Search NASA⌕ Search

SEARCH · Search NASA

Results for “policy and regulatory analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Task 12 PV Sustainability - Human Health Risk Assessment Methods for PV, Part 3: Module Disposal Risks

End-of-life management is important for addressing large future photovoltaic (PV) waste volumes and conserving raw materials for use in new PV modules. In regions without regulatory mandates for PV recycling, end-of-life PV modules can be disposed in accordance with general waste laws. Given the use of various metals as raw materials in semiconductor compounds and electrical contacts in commercial PV modules, some stakeholders have raised concerns regarding potential environmental impacts if PV modules are subject to improper disposal instead of being recycled or disposed in sanitary landfills, as is required in most world regions. To evaluate these concerns, screening-level risk assessment methods are developed herein that evaluate potential human health risks from groundwater and surface (air, soil, surface water) exposure pathways. The methods estimate potential impacts from disposal of end-of-life (EOL) PV modules in non-sanitary landfills under the following worst-case conditions: no leachate collection or groundwater monitoring, no liner for preventing leachate migration, uncovered waste, and lack of stormwater management. Examining worst-case conditions allows the exploration of maximum potential risk to attempt to ensure disposal does not increase health risk above regulatory thresholds. Specifically, this report presents an analysis of potential human health risks associated with non-sanitary landfill disposal for three PV technologies, focusing on release of the highest-prioritized chemical element for each: lead (Pb) in crystalline-silicon (c-Si) PV modules, cadmium (Cd) in thin film cadmium telluride (CdTe) PV modules, and selenium (Se) in thin film copper indium selenide (CIS) PV modules. The prioritization of these chemical elements for analysis is based on stakeholder interest. Because the methodology is chemical-specific, the risk assessment results for these chemicals cannot be directly generalized to other chemicals, although the risk assessment methodology can be applied to other chemicals. If the chemicals chosen are indeed the ones presenting greatest risk, then the results herein should represent the upper bound of health risk from exposure to a single constituent.

14 SOLAR ENERGY↗

Virtual Power Plants and Energy Justice

The Federal Energy Regulatory Commission's (FERC) Order 2222, issued in September 2020, removes barriers for distributed energy resources (DERs) to participate in wholesale energy markets by allowing DERs to aggregate and participate in wholesale markets as a single entity, known as a virtual power plant (VPP). VPPs can provide balancing, reliability, and resiliency grid services and can participate in capacity, energy and ancillary services markets. They can also increase customer energy access and lower electricity bills. This report focuses on VPP business models, including considerations of energy justice (EJ). Through an analysis of the VPP value chain, business models, programs, and pilots, several VPP applications are identified and grouped by their ability to have quantitatively measurable or monetized benefits. Benefits and barriers specific to underserved communities are outlined, and VPP programs with an intentional focus on underserved communities are compared to those without such a focus.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States (2023 Edition)

Estimates of the potential of renewable energy are essential for understanding how we can decarbonize our electric grid and economy. They provide key data for policymakers, land managers, and energy modelers by defining the quantity, quality, and cost of renewable resources. However, estimating renewable energy potential is challenging and requires frequent updates because of rapid advances in technology, cost reductions, and uncertainty about developable land that are due to social, regulatory, and environmental factors. Additionally, the complex processes involved in renewable energy development require regular reviews of methods and assumptions, which can also impact our understanding of renewable potential. In this, the 2023 edition of this annual report, we present new estimates of the technical potential for land-based wind and solar photovoltaics (PV) for the contiguous United States (CONUS). We also provide cost estimates for the available resources, presenting representative supply curves that can be used in downstream modeling and analysis. Additionally, we introduce the new methodologies used to estimate wind capacity, wind energy losses, transmission cost and representation, updated technology cost and design, and scenarios of siting constraints designed to help bound the uncertainty of renewable potential.

14 SOLAR ENERGY↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High Temperature Electrolysis Hydrogen Production Plant

Two generic probabilistic risk assessments (PRA) for the addition of a heat extraction system (HES) addition to a light water reactor (LWR) are performed, one for a pressurized water reactor (PWR) and one for a boiling water reactor (BWR). The results investigate the applicability of the potential licensing approaches which do not require a full U.S. Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic, and some assumptions are made. Many conservative assumptions from a the preliminary PWR PRA report were eliminated using design data for both the HES and the high temperature electrolysis facility (HTEF). The results of the PRA indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all DBAs, none exceeding 5.6%. The PRA results for CDF and LERF support the use of RG 1.174 as further risk information that supports a change without a full LAR. Further insights provided through hazard analysis and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and a HTEF sited at 1.0 km from the NPP is strong and that the placement of a HTEF at 0.5 km is a viable case. Site specific information can alter these conclusions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Interactions of Wind Energy Project Siting, Wind Resource Potential, and the Evolution of the U.S. Power System

The interactions of wind energy project siting, resource potential, and power system evolution are critical to understand given interest in high renewable energy systems, particularly as wind costs have fallen and grid operators implement solutions to manage variable generation. This study applies an integrative approach that combines spatially-explicit resource potential analysis with high spatial resolution U.S. electricity system modeling. Multiple wind supply curves, representing variations in siting regimes that account for interactions with built infrastructure, regulatory, physical, and social land use factors, are evaluated to determine how siting could influence prospective wind development. Different siting regimes lead to variations in future wind capacity, with the greatest impacts observed under scenarios with high demand for clean energy. With the tightest emissions limit modeled, 2050 onshore wind capacity varied by +7% (49 GW) in the least-restrictive siting regime to a decrease of 37% (270 GW) under the most-constrained case. More-stringent siting restrictions lead to higher electricity prices and emissions that should be weighed with local impacts. Under restrictive siting regimes, wind deployment is also sensitive to transmission availability and wind plant design. Overall, the findings highlight the importance of local land use considerations in regional and national power system planning.

17 WIND ENERGY↗

Ecological Impacts of the Space Shuttle Program at John F. Kennedy Space Center, Florida

The Space Shuttle Program was one of NASAs first major undertakings to fall under the environmental impact analysis and documentation requirements of the National Environmental Policy Act of 1969 (NEPA). Space Shuttle Program activities at John F. Kennedy Space Center (KSC) and the associated Merritt Island National Wildlife Refuge (MINWR) contributed directly and indirectly to both negative and positive ecological trends in the region through the long-term, stable expenditure of resources over the 40 year program life cycle. These expenditures provided support to regional growth and development in conjunction with other sources that altered land use patterns, eliminated and modified habitats, and contributed to cultural eutrophication of the Indian River Lagoon. At KSC, most Space Shuttle Program related actions were conducted in previously developed facilities and industrial areas with the exception of the construction of the shuttle landing facility (SLF) and the space station processing facility (SSPF). Launch and operations impacts were minimal as a result of the low annual launch rate. The majority of concerns identified during the NEPA process such as potential weather modification, acid rain off site, and local climate change did not occur. Launch impacts from deposition of HCl and particulates were assimilated as a result of the high buffering capacity of the system and low launch and loading rates. Metals deposition from exhaust deposition did not display acute impacts. Sub-lethal effects are being investigated as part of the Resource Conservation and Recovery Act (RCRA) regulatory process. Major positive Space Shuttle Program effects were derived from the adequate resources available at the Center to implement the numerous environmental laws and regulations designed to enhance the quality of the environment and minimize impacts from human activities. This included reduced discharges of domestic and industrial wastewater, creation of stormwater management systems, remediation of past contamination sites, implementation of hazardous waste management systems, and creation of a culture of sustainability. Working with partners such as the USFWS and the St Johns River Water Management District (SJRWMD), wetlands and scrub restoration and management initiatives were implemented to enhance fish and wildlife populations at the Center. KSC remains the single largest preserve on the east coast of Florida in part due to NASAs commitment to stewardship. Ongoing Ecological Program projects are directed at development of information and knowledge to address future KSC management questions including the transition to a joint government and commercial launch facility, enhanced habitat management requirements for wetlands and scrub, potential impacts of emerging contaminants, and adaptation to climate change including projected sea level rise over the next 50-75 years.

Space Shuttle Program↗

Behavioral and Population Data-Driven Distribution System Load Modeling

Distribution system residential load modeling and analysis for different geographic areas within a utility or an independent system operator territory are critical for enabling small-scale, aggregated distributed energy resources to participate in grid services under Federal Energy Regulatory Commission Order No. 2222 [1]. In this study, we develop a methodology of modeling residential load profiles in different geographic areas with a focus on human behavior impact. First, we construct a behavior-based load profile model leveraging state-of-the-art appliance models. We simulate human activity and occupancy using Markov chain Monte Carlo methods calibrated with the American Time Use Survey data set. Second, we link our model with cleaned Current Population Survey data from the U.S. Census Bureau. Finally, we populate two sets of 500 households using California and Texas census data, respectively, to perform an initial analysis of the load in different geographic areas with various group features (e.g., different income levels). To distinguish the effect of population behavior differences on aggregated load, we simulate load profiles for both sets assuming fixed physical household parameters and weather data. Analysis shows that average daily load profiles vary significantly by income and income dependency varies by locality.

American Time Use Survey↗

Virtual Power Plant Architecture and Resilient Design

Virtual Power Plants (VPPs) represent a fundamental shift in electric grid operations, aggregating distributed energy resources (DERs) such as solar panels and battery storage to deliver utility-scale grid services traditionally provided by centralized power plants. This report examines the unique architectural, operational, and digital assurance considerations that distinguish VPPs from conventional utility infrastructure as they scale from pilot projects to mainstream deployment across the United States. While VPPs offer significant opportunities for grid modernization and enhanced flexibility, their distributed, multi-stakeholder architecture introduces distinct security challenges that differ fundamentally from traditional generation facilities. The analysis identifies risks in VPP operations, including device-level security gaps, platform vulnerabilities, and communication protocol weaknesses that create expanded attack surfaces compared to centralized power plants. Through examination of real-world incidents and emerging threat patterns, the report demonstrates how some VPPs' reliance on consumer-owned devices, public internet infrastructure, and complex vendor ecosystems require new approaches to digital assurance and operational security. The findings provide practical guidance for utilities, regulators, and aggregators to implement robust security frameworks and operational best practices essential for maintaining grid reliability as VPP deployment accelerates under the Federal Energy Regulatory Commission (FERC) Order 2222 and related regulatory initiatives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Risk Assessment of a Light-Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This report details an expansion of the original two generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to a light-water reactor, one for a pressurized-water reactor and one for a boiling-water reactor. The new material in this revision includes a new HES design, direct electrical coupling of the nuclear power plant to the High-Temperature Electrolysis Facility (HTEF), and a smaller 100-MWt HTEF analysis. The results investigate the applicability of the potential licensing approaches, which do not require a full United States Nuclear Regulatory Commission licensing review. The PRAs are generic and include some assumptions. We eliminated many conservative assumptions from the preliminary pressurized-water reactor PRA report using design data for both the HES and HTEF. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 5.6%. The PRA results for core damage frequency and large early release frequency support the use of RG 1.174 as further risk information that supports a change without a full licensing amendment review. Further insights provided through hazard analyses and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and an HTEF sited 1.0 km from the nuclear power plant is strong and that the placement of a HTEF at 0.5 km is also a viable case. Site-specific information can alter these conclusions.

08 HYDROGEN↗

Overview of the Electrification of Transportation in Hawaii

This document is a summary of electric vehicle (EV) experiences in Hawaii. It is meant to be informative but does not present any new technical analysis except for the development of key lessons learned that could be applied in similar contexts. The electrification of transportation is essential for Hawaii's energy goal. An electrification of transportation strategy complements other energy policy goals, increases clean energy impacts, and provides customer value. By the end of 2020, there were over 12,000 EVs registered in Hawaii (about 1 percent of all cars). That number is expected to grow, based on the results from recent surveys and studies in Hawaii. Surveys pointed out the need for more charging stations, especially in places where people do business or park for long periods of the day. Participation in controlled charging programs should have attractive incentives since a majority of EV owners would not be willing to interrupt their EV charging for demand response. Various studies have confirmed the EV potential in Hawaii. For example, the JUMPSmart Maui demonstration project, a public-private partnership with Japan, helped to establish the EV charging station infrastructure in Maui and provided important information about charging behaviors. A critical backbone study commissioned by the utility recommended that 3,600 public chargers be installed by 2030 on the five islands, which confirms the need for infrastructure improvements expressed in earlier surveys. The process that emerged in Hawaii can be an example to other locations, which could heed the lessons from Hawaii's EV experiences: The importance of an overarching energy goal/objective based on a shared vision; planning and pilot projects; a strategic plan (roadmap) leveraging on initial experiences; evaluation of the effectiveness/success of actions; fine-tuning as needed; close regulatory oversight and stakeholder participation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WECC Wide-Area Oscillation Assessment and Trending Study Report

This project, Wide-area Oscillation Analysis and Trending Study, is sponsored by the Office of Electricity (OE) of the Department of Energy (DOE) who tasked Northwest National Laboratory (PNNL) to conduct this research. Staff of Federal Energy Regulatory Commission (FERC) have been involved in the project as observers and have provided advisory comments and suggestions. The primary objective of this study is to assess whether there are significant trends in the wide-area oscillatory behavior with respect to the significant generation-mix changes brought by the increased penetration of RES in the WECC system. The work performed in this project is considered to be complimentary to previous work by NERC/industry and covers the aspects that have not been studied or trended before. The trending analysis presented in this report can serve as reference for future grid planning and operation of the WECC system. In this report, how the changes in the generation mix can impact the frequency and damping ratio (DR) of WECC wide-area oscillation modes has been studied. Thorough data-based and model-based analyses have been carried out to analyze the current trends and then extended to evaluate the oscillation behaviors of the future WECC system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sampling and Analysis Plan for Investigation of Undeclared Nuclear Activities - 20104

The nuclear-centered energy policy in South Korea is moving towards a nuclear-free era. It also facilitates an action or progress on the denuclearization of the Korean peninsula. The Nuclear Safety and Security Commission (NSSC) launched a new R and D project which attempts to verify nuclear activities via analyzing environmental samples. Environmental samples possibly contain significant radiological information relevant to past undeclared activities. In order to precisely verify them, it is essential to provide 1) the concrete information of target facilities, 2) appropriate methodologies and procedures, and 3) well-suited instrumentation and equipment corresponding to sample signatures. It is also important to provide scientific reliability or validity in any process such as sample collection, handling, transportation and laboratory analysis. Therefore, the information of nuclear facilities (fuel fabrication plant, graphite moderated reactor, reprocessing plant) in North Korea are reviewed in order to determine parameters for appropriate sampling methods representing a facility's characteristics. Secondly, a sampling procedure for radioactive elements is being developed based on international and domestic standards such as ASTM (American Society for Testing and Materials), KS (Korean industrial Standards), and International Atomic Energy Agency (IAEA) manuals. The procedure contains some specific information including sampling process, sampling tools, amount of sample, sample identification, and other related information. Developing the qualified national guidelines is most important since sampling and analyzing results can be used as evidences of nuclear activities. The guideline developed through this work will clearly define various methodologies such as document verification, sampling procedures, collection methods, sample storage criteria, chain of custody, and transportation conditions. The final objective of this work is to establish the infrastructure and regulatory framework for assessment of nuclear activities, and provide a national guideline for sampling and analysis. This will bring confidence in the results and play a critical role in complete denuclearization progress in South Korea. (authors)

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Cyber Resilience and Social Equity: Twin Pillars of a Sustainable Energy Future

This paper examines the intersection of security and accessibility within energy systems amidst the rise of grid modernization and digitization, especially considering the regulatory changes and the imperatives of inclusive energy strategies. It addresses the dual need for secure, resilient infrastructure and a commitment to mitigate energy poverty while maintaining equitable access to energy. Amid escalating cybersecurity and physical threats, the paper advocates for sustainable energy delivery systems that ensure robust defenses without compromising the goals of reducing energy poverty and ensuring energy security. This paper identifies the pressing need for Cyber-Informed Engineering (CIE) and Secure-by-Design (SbD) principles, highlighting how these strategies can protect critical infrastructure and democratize access to secure energy, particularly for disadvantaged communities. The analysis underscores the challenges presented by the expansion of attack surfaces, interoperability requirements, and grid-edge analytics, offering innovative solutions that leverage advanced technologies and data-driven insights. Furthermore, this paper addresses the workforce development gap, emphasizing the necessity for public-private partnerships and vendor engagement in creating a skilled cybersecurity workforce. This paper has a dual focus on both the technological aspect of cybersecurity and the social dimension of equity within the context of sustainable energy development. It suggests a comprehensive examination of how these two critical elements interact and support the overarching goal of a sustainable energy future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Large reductions in Permian Basin methane intensity shown in multi-year comparison of aerially-visible methane emissions

Spanning the US states of Texas and New Mexico, the Permian Basin has been a hotspot of methane emissions from oil and natural gas activity 1–4, although studies disagree over the magnitude of these emissions. The most comprehensive measurement campaigns published were conducted in 2019 1–5 .There have been large changes in the energy industry since then, including in the prices of oil and gas, both state and federal regulatory environments, investor and activist pressure over methane emissions, and the adoption of new technologies and policies by energy operators. Understanding how any or all of these might influence methane emissions is important for policy makers, oil and gas operators, and other stakeholders. We characterize the time evolution of Permian Basin methane emissions using a series of comprehensive aerial surveys conducted every year from 2020-2023 and compare them to the 2019 results cited above. To maintain comparability, all the data sets are from surveys using Insight M point source methane sensing technology. The scope of these surveys expanded over time: from 33-46% of wells, oil production, and gas production in 2020 to 60-65% in 2021, to 84% of wells and over 90% of both oil and gas production in 2023. These surveys by Insight M also include hundreds of gas processing plants and compressor stations as well as 1000s of km of gathering and transmission pipelines. Considering only the aerially detected portion of emissions (typically the majority of the total in such surveys 4), we find reductions of more than 70% in methane emissions intensity compared to the 2019 New Mexico-only Insight M survey, with variation depending on the year 3,4. Notably, although sources below 100 kg/hr contributed less than 10% of aerially measured emissions the 2019 New Mexico survey 3, these smaller sources constitute a larger proportion of total aerially measured emissions (although not the majority) in 2020-2023. Production facilities and gathering pipelines are responsible for the larges shares of total emissions, followed by compressor stations and gas processing plants. Permian methane emissions were also measured in a comprehensive 2019 Permian-wide survey by the Carbon Mapper team 2. That analysis led to a lower total emissions estimate at the time 4. These new Insight M-based emission rates are still roughly 30-70% lower than the aerially measured portion of the 2019 Carbon Mapper-based estimates 4. Further work is needed to harmonize these surveys in space and time to create the most intercomparable numbers possible 5. Additional analysis is needed to compare our findings to the more spatially constrained 2020, 2021, and 2023 Carbon Mapper surveys in the Permian 4,6. The evidence is strong from these two survey teams that emissions intensity has declined significantly since 2019. Reasons for this trend are currently unclear but point to possible success of emissions control programs. Future work investigating frequency, source, and operator-specific intensities could provide insights into the causes of this promising trend.

methane, oil and gas, data science, remote sensing↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Advances in Resin Management Using 3R-Scan - 20154

The most important factor underlying optimal waste management is developing a clear picture of the radioactivity content of the waste and its impact on waste disposal cost. For over 35 years since the publishing of 10CFR61, waste characterization has relied on sampling the final waste product after formation. In the days following 10CFR61, the cost of final disposal was marginal with only a small impact on the overall costs. Constraints were added by provisions of the Low Level Waste Policy Act of 1985 leading to increasingly limited access to those disposal sites that remained available. In addition, Nuclear Regulatory Commission (NRC) pressure promoting waste volume reduction led to disposal costs inevitably rising. Despite this, characterization practices in monitoring of waste generation for activity content still center on the same dated processes. This results in a disposal classification on the basis of endpoint sampling without consideration of the homogeneity of the waste mixture. It can also disregard consideration of the representativeness of the single or small sample base. As a minimum effort, a formalized sampling program of a fixed grouping of waste streams can be implemented that could account for more than 95% of all of the activity carried in solid waste products. The sample results for each radionuclide could then be trended as time passes to develop reasonable scaling factors for difficult to measure radionuclides. This process, identified in NRC guidance, has been rigorously followed by a relatively small number of facilities. The trended scaling factors serve to improve accuracy by identifying anomalous results that could otherwise go undetected. Direct monitoring of the accumulation of activity in process streams generating solid radwaste, including demineralizers and filter streams, is a more precise approach. Nearly all of these streams are monitored by plant chemistry on a regular schedule to maintain water quality. This paper discusses viable options for developing the basis for characterization through process monitoring of the accumulation of activity at the point of generation. Special focus is on resin bed tracking and how process knowledge of these streams can be brought together to form a consistent and precise solid waste radioactivity inventory. Some of the specific points covered in this paper include the merger of the fission product release computer program, 3R-STAT, with the radwaste sample analysis computer program, SCAN4 to create 3R-SCAN, the importance of individual waste stream influences on the overall source term, and the use of historic sample data to develop scaling factors using an automated process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗