Search NASA⌕ Search

SEARCH · Search NASA

Results for “progress update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

Project PARETO – DOE’s Produced Water Optimization Initiative

The data will take the form of a poster communicating DOE’s progress on Project PARETO, including recent developments in the PARETO framework, updates to efforts in water treatment modelling, and a new water sharing extension that facilitates water reuse.

Susarla, Naresh↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (Progress Report for FRD-17-002)

In the month of April, we planned to have the Site License Agreement with SPI signed and fully executed, make further progress on the market assessment for the Wood-to-Bio-oil Market Report, and hoped to have the subcontracts in place with Iowa State University and Frontline BioEnergy, LLC once we have approval from the CAM. We also plan to have the updated budget from Iowa State in order to send both updated sub-recipient budget sheets to the CAM for approval.We continue to make more progress towards getting our subcontracts in place and received the requested adjustments to ISU’s budget sheets. These were sent to the CAM on 4/30/2020. As the COVID-19 situation is country-wide, we anticipate slower responses from our partners due to similar delays in their organizations to what we are experiencing internally. Although their response times will be slower, both ISU and Frontline are continuing to make good progress on their work for the demonstration in Iowa for this summer, which is assisting with keeping us on schedule for the overall effort. We are continuing to work on the required documents for our subcontracts – though neither will be placed before we receive official approval from our CAM – so that once we have approval, we can place them very quickly.

09 BIOMASS FUELS↗

Beam correction for multi-pass arcs in FFA@CEBAF: status update

This work examines the multi-pass steering of six electron beams in an FFA arc ranging from approximately 10.5 GeV to 22 GeV. Shown here is an algorithm based on singular value decomposition (SVD) to successfully steer all six beams through the arc given precise knowledge of all beam positions at each of one hundred and one diagnostic locations with one hundred individual corrector magnets: that is successive application of SVD to different 100 × 101 response matrices—one for each beam energy. Further, a machine learning scheme is developed which only requires knowledge of the energy-averaged beam position at each location to provide equivalent steering. Extension of this scheme to other beam optics quantities as well as transverse and longitudinal coupling is explored.

Accelerator Physics↗

LANL Meteorological Program Self-Assessment 2021 Update

This self-assessment, documented in Table 1, has shown that there has been continued significant progress achieved in meeting the intent of the 21 recommendations from the 2015 DMCC Assist Visit. Every year after the Assist Visit, the LANL Met Program has improved, mainly by addressing the recommendations in the Assist Visit report. The Met Program management should continue to strive to apply its limited resources and seek to acquire additional human capital and physical resources to meet the dynamic needs of its growing sitewide customer base. This includes additional upgrading of the hardware and software elements of the Met Program and implementation of its operational procedures and QAPP to ensure it will consistently meet important present program requirements, as well as anticipated future requirements. These improvements have been summarized in the “present improvements and future initiatives” column in Table 1.

47 OTHER INSTRUMENTATION↗

ECP Software Technology Capability Assessment Report

The Exascale Computing Project (ECP) Software Technology (ST) Focus Area is responsible for developing critical software capabilities that will enable successful execution of ECP applications, and for providing key components of a productive and sustainable Exascale computing ecosystem that will position the US Department of Energy (DOE) and the broader high performance (HPC) community with a firm foundation for future extreme-scale computing capabilities. This ECP ST Capability Assessment Report (CAR) provides an overview and assessment of current ECP ST capabilities and activities, giving stakeholders and the broader HPC community information that can be used to assess ECP ST progress and plan their own efforts accordingly. ECP ST leaders commit to updating this document on regular basis (every six to 12 months).

97 MATHEMATICS AND COMPUTING↗

ECP Software Technology Capability Assessment Report

The Exascale Computing Project (ECP) Software Technology (ST) Focus Area is responsible for developing critical software capabilities that will enable successful execution of ECP applications, and for providing key components of a productive and sustainable Exascale computing ecosystem that will position the US Department of Energy (DOE) and the broader high performance (HPC) community with a firm foundation for future extreme-scale computing capabilities. This ECP ST Capability Assessment Report (CAR) provides an overview and assessment of current ECP ST capabilities and activities, giving stakeholders and the broader HPC community information that can be used to assess ECP ST progress and plan their own efforts accordingly. ECP ST leaders commit to updating this document on regular basis (every six to 12 months).

97 MATHEMATICS AND COMPUTING↗

Tracking Improvement in Simulated Marine Biogeochemistry Between CMIP5 and CMIP6

The changes or updates in ocean biogeochemistry component have been mapped between CMIP5 and CMIP6 model versions, and an assessment made of how far these have led to improvements in the simulated mean state of marine biogeochemical models within the current generation of Earth system models (ESMs). The representation of marine biogeochemistry has progressed within the current generation of Earth system models. However, it remains difficult to identify which model updates are responsible for a given improvement. In addition, the full potential of marine biogeochemistry in terms of Earth system interactions and climate feedback remains poorly examined in the current generation of Earth system models. Increasing availability of ocean biogeochemical data, as well as an improved understanding of the underlying processes, allows advances in the marine biogeochemical components of the current generation of ESMs. The present study scrutinizes the extent to which marine biogeochemistry components of ESMs have progressed between the 5th and the 6th phases of the Coupled Model Intercomparison Project (CMIP).

54 ENVIRONMENTAL SCIENCES↗

Progress on the design of the interaction region of the Electron-Ion Collider EIC

We present an update on the design of the Interaction Region (IR) for the the Electron Ion Collider (EIC) being built at Brookhaven National Laboratory (BNL). The EIC will collide high energy and highly polarized hadron and electron beams with a center of mass energy up to 140 GeV with luminosities of up to 10^34 /cm^2/s. The IR, located at RHIC's IR6, is designed to meet the requirements of the nuclear physics community as outlined in [1]. A second IR is technically feasible but not part of the project.The magnet apertures are sufficiently large to allow desired collision products to reach the far-forward detectors; the electron magnet apertures in the rear direction are chosen to be large enough to pass the synchrotron radiation fan. In the forward direction the electron apertures are large enough for non-Gaussian tails.The paper discusses a number of recent recent changes to the design. The machine free region was recently increased from 9 to 9.5 m to allow for more space in the forward direction for the detector. The superconducting magnets on the forward side now operate at 1.9 K, which helps crosstalk and space issues.

43 PARTICLE ACCELERATORS↗

Project Update for “Designing Nuclear-data Measurements that Resolve Discrepancies in Existing Data” [Slides]

AIACHNE has made key progress this past year and will contribute to the larger scientific community. We recovered input data for the current 252 Cf(sf) PFNS evaluation that was previously lost. We render a standard to the best of our ability reproducible. We critically reviewed past data as input for ML & new standard evaluation that will impact PFNS of all major actinides. We developed a unique AI/ ML code that highlights which measurement features are related to bias and are working towards open-sourcing it for the community. Features that were identified as related to bias follow physics’ intuition and bring new understanding of exp effects and might help us for other reactions and isotopes. The results highlight that EXFOR is a goldmine of features that could help us understand experiment bias (if they are easy to parse).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Status of genome function annotation in model organisms and crops

Abstract Since the entry into genome‐enabled biology several decades ago, much progress has been made in determining, describing, and disseminating the functions of genes and their products. Yet, this information is still difficult to access for many scientists and for most genomes. To provide easy access and a graphical summary of the status of genome function annotation for model organisms and bioenergy and food crop species, we created a web application ( https://genomeannotation.rheelab.org ) to visualize, search, and download genome annotation data for 28 species. The summary graphics and data tables will be updated semi‐annually, and snapshots will be archived to provide a historical record of the progress of genome function annotation efforts. Clear and simple visualization of up‐to‐date genome function annotation status, including the extent of what is unknown, will help address the grand challenge of elucidating the functions of all genes in organisms.

59 BASIC BIOLOGICAL SCIENCES↗

Monitoring, Evaluating, and Updating Your Community Solar Action Plan

The Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. This fact sheet describes some things to consider when implementing, monitoring, evaluating, and updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

MjCyc: Rediscovering the pathway-genome landscape of the first sequenced archaeon, Methanocaldococcus (Methanococcus) jannaschii

The genome of Methanocaldococcus (Methanococcus) jannaschii DSM 2661 was the first Archaeal genome to be sequenced in 1996. Subsequent sequence-based annotation cycles led to its first metabolic reconstruction in 2005. Leveraging new experimental results and function assignments, we have now re-annotated M. jannaschii, creating an updated resource with novel information and testable predictions in a pathway-genome database available at BioCyc.org. This reannotation effort has resulted in 652 function assignments with enzyme roles, accounting for a third of the total protein-coding entries for this genome. The updated resource includes 883 reactions, 540 enzymes, and 142 individual pathways. Despite notable progress in computational genomics, more than a third of the genome remains functionally uncharacterized. The publicly available MjCyc pathway-genome database holds great potential for the wider community to conduct research on the biology of methanogenic Archaea.

59 BASIC BIOLOGICAL SCIENCES↗

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

Update on Our Action Plan for Equity, Inclusion, and Diversity in Publishing at JGR: Biogeosciences

We made a commitment to better include underrepresented members of our community in the publication pipeline of JGR: Biogeosciences. This commitment consists of regular updates on our policies and practices, and concrete actions we intend to implement over the next year. So far, our progress to tackle biases and ensure equitable research in the biogeosciences has focused on improving diversity of our associate editor and reviewer pools, increasing awareness of unconscious bias in peer-review, and promoting inclusion in global collaborations. In this update, we explore manuscript submissions and manuscript decisions by gender, and we present a pilot that aims to promote ethical and equitable global collaborations in resource-poor settings. Here, we end our editorial by presenting our next set of actions that we plan on completing over the next year, which include a more thorough analysis of reviewer demographics.

99 GENERAL AND MISCELLANEOUS↗

INFN LASA in-kind contribution to PIP-II

This paper reports the status and recent progress of INFN LASA’s in-kind contribution to the PIP-II project at Fermilab, with updates on key activities and major procurements. Production efforts for the 38 INFN LASA-designed, 5-cell cavities (β=0.61) for the LB650 section of the linac are underway and two pre-series prototypes are being realized as a first step to validate the manufacturing and treatment sequence. Concurrently, preliminary testing on existing prototypes is progressing to gain a deeper understanding of the surface preparation and qualification procedures, including cross-validation at different infrastructures. Series LB650 cavities will be industrially produced and surface-treated to achieve the stringent performance targets, qualified via vertical cold tests at DESY AMTF, and delivered installation-ready for string assembly.

Paparella, Rocco [INFN, Pisa; LASA, Segrate]↗