Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Zero Energy University Campuses: A 2018 Progress Update on Reaching Campus Energy Goals

Many universities have aggressive energy-reduction and climate action plans. To reach these goals, leading universities have developed a suite of common energy-efficiency and renewable generation strategies. In this paper, we present a common set of approaches across the following areas: zero energy campus definitions and planning, best practices for including energy targets in new construction procurement contracts and design guidelines, implementing pilot new construction zero energy projects, aggressively implementing best-in-class laboratory energy-efficiency strategies, planning for and optimizing on-site and off-site renewable energy projects, and high-performance district energy systems. Best practices are compiled from various experiences, including programs funded by the U.S. Department of Energy, Energy Efficiency and Renewable Energy program. The summary of these best practices is to reduce campus energy use and then meet the remaining campus energy needs with renewable energy. The fivestep process to developing and implementing campus energy-reduction plans is described: 1) determine baseline energy consumption, 2) analyze technology options, 3) develop a plan and set priorities, 4) implement the plan, and 5) evaluate progress. The process follows a logical hierarchy of actions to evaluate options by energy sector and set specific targets. It encompasses all energy systems on campus, recognizing that campus-wide measures have increased potential for reducing energy use. Common strategies are explained along with examples and results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chapter 4 - Environmental Sustainability Aspects of Forest Biomass Mobilisation. In the book Mobilisation of Forest Bioenergy in the Boreal and Temperate Biomes

The environmental sustainability of forest biomass procurement needs to be well understood, as the capacity of ecosystems to provide biomass without negative impacts on ecological functioning limits the biomass potential. Emerging bioenergy markets typically first take advantage of secondary residue streams of various wood processing industries and tertiary end-of-life residues. The use of these secondary and tertiary wood resources is not likely to compromise the environmental sustainability of forests. When these resources in any region become scarce or fully utilized, primary residues (i.e., by-products of forestry harvesting operations and silvicultural practices) such as branches, tops, and non-merchantable trees become increasingly targeted as feedstock sources. Forest biomass procurement in the boreal and temperate biomes should therefore not be analyzed as a stand-alone activity, but rather as an intensification of land use and of forest management, in which tree parts and trees are harvested in addition to conventional forest product fractions. Thus, principles of protection and sustainability should remain the same whether forests are managed for conventional forest products only or also for biomass for energy. Some modifications may be needed to properly identify and find mitigation strategies for sensitive conditions where field evidence suggests that the incremental removal of biomass or other forms of intensive management may not be sustainable. Silvicultural practices such as fertilization, competition control, and soil preparation are options to manage the microenvironment, tree growing conditions, and prevent or mitigate negative impacts. Moreover, landscape management regulations should be put in place to ensure that sufficient biodiversity-important features such as dead wood, aging stands, corridors, etc. are preserved. Special attention should then be directed to trees and stands with high biodiversity values or those important for maintaining ecosystem services which, without a bioenergy market, would have been left uncut. Applying the concept of adaptive forest management, ecological monitoring following harvesting operations, scientific field testing and modeling should be combined to produce better knowledge that could help improve practices. The forestry sector needs to start adapting to a future situation where it is expected to provide conventional forest products, biomaterials and bioenergy. To achieve this, good governance mechanisms such as landscape-level land use planning and science-based improvements of practices will become increasingly important to ensure sustainable forest product supply chains.

09 BIOMASS FUELS↗

Landing Humans and Human-Class Cargo on the Moon and Mars

For more than a decade, efforts have been ongoing at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, to land humans and large, human-rated cargo on planetary bodies like the Moon and Mars. This work continues today under the Center’s Lander Programs (LP) office. Recognizing MSFC’s heritage, NASA stood up the Human Landing System program at the Center in August 2019 to be responsible for spacecrafts that will land the next American astronauts on the Moon under Artemis. With work well underway for the historic Artemis III mission to land the first woman and first person of color on the lunar surface through the Appendix H Option A contract with SpaceX, LP is focused on the development of landers that will support the Agency’s long-term Artemis efforts at the Moon and NASA’s future at Mars. In March 2022, NASA announced its plan to solicit a second industry provider in addition to SpaceX to develop and demonstrate a lander that meets the program’s extended set of requirements for missions beyond Artemis III. Under the umbrella of Sustaining Lunar Development, these requirements will meet NASA’s needs for recurring, long-term access to the lunar surface, such as accommodating an increased crew size and delivering more mass to the surface. Additionally, NASA plans to leverage crewed lander development activities to procure and certify the design of landers capable of human-class cargo delivery. This paper will examine how the Lander Program office at MSFC is bridging from the initial demonstration phase of development for the Human Landing System program to the Sustaining Lunar Development phase and feeding forward to Mars. The requirements and lines of effort for landing humans and human class cargo will be discussed, as well as near-term and future milestones for the program.

Lemuel Carpenter↗

Biomass cofiring: another way to clean your coal

Demand for renewable power is burgeoning as state government impose increasingly rigorous environmental and procurement standards on the energy industry. Surprisingly, biomass cofiring has yet to attract much attention, even though it could help many utilities meet their renewable portfolio requirements, reduce carbon emissions, and solve other regional environmental problems. US developers, investors, and regulators should consider including cofiring as part of the energy mix going forward. This is the message of the article. Currently 28 US states and the District of Columbia have mandatory renewable portfolio standard (RPS) regimes and congress has both federal RPS and a national carbon regulation regime as top priority this session. Henry Waxman's RPS proposal, how HR 2454, the American Clean Energy and Security Act of 2009 includes cofiring as a renewable energy source. These options for cofiring biomass with a coal-fired power plant - direct, indirect and paralled cofiring are outlined. 2 figs., 1 photo.

01 COAL, LIGNITE, AND PEAT↗

Evaluation of DNA Extraction Efficiency in Diverse Algae Strains Using Commercial Kits and Lysis Approaches

Efficient DNA extraction is essential for accurately monitoring microalgae communities in large-scale cultivation systems such as raceway ponds and wastewater ponds. Traditional phenol chloroform extracts are a staple in microbiology but are obsolete for routine sampling due to its high toxicity reagents and time intensive setups. Commercial DNA extraction kits are more favorable for the microbes found in these ponds, but lack specific kits made for these communities. Little is known about which kits perform the best, leading researchers to use a variety of different kits with inconsistent results. This project compared one precipitation based commercial kit (Lucigen Masterpure) and five wash based kits (Monarch, Zymo Quick-DNA, and three Qiagen DNeasy kits) using four brackish algae strains to determine which methods yield the greatest quantity and quality of genomic DNA. Extractions were evaluated using the manufacturers protocol, and additional pretreatment options were administered before a single kit to compare its potential in being added routinely before extractions. Pretreatment options included both cryogenic freeze-thawing and heat incubation using enzymes. DNA was quantified using Qubit fluorometry and NanoDrop purity ratios. Overall, the Qiagen PowerWater kit provided the highest DNA yield and purity, but at a significantly higher cost then the precipitation-based kit (MasterPure). It was also noted that while the precipitation-based kit was significantly cheaper, provided similar results, it took significantly more time to complete a single run. Cryogenic pretreatment (6x cycles) increased average DNA yields by up to 80%, whereas enzymatic pretreatment most improved purity ratios without substantially improving quantity. The results suggest that it may be more cost and time efficient to use Qiagen kits with the addition of lysis pretreatments to procure better results. Future works includes developing a better system to efficiently collect multi variable data, and to upscale to artificial polycultures using similar methodologies alongside sequencing to confirm kit results.

59 BASIC BIOLOGICAL SCIENCES↗

Office of the Chief Financial Officer Annual Report 2007

2007 was a year of progress and challenges for the Office of the Chief Financial Officer (OCFO). I believe that with the addition of a new Controller, the OCFO senior management team is stronger than ever. With the new Controller on board, the senior management team spent two intensive days updating our strategic plan for the next five years ending in 2012, while making sure that we continue to execute on our existing strategic initiatives. In 2007 the Budget Office, teaming with Human Resources, worked diligently with our colleagues on campus to reengineer the Multi-Location Appointment (MLA) process, making it easier for our Principal Investigators (PIs) to work simultaneously between the Laboratory and UC campuses. The hiring of a point-of-contact in Human Resources to administer the program will also make the process flow smoother. In order to increase our financial flexibility, the OCFO worked with the Department of Energy (DOE) to win approval to reduce the burden rates on research and development (R&D) subcontracts and Intra-University Transfers (IUT). The Budget Office also performed a 'return on investment' (ROI) analysis to secure UCRP funding for a much needed vocational rehabilitation counselor. This new counselor now works with employees who are on medical leave to ensure that they can return to work in a more timely fashion, or if not able to return, usher them through the various options available to them. Under the direction of the new Controller, PriceWaterhouse Coopers (PWC) performed their annual audit of the Laboratory's financial data and reported positive results. In partnership with the Financial Policy and Training Office, the Controller's Office also helped to launch self-assessments of some of our financial processes, including timekeeping and resource adjustments. These self assessments were conducted to promote efficiencies and mitigate risk. In some cases they provided assurance that our practices are sound, and in others highlighted opportunities to improve. A third, and most important assessment on funds control was also conducted that proved very useful in making sure that our financial processes are sound and of the highest ethical standards. In June of 2007 the Procurement Department was awarded the DOE's FY2006 Secretarial Small Business Award for the advancement of small business contracts at Lawrence Berkeley National Laboratory (LBNL). The award was presented in Washington, D.C. Procurement also distinguished itself by passing the tri-ennial Procurement Evaluation and Re-engineering Team (PERT) Review of its systems and processes. We continue to reduce costs through the Supply Chain Initiative saving the Laboratory {approx}$6M to date and have placed over 11,000 orders with over seven vendors using the eBuy system. Our wall-to-wall inventory, which was completed in March of 2007, reported a result of 99+% for item count and 99.51% by value. This was a remarkable achievement that required the hard work of every Division and the Property Department working together. Training continues to be a major initiative for the OCFO and in 2007 we rolled out financial training programs specifically tailored to meet the needs of the scientific divisions. FY2008 presents several opportunities to enhance and improve our service to the scientific community. With the awarding of the HELIOS and JBEI programs, we will be developing new financial paradigms to provide senior management flexibility in decision making. Last year we heard the Laboratory community loud and clear when they expressed their frustration with our current travel system. As we head into the new fiscal year, a cross-functional travel team has identified a new model for how we provide travel services. We will be implementing the Oracle PeopleSoft Travel Reimbursement system by July of 2008. The new system will be more user-friendly and provide better information to the divisions and travel operations. We will also continue to review the travel disbursements operation for further improvement. Also in FY2008, several key information systems implementation projects are under way which will strengthen the Laboratory's financial and business processes. These include Supply Chain Management, and the Budget and Planning System. Future planned systems development includes an electronic sponsored research administration system. Continuing to improve the procurement process at the Laboratory is another major priority for the OCFO. To that end, we will be working to re-engineer the 'procure-to-pay' process. The goal will be to correct process flow to maximize efficiency and effectiveness, while implementing sound business practices and incorporating strong internal controls. Along the same lines, we will also be working with the divisions to implement the Property Management Improvement Program that was identified in FY2007.

57↗

Liquid Methane Conditioning Capabilities Developed at the NASA Glenn Research Center's Small Multi- Purpose Research Facility (SMiRF) for Accelerated Lunar Surface Storage Thermal Testing

Glenn Research Center s Creek Road Cryogenic Complex, Small Multi-Purpose Research Facility (SMiRF) recently completed validation / checkout testing of a new liquid methane delivery system and liquid methane (LCH4) conditioning system. Facility checkout validation was conducted in preparation for a series of passive thermal control technology tests planned at SMiRF in FY10 using a flight-like propellant tank at simulated thermal environments from 140 to 350K. These tests will validate models and provide high quality data to support consideration of LCH4/LO2 propellant combination option for a lunar or planetary ascent stage.An infrastructure has been put in place which will support testing of large amounts of liquid methane at SMiRF. Extensive modifications were made to the test facility s existing liquid hydrogen system for compatibility with liquid methane. Also, a new liquid methane fluid conditioning system will enable liquid methane to be quickly densified (sub-cooled below normal boiling point) and to be quickly reheated to saturation conditions between 92 and 140 K. Fluid temperatures can be quickly adjusted to compress the overall test duration. A detailed trade study was conducted to determine an appropriate technique to liquid conditioning with regard to the SMiRF facility s existing infrastructure. In addition, a completely new roadable dewar has been procured for transportation and temporary storage of liquid methane. A new spherical, flight-representative tank has also been fabricated for integration into the vacuum chamber at SMiRF. The addition of this system to SMiRF marks the first time a large-scale liquid methane propellant test capability has been realized at Glenn.This work supports the Cryogenic Fluid Management Project being conducted under the auspices of the Exploration Technology Development Program, providing focused cryogenic fluid management technology efforts to support NASA s future robotic or human exploration missions.

Bamberger, Helmut H.↗

Deep Retrofits for Multifamily: Experiences in Scaling to Zero Energy: Preprint

Zero net energy (ZNE) buildings are needed to reverse the growing trend of increasing energy consumption. But to make dramatic changes, existing buildings must be renovated at scale. In addition, the building stock must be electrified so that its energy needs could be met by renewable generation. Such aggressive goals often mean very high custom design and capital construction costs. Suitable options for comprehensive envelope retrofits can be too expensive to be practical, and electrification requires upgrades to building-level electrical infrastructure. This paper is a case study of eight projects—primarily multifamily residential—that strived for zero-energy, all-electric retrofits. The design teams were challenged to create solutions that could be replicated at scale, showing decreasing costs with broader adoption. Key technologies considered in designing cost-effective, scalable solutions include industrialized prefabricated retrofit components, modular HVAC solutions, and innovative domestic hot water systems. We trace the progress toward the goals set and examine the choices made by the teams as they encountered technical, logistical, and cost barriers. We also discuss financial challenges for multifamily retrofits, provide guidance for incentives, and examine procurement processes for design services and technologies.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

K-Basins Sludge Treatment and Packaging at the Hanford Site - 13585

Highly radioactive sludge resulting from the storage of degraded spent nuclear fuel has been consolidated in Engineered Containers (ECs) in the 105-K West Storage Basin located on the Hanford site near the Columbia River in Washington State. CH2M Hill Plateau Remediation Company (CHPRC) is proceeding with a project to retrieve the sludge, place it in Sludge Transport and Storage Containers (STSCs) and store those filled containers within the T Plant Canyon facility on the Hanford Site Central Plateau (Phase 1). Retrieval and transfer of the sludge material will enable removal of the 105-K West Basin and allow remediation of the subsurface contamination plumes under the basin. The U.S. Department of Energy (DOE) plans to treat and dispose of this K Basins sludge (Phase 2) as Remote Handled Transuranic Waste (RH TRU) at the Waste Isolation Pilot Plant (WIPP) located in New Mexico. The K Basin sludge currently contains uranium metal which reacts with water present in the stored slurry, generating hydrogen and other byproducts. The established transportation and disposal requirements require the transformation of the K Basins sludge to a chemically stable, liquid-free, packaged waste form. The Treatment and Packaging Project includes removal of the containerised sludge from T Plant, the treatment of the sludge as required, and packaging of all the sludge into a form that is certifiable for transportation to and disposal at WIPP. Completion of this scope will require construction and operation of a Sludge Treatment and Packaging Facility (STPF), which could be either a completely new facility or a modification of an existing Hanford Site facility. A Technology Evaluation and Alternatives Analysis (TEAA) for the STP Phase 2 was completed in 2011. A Request for Technology Information (RFI) had been issued in October 2009 to solicit candidate technologies for use in Phase 2. The RFI also included a preliminary definition of Phase 2 functions and requirements. Potentially applicable technologies were identified through a commercial procurement process, technical workshops, and review of the numerous previous sludge treatment technology studies. The identified technology approaches were screened using the criteria established in the Decision Plan, and focused bench top feasibility testing was conducted. Engineering evaluations of the costs, schedules, and technical maturity were developed and evaluated. Recommendations were developed based on technical evaluations. The criteria used in the evaluation process were as follows: (1) Safety, (2) Regulatory/stakeholder acceptance, (3) Technical maturity, (4) Operability and maintainability, (5) Life cycle cost and schedule, (6) Potential for beneficial integration with ongoing STP-Phase 1 activities, and (7) Integration with Site-wide RH-TRU processing/packaging, planning, schedule, and approach. The TEAA recommended Warm Water Oxidation (WWO) as the baseline treatment technology and two risk reduction enhancement options for further consideration during development of the process - size reduction and chemical oxidation (Fenton's reagent). The enhancement options would potentially allow a useful reduction in the total operating time required to process the K Basins sludge. The U.S. Department of Energy's Richland Field Office (DOE-RL) has approved this recommended technical approach. The baseline process can be broken down into the following main process steps: (1) STSC transfer from T Plant to the Sludge Treatment and Packaging Facility (STPF). (2) Retrieval of sludge from the STSCs and transfer to the Receipt and Reaction Tank (RRT). (3) Preparation for immobilization by oxidation using heated water (i.e., WWO) for those batches that require it and concentration by evaporating water at about atmospheric pressure in the RRT. (4) Immobilization by using additives to eliminate free liquids and packaging of the treated sludge into drums. (5) Inspection and handling of the filled drums prior to transfer to a separate storage and shipping facility. (6) Handling of vapor, condensate, and other waste streams generated by the process. Each of these steps is discussed in the paper, together with the current state of progress in developing the technology and requirements for continued development. A schematic of the recommended baseline WWO treatment process is given below. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but factors that impact transmission costs and the relative market value of each renewable option can also be important. Under scenarios in which each load zone must meet 33% of its load with delivered renewable energy from the WREZ-identified resource hubs, the total transmission investment required to meet the 33% west-wide RE target is estimated at between $22 billion and $34 billion. Although a few of the new transmission lines are very long - over 800 miles - most are relatively short, with average transmission distances ranging from 230-315 miles, depending on the scenario. Needed transmission expenditure are found to decline to $17 billion if wide use of renewable energy credits is allowed; consideration of renewable resources outside of WREZ-identified hubs would further reduce this transmission cost estimate. Even with total transmission expenditures of $17-34 billion, however, these costs still represent just 10-19% of the total delivered cost of renewable energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will↗

Microbial Monitoring of Pathogens by Comparing Multiple Real-Time PCR Platforms for Potential Space Applications

The International Space Station (ISS) is a closed environment wi~h rotations of crew and equipment each introducing their own microbial flora making it necessary to monitor the air, surfaces, and water for microbial contamination. Current microbial monitoring includes labor and time intensive methods to enumerate total bacterial and fungal cells with limited characterization during in-flight testing. Although this culture-based method has been sufficient for monitoring the ISS, future long duration missions will need to perform more comprehensive characterization in-flight, since sample return and ground characterization may not be available. A workshop was held in 2011 at the Johnson Space Center to discuss alternative methodologies and technologies suitable for microbial monitoring for these longterm exploration missions where molecular-based methodologies, such as polymerase chain reaction (PCR), were recommended. In response, a multi-center (Marshall Space Flight Center, Johnson Space Center, Jet Propulsion Laboratory, and Kennedy Space Center) collaborative research effort was initiated to explore novel commercial-off-the-shelf hardware options for spaceflight environmental monitoring. The goal was to evaluate quantitative/semi-quantitative PCR approaches to space applications for low cost in-flight rapid identification of microorganisms affecting crew safety. The initial phase of this project identified commercially available platforms that could be minimally modified to perform nominally in microgravity followed by proof-of-concept testing on the highest qualifying candidates with a universally available test organism, Salmonella enterica. The platforms evaluated during proof-of-concept testing included the iCubate 2.0(TradeMark) (iCubate, Huntsville, AL), RAZOR EX (BioFire Diagnostics; Salt Lake City, Utah) and SmartCycler(TradeMark) (Cepheid; Sunnyvale, CA). The analysis identified two potential technologies (iCubate 2.0 and RAZOR EX) that were able to perform sample-to-answer testing with cell sample concentrations between SO to 400 cells. In addition, the commercial systems were evaluated for initial flight safety and readiness, sample concentration needs were reviewed, and a competitive procurement of commercially available platforms was initiated.

Birmele, Michele↗

Core Design Characteristics of the Fluoride Salt-Cooled High Temperature Demonstration Reactor

Fluoride salt-cooled high temperature reactors (FHRs) are a promising reactor technology option with significant knowledge gaps to implementation. One potential approach to address those technology gaps is via a small-scale demonstration reactor with the goal of increasing the technology readiness level (TRL) of the overall system for the longer term. The objective of this paper is to outline a notional concept for such a system, and to address how the proposed concept would advance the TRL of FHR concepts.Development of the proposed FHR Demonstration Reactor (DR) will enable commercial FHR deployment through disruptive and rapid technology development and demonstration. The FHR DR will close remaining gaps to commercial viability. Lower risk technologies are included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated within an acceptable budget and schedule. Important capabilities that will be demonstrated by building and operating the FHR DR include core design methodologies; fabrication and operation of high temperature reactors; salt procurement, handling, maintenance, and ultimate disposal; salt chemistry control to maximize vessel life; tritium management; heat exchanger performance; pump performance; and reactivity control. The FHR DR is considered part of a broader set of FHR technology development and demonstration efforts, some of which are already underway. Nonreactor test efforts (e.g., heated salt loops or loops using simulant fluids) can demonstrate many technologies necessary for commercial deployment of FHRs. The FHR DR, however, fulfills a crucial role in FHR technology development by advancing the technical maturity and readiness level of the system as a whole.

Brown, Nicholas↗

State-of-the-Art: Small Spacecraft Technology

When the first edition of NASA’s Small Spacecraft Technology State-of-the-art report was published in 2013, 247 CubeSats and 105 other non-CubeSat small spacecraft under 50 kilograms (kg) had been launched worldwide, representing less than 2% of launched mass into orbit over multiple years. In 2013 alone, around 60% of the total spacecraft launched had a mass under 600 kg, and of those under 600 kg, 83% were under 200 kg and 37% were nanosatellites (1). Of the total 1,849 spacecraft launched in 2021, 94% were small spacecraft with an overall mass under 600 kg, and of those under 600 kg, 40% were under 200 kg, and 11% were nanosatellites (1). Since 2013, the fight heritage for small spacecraft has increased by over 30% and has become the primary source to space access for commercial, government, private, and academic institutions. The total number of spacecraft launched in the past 10 years is 5,681 and 45% of those had a mass. As with all previous editions of this report, the 2022 edition captures and distills a wealth of new information available on small spacecraft systems from NASA and other publicly available sources. This report is limited to publicly available information and cannot reflect major advances in development that are not publicly disclosed. We encourage any opportunity to publish mission outcomes and technology development milestones (e.g., via conference papers, press releases, company website) so they can be reflected in this report. Overall, this report is a survey of small spacecraft technologies sourced from open literature; it does not endeavor to be an original source, and only considers literature in the public domain to identify and classify devices. Commonly used sources for data include manufacturer datasheets, press releases, conference papers, journal papers, public filings with government agencies, news articles, presentations, the compendium of databases accessed via NASA’s Small Spacecraft Systems Virtual Institute (S3VI) Information Search, and engagement with companies. Data not appropriate for public dissemination, such as proprietary, export controlled, or otherwise restricted data, are not considered. As a result, this report includes many dedicated hours of desk research performed by subject matter experts reviewing resources noted above. Content in this 2022 edition is based on data available by October 2022. This report should not be considered as a comprehensive overview of all the technologies but a great reference for the current state-of-the-art SmallSat technologies. The organizational approach for each chapter is relatively consistent with previous editions and includes an introduction of the technology, current development status of the technology’s procurable systems, and summary tables of technologies surveyed. The content in each chapter is uniquely organized to present a mini-stand-alone report on spacecraft subsystems. As in previous years, chapters include information from previous editions but are updated with new and maturating technologies and reference missions. Tables in each section provide a convenient summary of the technologies discussed, with explanations and references in the body text. The authors have attempted to isolate trends in the small spacecraft industry to point out which technologies have been adopted after successful demonstration missions. Lastly, the authors tried to use the terms “SmallSat,” “microsatellite,” “nanosatellite,” and “CubeSat” in a consistent manner, even as these terms are often used interchangeably in the space industry. Every subsystem chapter contains updated information to reflect the growth in the small spacecraft market. Significant changes are included in several chapters. The “Complete Spacecraft Platforms” chapter now includes information on the two main market options, hosted payload services and dedicated buses. The “Power” chapter provides information on the development of solid-state batteries with significantly higher energy than the current state-of-theart lithium-ion batteries. A large effort was made to update the “Communications” chapter to appropriately capture the recent technology maturation of optical communications for SmallSats. The “Ground Data Systems and Mission Operations” chapter was updated to reflect the recent establishment of the Near Space Network and influx of SmallSat Optical Ground Stations. The “Guidance, Navigation and Control” chapter was updated to include Lidar sensor technology. The “Deorbit Systems” chapter includes a discussion of recently proposed changes by the Federal Communications Commission (FCC) to limit a spacecraft’s lifetime to no longer than 5 years after end-of-mission. The “Identification and Tracking” Chapter includes updated information on the progress of SmallSat tracking. Finally, this report now encompasses technology funded by NASA’s Small Spacecraft Technology (SST) program’s SmallSat Technology Partnerships (STP) initiative which is described further in this Introduction. The reader can find the included SST technology in the “On the Horizon” section of the “Thermal Systems”, “Communications”, and “Guidance, Navigation, and Control” chapters. A central element of this report is to list state-of-the-art technologies by NASA standard Technology Readiness Level (TRL) as defined by the 2020 NASA Engineering Handbook, found in NASA NPR 7123.1C NASA Systems Engineering Processes and Requirements. The authors have endeavored to independently verify the TRL value of each technology by reviewing and citing published test results or publicly available data to the best of their ability. Where test results and data disagree with vendors’ own advertised TRL, the authors have attempted to engage the vendors to discuss the discrepancy. Readers are strongly encouraged to follow the references cited in the literature describing the full performance range and capabilities of each technology. Readers of this report should reach out to individual companies to further clarify information. It is important to note that this report takes a broad system-level view. To attain a high TRL, the subsystem must be in a flight-ready configuration with all supporting infrastructure—such as mounting points, power conversion, and control algorithms—in an integrated unit. An accurate TRL assessment requires a high degree of technical knowledge on a subject device, and an in-depth understanding of the mission (including interfaces and environment) on which the device was flown. There is variability in TRL values depending on design factors for a specific technology. For example, differences in TRL assessment based on the operating environment may result from the thermal environment, mechanical loads, mission duration, or radiation exposure. If a technology has flown on a mission without success, or without providing valid confirmation to the operator, such claimed “flight heritage” was discounted. The authors believe TRLs are most accurately determined when assessed within the context of a program’s unique requirements. While the overall capability of small spacecraft has matured since the 2021 edition of this report, technologies are still being developed to make deep space SmallSat missions more routine and more cost effective. Future editions of this report may include content dedicated to the rapidly growing fields of assembly, integration, and testing services, and mission modeling and simulation–all of which are now extensively represented at small spacecraft conferences. Many of these subsystems and services are still in their infancy, but as they evolve and reliable conventions and standards emerge, the next iteration of this report may also evolve to include additional chapters.

Bruce Yost↗

NASA Software Engineering Benchmarking Study

To identify best practices for the improvement of software engineering on projects, NASA's Offices of Chief Engineer (OCE) and Safety and Mission Assurance (OSMA) formed a team led by Heather Rarick and Sally Godfrey to conduct this benchmarking study. The primary goals of the study are to identify best practices that: Improve the management and technical development of software intensive systems; Have a track record of successful deployment by aerospace industries, universities [including research and development (R&D) laboratories], and defense services, as well as NASA's own component Centers; and Identify candidate solutions for NASA's software issues. Beginning in the late fall of 2010, focus topics were chosen and interview questions were developed, based on the NASA top software challenges. Between February 2011 and November 2011, the Benchmark Team interviewed a total of 18 organizations, consisting of five NASA Centers, five industry organizations, four defense services organizations, and four university or university R and D laboratory organizations. A software assurance representative also participated in each of the interviews to focus on assurance and software safety best practices. Interviewees provided a wealth of information on each topic area that included: software policy, software acquisition, software assurance, testing, training, maintaining rigor in small projects, metrics, and use of the Capability Maturity Model Integration (CMMI) framework, as well as a number of special topics that came up in the discussions. NASA's software engineering practices compared favorably with the external organizations in most benchmark areas, but in every topic, there were ways in which NASA could improve its practices. Compared to defense services organizations and some of the industry organizations, one of NASA's notable weaknesses involved communication with contractors regarding its policies and requirements for acquired software. One of NASA's strengths was its software assurance practices, which seemed to rate well in comparison to the other organizational groups and also seemed to include a larger scope of activities. An unexpected benefit of the software benchmarking study was the identification of many opportunities for collaboration in areas including metrics, training, sharing of CMMI experiences and resources such as instructors and CMMI Lead Appraisers, and even sharing of assets such as documented processes. A further unexpected benefit of the study was the feedback on NASA practices that was received from some of the organizations interviewed. From that feedback, other potential areas where NASA could improve were highlighted, such as accuracy of software cost estimation and budgetary practices. The detailed report contains discussion of the practices noted in each of the topic areas, as well as a summary of observations and recommendations from each of the topic areas. The resulting 24 recommendations from the topic areas were then consolidated to eliminate duplication and culled into a set of 14 suggested actionable recommendations. This final set of actionable recommendations, listed below, are items that can be implemented to improve NASA's software engineering practices and to help address many of the items that were listed in the NASA top software engineering issues. 1. Develop and implement standard contract language for software procurements. 2. Advance accurate and trusted software cost estimates for both procured and in-house software and improve the capture of actual cost data to facilitate further improvements. 3. Establish a consistent set of objectives and expectations, specifically types of metrics at the Agency level, so key trends and models can be identified and used to continuously improve software processes and each software development effort. 4. Maintain the CMMI Maturity Level requirement for critical NASA projects and use CMMI to measure organizations developing software for NASA. 5.onsolidate, collect and, if needed, develop common processes principles and other assets across the Agency in order to provide more consistency in software development and acquisition practices and to reduce the overall cost of maintaining or increasing current NASA CMMI maturity levels. 6. Provide additional support for small projects that includes: (a) guidance for appropriate tailoring of requirements for small projects, (b) availability of suitable tools, including support tool set-up and training, and (c) training for small project personnel, assurance personnel and technical authorities on the acceptable options for tailoring requirements and performing assurance on small projects. 7. Develop software training classes for the more experienced software engineers using on-line training, videos, or small separate modules of training that can be accommodated as needed throughout a project. 8. Create guidelines to structure non-classroom training opportunities such as mentoring, peer reviews, lessons learned sessions, and on-the-job training. 9. Develop a set of predictive software defect data and a process for assessing software testing metric data against it. 10. Assess Agency-wide licenses for commonly used software tools. 11. Fill the knowledge gap in common software engineering practices for new hires and co-ops.12. Work through the Science, Technology, Engineering and Mathematics (STEM) program with universities in strengthening education in the use of common software engineering practices and standards. 13. Follow up this benchmark study with a deeper look into what both internal and external organizations perceive as the scope of software assurance, the value they expect to obtain from it, and the shortcomings they experience in the current practice. 14. Continue interactions with external software engineering environment through collaborations, knowledge sharing, and benchmarking.

Rarick, Heather L.↗

GLYCOLIC ACID PHYSICAL PROPERTIES, IMPURITIES, AND RADIATION EFFECTS ASSESSMENT

The Defense Waste Processing Facility (DWPF) is pursuing alternative reductants/flowsheets to increase attainment to meet closure commitment dates. In fiscal year 2009, SRNL evaluated several options and recommended the further assessment of the nitric/formic/glycolic acid flowsheet. SRNL is currently performing testing with this flowsheet to support the DWPF down-select of alternate reductants. As part of the evaluation, SRNL was requested to determine the physical properties of formic and glycolic acid blends. Blends of formic acid in glycolic acid were prepared and their physical properties tested. Increasing amounts of glycolic acid led to increases in blend density, viscosity and surface tension as compared to the 90 wt% formic acid that is currently used at DWPF. These increases are small, however, and are not expected to present any difficulties in terms of processing. The effect of sulfur impurities in technical grade glycolic acid was studied for its impact on DWPF glass quality. While the glycolic acid specification allows for more sulfate than the current formic acid specification, the ultimate impact is expected to be on the order of 0.03 wt% sulfur in glass. Note that lower sulfur content glycolic acid could likely be procured at some increased cost if deemed necessary. A paper study on the effects of radiation on glycolic acid was performed. The analysis indicates that substitution of glycolic acid for formic acid would not increase the radiolytic production rate of H{sub 2} and cause an adverse effect in the SRAT or SME process. It has been cited that glycolic acid solutions that are depleted of O{sub 2} when subjected to large radiation doses produced considerable quantities of a non-diffusive polymeric material. Considering a constant air purge is maintained in the SRAT and the solution is continuously mixed, oxygen depletion seems unlikely, however, if this polymer is formed in the SRAT solution, the rheology of the solution may be affected and pumping of the solution may be hindered. However, an irradiation test with a simulated SRAT product supernate containing glycolic acid in an oxygen depleted atmosphere found no evidence of polymerization.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GLYCOLIC ACID PHYSICAL PROPERTIES, IMPURITIES, AND RADIATION EFFECTS ASSESSMENT

The DWPF is pursuing alternative reductants/flowsheets to increase attainment to meet closure commitment dates. In fiscal year 2009, SRNL evaluated several options and recommended the further assessment of the nitric/formic/glycolic acid flowsheet. SRNL is currently performing testing with this flowsheet to support the DWPF down-select of alternate reductants. As part of the evaluation, SRNL was requested to determine the physical properties of formic and glycolic acid blends. Blends of formic acid in glycolic acid were prepared and their physical properties tested. Increasing amounts of glycolic acid led to increases in blend density, viscosity and surface tension as compared to the 90 wt% formic acid that is currently used at DWPF. These increases are small, however, and are not expected to present any difficulties in terms of processing. The effect of sulfur impurities in technical grade glycolic acid was studied for its impact on DWPF glass quality. While the glycolic acid specification allows for more sulfate than the current formic acid specification, the ultimate impact is expected to be on the order of 0.03 wt% sulfur in glass. Note that lower sulfur content glycolic acid could likely be procured at some increased cost if deemed necessary. A paper study on the effects of radiation on glycolic acid was performed. The analysis indicates that substitution of glycolic acid for formic acid would not increase the radiolytic production rate of H{sub 2} and cause an adverse effect in the SRAT or SME process. It has been cited that glycolic acid solutions that are depleted of O{sub 2} when subjected to large radiation doses produced considerable quantities of a non-diffusive polymeric material. Considering a constant air purge is maintained in the SRAT and the solution is continuously mixed, oxygen depletion seems unlikely, however, if this polymer is formed in the SRAT solution, the rheology of the solution may be affected and pumping of the solution may be hindered. A series of tests to determine whether the polymer will be formed is currently being outlined. The first phase will be a simple experiment where a simulated SRAT supernatant containing the 80:20 blend of glycolic - formic acid could be irradiated in the Co-60 gamma source at SRNL to a very large dose resembling the dose received by the radioactive SRAT solution after several weeks. The resulting solution could then be heated to simulate refluxing in the SRAT process. Finally a radioactive demonstration of the SRAT process should be performed in the SRNL Shielded Cells to confirm successful execution of the glycolic - formic acid flowsheet.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗