Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

An “EPIIC” Vision to Evolve Project Integration, Innovation, and Collaboration with Broad Impact for How NASA Executes Complex Projects

Evolving Project Integration, Innovation, and Collaboration (EPIIC) is a vision defined to transform the way projects manage information to support real-time decisions, capture best practices and lessons learned, perform assessments, and manage risk across a portfolio of projects. The foundational project management needs for data and information will be revolutionized through innovations on how we manage and access that data, implement configuration control, and certify compliance. The embedded intelligence of new interactive data interfaces integrate technical and programmatic data such that near real time analytics can be accomplished to more efficiently and accurately complete systems engineering and project management tasks. The system-wide data analytics that are integrated into customized data interfaces allows the growing team of engineers and managers required to develop and implement major NASA missions the ability to access authoritative source(s) of system information while greatly reducing the labor required to complete system assessments. This would allow, for example, much of what is accomplished in a scheduled design review to take place as needed, between any team members, at any time. An intelligent data interface that rigorously integrates systems engineering and project management information in near real time can provide substantially greater insight for systems engineers, project managers, and the large diverse teams required to complete a complex project. System engineers, programmatic personnel (those who focus on cost, schedule, and risk), the technical engineering disciplines, and project management can realize immediate benefit from the shared vision described herein. Implementation of the vision also enables significant improvements in the performance of the engineered system being developed.

Moreland, Robert J.↗

Temperature control of the Mariner class spacecraft - A seven mission summary.

Mariner spacecraft have completed five missions of scientific investigation of the planets. Two additional missions are planned. A description of the thermal design of these seven spacecraft is given herein. The factors which have influenced the thermal design include the mission requirements and constraints, the flight environment, certain programmatic considerations and the experience gained as each mission is completed. These factors are reviewed and the impact of each on thermal design and developmental techniques is assessed. It is concluded that the flight success of these spacecraft indicates that adequate temperature control has been obtained, but that improvements in design data, hardware performance and analytical techniques are needed.

Dumas, L. N.↗

Orchestrator Telemetry Processing Pipeline

Orchestrator is a software application infrastructure for telemetry monitoring, logging, processing, and distribution. The architecture has been applied to support operations of a variety of planetary rovers. Built in Java with the Eclipse Rich Client Platform, Orchestrator can run on most commonly used operating systems. The pipeline supports configurable parallel processing that can significantly reduce the time needed to process a large volume of data products. Processors in the pipeline implement a simple Java interface and declare their required input from upstream processors. Orchestrator is programmatically constructed by specifying a list of Java processor classes that are initiated at runtime to form the pipeline. Input dependencies are checked at runtime. Fault tolerance can be configured to attempt continuation of processing in the event of an error or failed input dependency if possible, or to abort further processing when an error is detected. This innovation also provides support for Java Message Service broadcasts of telemetry objects to clients and provides a file system and relational database logging of telemetry. Orchestrator supports remote monitoring and control of the pipeline using browser-based JMX controls and provides several integration paths for pre-compiled legacy data processors. At the time of this reporting, the Orchestrator architecture has been used by four NASA customers to build telemetry pipelines to support field operations. Example applications include high-volume stereo image capture and processing, simultaneous data monitoring and logging from multiple vehicles. Example telemetry processors used in field test operations support include vehicle position, attitude, articulation, GPS location, power, and stereo images.

Powell, Mark↗

Put X-Ray Polarimetry on the MAP!

With Prof. R. Novick and others at the Columbia Astrophysics Laboratory I help found the field of X-ray polarimetry in the early 1970s. Currently I have more experience with the design, construction, calibration, and space flight of such instruments than anyone on the planet. The early probing beginnings saw only one definitive measurement (that of the integrated low-energy X-ray emission from the Crab Nebula sans pulsar) and a number of upper limits. The limited success did nevertheless inspire a number of detailed theoretical calculations, concentrating at first on neutron stars and black holes showing how precise measurements (e.g. degree of polarization and position angle as a function of pulse phase) would provide definitive limitations on otherwise equally plausible theoretical models. Over time the theoretical foundation has grown (e.g. the proceedings of the X-Ray Polarimetry Workshop held at SLAC in 2004). I will outline these foundations. It is important to understand the history of X-ray polarimetry beyond the early excitement. A polarimeter was at the focus of the original Einstein mission but was dropped during the restructuring. A polarimeter was successfully proposed (R. Novick PI, I was a Co-I) and built for the original Spectrum-X mission. During the years before the cancellation of Spectrum-X, the potential flight of this device stood in the way of other space flights for polarimeters --- "let us wait and see what it finds". This was unfortunate as there were a number of reasons why that polarimeter should not have been flown on the mission. Perhaps the most significant (but not only) reason was that a shared focal plane provided very little observing time. This is an extremely important point in considering the Roadmap. It is doubtful that there many 100%-polarized sources and so the "signal" is more typically a small fraction of the source flux. Thus, the source itself provides a substantial background, making continuum polarimetry even more difficult than narrow-line spectroscopy. X-ray polarimetry thus requires a dedicated mission that can, without programmatic pressures from other instruments/users, devote the integration time to perform meaningful measurements. The recently cancelled GEMS might have been such a mission. At least it was dedicated to polarimetry. Performing meaningful measurements is not going to be easy. In part because of the long hiatus and lack of experience, there appears to be too much pressure to "sell" polarimetry missions by the number of sources for which one might answer the simple question is, or is not, the integrated and time averaged emission from the source polarized at some confidence level? This was a fine question for the 1970 s but, I maintain, it is not today. One simply doesn't want to measure the time averaged polarization of the Crab s pulsar, but one wants to know the polarization as a function of energy and pulse phase to compare, e.g. to optical and radio measurements which divide even the primary pulse into dozens of phase bins. Such observations can distinguish amongst competing theories for the pulsed emission. The Roadmap should define what meaningful experiments are. I will pose some suggestions. Note that , because X-rays are usually believed originate in either non-thermal or highly aspherical situations we expect X-ray polarimetry to be much more important and rich in astrophysical information as opposed to the visible, where starlight often dominates the emission. One has often dreamt about an instrument that does polarimetry whilst it does other things, and I will discuss this. Even in this case, one needs to realize that the observing time will be driven by the polarimetry, otherwise no useful polarization measurements will be made. Finally, I will discuss some misconceptions that have appeared in the literature and at conferences which indicate to me that certain fundamental principles of polarimeter design and performance are not clearly understoodt is important for the Roadmap that we understand these principles and not advocate instruments that will not (or even worse cannot) accomplish the promised scientific return. I will discuss these principles.

Weisskopf, Martin C.↗

Promoting a Culture of Tailoring for Systems Engineering Policy Expectations

NASA's Marshall Space Flight Center (MSFC) has developed an integrated systems engineering approach to promote a culture of tailoring for program and project policy requirements. MSFC's culture encourages and supports tailoring, with an emphasis on risk-based decision making, for enhanced affordability and efficiency. MSFC's policy structure integrates the various Agency requirements into a single, streamlined implementation approach which serves as a "one-stop-shop" for our programs and projects to follow. The engineers gain an enhanced understanding of policy and technical expectations, as well as lesson's learned from MSFC's history of spaceflight and science missions, to enable them to make appropriate, risk-based tailoring recommendations. The tailoring approach utilizes a standard methodology to classify projects into predefined levels using selected mission and programmatic scaling factors related to risk tolerance. Policy requirements are then selectively applied and tailored, with appropriate rationale, and approved by the governing authorities, to support risk-informed decisions to achieve the desired cost and schedule efficiencies. The policy is further augmented by implementation tools and lifecycle planning aids which help promote and support the cultural shift toward more tailoring. The MSFC Customization Tool is an integrated spreadsheet that ties together everything that projects need to understand, navigate, and tailor the policy. It helps them classify their project, understand the intent of the requirements, determine their tailoring approach, and document the necessary governance approvals. It also helps them plan for and conduct technical reviews throughout the lifecycle. Policy tailoring is thus established as a normal part of project execution, with the tools provided to facilitate and enable the tailoring process. MSFC's approach to changing the culture emphasizes risk-based tailoring of policy to achieve increased flexibility, efficiency, and effectiveness in project execution, while maintaining appropriate rigor to ensure mission success.

Blankenship, Van A.↗

Modular, Adaptive, Reconfigurable Systems: Technology for Sustainable, Reliable, Effective, and Affordable Space Exploration

In order to execute the Vision for Space Exploration, we must find ways to reduce cost, system complexity, design, build, and test times, and at the same time increase flexibility to satisfy multiple functions. Modular, Adaptive, Reconfigurable System (MARS) technologies promise to set the stage for the delivery of system elements that form the building blocks of increasingly ambitious missions involving humans and robots. Today, space systems are largely specialized and built on a case-by-case basis. The notion of modularity however, is nothing new to NASA. The 1970's saw the development of the Multi-Mission Modular spacecraft (MMS). From 1980 to 1992 at least six satellites were built under this paradigm, and included such Goddard Space Flight Center missions as SSM, EUVE, UARS, and Landsat 4 and 5. Earlier versions consisted of standard subsystem "module" or "box" components that could be replaced within a structure based on predefined form factors. Although the primary motivation for MMS was faster/cheaper integration and test, standardization of interfaces, and ease of incorporating new subsystem technology, it lacked the technology maturity and programmatic "upgrade infrastructure" needed to satisfy varied mission requirements, and ultimately it lacked user buy-in. Consequently, it never evolved and was phased out. Such concepts as the Rapid Spacecraft Development Office (RSDO) with its regularly updated catalogue of prequalified busses became the preferred method for acquiring satellites. Notwithstanding, over the past 30 years since MMS inception, technology has advanced considerably and now modularity can be extended beyond the traditional MMS module or box to cover levels of integration, from the chip, card, box, subsystem, to the space system and to the system-of-systems. This paper will present the MARS architecture, cast within the historical context of MMS. Its application will be highlighted by comparing a state-of-the-art point design vs. a MARS-enabled lunar mission, as a representative robotic case design.

Esper, Jaime↗

The Role of Project Science in the Chandra X-Ray Observatory

The Chandra X-Ray Observatory, one of NASA's Great Observatories, has an outstanding record of scientific and technical success. This success results from the efforts of a team comprising NASA, its contractors, the Smithsonian Astrophysical Observatory, the instrument groups, and other elements of the scientific community, including thousands of scientists who utilize this powerful facility for astrophysical research. We discuss the role of NASA Project Science in the formulation, development, calibration, and operation of the Chandra X-ray Observatory. In addition to representing the scientific community within the Project, Project Science performed what we term "science systems engineering". This activity encompasses translation of science requirements into technical requirements and assessment of the scientific impact of programmatic and technical trades. We briefly describe several examples of science systems engineering conducted by Chandra Project Science.

O'Dell, Stephen L.↗

Preliminary Results from the Joint Russian and US Field Test: Measurement of Sensorimotor and Cardiovascular Responses Immediately Following Landing of the Soyuz Spacecraft

Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest have do serve as acceptable flight analogs, testing of crew responses following the long duration flights does not begin until a minimum of 24 hours after landing. As a result it is not possible to estimate the nonlinear trend of the early (<24 hr) recovery process nor is it possible to accurately assess the full impact of the decrements associated with long duration flight. To overcome these limitations both the Russian and U.S. sides have implemented testing at the time of landing and before the flight crews have left the landing site. By joint agreement this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (< 2 hr) with one to three immediate follow-up measurements on the day of landing. This goal has both sensorimotor and cardiovascular elements including an evaluation of NASA's new anti-orthostatic compression garment as compared with the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessment of hand/eye coordination, ability to egress from a seated position, walk normally without falling, measurement of dynamic visual acuity, ability to discriminate different forces generated with both the hands and legs, recovery from a fall, a coordinated walk involving tandem heel-to-toe placement and determination of postural ataxia while standing. The cardiovascular portion of the investigation includes blood pressure and heart rate measurements during a timed stand test in conjunction with postural ataxia testing. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content, and implementation. The PFT is currently scheduled for the September 2013 landing of the Soyuz spacecraft (34S). Testing will include: (1) a sit-to-stand test, (2) recovery from a fall where the crewmember begins in the prone position on the ground and then stands for 3 min while cardiovascular stability is determined and postural ataxia data are acquired, and (3) a tandem heel-to-toe walk to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors and severity of postflight motion sickness will be available for analysis. It is our intent to present, at this celebratory symposium, a summary of these data obtained from two crewmembers. In summary, the level of functional deficit is expected to be most profound during the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiological data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers. Overall, these early functional and related physiological measurements will allow estimation of nonlinear sensorimotor and cardiovascular recovery trends to an accuracy that has not been previously captured in over 50 years of space flight.

Reschke, M. F.↗

Preliminary Sensorimotor and Cardiovascular Results from the Joint Russian and U.S. Pilot Field Test with Planning for the Full Field Test Beginning with the Year Long Intenational Space Station

Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest does serve as acceptable flight analogs, testing of crew responses following the long duration flights previously has not been possible until a minimum of 24 hours after landing. As a result, it is not possible to estimate the nonlinear trend of the early (<24 hr) recovery process, nor is it possible to accurately assess the full impact of the decrements associated with long duration flight. To overcome these limitations, both the Russian and U.S. sides have implemented testing at landing site. By joint agreement, this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (< 2 hr) with one to three immediate follow-up measurements on the day of landing. This goal has both sensorimotor and cardiovascular elements, including evaluations of NASA's new anti-orthostatic compression garment and the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessment of hand/eye coordination, ability to egress from a seated position, walk normally without falling, measurement of dynamic visual acuity, ability to discriminate different forces generated with both the hands and legs, recovery from a fall, a coordinated walk involving tandem heel-to-toe placement, and determination of postural ataxia while standing. The cardiovascular portion of the investigation includes blood pressure and heart rate measurements during a timed stand test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during other functional tasks. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed upon subset of tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content and implementation. The PFT was first conducted following the September 2013 landing of the Soyuz spacecraft (34S) and again following the landing of Soyuz 35S in November. Testing included: (1) a sit-tostand test, (2) recovery from a fall where the crewmember began in the prone position on the ground and then stood for 3 min while cardiovascular stability was determined and postural ataxia data were acquired, and (3) a tandem heel-to-toe walk test to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors and severity of postflight motion sickness were collected for analysis. In summary, the level of functional deficit is expected to be most profound during the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiological data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers for exploration missions where the crew will be unassisted after landing. Overall, these early functional and related physiological measurements will allow estimation of nonlinear sensorimotor and cardiovascular recovery trends to an accuracy that has not been previously captured in over 50 years of space flight.

Reschke, M. F.↗

Preliminary Sensorimotor and Cardiovascular Results from the Joint Russian/U.S. Pilot Field Test in Preparation for the Full Field Test

Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short-duration (Space Shuttle) and long-duration (Mir and International Space Station [ISS]) space flights. While the unloading paradigms associated with dry immersion and bed rest does serve as acceptable flight analogs, testing of crew responses following the long-duration flights previously has not been possible until a minimum of 24 hours after landing. As a result, it is not possible to estimate the nonlinear trend of the early (<24 hours) recovery process nor is it possible to accurately assess the full impact of the decrements associated with long-duration flight. To overcome these limitations, both the Russian and U.S. programs have implemented testing at the landing site. By joint agreement, this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long-duration space-flight crews beginning as soon after landing as possible (< 2 hours) with one to three immediate follow-up measurements on the day of landing. This goal has both sensorimotor and cardiovascular elements, including evaluations of NASA's new anti-orthostatic compression garment and the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessing hand/eye coordination, egressing from a seated position, walking normally without falling, measuring of dynamic visual acuity, discriminating different forces generated with both the hands and legs, recovering from a fall, coordinated walking involving tandem heel-to-toe placement, and determining postural ataxia while standing. The cardiovascular portion of the investigation includes measuring blood pressure and heart rate during a timed stand test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during the other functional tasks. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired between one and three more other times within the 24 hours after landing and will continue over the subsequent weeks until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of a jointly agreed upon subset of tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content and implementation. The PFT has been collected on several ISS missions. Testing included: (1) a sit-to-stand test, (2) recovery from a fall where the crewmember began in the prone position on the ground and then stood for 3 minutes while cardiovascular stability was determined and postural ataxia data were acquired, and (3) a tandem heel-totoe walk test to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors, and severity of postflight motion sickness were collected for each test session. In summary, the level of functional deficit is expected to be most profound during the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiologic data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers for exploration missions where the crew will be unassisted after landing. Overall, these early functional and related physiologic measurements will allow estimation of nonlinear sensorimotor and cardiovascular recovery trends that has not been previously captured in over 50 years of space flight.

Reschke, M. F.↗

Pilot Sensorimotor and Cardiovascular Results from the Joint Russian/U.S. Field Test

The primary goal of this research is to determine functional abilities associated with long-duration space flight crews beginning as soon after landing as possible (< 2 hours) with an additional two follow-up measurements sessions on the day of landing. This goal has both sensorimotor and cardiovascular elements, including evaluations of NASA's new anti-orthostatic compression garment and the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessing hand/eye coordination, standing from a seated position (sit-to-stand), walking normally without falling, measurement of dynamic visual acuity, discriminating different forces generated with both the hands and legs, recovering from a fall (standing from a prone position), coordinated walking involving tandem heel-to-toe placement, and determining postural ataxia while standing. The cardiovascular portion of the investigation includes measuring blood pressure and heart rate during a timed stand test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during the other functional tasks. In addition to the immediate post-landing collection of data for the full FT, postflight data is being acquired twice more within the 24 hours after landing and will continue over the subsequent weeks until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a initial evaluation of the feasibility of testing in the field, and is comprised of a jointly agreed upon subset of tests from the full FT and relies heavily on Russia's Institute of Biomedical Problems Sensory-Motor and Countermeasures Laboratories for content and implementation. The PFT has been collected on several ISS missions. Testing on the U.S. side has included: (1) a sit-to-stand test, (2) recovery from a fall where the crewmember began in the prone position on the ground and then stood for 3 minutes while cardiovascular stability was determined and postural ataxia data were acquired, and (3) a tandem heel-to-toe walk test to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from bodyworn inertial sensors, and severity of postflight motion sickness were collected during each test session. Our Russian investigators have added measurements associated with: (a) obstacle avoidance, (b) muscle compliance and (c) postural adjustments to perturbations (push) applied to the subject's chest area. The level of functional deficit observed in the crew tested to date is typically beyond what was expected and is clearly triggered by the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiologic data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers for exploration missions where the crew will be unassisted after landing. Overall, these early functional and related physiologic measurements will allow the estimation of nonlinear sensorimotor and cardiovascular recovery trends that have not been previously captured

Reschke, M. F.↗

Initial Sensorimotor and Cardiovascular Data Acquired from Soyuz Landings: Establishing a Functional Performance Recovery Time Constant

INTRODUCTION Testing of crew responses following long-duration flights has not been previously possible until a minimum of more than 24 hours after landing. As a result, it has not been possible to determine the trend of the early recovery process, nor has it been possible to accurately assess the full impact of the decrements associated with long-duration flight. To overcome these limitations, both the Russian and U.S. programs have implemented joint testing at the Soyuz landing site. This International Space Station research effort has been identified as the functional Field Test, and represents data collect on NASA, Russian, European Space Agency, and Japanese Aerospace Exploration Agency crews. RESEARCH The primary goal of this research is to determine functional abilities associated with long-duration space flight crews beginning as soon after landing as possible on the day of landing (typically within 1 to 1.5 hours). This goal has both sensorimotor and cardiovascular elements. To date, a total of 15 subjects have participated in a 'pilot' version of the full 'field test'. The full version of the 'field test' will assess functional sensorimotor measurements included hand/eye coordination, standing from a seated position (sit-to-stand), walking normally without falling, measurement of dynamic visual acuity, discriminating different forces generated with the hands (both strength and ability to judge just noticeable differences of force), standing from a prone position, coordinated walking involving tandem heel-to-toe placement (tested with eyes both closed and open), walking normally while avoiding obstacles of differing heights, and determining postural ataxia while standing (measurement of quiet stance). Sensorimotor performance has been obtained using video records, and data from body worn inertial sensors. The cardiovascular portion of the investigation has measured blood pressure and heart rate during a timed stand test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during sensorimotor testing on all of the above measures. We have also collected motion sickness data associated with each of the postflight tests. When possible rudimentary cerebellar assessment was undertaken. In addition to the immediate post-landing collection of data, postflight data has been acquired twice more within 24 hours after landing and measurements continue until sensorimotor and cardiovascular responses have returned to preflight normative values (approximately 60 days postflight). SUMMARY The level of functional deficit observed in the crew tested to date is more severe than expected, clearly triggered by the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiologic data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers for exploration missions where the crew will be unassisted after landing. Overall, these early functional and related physiologic measurements will allow the estimation of nonlinear sensorimotor and cardiovascular recovery trends that have not been previously captured.

Reschke, M. F.↗

Sensorimotor Results from the Joint NASA and Russian Pilot Field Test

Testing of crew responses following long-duration flights has not previously been possible until a minimum of 24 hours after landing. As a result, it has not been possible to estimate the nonlinear trend of the early (<24 hours) recovery process, nor has it been possible to accurately assess the full impact of the decrements associated with long-duration flight. To overcome these limitations, both the Russian and U.S. programs have implemented testing at the Soyuz landing site. This research effort has been identified as the Field Test (FT). For operational reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The PFT has now been completed with the landing of the crew of International Space Station Increment 42/43 (Soyuz expedition 41S). RESEARCH: The primary goal of this research was to determine functional abilities associated with long-duration space flight crews beginning as soon after landing as possible (< 2 hours) with an additional two follow-up measurement sessions within 24 hours after landing. This study goal has both sensorimotor and cardiovascular elements. The PFT represented a initial evaluation of the feasibility of testing in the field and was comprised of a jointly agreed upon subset of tests drawn from the full FT and relied heavily on Russia's Institute of Biomedical Problems Sensory-Motor and Countermeasures Department for content and implementation. Data from the PFT was collected following several ISS missions. Testing on the U.S. side has included: (1) a sit-to-stand test, (2) recovery from a fall stand test where the crewmember begins in the prone position on the ground and then stands for 3.5 minutes while cardiovascular performance and postural ataxia data are acquired, and (3) a tandem heel-to-toe walk test to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors, and severity of postflight motion sickness were collected during each test session. In addition our Russian investigators have made measurements associated with: (a) obstacle avoidance, (b) muscle compliance, (c) postural adjustments to perturbations (pushes) applied to the subject's chest area and (d) center of mass measurements made across most test objectives with insoles inserted into the subjects' shoes. Data from 18 subjects have been obtained for a majority of the PFT objectives. SUMMARY: The increased level of functional deficit observed in the crewmembers tested with the PFT objectives has been typically greater than previously observed when measurements were collected after the 2 hr window. Significant improvement in crew performance was observed within 24 hours, but full recovery appears to require 6 to 16 days. Clearly measureable performance parameters such as ability to perform a seat egress, recovery from a fall or the ability to see clearly when walking, and related physiologic data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the variability among crewmembers for exploration missions where the crew will be unassisted after landing. Overall, these early functional and related physiologic measurements will allow the estimation of nonlinear sensorimotor and cardiovascular recovery trends that have not been previously captured.

Reschke, Millard↗

The "Programmatics" of the ISS Crewmembers' Twelve Month Mission

The mission duration for crewmembers' stay on the International Space Station (ISS) has historically been approximately six months, consistent with the service life of the Soyuz spacecraft that delivers and returns the crewmembers previous. Exploration missions beyond low Earth orbit are expected to require crew durations of a year or more. The ISS Partners have agreed to begin building an experience base of longer crew durations, and have selected two crewmembers to serve on ISS for approximately twelve months, beginning in the Spring of 2015. The preparations for the one NASA and one Roscosmos crewmember require many new considerations for the ISS Program and its Partnership - "programmatic" considerations that are separate from crew health concerns. Since the long-duration crew's Soyuz will need to be replaced halfway through their stay, crew rotation, handover and the Soyuz docking port plan are affected. There is also an opportunity for two short-duration crewmembers to fly during the Soyuz exchange. It is desirable to minimize additional training required of the prime and backup crewmembers; normal crew rotations have a Soyuz crew train as the backup crew, then train as the prime crew. Ground teams will adjust their traditional support to ISS crewmembers, including communication of long-term plans, onboard training, and logistics support. The lessons learned during the preparation and execution of the 12-month mission will support improvements in future ISS long-duration missions and exploration missions.

Hasbrook, Pete↗

Propellant Densification for Shuttle: The SSME Perspective

The subject of cryogenic propellant densification as a potential upgrade to the Space Shuttle is a subject that has been raised on several occasions over the last decade. Due to advancements in densification technology made as a part of and in parallel to the X-33 project, the subject was raised and studied once again in May 2001. Across the Space Shuttle program people from many disciplines converged to discuss issues and perform trade studies to determine whether densified propellants was worth pursuing. This paper discusses one of these areas, specifically the Space Shuttle Main Engine (SSME). The effects of propellant densification on steady state performance are presented along with discussions of potential transient performance issues. Engine component redesign and retrofit issues are discussed as well the high level requirements to modify the ground test stands to accommodate propellant densification hardware and tanks. And finally, the matter of programmatic concerns enters the subject at hand as part of a discussion of SSME recertification requirements. In the end, potential benefits to SSME performance can be demonstrated and, subject to the densification scheme chosen, there does not appear to insurmountable technical obstacles.

Greene, William D.↗

Payload specialist station study. Volume 1: Executive summary

The results of the Payload Specialist Station study are summarized. An optimum aft flight deck (AFD) controls and displays (C&D) configuration concept for payload operations within the Shuttle Orbiter were studied. The concept derived satisfied the large majority of identified payload C&D requirements through the 1980's, was cost effective, and utilized existing technology. The results are directly applicable to Phase C/D activities. Programmatic analyses, phase C/D program definition and schedules, and economic analyses were completed; and estimated phase C/D costs were identified. The AFD control and display concept was defined via panel layouts, CEI specifications, and programmatics for phase C/D. The study plan included the following six phases: (1) derive control and display requirements; (2) perform functional analyses; (3) perform system synthesis; (4) perform trade studies; (5) perform preliminary design; and (6) provide programmatics.

Source record↗

Coal liquefaction processes and development requirements analysis for synthetic fuels production

Focus of the study is on: (1) developing a technical and programmatic data base on direct and indirect liquefaction processes which have potential for commercialization during the 1980's and beyond, and (2) performing analyses to assess technology readiness and development trends, development requirements, commercial plant costs, and projected synthetic fuel costs. Numerous data sources and references were used as the basis for the analysis results and information presented.

Source record↗

Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

Source record↗