Search NASA⌕ Search

SEARCH · Search NASA

Results for “probabilistic framework”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Enabling Dynamic Probabilistic Risk Assessment of Physical Security Using EMRALD and MAAP

The optimization of physical security in nuclear power plants requires sophisticated methodologies that integrate operator actions and plant behavior through advanced simulation tools. To address this, Idaho National Laboratory [JL2.1]has developed the Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF) methodology, an approach that integrates force-on-force simulations, dynamic probabilistic risk assessment, and thermal-hydraulics modeling [JL3.1]to enhance security planning while reducing costs. We developed a tool that produces reduced order models using thermal hydraulic simulations from the Modular Accident Analysis Program (MAAP) [1]. These models can quickly evaluate reactor core behavior during attack simulations, and in so doing, address two barriers of traditional methods: (1) MAAP simulations are computationally intensive, and (2) attack scenarios must be run in a secure environment, which complicates analysis and validation. By precomputing scenario outcomes for a small number of modified parameters, the reduced order model significantly decreases the computational cost and enables offsite review of the results.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk-Informed Safety Assurance and Probabilistic Assessment of Mission-Critical Software-Intensive Systems

This report validates and documents the detailed features and practical application of the framework for software intensive digital systems risk assessment and risk-informed safety assurance presented in the NASA PRA Procedures Guide for Managers and Practitioner. This framework, called herein the "Context-based Software Risk Model" (CSRM), enables the assessment of the contribution of software and software-intensive digital systems to overall system risk, in a manner which is entirely compatible and integrated with the format of a "standard" Probabilistic Risk Assessment (PRA), as currently documented and applied for NASA missions and applications. The CSRM also provides a risk-informed path and criteria for conducting organized and systematic digital system and software testing so that, within this risk-informed paradigm, the achievement of a quantitatively defined level of safety and mission success assurance may be targeted and demonstrated. The framework is based on the concept of context-dependent software risk scenarios and on the modeling of such scenarios via the use of traditional PRA techniques - i.e., event trees and fault trees - in combination with more advanced modeling devices such as the Dynamic Flowgraph Methodology (DFM) or other dynamic logic-modeling representations. The scenarios can be synthesized and quantified in a conditional logic and probabilistic formulation. The application of the CSRM method documented in this report refers to the MiniAERCam system designed and developed by the NASA Johnson Space Center.

Guarro, Sergio B.↗

Error mitigation in variational quantum eigensolvers using tailored probabilistic machine learning

Quantum computing technology has the potential to revolutionize the simulation of materials and molecules in the near future. A primary challenge in achieving near-term quantum advantage is effectively mitigating the noise effects inherent in current quantum processing units (QPUs). This challenge is also decisive in the context of quantum-classical hybrid schemes employing variational quantum eigensolvers (VQEs) that have attracted significant interest in recent years. In this paper, we present a method that employs parametric Gaussian process regression (GPR) within an active learning framework to mitigate noise in quantum computations, focusing on VQEs. Our approach, grounded in probabilistic machine learning, exploits a custom prior based on the VQE ansatz to capture the underlying correlations between VQE outputs for different variational parameters, thereby enhancing both accuracy and efficiency. We demonstrate the effectiveness of our method on a two-site Anderson impurity model and a eight-site Heisenberg model, using the IBM open-source quantum computing framework, Qiskit, showcasing substantial improvements in the accuracy of VQE outputs while reducing the number of direct QPU energy evaluations. This paper contributes to the ongoing efforts in quantum-error mitigation and optimization, bringing us a step closer to realizing the potential of quantum computing in quantum matter simulations. Published by the American Physical Society 2024

97 MATHEMATICS AND COMPUTING↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y Zhu↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y. Zhu↗

Assessing the design of integrated methane sensing networks

Abstract While methane is the second largest contributor to global warming after carbon dioxide, it has a larger warming effect over a much shorter lifetime. Despite accelerated technological efforts to radically reduce global carbon dioxide emissions, rapid reductions in methane emissions are needed to limit near-term warming. Being primarily emitted as a byproduct from agricultural activities and energy extraction, methane is currently monitored via bottom–up (i.e. activity level) or top–down (via airborne or satellite retrievals) approaches. However, significant methane leaks remain undetected and emission rates are challenging to characterize with current monitoring frameworks. In this paper, we study the design of a layered monitoring approach that combines bottom–up and top–down approaches as an integrated sensing network. By recognizing that varying meteorological conditions and emission rates impact the efficacy of bottom–up monitoring, we develop a probabilistic approach to optimal sensor placement in its bottom–up network. Subsequently, we derive an inverse Bayesian framework to quantify the improvement that a design-optimized integrated framework has on emission-rate quantifications and their uncertainties. We find that under realistic meteorological conditions, the overall error in estimating the true emission rates is approximately 1.3 times higher, with their uncertainties being approximately 2.4 times higher, when using a randomized network over an optimized network, highlighting the importance of optimizing the design of integrated methane sensing networks. Further, we find that optimized networks can improve scenario coverage fractions by more than a factor of 2 over experimentally-studied networks, and identify a budget threshold beyond which the rate of optimized-network coverage improvement exhibits diminishing returns, suggesting that strategic sensor placement is also crucial for maximizing network efficiency.

54 ENVIRONMENTAL SCIENCES↗

Uncertainty Quantification and Sensitivity Analysis in Process-Structure-Property Simulations for Laser Powder Bed Fusion Additive Manufacturing

Process variations and process-induced defects like porosity cause significant uncertainty in the microstructure and mechanical behavior of additively manufactured metals. Establishing process-structure-property (PSP) relationships and quantifying uncertainty using experiments alone is costly, especially for structural applications where mechanical allowables must be established for qualification and certification. This work presents a PSP simulation framework for laser powder bed fusion with a focus on uncertainty quantification through probabilistic calibration and multi-fidelity uncertainty propagation. Motivated by phenomenological input parameters related to grain nucleation and growth that are difficult to characterize, a global sensitivity analysis (GSA) is completed. Through GSA, the most important input parameters are identified based on their influence on the statistical distributions of microstructural metrics that influence mechanical behavior, including grain size, morphology, and crystallographic texture. The results provide insight on what experiments are necessary to quantify and control PSP uncertainties, particularly those associated with the more challenging input parameters.

additive manufacturing↗

Impact of representative ground motion level on seismic PSA with the boundary between overestimation and underestimation

One commonly used approach in seismic probabilistic safety assessment (PSA) is the discrete method. This method follows the standard PSA framework and can be applied to various models, such as multi-unit models, while reducing computational costs using standard software. However, due to the inability to subdivide intervals infinitely, the discrete method approximates with a finite number of subintervals. In practice, different numbers of subintervals are applied, and the representative ground motion level is selected based on expert judgment. When employing a smaller number of subintervals, it is important to take caution to prevent underestimation. This study analyzes the impact of the representative ground motion level on seismic risk. It confirms that underestimation can occur with a small number of subintervals depending on the representative ground motion level. This study also proposes a method for determining the boundary of underestimation and overestimation. The method is demonstrated through examples, providing a mathematical foundation for selecting appropriate representative ground motion levels. By avoiding underestimation, this research helps prevent the oversight of significant risk contributors and enhances the understanding of seismic risk.

99 - GENERAL AND MISCELLANEOUS↗

Certainty grids for mobile robots

A numerical representation of uncertain and incomplete sensor knowledge called Certainty Grids has been used successfully in several mobile robot control programs, and has proven itself to be a powerful and efficient unifying solution for sensor fusion, motion planning, landmark identification, and many other central problems. Researchers propose to build a software framework running on processors onboard the new Uranus mobile robot that will maintain a probabilistic, geometric map of the robot's surroundings as it moves. The certainty grid representation will allow this map to be incrementally updated in a uniform way from various sources including sonar, stereo vision, proximity and contact sensors. The approach can correctly model the fuzziness of each reading, while at the same time combining multiple measurements to produce sharper map features, and it can deal correctly with uncertainties in the robot's motion. The map will be used by planning programs to choose clear paths, identify locations (by correlating maps), identify well-known and insufficiently sensed terrain, and perhaps identify objects by shape. The certainty grid representation can be extended in the same dimension and used to detect and track moving objects.

Moravec, H. P.↗

Endogenizing Probabilistic Resource Adequacy Risks in Deterministic Capacity Expansion Models

In this work, we demonstrate how power system capacity expansion models can understate the stochastic effects of thermal outages when considering resource availabilities on an hourly expected value basis, yielding system designs with multiple orders of magnitude more shortfall risk than stated adequacy targets. We develop a novel approximation approach to efficiently endogenize awareness of this risk in a deterministic, linear capacity expansion framework. We compare this approach to exogenous tuning of an energy reserve margin, the leading alternative method to compensate for unmodeled probabilistic shortfall risk. Empirical results from a test system show that the new endogenous method cost-effectively meets all regional reliability targets with a single optimization solve, and produces a near-identical system design as the incumbent method without the need for repeated re-optimizations to find an appropriate reserve level. The endogenous method may also use iterative re-optimizations to further improve solution quality, although these incremental benefits were modest in the system studied.

capacity expansion modeling↗

AI/ML-Enhanced Wind Forecasts for Reducing Uncertainty in Prescribed Fire Planning

Prescribed fire is a vital tool for ecosystem management and wildfire risk reduction but its escalation is constrained by overly conservative burn windows because of uncertainties, for instance, in wind forecasts. This review describes the state of the art in weather product use by fire/smoke models and identifies three priority research gaps that artificial intelligence/machine learning (AI/ML) is well positioned to address: (1) spatial and temporal downscaling to meter-scale, sub-hourly wind fields; (2) bias correction for systematic model errors in complex terrain; and (3) robust uncertainty quantification to inform ensemble-based simulations. Emerging AI/ML techniques offer promising frameworks to address all three challenges. By providing high-resolution, bias-corrected, and probabilistic wind fields, AI/ML-enhanced forecasts will allow for expanded burn windows, improved ignition strategy design and a reduced reliance on expert intuition, especially when a prescribed fire is introduced into new areas.

54 ENVIRONMENTAL SCIENCES↗

Light Water Reactor Sustainability Program: Upgrade of EMRALD to a Modern JavaScript-based Framework

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs, running, and using their results within EMRALD for dynamic and integrated assessment. This report goes over the work performed as part of the Risk-Informed Systems Analysis Pathway under the Light Water Reactor Sustainability program to upgrade the EMRALD software.

97 MATHEMATICS AND COMPUTING↗

Multi-Modal Active Perception for Autonomously Selecting Landing Sites on Icy Moons

Selecting suitable landing sites is fundamental to achieving many mission objectives in planetary robotic lander missions. However, due to sensing limitations, landing sites which are both safe and scientifically valuable often cannot be determined reliably from orbit, particularly, in icy moon missions where orbital sensing data is noisy and incomplete. This paper presents an active perception approach to Entry Descent and Landing (EDL) which enables the lander to autonomously plan informative descent trajectories, acquire high quality sensing data during descent and exploit this additional information to select higher utility landing sites. Our approach consists of two components: probabilistic modeling of landing site features and approximate trajectory planning using a sampling based planner. The proposed framework allows the lander to plan long horizons paths and remain robust to noisy data. Results in simulated environments show large performance improvements over alternative approaches and show promise that our approach has strong potential to improve science return of not only icy moon missions but EDL systems in general.

autonomy↗

Risk management for the Space Exploration Initiative

Probabilistic Risk Assessment (PRA) is a quantitative engineering process that provides the analytic structure and decision-making framework for total programmatic risk management. Ideally, it is initiated in the conceptual design phase and used throughout the program life cycle. Although PRA was developed for assessment of safety, reliability, and availability risk, it has far greater application. Throughout the design phase, PRA can guide trade-off studies among system performance, safety, reliability, cost, and schedule. These studies are based on the assessment of the risk of meeting each parameter goal, with full consideration of the uncertainties. Quantitative trade-off studies are essential, but without full identification, propagation, and display of uncertainties, poor decisions may result. PRA also can focus attention on risk drivers in situations where risk is too high. For example, if safety risk is unacceptable, the PRA prioritizes the risk contributors to guide the use of resources for risk mitigation. PRA is used in the Space Exploration Initiative (SEI) Program. To meet the stringent requirements of the SEI mission, within strict budgetary constraints, the PRA structure supports informed and traceable decision-making. This paper briefly describes the SEI PRA process.

Buchbinder, Ben↗

LLMs and GenAI Tools to Depict Contributions of Human Systems to Spaceflight Tasks Execution

Recent advancements in Artificial Intelligence and Machine Learning (AI/ML) technologies, particularly Large Language Models (LLMs) capable of sophisticated syntax analysis, offer substantial potential in automating complex processes, thereby saving time and human resources. This study explores the development of an LLM-driven model designed to analyze and categorize a diverse set of Mars mission tasks into 18 predefined Human System Task Categories (HSTCs) based on their textual descriptions. As part of developing the Crew Health and Performance – Probabilistic Risk Assessment (CHP-PRA projects Performance Risk Model (PRisM) proof-of-concept, we established a framework to project performance scores from small-scale tests onto a preliminary list of Mars tasks. The foundation of our model was a comprehensive spreadsheet populated by NASA experts and clinicians, which detailed each Mars task alongside binary indicators of HSTC involvement. This dataset enabled the initial application of supervised ML, training and testing on existing HSTC labels. The HSTCs were originally defined from a medical system perspective, focusing on task impairments due to deteriorated human health. To expand our model's scope to include categories impacting performance, we face the challenge of generating binary labels (0 or 1) for new categories without pre-existing data. We address this by employing Generative AI (GenAI) software to determine whether a given task involved a new category by asking, "Does task A involve using category B?" We validate our approach by comparing the GenAI's binary classifications with the expert-provided labels for existing HSTCs. Notably, we utilize Ollama [4], a locally hosted GenAI tool that does not require cloud access, thus safeguarding NASA's proprietary data from unauthorized exposure. This study demonstrates the feasibility of leveraging cutting-edge AI tools to advance research, paving the way for automation and rapid decision-making in space exploration.

Mona Matar↗

Reduced Complexity Model Intercomparison Project Phase 2: Synthesizing Earth System Knowledge for Probabilistic Climate Projections

Over the last decades, climate science has evolved rapidly across multiple expert domains. Our best tools to capture state-of-the-art knowledge in an internally self-consistent modelling framework are the increasingly complex fully coupled Earth System Models (ESMs). However, computational limitations and the structural rigidity of ESMs mean that the full range of uncertainties across multiple domains are difficult to capture with ESMs alone. The tools of choice are instead more computationally efficient reduced complexity models (RCMs), which are structurally flexible and can span the response dynamics across a range of domain-specific models and ESM experiments. Here we present Phase 2 of the Reduced Complexity Model Intercomparison Project (RCMIP Phase 2), the first comprehensive intercomparison of RCMs that are probabilistically calibrated with key benchmark ranges from specialized research communities. Unsurprisingly, but crucially, we find that models which have been constrained to reflect the key benchmarks better reflect the key benchmarks. Under the low-emissions SSP1-1.9 scenario, across the RCMs, median peak warming projections range from 1.3 to 1.7°C (relative to 1850-1900, using an observationally-based historical warming estimate of 0.8°C between 1850-1900 and 1995-2014). Further developing methodologies to constrain these projection uncertainties seems paramount given the international community's goal to contain warming to below 1.5°C above pre-industrial in the long-term. Our findings suggest that users of RCMs should carefully evaluate their RCM, specifically its skill against key benchmarks and consider the need to include projections benchmarks either from ESM results or other assessments to reduce divergence in future projections.

Climate↗

Reliability-Based Damage Tolerance Framework for Achieving Highly Reusable Launch Systems

The United States Space Force and NASA are exploring approaches that enable rapid launch response via highly reusable launch systems. One hindrance to achieving high reusability is the inability to meet damage tolerance requirements. To this end, a framework for applying reliability-based damage tolerance to space structures is presented. The reliability-based approach employs probabilistic distributions of key input variables such as material properties, geometry, loads, inspection probability, and defect characteristics to predict hardware reliability for the planned mission life. The probabilistic variables needed to perform the reliability assessments are defined and recommendations on how to collect the required data are provided. Several example problems illustrate the implementation and execution of this approach.

Leland Shimizu↗