Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

THE IMPACT OF THE MCU LIFE EXTENSION SOLVENT ON DWPF GLASS FORMULATION EFFORTS

As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Project, a next generation solvent (NG-CSSX), a new strip acid, and modified monosodium titanate (mMST) will be deployed. The strip acid will be changed from dilute nitric acid to dilute boric acid (0.01 M). Because of these changes, experimental testing with the next generation solvent and mMST is required to determine the impact of these changes in 512-S operations as well as Chemical Process Cell (CPC), Defense Waste Processing Facility (DWPF) glass formulation activities, and melter operations at DWPF. To support programmatic objectives, the downstream impacts of the boric acid strip effluent (SE) to the glass formulation activities and melter operations are considered in this study. More specifically, the impacts of boric acid additions to the projected SB7b operating windows, potential impacts to frit production temperatures, and the potential impact of boron volatility are evaluated. Although various boric acid molarities have been reported and discussed, the baseline flowsheet used to support this assessment was 0.01M boric acid. The results of the paper study assessment indicate that Frit 418 and Frit 418-7D are robust to the implementation of the 0.01M boric acid SE into the SB7b flowsheet (sludge-only or ARP-added). More specifically, the projected operating windows for the nominal SB7b projections remain essentially constant (i.e., 25-43 or 25-44% waste loading (WL)) regardless of the flowsheet options (sludge-only, ARP added, and/or the presence of the new SE). These results indicate that even if SE is not transferred to the Sludge Receipt and Adjustment Tank (SRAT), there would be no need to add boric acid (from a trim tank) to compositionally compensate for the absence of the boric acid SE in either a sludge-only or ARP-added SB7b flowsheet. With respect to boron volatility, the Measurement Acceptability Region (MAR) assessments also suggest that Slurry Mix Evaporator (SME) acceptability decisions would not be different assuming either 100% of the B{sub 2}O{sub 3} from the SE were retained or volatilized. More specifically, the 0.84 wt% B{sub 2}O{sub 3} in the SE is so minor that its presence in the SME analysis does not influence SME acceptability decisions. In fact, using the 100% retention and 100% volatilization composition projections, only minor differences in the predicted properties of the glass product occur with all of the glasses being acceptable over a WL interval of 32-42%. Based on the 0.01M boric acid flowsheet, there is very little difference between Frit 418 and Frit 418-7D (a frit that was compositionally altered to account for the 0.84 wt% B{sub 2}O{sub 3} in the SE) with respect to melt temperature. In fact, when one evaluates the composition of Frit 418-7D, it lies within the current Frit 418 vendor specifications and therefore could have been produced by the vendor targeting the nominal composition of Frit 418.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Building 23-702, Los Alamos Scientific Laboratory H-8 Foil Handling Building, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-702, the Los Alamos Scientific Laboratory (LASL) H-8 Foil Handling Building (Nevada State Historic Preservation Office [SHPO] Resource No. B15278) at the Nevada National Security Site (NNSS) in Nye County, Nevada. The NNSA/NFO is implementing a long-term project to modernize the town of Mercury for future mission needs. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. As part of the modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement Between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. Building 23-702 is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria prior to initiating any activity that may affect the elements. The purpose of this report is to evaluate Building 23-702 as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that Building 23-702 is not individually eligible for listing in the NRHP. Although it retains aspects of integrity and continues to contribute to the MHD, it is not individually significant under any of the SOI Significance Criteria.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Spent Nuclear Fuel Disposition in Salt (FY18)

This report summarizes the 2018 fiscal year (FY18) field, laboratory, and modeling work funded by the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Science & Technology (SFWST) campaign as part of the Sandia National Laboratories Salt Research and Development (R&D) and Salt International work packages. This report satisfies level-two milestone M2SF-18SNO10303031and comprises three related but stand-alone sections. The first section summarizes the programmatic progress made to date in the DOE-NE salt program and its goals going forward. The second section presents brine composition modeling and laboratory activities related to salt evaporation experiments, which will be used to interpret data collected during the heater test. The third section presents theoretical and numerical modeling work done to investigate the effects brine composition have on dihedral angle and the permeability of salt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unmanned air vehicle (UAV) ultra-persitence research

Sandia National Laboratories and Northrop Grumman Corporation Integrated Systems, Unmanned Systems (NGIS UMS) collaborated to further ultra-persistence technologies for unmanned air vehicles (UAVs). The greatest shortfalls in UAV capabilities have been repeatedly identified as (1) insufficient flight persistence or 'hang time,' (2) marginal electrical power for running higher power avionics and payload systems, and (3) inadequate communications bandwidth and reach. NGIS UMS requested support from Sandia to develop an ultra-persistent propulsion and power system (UP3S) for potential incorporation into next generation UAV systems. The team members tried to determine which energy storage and power generation concepts could most effectively push UAV propulsion and electrical power capabilities to increase UAV sortie duration from days to months while increasing available electrical power at least two-fold. Primary research and development areas that were pursued included these goals: perform general system engineering and integration analyses; develop initial thermal and electrical power estimates; provide mass, volume, dimensional, and balance estimates; conduct preliminary safety assessments; assess logistics support requirements; perform, preliminary assessments of any security and safeguards; evaluate options for removal, replacement, and disposition of materials; generally advance the potential of the UP3S concept. The effort contrasted and compared eight heat sources technologies, three power conversion, two dual cycle propulsion system configurations, and a single electrical power generation scheme. Overall performance, specific power parameters, technical complexities, security, safety, and other operational features were successfully investigated. Large and medium sized UAV systems were envisioned and operational flight profiles were developed for each concept. Heat source creation and support challenges for domestic and expeditionary operations were considered. Fundamental cost driver analysis was also performed. System development plans were drafted in order to determine where the technological and programmatic critical paths lay. As a result of this effort, UAVs were to be able to provide far more surveillance time and intelligence information per mission while reducing the high cost of support activities. This technology was intended to create unmatched global capabilities to observe and preempt terrorist and weapon of mass destruction (WMD) activities. Various DOE laboratory and contractor personnel and facilities could have been used to perform detailed engineering, fabrication, assembly and test operations including follow-on operational support. Unfortunately, none of the results will be used in the near-term or mid-term future. NGIS UMS and SNL felt that the technical goals for the project were accomplished. NGIS UMS was quite pleased with the results of analysis and design although it was disappointing to all that the political realities would not allow use of the results. Technology and system designs evaluated under this CRADA had previously never been applied to unmanned air vehicles (UAVs). Based upon logistic support cost predictions, because the UAVs would not have had to refuel as often, forward basing support costs could have been reduced due to a decrease in the number and extent of support systems and personnel being required to operate UAVs in remote areas. Basic application of the advanced propulsion and power approach is well understood and industry now understands the technical, safety, and political issues surrounding implementation of these strategies. However, the overall economic impact was not investigated. The results will not be applied/implemented. No near-term benefit to industry or the taxpayer will be encountered as a result of these studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of the Los Alamos Nuclear Material Packaging Risk Ranking Method

Repackaging nuclear material into robust containers to protect workers and the public has been ongoing at LANL and around the DOE complex for nearly two decades. The number of containers at LANL is around 5,000; limited resources for repackaging material has led to extended repackaging campaigns and the need to prioritize repackaging. Various methodologies have been used to prioritize the repackaging efforts and to demonstrate progress in risk reduction over time (e.g., Boerigter, 1997). The 2000-1 DNFSB recommendation recognized the limited DOE resources for repackaging, and acknowledged the need to “prioritize and schedule tasks to be undertaken with available funds according to consideration of risks.” Later, in DNFSB recommendation 2005-1, in addition to recommending that DOE develop a packaging standard, the Board recommended that “Characterization information should also be used to develop a surveillance program prioritized according to expected material and container risk (including, for example, material type, material form, and the age and type of container).” In response to requests and recommendations from the DOE and DNSFB to prioritize according to worker risk, a risk ranking method based on the potential consequence of dropping a container from 3 meters was developed in 2007 (Smith, 2007) and updated in 2014 (Hoffman, 2014). Various LANL implementation plans for repackaging were developed over the years using this methodology (Stone, 2014). Currently, this method is utilized in conjunction with an algorithm to mitigate programmatic risk to prioritize container repackaging and material processing (Prochnow, 2015). The purpose of this study is to document how the current risk ranking method works, how it is used and potential limitations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Historic American Landscapes Survey: Arco Naval Proving Ground (Idaho National Laboratory)

Based on historical evaluations in 1993 and 1997, historians determined that the then-remaining Arco NPG structures were significant to the nation’s history through their association with World War II . Through ensuing discussions with the SHPO, it was further determined that the infrastructure and associated landscape were also significant. According to provisions of INL’s Cultural Resource Management Plan (CRMP) as legitimized through a 2004 Programmatic Agreement between DOE-ID, the Idaho State Historic Preservation Office (SHPO), and Advisory Council on Historic Preservation (ACHP) historians identified the World War II structures as DOE “Signature Properties”. As defined by DOE-HQ, Signature Properties “denote its [DOE’s] most historically important properties across the complex…and/or those properties that are viewed as having tourism potential.” The INL is a secure site and the INL land and structures are not accessible to the public and, therefore have no “tourism potential”. Although DOE-ID actively sought other uses for the vacant, unused buildings, none were identified and the buildings present safety and health concerns. A condition assessment found lead based paint, asbestos, rodent infestation/droppings, small animal carcasses, mold, and, in CF-633, areas of radiological contamination. In early 2013, DOE-ID notified the Idaho SHPO, ACHP, and, as required by the INL CRMP and PA, DOE-Headquarters Federal Preservation Officer, of their intent to demolish the vacant buildings (CF-606, CF-607, CF-613, CF-632, and CF-633). The proposed “end-state” of the buildings will be either grass and/or gravel pads. Through the NHPA Section 106 consultation process, measures to mitigate the adverse impacts of demolition were determined and agreed to through a Memorandum of Agreement (MOA) between DOE-ID, SHPO, and ACHP. The measures include the development and installation of interpretive signs to be placed at a publicly accessible location, retention of original components of CF-633, and completion of this HALS standard format report. Buildings, infrastructure, and features that are not scheduled for removal are documented here as well as properties that are scheduled for removal and the overall Arco NPG landscape. The Arco NPG, located in the remote high-desert of eastern Idaho aided in the defense and eventual ally victory in the Pacific Theater of World War II, in addition to revising national standards for the safe storage and transport of conventional ordnance.

99 GENERAL AND MISCELLANEOUS↗

Developing a Robust Market for CHP: A Plan for Fostering Economic Development, Business Competitiveness and Resiliency in the Mid-Atlantic Region

The Department of Energy’s Mid Atlantic Combined Heat and Power Technical Assistance Partnership (MA CHP TAP) was established to develop public-private partnerships to advance the technology, policies, and programmatic support for combined heat and power (CHP), including its application in microgrids, heat to power and district energy. The MA CHP TAP’s work includes education and outreach as well as technical assistance to a variety of stakeholders including end-users (commercial, industrial, institutional and more), state decision makers, electric and gas utilities, trade associations and non-profit organizations. This assistance includes evaluating the economic, energy, reliability and environmental value of proposed systems. The MA CHP TAP represents the multi-state Mid- Atlantic region and is the CHP expert in the region who provides fact-based, un-biased information on CHP, including technologies, project development, project financing, local electric and natural gas utility interfaces, and related state best practice policies.

20 FOSSIL-FUELED POWER PLANTS↗

Methods, software and datasets to verify DVH calculations against analytical values: Twenty years late(r)

Purpose: The authors designed data, methods, and metrics that can serve as a standard, independent of any software package, to evaluate dose-volume histogram (DVH) calculation accuracy and detect limitations. The authors use simple geometrical objects at different orientations combined with dose grids of varying spatial resolution with linear 1D dose gradients; when combined, ground truth DVH curves can be calculated analytically in closed form to serve as the absolute standards. Methods: DICOM RT structure sets containing a small sphere, cylinder, and cone were created programmatically with axial plane spacing varying from 0.2 to 3 mm. Cylinders and cones were modeled in two different orientations with respect to the IEC 1217 Y axis. The contours were designed to stringently but methodically test voxelation methods required for DVH. Synthetic RT dose files were generated with 1D linear dose gradient and with grid resolution varying from 0.4 to 3 mm. Two commercial DVH algorithms—PINNACLE (Philips Radiation Oncology Systems) and PlanIQ (Sun Nuclear Corp.)—were tested against analytical values using custom, noncommercial analysis software. In Test 1, axial contour spacing was constant at 0.2 mm while dose grid resolution varied. In Tests 2 and 3, the dose grid resolution was matched to varying subsampled axial contours with spacing of 1, 2, and 3 mm, and difference analysis and metrics were employed: (1) histograms of the accuracy of various DVH parameters (total volume, D{sub max}, D{sub min}, and doses to % volume: D99, D95, D5, D1, D0.03 cm{sup 3}) and (2) volume errors extracted along the DVH curves were generated and summarized in tabular and graphical forms. Results: In Test 1, PINNACLE produced 52 deviations (15%) while PlanIQ produced 5 (1.5%). In Test 2, PINNACLE and PlanIQ differed from analytical by >3% in 93 (36%) and 18 (7%) times, respectively. Excluding D{sub min} and D{sub max} as least clinically relevant would result in 32 (15%) vs 5 (2%) scored deviations for PINNACLE vs PlanIQ in Test 1, while Test 2 would yield 53 (25%) vs 17 (8%). In Test 3, statistical analyses of volume errors extracted continuously along the curves show PINNACLE to have more errors and higher variability (relative to PlanIQ), primarily due to PINNACLE’s lack of sufficient 3D grid supersampling. Another major driver for PINNACLE errors is an inconsistency in implementation of the “end-capping”; the additional volume resulting from expanding superior and inferior contours halfway to the next slice is included in the total volume calculation, but dose voxels in this expanded volume are excluded from the DVH. PlanIQ had fewer deviations, and most were associated with a rotated cylinder modeled by rectangular axial contours; for coarser axial spacing, the limited number of cross-sectional rectangles hinders the ability to render the true structure volume. Conclusions: The method is applicable to any DVH-calculating software capable of importing DICOM RT structure set and dose objects (the authors’ examples are available for download). It includes a collection of tests that probe the design of the DVH algorithm, measure its accuracy, and identify failure modes. Merits and applicability of each test are discussed.

60 APPLIED LIFE SCIENCES↗

SURF: Advances in the Incorporation of Sustainability Into Remedial Approaches - 16451

The inclusion of sustainability considerations in remediation cleanup process (investigation through site closure) benefits site owners, including Federal agencies such as the Department of Defense (DOD) and Department of Energy (DOE), through development of more efficient and cost-effective remedies as well as communities by considering socio-economic impacts and redevelopment into remedial decisions. The incorporation of social, environmental, and economic considerations early in the remedial process often enables achievement of regulatory site closure sooner and with broader community acceptance. In order to achieve these objectives, stakeholders, including federal facilities, regulators, contractors, and consultants, have expressed the need for case studies demonstrating successful implementation of sustainable practices. The Sustainable Remediation Forum emerged in 2006 and was established as a non-profit organization in 2010. Through exploration of technical issues such as groundwater conservation and reuse at remediation sites to life cycle assessment approaches, subject matter experts have led discussions across the industry of how the incorporation of sustainability into the remediation process can provide benefits through: - Consideration of socioeconomic impacts and drivers for remediation and redevelopment; - Reduced environmental impacts of remedial actions; and - Enhanced economic value through partnerships and informed decision making. Incorporation of sustainable remediation concepts provides distinct and recognizable value, as demonstrated through the technical initiatives of the Sustainable Remediation Forum, remediation industry conferences and events, and the prevalence of government agency and corporate sustainable remediation programs, such as the DOE's Cross-Programmatic Work Group. Sustainable remediation has evolved from discussions of environmental impacts of cleanups (with considerable green-washing), to quantifying and minimizing the environmental footprint and subsequent long term global impacts of a remedy, and currently, incorporating strategies to address all three components of sustainability - environmental, social, and economic. However, the practice of sustainability must continue to advance and new approaches should be adopted to holistically evaluate beneficial and detrimental impacts from the remedial process and incorporate sustainability concepts throughout the project life cycle. A more holistic and comprehensive approach, beyond the traditional paradigm of sustainable remediation, will lead a project team to achieve social and economic sustainability objectives of the community while protecting human health and the environment. This 'advanced' approach is where the most significant benefits will be achieved. Practitioners need documented, peer-reviewed, technically sound concepts and examples of sustainable remediation as supporting material to gain acceptance and approval of incorporation of best management practices and evaluation techniques. Reviewing the advancements of sustainable remediation over the last 5-10 years and the identification of lessons learned has great merit. This discussion of case studies will highlight successful incorporation of social impacts, economic analysis, and site redevelopment into the remedial process to provide a roadmap for site owners in developing sustainable approaches for their sites. Specifically, benefits were achieved in these case studies through promotion of economic development, innovative financing, incorporation of risk-based approaches, and consideration of social value of a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the American Recovery and Reinvestment Act Upon the Department of Energy Weatherization Assistance Program: Assessment of the ARRA

The Department of Energy (DOE) administers the national low-income Weatherization Assistance Program (WAP). Under this program, DOE provides grants to states (grantees), which then provide grants to local weatherization agencies (subgrantees), to weatherize income-eligible homes for free. The American Recovery and Reinvestment Act (ARRA) of 2009 allocated $5 billion in funding to WAP, a very significant increase from an annual appropriation that ranged in the $200–250 million range for many years. Furthermore, as part of a major evaluation of WAP, states and local weatherization agencies were surveyed, in part, to assess their experiences during the ARRA period. The substantial funding increase created a number of issues for the national weatherization network: the political visibility of their programs increased significantly, organizational responsibilities were shifted, new laws and regulations were passed that impacted their programs, media attention of their programs increased, federal oversight of their programs increased; and programmatic costs increased because of the increased oversight and because ARRA required WAP to operate under the provisions of the Davis-Bacon Act of 1931. There was also some concern within the national weatherization network that the influx of ARRA funds would permanently damage nonfederal funding leveraging relationships. However, two-thirds of grantees and over 40% of subgrantees stated that they believe that the long-term impacts of ARRA on leveraging relationships will be positive.

54 ENVIRONMENTAL SCIENCES↗

Preliminary estimation of isotopic inventories of 2000 MWt ABR (revision 1).

The isotopic inventories of a 2000 MWt Advanced Burner Reactor (ABR) core have been estimated to support the ABR accident analysis to be reported in the Appendix D of the Programmatic Environmental Impact Statement (PEIS). Based on the Super-PRISM design, a preliminary core design of 2000 MWt ABR was developed to achieve a one-year cycle length with 3-batch fuel management scheme. For a bounding estimation of transuranics (TRU) inventory, a low TRU conversion ratio ({approx}0.3) was targeted to increase the TRU enrichment. By changing the fuel compositions, isotopic inventories of mass and radioactivity were evaluated for four different core configurations: recycled metal fuel core, recycled oxide fuel core, startup metal fuel core, and startup oxide fuel core. For recycled cores, the TRU recovered from ABR spent fuel was used as the primary TRU feed, and the TRU recovered from 10-year cooled light water reactor spent fuel was used as the makeup TRU feed. For startup cores, weapons-grade plutonium was used as TRU feed without recycling ABR spent fuel. It was also assumed that a whole batch of discharged fuel assemblies is stored in the in-vessel storage for an entire irradiation cycle. For both metal and oxide fuel cores, the estimated TRU mass at beginning of equilibrium cycle (BOEC), including spent fuel TRU stored in the in-vessel storage, was about 8.5-8.7 MT for the recycled cores and 5.2 MT for the startup cores. Since a similar power was generated, the fission product mass are comparable for all four cores: 1.4 MT at BOEC and about 2.0 MT at end of equilibrium cycle (EOEC). Total radioactivity at BOEC is about 8.2 x 10{sup 8} curies in recycled cores and about 6.9 x 10{sup 8} curies in startup cores, and increases to about 1.1 x 10{sup 10} curies at EOEC for all four cases. Fission products are the dominant contributor (more than 80%) to the total radioactivity at EOEC for all four cases, but the fission product radioactivity decreases by 79% after one-year cooling. The heavy metal radioactivity in recycled cores is higher than that of the startup core because of the higher TRU inventory at BOEC. The leading contributors at EOEC are U-239, Np-239, Am-242 and Pu-243 at EOEC, but these short-lived nuclides decay out quickly during the refueling time. As a result, the leading contributors at BOEC are Pu-241, Cm-242, Cm-244, and Pu-238.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mechanical Analysis of W78/88-1 Life Extension Program Warhead Design Options

Life Extension Program (LEP) is a program to repair/replace components of nuclear weapons to ensure the ability to meet military requirements. The W78/88-1 LEP encompasses the modernization of two major nuclear weapon reentry systems into an interoperable warhead. Several design concepts exist to provide different options for robust safety and security themes, maximum non-nuclear commonality, and cost. Simulation is one capability used to evaluate the mechanical performance of the designs in various operational environments, plan for system and component qualification efforts, and provide insight into the survivability of the warhead in environments that are not currently testable. The simulation efforts use several Sandia-developed tools through the Advanced Simulation and Computing program, including Cubit for mesh generation, the DART Model Manager, SIERRA codes running on the HPC TLCC2 platforms, DAKOTA, and ParaView. Several programmatic objectives were met using the simulation capability including: (1) providing early environmental specification estimates that may be used by component designers to understand the severity of the loads their components will need to survive, (2) providing guidance for load levels and configurations for subassembly tests intended to represent operational environments, and (3) recommending design options including modified geometry and material properties. These objectives were accomplished through regular interactions with component, system, and test engineers while using the laboratory's computational infrastructure to effectively perform ensembles of simulations. Because NNSA has decided to defer the LEP program, simulation results are being documented and models are being archived for future reference. However, some advanced and exploratory efforts will continue to mature key technologies, using the results from these and ongoing simulations for design insights, test planning, and model validation.

42 ENGINEERING↗

Considerations on Managing Flowsheet and Technology for DFLAW Production

This report evaluates best practices for flowsheet and technology (F&T) management and makes recommendations for Hanford tank waste treatment operations initially for Direct Feed Low Activity Waste (DFLAW). Establishing practicing F&T management operations prior to hot commissioning the Hanford Waste Treatment Plant is desirable to ensure focused F&T leadership and F&T capabilities and competencies are immediately ready to sustain DFLAW production operations. Management of F&T is characterized by the five programmatic elements important to sustained operations and leads to recommendations for Hanford tank waste treatment operations:

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biorefinery Demonstration Project Final Progress Report

In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

09 BIOMASS FUELS↗

Developing Separate Effects Transient Test Experiments Using an Out-of-Pile Flowing Water Loop

In 2017 the Transient Reactor Test Facility was restarted after being placed in a standby state since 1994. This Test Reactor’s restart has since enabled the progressive development of new nuclear technologies within the U.S. that were previously required to outsource to other countries. While the reactor’s restart was a large feat worthy of recognition, the experimental use of its characteristics has required the further development of in-pile experimental infrastructure sufficient to support programmatic needs. This hardware have taken the form of capsule designs (compact and elongated) as well as loop concepts representing the phenomena of interest for a subset of separate effects tests desire for each respective testing campaign. The Transient Testing Program has a large-integrated effort that aligns with the U.S. Department of Energy’s current needs. This study compliments those programmatic elements by developing, fabricating and demonstrating a full-scale flowing water loop in an out-of-pile environment. The goal of this effort is to develop a pragmatic understanding of the engineering capabilities and limitations associated with geometric form-factors, metering technology, and controls logic under representative thermal hydraulic conditions that would be experienced within the TREAT reactor during an in-pile reactivity initiated accident test. The outcomes of this study result in an evaluation of the conceptual design of a comprehensive flowing water loop including objective figures of merit (FoMs) for comparing unique instrumentation and the basis for their selection during operations. These efforts directly contribute to and are required for the further advancement of transient testing capabilities within the U.S.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Independent Review of Siesmic Performance Assessments for the Plutonium Facility PF-4

The Plutonium Facility, designated PF-4, is located in Technical Area 55 at the Los Alamos National Laboratory (LANL). The facility is a one-story rectangular structure above a complete basement; the building was constructed of cast-in-place reinforced concrete, with small interior frames of structural steel. The plan dimensions of the building are 265’×284’. The overall height of the building varies between 39’-0” at the north and south ends, and 40’-6” at the center ridge. The programmatic work performed in the building is vital to our national security and its functions and storage purposes are not replicated elsewhere in the United States Department of Energy (DOE).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

U Metal Oxidation with Steam (U)

The Savannah Rive National Laboratory 9SRNL) is evaluating a method to produce uranium oxide (UO 2 ) from uranium metal using steam. The typical methods for making UO 2 yield powders with particle-size ranges of 1 to 50 micron. The goal of the steam oxidation is to produce a depleted uranium (DU) product with a larger particle size that can be used as a surrogate for testing physical and mechanical process techniques to refine uranium and/or plutonium bearing residues. Several studies in the literature indicated that reactions between uranium metal and steam will yield UO 2 as fine powders in the 160 to 500 °C range, but granular materials form above 500°C. Above 880 °C, a hard compact scale forms on the U metal. Furthermore, sintering of UO 2 occurs at about 1300 °C, but it has been stated that the presence of steam enhances the sintering characteristics of UO 2 . Initial studies into the oxidation of DU metal in an atmosphere of argon and steam have been completed. Oxidation of depleted uranium metal in Ar/steam at 600, 710, 700, and 830 °C yielded at UO 2 product with little or no impurity at each temperature. Although not enough sample was available to perform sieve analysis for particle size distribution, SEM images reveal that a significant volume fraction of the products at 710, 770, and 830 °C exceeds 100 microns. The material produced at 600 °C was too fine for programmatic needs. Questions associated with the UO 2 include morphology of product, mechanical strength of the particles, and performance in milling operations. The size of the samples produced in these tests did not allow for quantitative assessment of particle size of mechanical strength. A qualitative assessment of the particles formed at 710, 770, and 830 °C was that the samples produced at 710 and 770 °C were friable, and the sample produced 830 °C had more mechanical strength. Sintering of the samples in Ar/steam at 970 °C appeared to increase the strength of the particles without changing their general particle size characteristics. Due to the small sample sizes, the increase in strength could not be quantified. If the sintering at 970 °C is inadequate, higher sintering temperatures in Ar/steam can be evaluated. Future work will increase scale of the steam oxidation conditions which yield the most-favorable particle-size distributions with sufficient mechanical strength for programming usage. Further consideration will be given to oxidation temperature, steam addition to the reaction vessel, U metal pretreatment, and sintering conditions after oxidation. The UO 2 production could involve a two-step process where particles are formed in steam at lower temperatures (700-850 °C) and then sintered in Ar/steam at elevated temperatures (950-1200 °C). Larger samples (50-100 g each) will provide sufficient UO 2 product for sieve analysis and assessment of mechanical strength relatives to subsequent milling operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.

54 ENVIRONMENTAL SCIENCES↗