Search NASA⌕ Search

SEARCH · Search NASA

Results for “programming systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Decision Making and Communications Process Assessment of NASA Using Three Change Requests from the Space Launch System Program

This thesis investigated the communication and decision making process as part of the Systems Engineering practices at the NASA/Marshall Center to determine its level of effectiveness. Data was collected across three change requests to assess how decisions were made, how the decisions were communicated, and whether a process mattered in the formulation and dissemination of those decisions. Data results revealed the comprehensive decision making process for the technical change requests to be effective. Evidence revealed that the process was sufficiently tailored to accommodate the need of each individual technical change which promoted effective communication amongst the stakeholders in the formulation of the strategic decision recommendations elevated to upper management. However, data results also revealed the dissemination of the final decision and approval of the change requests from the higher organizational level down to all stakeholders was less effective. An establishment of a culmination meeting at the end of the change request decision process in which to close the communication loop with all entities would be beneficial.

Hicks, Karen Campbell↗

Space shuttle system program definition. Volume 1: Executive summary

A study for the selection of a low cost shuttle system for design and development was conducted. The objective of the final study was to examine and penetrate the major technical and cost issues affecting the choice of the following: (1) liquid propulsion recoverable or solid propulsion recoverable booster, (2) parallel burn/parallel mount or series burn/tandem mount configurations, and (3) payload weight and payload bay size of the orbiter. The matrix of program options which were considered in the study is developed.

Source record↗

USAF/WL robust 300 C wire insulation system program status

The objective of this program is to identify, develop, and demonstrate an optimum wire insulation system capable of continuous operation at 300 C which possesses a combination of superior electrical (AC or DC), mechanical, and physical properties over Kapton derived insulations described in MIL-W-81381 and those hybrid materials commonly known as TKT constructions.

Wong, Wing↗

High-speed research program systems analysis activities at Ames Research Center

The Ames Systems Analysis Branch has been working to support the High Speed Research Program (HSRP) for nearly one year. Both the status of methodology development activities and the results of studies are presented whether completed or underway. The discussion involves the conceptual design synthesis program used for High Speed Civil Transport (HSCT) studies, ACSYNT (aircraft synthesis), and enhancements that have been made especially for HSRP. Some results are presented for one study that has been completed and two that are underway. These are the advanced controls integration study, the fuel cost impact study, and the oblique wing configuration evaluation that is part of a larger innovative concepts study.

Kidwell, George H.↗

An Overview of NASA Langley Low-Speed CFD Contributions to the Space Launch System Program

In this review paper, low-speed computational work from NASA Langley in support of the Space Launch System (SLS) is discussed. This information includes both historic and present efforts with the Kestrel CFD solver. The low-speed aerodynamics of SLS is highly complex and analysis of the unsteady flowfield requires significant computational efforts. The SLS mission profile varies from the vehicle static on the launch pad through high-speed ascent, and this paper focuses on the prelaunch as well as liftoff and transition portions of the flight both in proximity to the launch tower and in isolation. High-alpha conditions, as large as 90~deg, result in a flowfield dominated by massive, large-scale flow separation and asymmetric vortices. High-fidelity solutions require an unsteady computational formulation to accurately capture the aerodynamics of the vehicle. A detailed discussion of the computational approach is presented, followed by key efforts to support the program.

Brent W Pomeroy↗

Opportunities for ceramics in the ERDA/NASA continuous combustion propulsion systems program

An overview on engine development projects for potential use of ceramics is reported. A major ceramics materials technology effort is described to meet anticipated engine system requirements in terms of the automotive application, some of the more pressing technology needs, and some indications of how to conduct this technology program with industry-engine development projects focus on both gas turbine and Stirling engines.

Blankenship, C. P.↗

Space shuttle system program definition. Volume 4: Cost and schedule report

The supporting cost and schedule data for the second half of the Space Shuttle System Phase B Extension Study is summarized. The major objective for this period was to address the cost/schedule differences affecting final selection of the HO orbiter space shuttle system. The contending options under study included the following booster launch configurations: (1) series burn ballistic recoverable booster (BRB), (2) parallel burn ballistic recoverable booster (BRB), (3) series burn solid rocket motors (SRM's), and (4) parallel burn solid rocket motors (SRM's). The implications of varying payload bay sizes for the orbiter, engine type for the ballistics recoverable booster, and SRM motors for the solid booster were examined.

Source record↗

Space Station Freedom ground systems program - A survey

The key facilities identified to support Space Station Freedom Program (SSFP) integrated operations and their SSFP roles are described in detail. The ground infrastructure, which must be able to support both assembly and long-term operations, will consist of ground facilities, support systems, and the associated planning and management procedures. During 1992 the SSFP is conducting a major program review of the ground infrastructure including the definition of all facility and support system functional capabilities, interfaces, and data-flow requirements. Operations functionality and interface verification tests are being identified, and operations readiness dates are being set.

Accola, A.↗

NASA Aviation Safety Program Systems Analysis/Program Assessment Metrics Review

The goal of this project is to evaluate the metrics and processes used by NASA's Aviation Safety Program in assessing technologies that contribute to NASA's aviation safety goals. There were three objectives for reaching this goal. First, NASA's main objectives for aviation safety were documented and their consistency was checked against the main objectives of the Aviation Safety Program. Next, the metrics used for technology investment by the Program Assessment function of AvSP were evaluated. Finally, other metrics that could be used by the Program Assessment Team (PAT) were identified and evaluated. This investigation revealed that the objectives are in fact consistent across organizational levels at NASA and with the FAA. Some of the major issues discussed in this study which should be further investigated, are the removal of the Cost and Return-on-Investment metrics, the lack of the metrics to measure the balance of investment and technology, the interdependencies between some of the metric risk driver categories, and the conflict between 'fatal accident rate' and 'accident rate' in the language of the Aviation Safety goal as stated in different sources.

Louis, Garrick E.↗

A role for AVIRIS in the Landsat and Advanced Land Remote Sensing Systems program

As a calibrated imaging spectrometer flying at a 20 km altitude, AVIRIS may contribute to the Landsat and the Advanced Land Remote Sensing System efforts. These contributions come in the areas of: (1) on-orbit calibration, (2) specification of new spectral bands, (3) validation of algorithms, and (4) investigation of an imaging spectrometer of the Advanced Land Remote Sensing System.

Green, Robert O.↗

A Role for AVIRIS in the Landsat and Advanced Land Remote Sensing System Program

As a calibrated imaging spectrometer flying at a 20 km altitude, AVIRIS may contribute to the Landsat and the Advanced Land Remote Sensing System efforts. These contributions come in the areas of: 1) on-orbit calibration, 2) specification of new spectral bands, 3) validation of algorithms and 4) investigation of an imaging spectrometer for the Advance Land Remote Sensing System.

AVIRIS↗

Networks consolidation program system design

The general system design for the Mark 4-A Deep Space Network to be implemented in the Networks Consolidation Program is discussed. The arrangement and complement of antennas and the list of subsystem equipment at the Signal Processing Center are described.

Gatz, E. C.↗

Science and the Constellation Systems Program Office

An underlying tension has existed throughout the history of NASA between the human spaceflight programs and the external scientific constituencies of the robotic exploration programs. The large human space projects have been perceived as squandering resources that might otherwise be utilized for scientific discoveries. In particular, the history of the relationship of science to the International Space Station Program has not been a happy one. The leadership of the Constellation Program Office, created in NASA in October, 2005, asked me to serve on the Program Manager s staff as a liaison to the science community. Through the creation of my position, the Program Manager wanted to communicate and elucidate decisions inside the program to the scientific community and, conversely, ensure that the community had a voice at the highest levels within the program. Almost all of my technical contributions at NASA, dating back to the Apollo Program, has been within the auspices of what is now known as the Science Mission Directorate. However, working at the Johnson Space Center, where human spaceflight is the principal activity, has given me a good deal of incidental contact and some more direct exposure through management positions to the structures and culture of human spaceflight programs. I entered the Constellation family somewhat naive but not uninformed. In addition to my background in NASA science, I have also written extensively over the past 25 years on the topic of human exploration of the Moon and Mars. (See, for example, Mendell, 1985). I have found that my scientific colleagues generally have little understanding of the structure and processes of a NASA program office; and many of them do not recognize the name, Constellation. In many respects, the international ILEWG community is better informed. Nevertheless, some NASA decision processes on the role of science, particularly with respect to the formulation of a lunar surface architecture, are not well known, even in ILEWG. At the recent annual Lunar and Planetary Science Conference, I reviewed the evolution of the program as a function of Agency leadership and the constraints put on NASA by the President in his 2004 announcement. I plan to continue my long-time ILEWG tradition of reporting a personal view of the state of development of human exploration of the solar system, this time coming from within the program office tasked to implement the vision for the United States. The current NASA implementation of the Vision for Space Exploration is consistent with certain classical scenarios that have been discussed extensively in the literature. I will discuss the role of science within the Vision, both from official policy and from a de facto interaction. While science goals are not officially driving the implementation of the Vision, the tools of scientific exploration are integral to defining the extraterrestrial design environments. In this respect the sharing of results from international missions to the Moon can make significant contributions to the success of the future human activities.

Mendell, Wendell↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in the past year, including firing tests of both main propulsion elements, manufacturing of flight hardware, and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons (t) (154,000 pounds) of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 t (286,000 pounds) to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware, including flight hardware for Exploration Mission 1 (EM-1). This paper will provide an overview of the progress made over the past year and provide a glimpse of upcoming milestones on the way to a 2018 launch readiness date.

May, Todd↗