Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot system design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

3D Play Fairway Analysis for Examining of Superhot Drilling Production Scenarios: Preprint

The DEEPEN (DE-risking Exploration for geothermal Plays in magmatic ENvironments) project was a multi-laboratory, international effort to reduce uncertainty and improve resource characterization in superhot geothermal systems. Building on this foundation, this work advances open-source tools designed to lower the exploration risk and cost of superhot geothermal projects while promoting transparency, reproducibility, and efficiency in exploration workflows. These tools are being tested at two key sites: (1) the Nesjavellir Geothermal Area in Iceland, where the Icelandic Deep Drilling Project (IDDP) will drill its third well, and (2) Newberry Volcano in Oregon, USA, where Mazama Energy will pilot the first superhot enhanced geothermal system (EGS). A major outcome is the creation of a modular, open-source Python framework for play fairway analysis (PFA) in 2D and 3D, called geoPFA. The PFA workflow has been expanded to produce pseudo conceptual models, and will soon be refined to assess reservoir components through integration with the thermo-hydraulic-mechanical-chemical (THMC) simulator TReactMech, to enable iterative coupling between PFA and THMC models, improving characterization of superhot systems. All three of the Icelandic Deep Drilling Project's production scenarios were analyzed via this framework: (1) a superhot deep injection well paired with conventional production wells at Nesjavellir, (2) a superhot deep production well at Nesjavellir, and (3) superhot enhanced geothermal system at Newberry Volcano. This analysis provides useful insights around conceptual modeling of these production scenarios, helping to inform decisions around which scenario is best suited for which types of environments.

15 GEOTHERMAL ENERGY↗

Start-up and Emergency Shutdown Modeling for a Coal-fired 10MWe sCO₂ Power Plant

As part of a Phase II Front End Engineering Design (FEED) study for the DOE Fossil Fuel Large Scale Pilots program, investigations of novel start-up and emergency shutdown methods for a stoker-fed, coal-fired, 10MWe sCO₂ power plant proposal were performed. These investigations were performed using 1D transient system models of the plant created within the GT-SUITE system modeling platform. The system model components were created using vendor quotation data (heat exchangers), performance maps (turbomachines), or FMU models (fired heater). Previously, Echogen Power Systems (Echogen) has used a sCO₂ power cycle start-up method that fills the system with liquid CO₂ to facilitate easy use of an electrically-driven start pump to transition the system from initial CO₂ fill to turbo-compressor initialization. The novel start-up method presented attempts this transition with a minimal filling of the system with liquid CO₂, to reduce the total CO₂ inventory required. This method leaves the start pump vulnerable to a two phase inlet condition as system pressure is below the CO₂ saturation pressure for the condenser cooling water temperature (Tcw). System model cases at Tcw of 18°C, 26°C, and 32°C, corresponding to cold, design, and hot ambient days, were analyzed to determine if the SP inlet condition could be kept as a subcooled liquid and estimate the CO₂ inventory reduction amount./p> Stoker-fed, coal-fired heaters continue to emit heat for some time even after emergency shutdown from events such as a power failure. This heat emission would lead to a failure of the fired heater, as the metal overheats, if the CO₂ flow is shut off. The emergency shutdown method presented utilizes CO₂ vented by a controllable vent valve (CRV) to provide CO₂ cooling flow to the fired heater. To determine the effectiveness of this method at keeping the fired heater peak tubing metal temperature below the ASME material temperature limit, for pressures below 5 MPa, of 816 °C, system model cases with CRV diameters ranging from 4” to 10”, and an alternative CO₂ vent routing with CRV size of 6”, were investigated./p>

01 COAL, LIGNITE, AND PEAT↗

The spherical tokamak advanced reactor (STAR) fusion power plant design

Scientific and technical advancements have been made that improve fusion’s prospects to provide a new energy source, showing enhanced plasma confinement conditions with plasma temperatures reaching or exceeding 100 million degrees. Overshadowing this progress is the challenge involved in developing an economically viable fusion power plant design. Many proposed next-step DEMO and pilot plant designs are extensions of existing physics-focused experimental devices defined to understand and control plasma operations to achieve and sustain a fusion reaction. Transitioning scientific and technical advancements into a functional power plant requires a dedicated focus on architectural designs that integrate diverse technologies, while optimizing physics conditions, with a focus on economic viability. This holistic approach is essential in turning the promise of fusion energy into a reality. The Spherical Tokamak Advanced Reactor (STAR) is a fusion power plant conceptual design with the architectural focus that strives to balance physics, engineering, and cost considerations. In conclusion, it has been set up to introduce relevant physics, engineering and concept features that an intermediate pilot plant might follow, with the goal of meeting system performances and economic requirements that lead to a commercially competitive fusion power plant.

Blanket segmentation↗

Design, construction, and testing of no-insulation small subscale solenoids for compact tokamaks

Fusion energy systems studies (FESS) for next-step devices based on the most promising magnetic configurations indicate that high magnetic fields and high current density for magnet coil systems may reduce device size and lower the cost. High current density and radiation resistant fusion magnets are particularly beneficial for low cost, low aspect ratio compact reactor designs such as Fusion Nuclear Science Facility (FNSF), Fusion Pilot Plant (FPP) of low-aspect ratio spherical tokamak (ST) or compact stellarators. Unlike typical high field magnets for nuclear magnetic resonance (NMR), magnetic resonance imaging (MRI), or high energy physics research applications, neutron irradiation damage to organic insulations in the coil winding pack is a critical issue for next generation fusion reactors where orders of magnitude higher neutron fluence than those in present experimental reactors such as ITER are expected. Moreover, a high coil winding pack current density is needed for high field magnets in low cost, compact radial build next step fusion reactors. The slow current charging time, however, is an issue in fully non-insulated coils. In this work, we present the design, construction and testing of subscale Nb3Sn solenoids, up to half the diameter of the central solenoid (CS) for National Spherical Torus Experiment (NSTX), with and without inter-layer insulation for enhancing radiation resistance while improving the winding pack current density and coil performance. The major radius for the NSTX/NSTX-Upgrade (reference for compact ST) is 0.854/0.934 meter, and 4.8 meters for FNSF. The magnetic field for NSTX/NSTX-U at the plasma center is 0.6/1 Tesla and 9 Tesla for FNSF. The inner diameter of the central solenoid coil is 0.2/0.4 meter for NSTX/NSTX-U and 1.2 meters for FNSF. The current charging and discharging behavior of the prototype solenoids was investigated to quantify performance advantages of a simplified coil fabrication without error-prone vacuum pressure impregnation (VPI) for the removal of epoxy organic insulation. Scalability of the no insulation concept for fusion can be addressed via engineered coating for novel insulation on contact resistance or intra-layer no insulations. Radiation resistance and coil winding efficiency were significantly improved in the no insulation coils for next step compact fusion reactors.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

CalWave - Reports and Plans for xWave Device Demonstration at PacWave South Site

CalWave has developed a submerged pressure differential type Wave Energy Converter (WEC) architecture called xWave. The single body device oscillates submerged, is positively buoyant, and taut moored to the sea floor and integrates novel features such as absorber submergence depth control. Since participation in the US Wave Energy Prize, CalWave has evolved the design and successfully concluded a scaled 10-month open ocean pilot. CalWave recently concluded the final design phase of a scaled up WEC version for PacWave and started component order/build of the WEC towards the grid-connected demonstration at PacWave. Documentation and data here includes: a system certification plan, a risk registry in the form of an FMECA (Failure Mode, Effects, and Criticality Analysis) table, an updated LCOE content model, a report on performance metrics, and a risk management plan.

16 TIDAL AND WAVE POWER↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

MRPP UO x Product Recover System Upgrade

The Material Recovery Pilot Plant (MRPP) produces U 3 O 8 /OU 3 product in powder form. This product must be collected, and cyclonic separators are an efficient method for collecting particles from an air stream. However, the M10 SafeVac currently installed at MRPP has design flaws and is failing. A new, semi-custom cyclonic separator from Hanningfield has been designed and ordered to replace the SafeVac. The Hanningfield model will be more efficient and better designed to suit the recovery at MRPP, increasing the quality of research produced at the plant. Unit cost is $118,000 with a 24 week lead time. It is expected to be operational by January 2025.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Monitoring and Control in the ANL METL Facility Using an Engineering Digital Twin

The potential benefits of using an engineering digital twin to achieve greater autonomy for monitoring and control functions in advanced reactors was investigated for the Mechanisms Engineering Test Loop (METL) liquid sodium facility at Argonne National Laboratory. The METL sodium purification system served as a representative system as it requires significant human in-the-loop interaction to accomplish its design function. The objective was to demonstrate how real-time operation could be automated while preserving oversight of the operator for ensuring that the system design functions are met. A digital twin model of the purification system was developed for both the cold trap purification loop and plugging meter diagnostic loop using information from the METL piping and instrumentation diagram (P&ID). Automated monitoring and diagnosis of component degradation in the METL facility was demonstrated in tests using the PRO-AID health monitoring software with the digital twin model incorporated in the library of components. Component failures were introduced and were successfully diagnosed in real time. These tests serve to demonstrate an advanced monitoring capability able to differentiate sensor degradation from component degradation, to generate a rank ordering of probabilities of different failure mechanisms that serves to circumvent the false alarm problem with current anomaly detection methods, and how facility monitoring can be transformed from anomaly detection to identification of a specific fault. Automated control of the purification system was demonstrated through simulations that exercised a model predictive controller designed using the digital twin model. Results of these simulations compared favorably with experimental data showing very good reference tracking response with negligible overshoot. In conclusion, these pilot tests and simulations successfully demonstrated the use of a digital twin for improved automation of monitoring and control. It was shown how the digital twin enables switching between control modes from cold trap operation where impurities are removed to plugging meter operation where impurity concentrations are measured.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Transforming Aeration Energy in Water Resource Recovery Facilities (WRRFs) through Suboxic Nitrogen Removal (Final Report)

The objective of this project was to advance two key technological components—aeration control strategies and process design methodologies—to support the development and broader adoption of suboxic biological nitrogen removal (SBNR). The project focused on achieving the following three goals: • Enhance Model Predictive Control (MPC) Technology: Advance the DO/Nmaster MPC platform from its initial 2018 pilot deployment at the Chico Water Resource Recovery Facility in California to full-scale integration. This included partnering with a blower technology commercialization partner and incorporating machine learning (ML) capabilities to enable nationwide deployment. • Bridge Knowledge Gaps in SBNR Process Design: Address fundamental gaps in SBNR process understanding through controlled pilot-scale testing at a dedicated pilot facility. These efforts supported the development of robust kinetic models to inform reliable SBNR control, operational strategies, and design frameworks. • Demonstrate Full-Scale Implementation of Low DO/SBNR with ML: Transition low dissolved oxygen (DO)/SBNR coupled with ML from pilot-scale trials to full-scale demonstration in flow-through biological nutrient removal (BNR) systems, with the goal of enabling scalable, nationwide adoption in activated sludge treatment processes. The project included demonstration of SBNR at the pilot scale as performed by Hampton Roads Sanitation District (HRSD) and at the full-scale as performed by the Los Angeles County Sanitation Districts' (LACSD) Pomona Water Reclamation Plant (POWRP).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High Inlet Temperature Combustor for Direct-Fired Supercritical Oxy-Combustion

It is envisioned that supercritical CO 2 (sCO 2 ) electric power plant efficiencies can exceed 52% with 99% carbon capture using direct-fired oxy-combustion. Such efficiencies would be competitive with Natural Gas Combined Cycles (NGCC) and operate with nearly zero carbon emissions. To achieve high plant efficiencies, turbine inlet conditions must approach 1,200 °C at 250 bar. Such conditions, while desirable from a systems perspective, exceed the current state of the art in turbine design and materials qualification. The team of Southwest Research Institute ® (SwRI ® ), Georgia Institute of Technology (Georgia Tech), Spectral Energies, LLC (Spectral), GE Global Research (GE-GRC), and the University of Central Florida (UCF) sought to demonstrate an intermediate step toward these high efficiency plants with the development of a 1 MWth, subscale direct-fired oxy-fuel combustor. The efforts focused largely on the development of an auto-ignition based combustion system capable of providing the targeted 1200 °C and the pilot-scale plant to operate the combustor. While the project was stopped short of the commissioning and demonstration work, the advances made in this effort will reduce risks associated with chemical kinetics, thermal management, water separation, flue gas cleanup, materials selection, and corrosion in future demonstration efforts for the direct-fired oxy-fuel combustion cycles. The following report documents the design, analysis, and installation efforts completed during the project periods of performance.

03 NATURAL GAS↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) HEPA Filtration System - 20165

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous High Efficiency Particulate Air (HEPA) filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The integrated system design provides for reducing the salt, clay and diesel particulates from the exhaust airflow from the mine, prior to full filtration using Nuclear Safety Significant HEPA filters. The SSCVS design and equipment provides for continuous HEPA filtration over a wide range of operating and environmental conditions. The new exhaust system connects to the existing underground exhaust shaft, and the exhaust air flows from the underground through Salt Reduction Units (SRUs) to protect the final filter banks from excessive moisture and rapid salt/dust buildup. Each of the six (6) SRUs consists of a demister to remove entrained moisture, a dry salt remover unit to filter approximately 90% of the entrained salt/dust, and an automated water treatment system to periodically clean the demisters and to remove salt from the SRU filters. At the maximum expected exhaust flowrate of 540,000 Cubic Feet per Minute (CFM) / 255 Cubic Meters per Second (m{sup 3}/s), five (5) salt removal units will be in operation with one unit in standby or maintenance. An in-line variable frequency drive booster fan will offset pressure losses through each SRU and reduce the relative humidity of the air exiting the SRUs. In the event of a high radiation alarm from the underground Continuous Air Monitors (CAMs), the SRUs will be automatically bypassed, which places the SRS and building outside of the Safety Significant confinement boundary. From the SRUs, the exhaust is directed to the HEPA filter banks located in the New Filter Building. The exhaust system is designed to provide continuous HEPA filtration prior to release to the exhaust stack. There are 22 HEPA filter banks rated at 27,000 CFM / 12.75 m{sup 3}/s each. Each filter bank has two stages of pre-filters and two stages of HEPA filters. The filtered air from each of the 22 filter banks discharges into a common concrete plenum, which is maintained under a negative pressure by the main exhaust fans. Six 1,000 HP variable frequency drive exhaust fans are provided on the south side of the plenum. At the maximum expected exhaust flow of 540,000 CFM, four exhaust fans and twenty filter banks will be in operation. The fans discharge vertically to a separate concrete exhaust plenum. The filtered exhaust is routed from the exhaust plenum to a 125-foot-tall exhaust stack via a 13-foot diameter duct. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of and future perspective on scaling ultrafast-laser-ablation microstructuring of Li-ion battery electrodes to roll-to-roll production and large-format cells

This work demonstrates integration of an ultrafast laser onto a roll-to-roll machine, the laser structuring of a double-sided, 700 m long roll of graphite battery anode and its subsequent manufacture into 27 Ah prismatic cells. The electrode was ablated with a novel hybrid-microstructure composed of both hexagonally arranged pores for enhanced rate performance and channels for fast electrolyte wetting. Subsequently, this anode and a non-ablated baseline anode are paired with an NMC111 cathode for cell building and electrochemical characterization. Compared to the baseline, laser ablated cells demonstrated a reduction in soaking time of at least 60%, an improvement in fast charge capability with >30% more capacity accepted during 6C charging, and an extension of cycle life of >40% during 0.5C cycling. Further, a perspective is provided on scaling ultrafast laser ablation of battery electrodes to industrial throughputs. Additionally, lessons learned from this pilot-scale demonstration are provided in regards to optical architecture, debris removal, and system control. A techno-economic analysis is used to demonstrate that laser ablation can be integrated into existing electrode manufacturing facilities with only ≈$\$$1.3 per kWh increase (≈2%) in manufacturing cost. Preemptive electrode design for laser ablation is discussed as a further method for enhancing performance. Finally, an analysis of available laser systems and beam-scanning architectures is used to determine design requirements to scale process throughput to a state-of-the-art speed of 50 m min −1 . This analysis demonstrates that laser ablating Li-ion battery electrodes has multiple benefits to manufacturing and battery performance, that the technology already exists to achieve high laser-ablation throughputs, and that integrating ultrafast laser ablation to electrode manufacturing will not create a cost or processing bottleneck.

25 ENERGY STORAGE↗

Application of a Heat Integrated Post-combustion CO 2 Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant (Final Technical Report)

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0007395. In accordance with the Project Management Plan (PMP), Revision F dated 5/10/2019, and Statement of Project Objectives (SOPO) within, the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) has successfully demonstrated a unique, versatile CO 2 capture system (CCS) using a heat integrated process combined with two-stage stripping for process intensification, heat recovery and demineralized (DM) water generation. This project involved the design, fabrication, installation, testing of and data analysis from the UK CAER 0.7 MWe small pilot scale CO2 capture process installed at Kentucky Utilities (KU) E.W. Brown Generating Station in Harrodsburg, KY. During each of the four project Budget Periods (BPs), UK CAER met all project deliverables, all project milestones, with National Energy Technology Laboratory (NETL) approved adjustments made to the campaign long-term hours during BP4. The CCS was constructed in modular skids. Two solvent campaigns were initially conducted; the first with a 30 wt% monoethanolamine (MEA) as a baseline, and the second with the Hitachi H3-1 advanced solvent. Additional tests were performed with two advanced solvents including CAER and Proprietary Solvent C. Short-period testing with a higher concentration of 40 wt% MEA was conducted to evaluate the potential saving with high alkalinity. From the various solvent campaigns, unique aspects of the UK CAER CCS technology, as well as its flexibility and versatility were experimentally validated and demonstrated. With respect to solvent evaluation efforts in identifying candidates with significant operational and capital cost savings potential, performance of solvents were evaluated to determine the energy requirements for regeneration; environmental impacts from secondary emissions and degradation products; degradation rates, solvent make-up rates and stability. The assessments were done from parametric tests that determined optimum operating conditions for the individual solvents to maximize process efficiency and minimize the parasitic load of the power plant, and from long term campaigns (1000 hours for 30 wt% MEA and 1000 hours for H3-1) which collectively informed the techno-economic analyses (TEA) of the process. The long term campaigns included corrosion studies which used three types of metal coupons in different sections of the process: (absorber, primary stripper, lean carbon-loaded and rich carbon loaded flow streams in process) to mimic heat and flow dynamics process equipment were exposed to. The estimated corrosion rates were used to elucidate corrosion mechanisms and to further guide process material selection for potential capital cost savings.

gas separation↗

FEED Study of Carbon Capture Inc. DAC and CarbonCure Utilization Using United States Steel's Gary Works Waste Plant

Direct Air Capture (DAC) has been proposed as a means of reducing atmospheric concentrations of CO2. While DAC has been evaluated through lab-scale, bench-scale, and small-scale pilot units, large-scale deployment has not been achieved. Feasibility studies are one tool to understand the potential design, operation, performance, and impact of commercial-scale DAC. This paper presents the results of a feasibility study for a passive DAC system deployed at >100,000 tpy scale in three different regions across the U.S. and awarded to Carbon Collect by the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL). The MechanicalTree™technology has been designed and engineered by Carbon Collect based on the concept initially developed at Arizona State University Center for Negative Carbon Emissions. It uses a tower of stacked, sorbentcontaining disks supported by a lifting mechanism, exposed to the air to capture CO2 during the adsorption phase. The disks are then lowered into a regeneration chamber for vacuum and steam regeneration to produce CO2 product during the desorption step. The modular tree design allows large installations with repeatable, mass-manufactured units connected to common utilities such as steam supply, vacuum, and CO2 processing for compression and geologic storage. The passive DAC system eliminates the equipment and energy of forced air fans by using natural air circulation to contact the sorbent with the CO2 in the air. Because of this, the performance is dependent on the wind speed in addition to the temperature and relative humidity. Performance and flow rate fluctuations were incorporated into equipment and facility design with considerations for turndown to 10% of maximum rated flow to allow operation in all seasons. The feasibility study was undertaken to evaluate the technology in different regions and climates. Three locations were selected for this study representing different climates: Alabama (hot and humid), California (hot and arid), and Wyoming (continental). For each region, the adsorption/desorption cycle was optimized including tuning the heat integration and cycle timings. The performance of individual trees was then scaled to the full facility with the same design of more than 20,000 trees common between all regions. The installations had expected average CO2 capture rates of between 330,000 and 485,000 tonnes of CO2 per year depending on the climate. The initial engineering design for the facility at each location was performed with cost and performance estimates for the trees, carbon purification and compression, and the balance of plant. To supply thermal and electrical energy for the facility, carbon-free or low-carbon power must be considered. Options for low-carbon, continuous thermal and electrical energy were considered. The best-performing option from those considered was identified to be an electrically-heated molten salt energy storage system, powered by an on-site photovoltaic field. During molten salt thermal discharge, steam is produced from heat exchange with the molten salt and used to generate power in a steam turbine as well as steam for regenerating the DAC carbon trees. The thermal and electrical supply and analysis is presented in the context of low-carbon power for carbon removal. Modelling and economics of transportation and geologic storage of the CO2 is considered and presented for each location. The results of the feasibility study are incorporated into the presented techno-economic and life-cycle assessments. This work is intended to provide an understanding of the performance, cost, and impact of capturing CO2 at the commercial scale and the impact of climate and regional siting on the considered passive DAC system.

42 ENGINEERING↗

MW-Class SOFC Pilot System Development

The overall objective of this project is to develop a low-cost, efficient, and reliable MWe-class Solid Oxide Fuel Cell (SOFC) power system towards commercial deployment in natural-gas fueled distributed generation applications. This report details the successful completion of all project objectives. The main goals of the project were to develop the conceptual design of a MWe-class SOFC power system, and to complete a techno-economic analysis (TEA) to determine system costs at low-volume production levels of >100MW per year. The combination of the BoP equipment cost and SOFC stack module factory cost provided the net fabrication cost of the selected 1MW SOFC system configuration. The results of the study showed that the cost target of less than $6000/kW is achievable for a FOAK 1MW SOFC system, exclusive of the first-time engineering cost. Also, the project included an exploratory analysis of the factory cost of next generation stack technology based on the Compact Solid-oxide Architecture (CSA) design at a high annual manufacturing rate of one-GW produced in a giga-factory. The BoP capital cost for one giga-watt power production was estimated using learning-curve analysis based on the historical manufacturing cost data related to similar high temperature Molten Carbonate fuel cell systems built by FuelCell Energy (FCE). The giga-factory manufactured SOFC cost estimate combined with the BoP cost at high production rates led to the estimation of entire system capital cost. Ultimately, a Cost of Electricity (COE) analysis was performed including natural gas fuel prices, installation and O&M costs, and stack replacement cost. The results of the techno-economic analysis were summarized by parametric estimation of COE for 1MW SOFC NOAK (Nth-of-a-Kind) system with natural gas prices as a variable parameter.

08 HYDROGEN↗

Scaling Up CSP: How Long Will it Take?

Concentrating solar power (CSP) is one of the few scalable technologies capable of delivering dispatchable renewable power. Therefore, many expect it to shoulder a significant share of system balancing in a renewable electricity future powered by cheap, intermittent PV and wind power: the IEA, for example, projects 73 GW CSP by 2030 and several hundred GW by 2050 in its Net-Zero by 2050 pathway. In this paper, we assess how fast CSP can be expected to scale up and how long time it would take to get new, high-efficiency CSP technologies to market, based on observed trends and historical patterns. We find that to meaningfully contribute to net-zero pathways the CSP sector needs to reach and exceed the maximum historical annual growth rate of 30%/year last seen between 2010-2014 and maintain it for at least two decades. Any CSP deployment in the 2020s will rely mostly on mature existing technologies, namely parabolic trough and molten-salt towers, but likely with adapted business models such as hybrid CSP-PV stations, combining the advantages of higher-cost dispatchable and low-cost intermittent power. New third-generation CSP designs are unlikely to play a role in markets during the 2020s, as they are still at or before the pilot stage and, judging from past pilot-to-market cycles for CSP, they will likely not be ready for market deployment before 2030. CSP can contribute to low-cost zero-emission energy systems by 2050, but to make that happen, at the scale foreseen in current energy models, ambitious technology-specific policy support is necessary, as soon as possible and in several countries.

concentrated solar power↗

ARCADE Analysis Methods & Validation Pathway

The Advanced Reactor Cyber Analysis and Development Environment (ARCADE) provides an automated analysis system which supports risk-informed performance based (RIPB) evaluations of nuclear control systems. Every possible cyber threat which could lead to consequence is identified by simulating the unsafe control action sequences which transform digital harm into physical harm. Eliminating the simulation of complex digital cyber attack chains cuts out unnecessary computational overhead and focuses directly on the physics of cyber-physical attacks. This focus enables designers to make informed decisions which can entirely eliminate categories of cyber threats against advanced reactors through the physical nature of the plant design. This narrowing of cyber threat against nuclear power plants through the physics of the system is intended to make any remaining threat management and cost efficient. This is the goal of the Tiered Cyber Analysis (TCA) outlined in NRC Draft Regulation Guide (RG) 5.96, which provides a RIPB cybersecurity approach for new reactors. ARCADE has been custom developed to meet the demands of the rigorous analysis required in Tier 1 of the TCA, which forms the foundation of the TCA process. Currently, ARCADE is still under development, but has made significant leaps in capability. A pilot analysis on the opensource Asherah simulator was performed which demonstrated key functionality goals. The next stage of ARCADE development involves improvements to the applications which support the analysis system, and enabling the analysis system to utilize the full suite of unsafe control action simulations. Since the analysis method’s core functions are complete, validation of the analysis method will be started concurrent to the next development stages. The automated analysis ARCADE will provide can radically change the cybersecurity design process for advanced reactors, reducing the cost of security implementation while enhancing cyber resilience. The pathway for ARCADE’s development to this goal has become much clearer. The majority of technical hurdles have been cleared, and the remaining development needs have been solidified. ARCADE is now capable of assisting the advanced reactor design process and directly support advanced reactor industry RIPB practices.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

“Hybridizing heat-integrated 3D printed modules with mass manufacturable, low pressure drop fiber sorbents” (Final Report)

The overall objective of this proposal was to research, develop, and evaluate a modular direct air capture (DAC) system that is simple and scalable. This system was based on the adsorption of CO 2 into commercial polyamines supported by porous fiber sorbents, which can be produced at kilometer per hour scales using our pre-pilot spinning line. We have housed these fiber materials in novel 3D printed modular housing systems that provide easy-to-manufacture and localized heat integration and flow control. This hybridization of fiber sorbent technology with modular housing provided several advantages that led to lower air pressure drops, higher sorbent productivity, as well as ease of manufacturing and assembly unrivaled by existing and emerging heat integrated contactor designs. The modular housing was fabricated with the following features, at a minimum: (i) a tapered air intake to reduce pressure drop related to entrance effects, (ii) a structured network of heat transfer channels to enable localized cooling and heating during adsorption and desorption, respectively, and (iii) low pressure drop supports for the fiber sorbents. This hybrid manufacturing approach provides a facile method for taking fiber sorbents from lab scale to pilot scale as it dramatically simplifies the fabrication of heat integrated contactor structures.

42 ENGINEERING↗