy and established the Program Executive Officer-Mission Assurance. This highlights a shift from simply protecting data to balancing risk and begins a necessary dialogue to establish a cyber security roadmap. The Military Operations Research Society has recommended a cyber community of practice, recognizing there are too few professionals having both cyber and analytic experience. The authors characterize the limited body of knowledge in this symbiotic relationship. This paper identifies operational and research requirements for mission assurance M&S supporting defense and homeland security. M&S techniques are needed for enterprise oversight of cyber investments, test and evaluation, policy, training, and analysis.

Gendron, Gerald↗

Using NASA's Reference Architecture: Comparing Polar and Geostationary Data Processing Systems

The JPSS and GOES-R programs are housed at NASA GSFC and jointly implemented by NASA and NOAA to NOAA requirements. NASA's role in the JPSS Ground System is to develop and deploy the system according to NOAA requirements. NASA's role in the GOES-R ground segment is to provide Systems Engineering expertise and oversight for NOAA's development and deployment of the system. NASA's Earth Science Data Systems Reference Architecture is a document developed by NASA's Earth Science Data Systems Standards Process Group that describes a NASA Earth Observing Mission Ground system as a generic abstraction. The authors work within the respective ground segment projects and are also separately contributors to the Reference Architecture document. Opinions expressed are the author's only and are not NOAA, NASA or the Ground Projects' official positions.

Ullman, Richard↗

A Study to Estimate the Effectiveness of Visual Testing Training for Aviation Maintenance Management

The Air Commerce Act of 1926 set the beginning for standards in aviation maintenance. Even after deregulation in the late l970s, maintenance standards and requirements still have not changed far from their initial criteria. After a potential candidate completes Federal Aviation Administration training prerequisites, they may test for their Airframe and Powerplant (A&P) certificate. Performing maintenance in the aviation industry for a minimum of three years, the technician may then test for their Inspection Authorization (IA). After receiving their Airframe and Powerplant certificate, a technician is said to have a license to perform. At no time within the three years to eligibility for Inspection Authorization are they required to attend higher-level inspection training. What a technician learns in the aviation maintenance industry is handed down from a seasoned technician to the new hire or is developed from lessons learned on the job. Only in Europe has the Joint Aviation Authorities (JAA) required higher-level training for their aviation maintenance technicians in order to control maintenance related accidents (Lu, 2005). Throughout the 1990s both the General Accounting Office (GAO) and the National Transportation Safety Board (NTSB) made public that the FAA is historically understaffed (GAO, 1996). In a safety recommendation the NTSB stated "The Safety Board continues to lack confidence in the FAA's commitment to provide effective quality assurance and safety oversight of the ATC system (NTSB, 1990)." The Federal Aviation Administration (FAA) has been known to be proactive in creating safer skies. With such reports you would suspect the FAA to also be proactive in developing more stringent inspection training for aviation maintenance technicians. The purpose of this study is to estimate the effectiveness of higher-level inspection training, such as Visual Testing (VT) for aviation maintenance technicians, to improve the safety of aircraft and to make recommendations to management with regard to the value of such training.

Law, Lewis Lyle↗

Commissioning of the Liquid Nitrogen Thermo-Siphon System for NASA-JSC Chamber-A

NASA's Space Environment Simulation Laboratory's (SESL) Chamber A, located at the Johnson Space Center in Houston Texas has recently implemented major enhancements of its cryogenic and vacuum systems. The new liquid nitrogen (LN2) thermo-siphon system was successfully commissioned in August of 2012. Chamber A, which has 20 K helium cryo-panels (or shrouds ) which are shielded by 80 K nitrogen shrouds, is capable of simulating a deep space environment necessary to perform ground testing of NASA s James Webb Space Telescope (JWST). Chamber A s previous system used forced flow LN2 cooling with centrifugal pumps, requiring 200,000 liters of LN2 to cool-down and consuming 180,000 liters per day of LN2 in steady operation. The LN2 system did not have the reliability required to meet the long duration test of the JWST, and the cost estimate provided in the initial approach to NASA-JSC by the sub-contractor for refurbishment of the system to meet the reliability goals was prohibitive. At NASA-JSC's request, the JLab Cryogenics Group provided alternative options in 2007, including a thermo-siphon, or natural flow system. This system, eliminated the need for pumps and used one tenth of the original control valves, relief valves, and burst disks. After the thermo-siphon approach was selected, JLab provided technical assistance in the process design, mechanical design, component specification development and commissioning oversight, while the installation and commissioning operations of the system was overseen by the Jacobs Technology/ESC group at JSC. The preliminary commissioning data indicate lower shroud temperatures, 70,000 liters to cool-down and less than 90,000 liters per day consumed in steady operation. All of the performance capabilities have exceeded the design goals. This paper will outline the comparison between the original system and the predicted results of the selected design option, and the commissioning results of thermo-siphon system.

Homan, J.↗

Lessons Learned Entry: Hypergolic Propellant Related Spills and Fires

The attached report is a compilation of all credible, unintentional hypergolic fluid related spills, fires, and explosions from the Apollo Program, the Space Shuttle Program, Titan Program, and a few other programs. Spill sites include the following government facilities: KSC, JSC, WSTF, VAFB, CCAFS, EAFB, Little Rock AFB, and McConnell AFB. The root causes and consequences of the incidents contained in this document vary drastically; however, certain "themes" can be deduced and utilized for future hypergolic propellant handling. Some of those common "themes" are summarized below: (1) Improper configuration control and complacency can lead to being falsely comfortable with a system (2) Communication breakdown can escalate an incident to a level where injuries occur and/or hardware is damaged (3) Improper propulsion system and ground support system designs can destine a system for failure (4) Improper training of technicians, engineers, and safety personnel can put lives in danger (5) Improper PPE, spill protection, and staging of fire extinguishing equipment can result in unnecessary injuries or hardware damage if an incident occurs (6) Improper procedural oversight, development, and adherence to the procedure can be detrimental and quickly lead to an undesirable incident (7) Improper local cleanliness or compatibility can result in fires or explosions The items listed above are only a short list of the issues that should be recognized prior to handling of hypergolic fluids or processing of vehicles containing hypergolic propellants. The summary of incidents in this report is intended to cover many more issues than those listed above that have been found during nearly the entire spectrum. of hypergolic propellant and/or vehicle processing.

Nufer, Brian↗

Commissioning of a 20 K Helium Refrigeration System for NASA-JSC Chamber A

A new 20 K helium refrigerator installed at NASA Johnson Space Center s Space Environment Simulation Laboratory (SESL) was successfully commissioned and tested in 2012. The refrigerator is used to create a deep space environment within SESL s Chamber A to perform ground testing of the James Webb Space Telescope (JWST). The chamber previously and currently still has helium cryo-pumping panels (CPP) and liquid nitrogen shrouds used to create low earth orbit environments. Now with the new refrigerator and new helium shrouds the chamber can create a deep space environment. The process design, system analysis, specification development, and commissioning oversight were performed by the cryogenics department at Jefferson Lab, while the contracts and system installation was performed by the ESC group at JSC. Commissioning data indicate an inverse coefficient of performance better than 70 W/W for a 18 kW load at 20 K (accounting for liquid nitrogen pre-cooling power) that remains essentially constant down to one third of this load. Even at 10 percent of the maximum capacity, the performance is better than 150 W/W at 20 K. The refrigerator exceeded all design goals and demonstrated the ability to support a wide load range from 10 kW at 15 K to 100 kW at 100 K. The refrigerator is capable of operating at any load temperature from 15 K to ambient with tight temperature stability. The new shroud (36 tons of aluminum) can be cooled from room temperature to 20 K in 24 hours. This paper will outline the process design and commissioning results.

Homan, J.↗

Commissioning of the Liquid Nitrogen Thermo-Siphon System for NASA-JSC Chamber A

NASA s Space Environment Simulation Laboratory s (SESL) Chamber A, located at the Johnson Space Center in Houston Texas has recently implemented major enhancements of its cryogenic and vacuum systems. The new liquid nitrogen (LN) thermo-siphon system was successfully commissioned in August of 2012. Chamber A, which has 20 K helium cryo-panels (or shrouds ) which are shielded by 80 K nitrogen shrouds, is capable of simulating a deep space environment necessary to perform ground testing of NASA s James Webb Space Telescope (JWST). Chamber A s previous system used forced flow LN cooling with centrifugal pumps, requiring 220,000 liters of LN to cool-down and consuming 180,000 liters per day of LN in steady operation. The LN system did not have the reliability required to meet the long duration test of the JWST, and the cost estimate provided in the initial approach to NASA-JSC by the subcontractor for refurbishment of the system to meet the reliability goals was prohibitive. At NASA-JSC s request, the JLab Cryogenics Group provided alternative options in 2007, including a thermo-siphon, or natural flow system. This system, eliminated the need for pumps and used one tenth of the original control valves, relief valves, and burst disks. After the thermo-siphon approach was selected, JLab provided technical assistance in the process design, mechanical design, component specification development and commissioning oversight, while the installation and commissioning operations of the system was overseen by the Jacobs Technology/ESC group at JSC. The preliminary commissioning data indicate lower shroud temperatures, 68,000 liters to cool-down and less than 91,000 liters per day consumed in steady operation. All of the performance capabilities have exceeded the design goals. This paper will outline the comparison between the original system and the predicted results of the selected design option, and the commissioning results of thermo-siphon system.

Homan, J.↗