An AI Approach to Ground Station Autonomy for Deep Space Communications
This paper describes an architecture for an autonomous deep space tracking station (DS-T).
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This paper describes an architecture for an autonomous deep space tracking station (DS-T).
The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, conducted the Ares I Crew Launch Vehicle System Requirements Review (SRR) at the end of 2006, a mere year after the project team was assembled. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the operability, reliability, and affordability goals outlined by the Constellation Program. As directed in NASA Procedure and Regulation (NPR) 7123, NASA Systems Engineering Procedural Requirements, the Ares I SRR examined "the functional and performance requirements defined for the system and the preliminary program or project plan and ensures that the requirements and the selected concept will satisfy the mission." The SRR was conducted to ensure the system- and element-level design and interface requirements are defined prior to proceeding into the project's design phase. The Exploration Launch Projects Control Board convened on December 19,2006, and accepted the findings of the SRR and the go-forward plan proceeding to PDR. Based upon these findings, the Ares project believes that operability must drive the vehicle's design, and that a number of design challenges, including system mass and reliability, must be addressed as part of the progress to PDR.
Modern active distribution grids are characterized by the increasing penetration of distributed energy resources (DERs). The proper coordination and scheduling of a large numbers of these small-scale and spatially distributed DERs is necessary, and warrants the use of novel distributed approaches. In this paper, we propose a hybrid volt-var control architecture for the distribution grid, which leverages existing centralized and local approaches to planning, decision making, and control, and augments it with distributed optimization and distributed control for DER management. First, we propose a convex model to describe the power physics of distribution grids of meshed topology and unbalanced structure, based on current injection and McCormick Envelopes. Second, we employ the distributed proximal atomic coordination (PAC) algorithm to coordinate DERs to provide voltage support. We implement volt-var optimization by optimally coordinating DERs including PV smart inverters and demand response. We present results using the IEEE-34 bus network, using real data from a distribution feeder in Hawaii, to model load and PV generation. Different levels of DER penetration and objective functions are simulated. Finally, our results show the need for the coordination of DERs to improve voltage profiles, even in networks with existing voltage control devices. Further, we show the need for flexible reactive power capabilities to achieve desired grid performance.
The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.
This report was produced in partial fulfillment of the mitigation of adverse effects to Building 06-CP-170, the Yucca Flat Weather Station on the Nevada National Security Site (NNSS), and is intended to comply with the 2021 Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the MOA). This MOA was executed to resolve adverse effects from the U.S. Department of Energy (DOE) plan to demolish 14 architectural resources at the Control Point and in the vicinity in Area 6 of the NNSS. The management and operations contractor for the NNSS identified these 14 architectural resources as environmental hazards unsafe for human occupation due to deterioration and rodent infestation. Building 06-CP-170 is scheduled for demolition as part of this undertaking. Building 06-CP-170 was originally recorded in 2018 during a Section 106 cultural resources inventory for a proposed installation of a 138-kilovolt transmission line on the NNSS. The building was determined individually eligible by the DOE, in consultation with the Nevada State Historic Preservation Office, for inclusion in the National Register of Historic Places under the Secretary of the Interior’s Significance Criterion A because of its association with nuclear testing. Pursuant to Stipulation III.D.3 of the MOA, this report provides a summary of the historic significance of Building 06-CP-170 and a description of its current condition and accessory resources. In addition, an updated Architectural Resource Assessment (ARA) form with new information and photographs is included in the appendix in fulfillment of Stipulation III.D.2.
The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.
The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.
A system for assisting terminal area air traffic controllers in the management and control of arrival traffic, referred to as the Final Approach Spacing Tool (FAST), is being developed at NASA Ames Research Center. In a cooperative program, NASA and FAA have efforts underway to install and evaluate the system at the Dallas/Fort Worth Terminal Radar Approach Control facility. This paper will review the software architecture, the algorithms components, and the human-machine interface. The system is based on continuous updates of a detailed trajectory analyses of all arrival aircraft. FAST interprets the results of these trajectory analyses to build an efficient and procedurally acceptable plan for the arrival traffic that consists of a sequence, schedule, and runway assignment. The system utilizes a heuristically-based conflict resolution algorithm to build a solution trajectory that satisfies the plan, It extracts a series of speed and heading advisories from the solution trajectory to assist the controller in efficiently managing and controlling the arrival traffic down to the runway. The advisories are displayed in a graphical format to the controller. In addition to the radar tracking data, the system also relies on a series of data bases. These data bases contain aircraft performance models, airline preferred operational procedures, airspace structure, air traffic procedural models, and a three dimensional wind model. Field evaluation of FAST is expected to begin in 1994.
Rovers will play a critical role in the exploration of Mars. Near-term mission plans call for long traverses over unknown terrain, robust navigation and instrument placement, and reliable operations for extended periods of time. Longer-term missions may visit multiple science sites in a single day and perform opportunistic science data collection, as well as complex scouting, construction, and maintenance tasks in preparation for an eventual human presence. The Pathfinder mission demonstrated the potential for robotic Mars exploration but at the same time indicated the need for more rover autonomy. The highly ground-intensive control with infrequent communication and high latency limited the effectiveness of the Sojourner rover. When failures occurred, Sojourner often sat idle for extended periods of time, awaiting further commands from earth. In future missions, the tasks will be more complex and extended; hence there will be even more situations where things do not go exactly as planned. Significant advances in rover autonomy are needed to cope with increasing task complexity and greater execution uncertainty. Towards this end, we have designed an on-board executive architecture that incorporates robust operation, resource utilization, and failure recovery. In addition, we have designed ground tools to produce and refine contingent schedules that take advantage of the on-board architecture's flexible execution characteristics. Together, the on-board executive and the ground tools constitute an integrated rover autonomy architecture. This work draws from our experience with the Deep Space One autonomy experiment, with enhancements to ensure robust operation in the face of the unpredictable, complex environment that the rover will encounter on Mars. The rover autonomy architecture is currently being developed and deployed on the Marsokhod rover platform at NASA Ames Research Center. The capabilities of the rover autonomy architecture to support autonomous operations will be demonstrated concretely in upcoming field tests.
NASA is developing a flight deck decision support tool to support research into autonomous operations in a future distributed air/ground traffic management environment. This interactive real-time decision aid, referred to as the Autonomous Operations Planner (AOP), will enable the flight crew to plan autonomously in the presence of dense traffic and complex flight management constraints. In assisting the flight crew, the AOP accounts for traffic flow management and airspace constraints, schedule requirements, weather hazards, aircraft operational limits, and crew or airline flight-planning goals. This paper describes the AOP and presents an overview of functional and implementation design considerations required for its development. Required AOP functionality is described, its application in autonomous operations research is discussed, and a prototype software architecture for the AOP is presented.
ANTS (Autonomous Nano- Technology Swarm), a mission architecture consisting of a large (1000 member) swarm of picoclass (1 kg) totally autonomous spacecraft with both adaptable and evolvable heuristic systems, is being developed as a NASA advanced mission concept, and is here examined as a paradigm for lunar surface exploration. As the capacity and complexity of hardware and software, demands for bandwidth, and the sophistication of goals for lunar and planetary exploration have increased, greater cost constraints have led to fewer resources and thus, the need to operate spacecraft with less frequent human contact. At present, autonomous operation of spacecraft systems allows great capability of spacecraft to 'safe' themselves and survive when conditions threaten spacecraft safety. To further develop spacecraft capability, NASA is at the forefront of development of new mission architectures which involve the use of Intelligent Software Agents (ISAs), performing experiments in space and on the ground to advance deliberative and collaborative autonomous control techniques. Selected missions in current planning stages require small groups of spacecraft weighing tens, instead of hundreds, of kilograms to cooperate at a tactical level to select and schedule measurements to be made by appropriate instruments onboard. Such missions will be characterizing rapidly unfolding real-time events on a routine basis. The next level of development, which we are considering here, is in the use of autonomous systems at the strategic level, to explore the remote terranes, potentially involving large surveys or detailed reconnaissance.
NASA’s vision for Advanced Air Mobility (AAM) is to help emerging aviation markets to safely develop an air transportation system that moves people and cargo between places previously not served or underserved by aviation using revolutionary new aircraft types. Urban Air Mobility (UAM), the concept of expanding transportation networks by serving short flights to transport people and goods around metropolitan areas, is part of a larger paradigm shift toward AAM, in which new technologies and business models are enabling transformational applications of aviation. In NASA’s Concept of Operations for UAM, Providers of Services for UAM (PSU) play a key role to enable safe and efficient UAM operations by sharing operational data among UAM operators. PSUs provide a pre-departure strategic conflict management service that establishes operational plans for new flights and coordinates them with all relevant operations in shared airspace. The strategic conflict management aims to minimize the need for tactical separation provision, while considering anticipated traffic demand, vertiport capacity and availability, forecasted weather, and airspace restrictions. NASA is currently preparing a new lab evaluation activity with aviation industry partners, called the X4 simulation, to demonstrate their airspace services and capabilities and test new information exchange requirements for UAM operations. This simulation activity will support NASA’s National Campaign (NC) flight tests which are planned over the next several years to guide the collective community and stakeholders through a series of scenario-based test activities that involve vehicles and airspace management services operating in a live test environment. This presentation will provide an overview of the X4 simulation, including objectives, scenarios, assumptions, system architecture, and test schedule. The X4 simulation will evaluate the interconnectivity and operational intent sharing between PSUs for multiple operators, as well as the performance of strategic conflict management.
Achieving the science exploration and defense goals of the following decades will require flight systems capable of operations with limited operator contact, system mode changes and retasking based on sensor data, and complex robotic operations. To support these capabilities, increasingly autonomous flight systems are required that can perform dedicated mission functions, e.g. payload targeting and communications, and system-level functions, e.g. planning and goal monitoring. Architecting an autonomous system requires a well-reasoned, self-consistent framework to avoid \textit{ad hoc} design choices that will introduce complexity and risk. The Framework for Robust Execution and Scheduling of Commands On-Board, FRESCO, is the result of lessons learned in developing a software architecture to enable autonomous solar system exploration. FRESCO generalizes this work to offer a modular, software-agnostic approach to developing verifiable architecture for autonomous space systems. FRESCO specifies guiding principles, functions, interfaces, and interactions from which mission-specific autonomous control architectures can be derived. FRESCO is a principled framework relying on explicit, state-based goal definitions, centralized management of state knowledge, clearly separated control boundaries, and hierarchical reasoning. Using components from FRESCO reference architecture, an autonomous decision-making architecture can be designed for spacecraft which can then be mapped to flight software architecture. FRESCO is flexibly defined to enable autonomous control of flight systems built using extensive software and hardware heritage. Finally, FRESCO-derived architectures support a spectrum of operator/spacecraft interactions, ranging from traditional commanding to goal-driven commanding with the ability to change mission goals autonomously. FRESCO has been used in defining the autonomy architectures for the ASTERIA mission and have been demonstrated in laboratory and software simulation for small body rendezvous and in-space servicing missions.
Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.
Nowcasts, or near-real-time (NRT) forecasts, of soil moisture based on the Soil Moisture Active and Passive (SMAP) mission could provide substantial value for a range of applications including hazards monitoring and agricultural planning. To provide such a NRT forecast with high fidelity, we enhanced a time series deep learning architecture, long short-term memory (LSTM), with a novel data integration (DI) kernel to assimilate the most recent SMAP observations as soon as they become available. The kernel is adaptive in that it can accommodate irregular observational schedules. Testing over the CONUS, this NRT forecast product showcases predictions with unprecedented accuracy when evaluated against subsequent SMAP retrievals. It showed smaller error than NRT forecasts reported in the literature, especially at longer forecast latency. The comparative advantage was due to LSTM’s structural improvements, as well as its ability to utilize more input variables and more training data. The DI-LSTM was compared to the original LSTM model that runs without data integration, referred to as the projection model here. We found that the DI procedure removed the autocorrelated effects of forcing errors and errors due to processes not represented in the inputs, for example, irrigation and floodplain/lake inundation, as well as mismatches due to unseen forcing conditions. The effects of this purely data-driven DI kernel are discussed for the first time in the geosciences. Furthermore, this work presents an upper-bound estimate for the random component of the SMAP retrieval error.
We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).
Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.
Space Technology 5 (ST-5) is a three-satellite constellation, technology validation mission under the New Millennium Program at NASA to be launched in March 2006. One of the key technologies to be validated is a lights-out, model-based operations approach to be used for one week to control the ST-5 constellation with no manual intervention. The ground architecture features the GSFC Mission Services Evolution Center (GMSEC) middleware, which allows easy plugging in of software components and a standardized messaging protocol over a software bus. A predictive modeling tool built on MatLab's Simulink software package makes use of the GMSEC standard messaging protocol to interface to the Advanced Mission Planning System (AMPS) Scenario Scheduler which controls all activities, resource allocation and real-time re-profiling of constellation resources when non-nominal events occur. The key features of this system, which we refer to as the ST-5 Simulink system, are as follows: Original daily plan is checked to make sure that predicted resources needed are available by comparing the plan against the model. As the plan is run in real-time, the system re-profiles future activities in real-time if planned activities do not occur in the predicted timeframe or fashion. Alert messages are sent out on the GMSEC bus by the system if future predicted problems are detected. This will allow the Scenario Scheduler to correct the situation before the problem happens. The predictive model is evolved automatically over time via telemetry updates thus reducing the cost of implementing and maintaining the models by an order of magnitude from previous efforts at GSFC such as the model-based system built for MAP in the mid-1990's. This paper will describe the key features, lessons learned and implications for future missions once this system is successfully validated on-orbit in 2006.