Search NASA⌕ Search

SEARCH · Search NASA

Results for “pipeline infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

Blending Pipeline Analysis Tool for Hydrogen (BlendPATH) Documentation and User Manual

The Blending Pipeline Analysis Tool for Hydrogen (BlendPATH) is a flexible, open-source Python tool designed to provide users with case-by-case analysis capabilities to identify the necessary modifications to repurpose existing natural gas transmission pipeline networks to transport hydrogen as a blend of a user-specified volume fraction of hydrogen or as a pure stream and to estimate the associated capital and operating expenditures resulting from those modifications. This tool is intended to be applied during the initial screening stage of a prospective project when pipeline developers compile transmission pipeline technical documentation and history but prior to performing detailed pipeline inspections. Performing analysis with BlendPATH during this initial screening stage can provide the user with an understanding of promising opportunities and probable economic outcomes of repurposing their pipeline network for hydrogen before proceeding with detailed pipeline materials testing and pipeline inspections. BlendPATH consists of multiple modules to simulate, assess, and modify existing natural gas transmission pipeline network designs to be compatible with hydrogen as a blend or pure stream. The tool employs an open-source gas network hydraulic model to simulate existing, user-specified transmission pipeline networks, and it applies ASME B31.12 to assess the pipe segments within these networks for compatibility with hydrogen and to modify the networks to achieve compatibility where the existing infrastructure is inadequate. Users can specify ASME B31.12 design options for pipeline assessment and can select from multiple methods for pipeline modification. This report details the functionalities of BlendPATH Version 2.0.2 and demonstrates an example of applying BlendPATH to a case study. Potential and intended users of this framework include natural gas pipeline developers and operators and researchers at both public and private institutions. BlendPATH is publicly available at https://github.com/NREL/BlendPATH.

08 HYDROGEN↗

Hydropower Infrastructure - LAkes, Reservoirs, and RIvers (HILARRI), v4

HILARRI is a database of links between major datasets of operational hydropower dams and powerplants, and inland water bodies. These connections are critical for conducting large-scale analysis of hydropower infrastructure and their associated natural and engineered water systems. Features include: – Dams from the National Inventory of Dams (2025) and the Global Reservoir and Dam Database (GRanD v1.3) – Hydropower plants from the Existing Hydropower Assets dataset (EHA 2025) – Power plants that are listed in the 2025 U.S. Hydropower Development Pipeline Data or were listed in previous versions of the dataset These hydropower infrastructure features are linked to several major datasets that provide hydrologic and hydraulic information relevant for analysis of hydropower systems that includes the integral water resources. That information comes from: – Products from the National Hydrography Dataset (NHD) – NHDPlusV2 Medium Resolution river network flowlines, – NHD waterbodies (limited to lakes and reservoirs), – NHD Watershed Boundary Dataset (HUC12-level for the Conterminous United States (CONUS)) – NHD High Resolution waterbodies – HydroLAKES water bodies (lakes and reservoirs) – LAGOS-US lakes and reservoirs – EPA National Lakes Assessment (2007, 2012, 2017, and 2022) – The Reservoir Sedimentation Database (RESSED) – EPA SuRGE sampling locations Unique identifiers are used to facilitate joining to the original full datasets. For example, characteristics of NHD flowlines such as estimated average flow rate can be joined from the NHDPlusV2 dataset to a dam or power plant listed in HILARRI based on the ID field, “COMID”, that is common to both datasets. HILARRI only includes basic information about identifiers, location, and data quality or usage notes. It does not contain the attributes or time series data associated with these sites. The HILARRI dataset incorporates information from several datasets to facilitate more effective and accurate analysis of hydropower infrastructure and their associated waterbodies. For example, dams were checked against the most recent American Rivers Dam Removal Database to identify and flag facilities that may no longer exist. Additionally, dams that are listed multiple times in the NID are identified and flagged to avoid double-counting when analyzing and summarizing information. Other quality flags include certainty of operational hydropower (i.e., if one or more datasets indicates hydropower at a particular location), whether an associated water body is accurate or composed of multiple polygons, or whether there is a known issue with reported characteristics in one of the underlying datasets. These additional data flags are designed to increase confidence in data usage for individual to large-scale analyses.

Hansen, Carly [ORNL] (ORCID:0000000193280838)↗

A review of technical and regulatory limits for hydrogen blending in natural gas pipelines

We report there is rising interest globally in the use of hydrogen for the provision of electricity or heat to industry, transport, and other applications in low-carbon energy systems. While there is attention to build out dedicated hydrogen infrastructure in the long-term, blending hydrogen into the existing natural gas pipeline network is also thought to be a promising strategy for incorporating hydrogen in the near-term. However, hydrogen injection into the existing gas grid poses additional challenges and considerations related to the ability of current gas infrastructure to operate with blended hydrogen levels. This review paper focuses on analyzing the current understanding of how much hydrogen can be integrated into the gas grid from an operational perspective and identifies areas where more research is needed. The review discusses the technical limits in hydrogen blending for both transmission and distribution networks; facilities in both systems are analyzed with respect to critical operational parameters, such as decrease in energy density, increased flow speed and pressure losses. Safety related challenges such as, embrittlement, leakage and combustion are also discussed. The review also summarizes current regulatory limits to hydrogen blending in different countries, including ongoing or proposed pilot hydrogen blending projects.

08 HYDROGEN↗

Geothermal Heat Recovery Complex: Large-Scale, Deep Direct-Use System in a Low-Temperature Sedimentary Basin (Final Report)

A feasibility study of using deep direct-use (DDU) geothermal energy to heat agricultural research facilities (ARFs) was conducted at the University of Illinois at Urbana-Champaign (U of IL) and its similar application to military facilities in the Illinois Basin (ILB). The geothermal energy system (GES) investigated utilizes low-temperature (30–90°C; 90–190°F) geothermal fluid (i.e., brine) from an extraction well that is part of a deep, two-well (doublet) system that extends to the bottom of the ILB. The geothermal reservoir modeled, the Mt. Simon Sandstone (MSS), is about 1,280 m (4,200 feet) deep and 457 m thick (1,500 feet) beneath the U of IL. The DDU GES surface infrastructure includes heat exchangers connected in-parallel to pipelines carrying the geothermal fluid and fresh cold and hot water. Analysis of the GES indicated that the MSS can provide a baseload of 2 MMBtu/hr to heat the ARFs by extracting 954 m³/d (6,000 barrels/day [bbl/d]) of geothermal fluid that has a temperature of 44–46 °C (111–115 °F). In addition to analyzing the levelized cost of heat (LCOH) and life cycle costs, the environmental effects of the DDU GES were evaluated, including reduced greenhouse gas (GHG) emissions and water consumption. Multiple system designs were evaluated and then ranked based on their maximum heating performance, energy efficiency, and cost recovery. This feasibility study identified the key components of the fully-integrated DDU technology that can be implemented, both technically and economically. The results and information from this study provides end-users and policy makers with guidance for additional research on the specific components of DDU technology such that its widespread use can provide an uninterruptible energy source, increase resilience from extreme weather conditions, reduce U.S. dependency on fossil fuels, and reduce greenhouse gas (GHG) emissions. The site-specific part of this study gives U of IL administrators a realistic and pragmatic assessment of the financial resources necessary to add a DDU GES in the MSS to the campus’ energy portfolio.

15 GEOTHERMAL ENERGY↗

Packaging data products using data grid middleware for Deep Space Mission Systems

We are investigating a distributed computing infrastructure for releasing science products out of the mission pipeline. We are creating a DSMS Product Service and DSMS Data Packaging Service based on the OODT middleware, a Data Grid middleware technology that has proven successful in providing access to heterogeneous, disparate data, and federating that data using a common data model.

Deep Space Mission Systems↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Feasibility of critical infrastructure protection using network functions for programmable and decoupled ICS policy enforcement over WAN

Industrial control systems (ICS) represent a major component of our critical infrastructure. With the increasing need for more control and monitoring of such systems, ICS have seen an increase in connectivity to wide area networks (WAN) exposing aging equipment to rapidly evolving cybersecurity threats. Furthermore, the ICS data requires a reliability measure from the networks for critical functions for infrastructure monitoring and control. Especially when remote plant sites are involved such as pipelines, energy distribution networks, and transportation, WAN transport impairments most often provide a best effort delivery with no strict reliability guarantees. Network functions can provide a vendor agnostic, programmable critical infrastructure protection with a single maintenance, policy determination, and reliability assurance surface. A network function (NF) can be utilized for policy enforcement over the communication between remote entities and the main control office. This paper presents the research on transparent integration with existing ICS without disrupting communications, resulting in minimal downtime while decoupling the fast paced evolution of defensive security measures from the upgrade cycle of expensive long term hardware. We report our measurements on the resource requirements and overhead in the network for successful NF insertion under a wide variety of network impairments (network packet delay, reordering, and loss). Our paired NF implementation provides a policy enforcement platform extensible to cover myriad cybersecurity-related communication goals, including packet signing for verification, encryption for data privacy, packet filtering and data diode operation (i.e. protecting against eavesdropping, packet injection, and denial-of-service). Furthermore, bundling communication specifications into packet flows allows for tunability in applying policies as coarse- or fine-grained as the needs of the operator. We report on network function resource requirements in the form of required queue depth and network utilization overhead to inform the decision making against hardware cost constraints.

42 ENGINEERING↗

New Energy Infrastructure Outlook [Slides]

This report provides a perspective on energy infrastructure under development in the continental U.S. as of the end of 2025, focusing on those making significant progress toward achieving commercial operation. Infrastructures covered in this report include power plants, electric transmission, natural gas pipelines, liquefied natural gas terminals, and datacenters. Additionally, this report includes a section on stockpiled volumes of coal, natural gas, and petroleum.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Cold Spraying Mild-Steel Powder onto Mild-Steel Substrate for Development of Waste Tank Repair System - 20515

Infrastructure for nuclear waste storage and processing (e.g., waste tanks, transfer pipelines, evaporators) at the U.S. Department of Energy (DOE) Hanford Site has been in service well beyond its original design life. Past corrosion control methods at Hanford for waste tanks have not been fully successful, as evidenced by leaks forming in tank AY-102, the first double-shell tank (DST) constructed, and significant degradation detected in the primary tanks of AP-102 and AY-101. Failure of infrastructure components can pose a significant risk to the environment, worker safety, and project schedules. Therefore, remotely deployable methods for repairing and extending the service life of the existing tank waste infrastructure are needed. Cold spray has been identified as a potential technique for performing in situ repairs and material buildup for life extension of waste storage and processing infrastructure. Cold-spray repair methods and technology are well-established and are used extensively by industry and the military for making repairs using dissimilar materials. Pacific Northwest National Laboratory is evaluating the process of making repairs using mild-steel powder applied to a mild-steel substrate to minimize the galvanic corrosion potential. This paper presents the initial results for a feasibility ('go/no-go') assessment as to whether low-density deposits with sound metallurgic bonds, to build-back steel plate material, can be achieved using existing commercial cold-spray equipment. An assessment of steel-on-steel deposit is necessary to determine if cold spray is a viable candidate for DST carbon steel plate restoration/repair and thus DST service life extension. Powder properties and preparation requirements have been investigated and operating conditions and parameters for depositing a cold-spray buildup of mild steel on a mild-steel substrate have been determined. Soundness of metallurgic bonding as a function of the operating parameters exercised and results from applying cold spray to lay a deposit over simulated small-diameter flaws in 1/2-inch mild-steel plate are presented. Application of in situ cold-spray repair to the DOE complex has the potential to reduce cost and schedule impacts associated with component failures and the need to procure and construct replacement infrastructure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Energy Infrastructure Outlook: Data as of December 31, 2024 [Slides]

This report provides a perspective on energy infrastructure under development in the continental U.S. as of the end of 2024, focusing on those making significant progress toward achieving commercial operation. Infrastructures covered in this report include power plants, electric transmission, natural gas pipelines and liquefied natural gas facilities. Additionally, this report includes a section on stockpiled volumes of coal, natural gas, and petroleum.

01 COAL, LIGNITE, AND PEAT↗

Wind Turbine Oil and Gas Pipeline Setbacks: Ordinances (2022) and Extrapolated Trends, 115 Hub Height 170 Rotor Diameter

This dataset represents wind energy setback requirements from oil and gas pipelines. A setback requirement is a minimum distance from a pipeline that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a median setback equivalent to 1.1 times the turbine tip-height, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where wind energy is prohibited or permitted across the contiguous United States. The turbine parameters used were a hub-height of 115 meters and a rotor diameter of 170 meters, as obtained from the Annual Technology Baseline (ATB) 2022. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Thermal Effects on Gas Pipelines

Irradiance from a nuclear weapon can be the source of heat on gas infrastructure. This exposure when sufficiently intense can result in failure. An estimation tool for this behavior is the object of this study. A lumped capacity technique is employed to estimate the system temperature rise. The temperature rise is related to three possible outcomes. Two of the outcomes are relatively certain failure and relatively certain lack of effect. A large range of exposures are assessed with the model, and a relatively small number of cases are in the uncertain range. This model is presented as a tool that can be used in conjunction with a structural assessment model to sensitivities to the overpressure and shock to screen potential outcomes from subject events .

02 PETROLEUM↗

Effects of hydrogen partial pressure on crack initiation and growth rate in vintage X52 steel

There is an increasing interest in ensuring compatibility of existing natural gas infrastructure with conveyance of hydrogen, especially for vintage (pre-1970s) pipeline steels. While hydrogen is known to affect the fatigue and fracture resistance of these materials, there is a lack of data on its effects on crack initiation at low hydrogen partial pressure. To address this gap, the current work presents a series of fatigue tests on vintage API Grade X52 steel in pure nitrogen, air and gaseous hydrogen at partial pressures of 1 and 207 bar. Circumferential notch tension (CNT) specimens with direct current potential difference (DCPD) measurements are used to get S–N curves for crack initiation and failure, and compact tension (CT) tests to assess crack growth rates. Results indicate that air accelerates crack initiation, low hydrogen partial pressure affects the crack growth rate, and higher pressures have the largest impact on both. Surprisingly, crack initiation is faster in air than at 1 bar hydrogen partial pressure. The CNT tests also reveal that the orientation of the banded microstructure has no effect on the crack initiation site, but it influences its growth behavior. Moreover, fractography shows that hydrogen also promotes instances of quasi-cleavage and intergranular fracture, linked to embrittlement of the material. Here, these results demonstrate that, while hydrogen may impact the entirety of the fatigue process, its effects on the early stages of damage accumulation become relevant only at larger pressures. More comprehensive studies of crack initiation in hydrogen atmospheres will be critical to future codes and standards for hydrogen infrastructure.

Circumferential notch tension↗

Biogas Utilization in Refuse Power Plants (BURP 2 )

The BURP 2 project investigated the technical and financial viability of co firing biogas with waste coal for power generation while using carbon capture and sequestration to achieve net negative emissions. A comparative assessment integrating geospatial mapping, technoeconomic analysis, and life cycle analysis was carried out to evaluate retrofitting an existing coal fired facility in West Virginia, versus developing a new greenfield power plant in Kentucky located near a low quality coal resource. The study found that CO 2 capture rates of 90% or higher, in combination with biogas feedstocks such as animal manure, could significantly reduce global warming potential compared to plants using neither biogas nor CO 2 capture systems. Economic feasibility depended heavily on federal tax credits and proximity to fuel sources. In both greenfield and retrofit scenarios, access to biogas played a key role. Because the retrofit site was located close to existing biogas resources, it represented a feasible option, whereas the greenfield site, being far from pipelines or biogas sources, would require prohibitively expensive biogas transport infrastructure. Overall, the research showed that repurposing waste or low-quality coal with renewable biogas and CO 2 capture systems could provide a viable approach for reducing carbon emissions in power production, if biogas resources are easily accessible and available in sufficient quantities.

01 COAL, LIGNITE, AND PEAT↗

AAM NC Tech Talk: Intro to Amazon Web Services

The purpose of this Tech Talk is to engage with the Advance Air Mobility National Campaign community on the use of a cloud provider to promote public confidence and accelerate the realization of emerging aviation markets for passenger and cargo transportation in urban, suburban, rural, and regional environments.

AWS↗

The LLNL nuclear data infrastructure for the GNDS data format

The next generation of nuclear data infrastructure tools at the Livermore National Laboratory (LLNL) consists of pipeline of codes that read and process nuclear data from evaluated files saved in the new GNDS (Generalised Nuclear Data Structure) nuclear data format. The processing code FUDGE (For Updating Data and Generating Evaluations) is at the front-end of this pipeline as it reads and process the evaluated data for use in downstream transport codes. FUDGE is Python based with C and C++ extensions for computationally intensive tasks. As is the case for the evaluated data, the processed output is also saved in the GNDS format and the GIDI+ API is provided as the interface between the processed data and the transport codes. GIDI+ is a C++ based suite of codes and it includes GIDI (General Interaction Data Interface), a library for reading and writing GNDS data, and MCGIDI which is the cross section lookup, and reaction and product distribution sampling interface between Monte Carlo transport codes and the GNDS data. GIDI provides methods for easy access to the multi-group processed GNDS data and this is demonstrated through its implementation in ARDRA, the LLNL deterministic transport code. The evaluation and sampling methods in MCGIDI are available as both CPU and GPU methods which facilitates the use of MCGIDI in both traditional CPU-based as well as the next generation mixed model computational architectures. This is demonstrated through the GIDI+ implementation in MERCURY, the LLNL Monte Carlo transport code. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mapping Critical Vulnerabilities in Natural Gas Pipeline Systems through Network Centrality and GIS Analytics

Natural gas plays a central role in the US energy landscape, providing 43% of electricity generation in 2023. Its exclusive recovery ability on pipelines for transmission underscores the importance of understanding the disruption recovery ability of this infrastructure. This study employs a network-based analytical framework integrating geographic information systems (GIS) with multiple centrality measures—betweenness, closeness, degree, and eigenvector—to pinpoint key segments and evaluate the structural robustness of the national pipeline network. Pipelines are grouped by System ID and Operator ID to capture variations across organizational and physical structures. The analysis reveals uneven patterns of network influence, where certain pipelines function as critical connectors or dominant hubs. Spatial mapping highlights geographic dependencies and potential chokepoints, offering a clear view of where targeted risk prevention measures would be most effective. The findings provide practical guidance for prioritizing maintenance, enhancing system robustness, and mitigating risks to ensure a stable and secure energy supply. Future research will expand the framework to incorporate dynamic operational data and real-time network behavior.

Peterson, Steven [ORNL] (ORCID:0000000287672998)↗