At least 127 records · Page 7

Incorporating energy justice into utility-scale photovoltaic deployment: A policy framework

Utility-scale photovoltaic (PV) installations made up 77 GW (6%) of installed capacity in the United States, as of the end of 2021. This will grow to more than 500 GW by 2050 under a mid-case projection or more than 800 GW if solar costs decline more rapidly. While utility-scale PV is projected to grow rapidly, to date, unlike energy efficiency or distributed PV, utility-scale PV has not been used to provide substantial financial benefits to underserved communities, either through ownership, financing of assets, or direct electricity bill reduction. We assess two mechanisms through which utility-scale PV could benefit underserved communities. We find that while a framework for direct electricity bill reduction can be meaningful to customers, this mechanism falls short of providing restorative justice via wealth creation for minority-owned businesses. In contrast, we find that a framework for procurement of utility-scale PV by public and private entities from PV projects that are financed, owned, and/or developed by minority-owned businesses can provide this restorative justice benefit, and thereby facilitate an equitable energy transition. We conclude with concrete recommendations for new policies and programs to ensure that the benefits of utility-scale PV systems are distributed to underserved communities.

14 SOLAR ENERGY↗

Auxiliary Propulsion Activities in Support of NASA's Exploration Initiative

The Space Launch Initiative (SLI) procurement mechanism NRA8-30 initiated the Auxiliary Propulsion System/Main Propulsion System (APS/MPS) Project in 2001 to address technology gaps and development risks for non-toxic and cryogenic propellants for auxiliary propulsion applications. These applications include reaction control and orbital maneuvering engines, and storage, pressure control, and transfer technologies associated with on-orbit maintenance of cryogens. The project has successfully evolved over several years in response to changing requirements for re-usable launch vehicle technologies, general launch technology improvements, and, most recently, exploration technologies. Lessons learned based on actual hardware performance have also played a part in the project evolution to focus now on those technologies deemed specifically relevant to the Exploration Initiative. Formal relevance reviews held in the spring of 2004 resulted in authority for continuation of the Auxiliary Propulsion Project through Fiscal Year 2005 (FY05), and provided for a direct reporting path to the Exploration Systems Mission Directorate. The tasks determined to be relevant under the project were: continuation of the development, fabrication, and delivery of three 870 lbf thrust prototype LOX/ethanol reaction control engines; the fabrication, assembly, engine integration and testing of the Auxiliary Propulsion Test Bed at White Sands Test Facility; and the completion of FY04 cryogenic fluid management component and subsystem development tasks (mass gauging, pressure control, and liquid acquisition elements). This paper presents an overview of those tasks, their scope, expectations, and results to-date as carried forward into the Exploration Initiative.

Best, Philip J.↗

An Evaluation of Energy Storage Cost and Performance Characteristics

The energy storage industry continues to expand globally as costs continue to fall and opportunities in consumer, transportation and grid applications are defined. As the rapid evolution of the industry continues, it has become increasingly important to understand how varying technologies compare in terms of cost and performance. This paper defines and evaluates cost and performance parameters of six battery energy storage technologies (BESS) - lithium-ion batteries, lead-acid batteries, redox flow batteries, sodium-sulfur batteries, sodium metal halide batteries, and zinc-hybrid cathode batteries - four non-BESS storage technologies - pumped storage hydropower, flywheels, compressed air energy storage, and ultracapacitors - and combustion turbines. Cost and performance information was compiled based on an extensive literature review, conversations with vendors and stakeholders, and costs of systems procured at sites across the United States. Detailed cost and performance estimates are presented for 2018 and projected out to 2025. Annualized costs were also calculated for each technology.

Mongird, Kendall↗

STS/Spacelab payload utilization planning study: Executive summary

The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.

Source record↗

LIGO vacuum system study

A laser interferometer gravitational wave observatory (LIGO) is being developed with sensitivities which will have a high probability of detecting gravitational waves from astrophysical sources. A major component of LIGO is a total of 16 km of 1.2 m (48 inch) diameter tube at a pressure of less than 10 to the minus 8th power torr. It will be of 304L stainless steel procured directly from the steel mills with the initial hydrogen content specially reduced. Projections of the outgassing rates of hydrogen and of water vapor as a function of time are given and the uncertainties discussed. Based on these, a preliminary analysis of the vacuum system is presented.

Livas, Jeffrey C.↗

The advantages of cost plus award fee contracts

A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

Keathley, William C.↗

Tailoring a ConOps for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this paper is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services. This tailoring effort was performed as the authors final Masters Project in the Spring of 2016 for the Stevens Institute of Technology and modified for publication with INCOSE (Owens, 2016).

Knowledge↗

SPC-3178 Rev 5 Beryllium Oxide Procurement Specification

TREAT microreactor Experiment Cell (T-REXC). This facility will provide a test bed for microreactor developers to perform demonstration projects and critical experiments in an expedited manner. In addition to other systems, structures, and components (SSCs), T-REXC will provide beryllium oxide (BeO) reflector components that T-REXC users can incorporate into their equipment installation. This specification details supplier requirements associated with these BeO components.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

FY23 Drone RFID (Final Report)

The Drone RFID project successfully completed proof-of-concept testing to demonstrate the potential of a drone-based inventory system for high value remote materials at Los Alamos National Laboratory. Multiple drone platforms were procured, flight authorizations were received, and the vehicles were flown demonstrating what was initially perceived as the most difficult part of the project, successfully flying drones at the lab. Three commercial RFID inventory systems were also purchased, and ground testing performed to determine their suitability. Ultimately, one system was chosen for flight testing and successfully demonstrated the drone's ability to execute inventory with great potential for a relatively low-cost implementation.

42 ENGINEERING↗

Systems engingeering for the Kepler Mission : a search for terrestrial planets

The Kepler mission will launch in 2007 and determine the distribution of earth-size planets (0.5 to 10 earth masses) in the habitable zones (HZs) of solar-like stars. The mission will monitor > 100,000 dwarf stars simultaneously for at least 4 years. Precision differential photometry will be used to detect the periodic signals of transiting planets. Kepler will also support asteroseismology by measuring the pressure-mode (p-mode) oscillations of selected stars. Key mission elements include a spacecraft bus and 0.95 meter, wide-field, CCD-based photometer injected into an earth-trailing heliocentric orbit by a 3-stage Delta II launch vehicle as well as a distributed Ground Segment and Follow-up Observing Program. The project is currently preparing for Preliminary Design Review (October 2004) and is proceeding with detailed design and procurement of long-lead components. In order to meet the unprecedented photometric precision requirement and to ensure a statistically significant result, the Kepler mission involves technical challenges in the areas of photometric noise and systematic error reduction, stability, and false-positive rejection. Programmatic and logistical challenges include the collaborative design, modeling, integration, test, and operation of a geographically and functionally distributed project. A very rigorous systems engineering program has evolved to address these challenges. This paper provides an overview of the Kepler systems engineering program, including some examples of our processes and techniques in areas such as requirements synthesis, validation & verification, system robustness design, and end-to-end performance modeling.

systems engineering↗

Laser light scattering instrument advanced technology development

The objective of this advanced technology development (ATD) project has been to provide sturdy, miniaturized laser light scattering (LLS) instrumentation for use in microgravity experiments. To do this, we assessed user requirements, explored the capabilities of existing and prospective laser light scattering hardware, and both coordinated and participated in the hardware and software advances needed for a flight hardware instrument. We have successfully breadboarded and evaluated an engineering version of a single-angle glove-box instrument which uses solid state detectors and lasers, along with fiber optics, for beam delivery and detection. Additionally, we have provided the specifications and written verification procedures necessary for procuring a miniature multi-angle LLS instrument which will be used by the flight hardware project which resulted from this work and from this project's interaction with the laser light scattering community.

Wallace, J. F.↗

Non-Proprietary Companion to the Q1 CY2021 PathForward Final Assessment (WBS 2.4.1, Milestone PM-HI-1040)

The PathForward element of the Exascale Computing Project (ECP) Hardware and Integration (HI) focus area has met its goals of preparing the US industry for exascale system procurements and generally improving US competitiveness in the worldwide computing market. This report is a companion to the deliverable for the ECP milestone PM-HI-1040, Assess PathForward Impact Against Exascale Hardware Challenges, which gives a summary of the final status of each PathForward project, describes progress achieved against PathForward contract milestones, and includes a final assessment of each vendor’s progress on key exascale challenges. This companion document details the results of the PathForward research to the extent possible without disclosing proprietary information and the impact on products and US exascale systems. In addition, it captures lessons learned in order to inform future projects in general and in high-performance computing in particular.

97 MATHEMATICS AND COMPUTING↗

RAT Requisition Approval Team - A L6S Initiative

L6S Project Description - Problem: The current cycle time for generating and approving Requisitions does not meet "Best-In-Class." . Scope: Only looking at the Florida Requisition Approval process for Orbiter (ORBF & ORBG) and Ground (GFAC) stocked items. This includes the time from when a requirement is generated by Logistics Planning and Supportability in Florida until it is approved and received by Procurement. Requisitions generated at other sites or for non stocked items will be out of scope of this Project

Hall, Valerie↗

Reliability Evaluation of Bifacial and Monofacial Glass/Glass Modules with EVA and non-EVA Encapsulants

The market share for bifacial modules is projected to be doubled from 30% to 60% in the next ten years. For the monofacial crystalline silicon glass/backsheet (G/B) modules, extensive reliability data has been available for over 40 years. However, practically little/no long-term field or accelerated reliability test data is available for the new generation glass/glass (G/G) bifacial modules and glass/transparent (G/T) bifacial modules. Therefore, the primary motivation of this project was to identify the reliability strengths and weaknesses of new generation G/G modules compared to G/B modules. In this 3-year project, the goal was to objectively recommend the best construction materials for the new generation G/G (bifacial) modules through a systematic experimental approach with appropriate tasks including: Evaluation of field retrieved old-generation G/G modules; Inspection of new-generation G/G modules installed in the plants; Evaluation of new-generation G/G, G/B and G/T modules using EAST (Extended Accelerated Stress Testing), CAST (Combined Accelerated Stress Testing) and FAST (Field Accelerated Stress Testing); and, dynamic literature search and review. Major accomplishments and outcomes of this project are: Accomplishments: Evaluated more than 60 field retrieved modules and constructed and characterized more than 135 mini-modules with three substrate types (G, B, and T), two encapsulant types (EVA and POE), and two cell types (monofacial and bifacial) as well as evaluated more than 30 commercial G/G and G/B modules; Subjected all the modules to multitude characterization tests and various indoor and outdoor accelerated stress tests including FAST (Field Accelerated Stress Testing), EAST (Extended Accelerated Stress Testing), and CAST (Combined Accelerated Stress Testing) to identify and correlate the failure modes in both field and lab tests. Outcomes: Based on the accelerated test results and handling/mounting experience obtained in this project, the recommended best construction for the glass/glass modules is: “Framed GG modules with cut-cells and POE encapsulant (UVpass front; UVpass back).” However, from a statistical and manufacturing point of view (along with stakeholders surveys), the following cautionary notes are added to the above-mentioned recommendation: (i) Cut cells could introduce a higher level of manufacturing issues, including a higher number of cell interconnects; (ii) POE encapsulant is more expensive than EVA and could present a delamination risk and lower throughput during manufacturing due to lower adhesion strength. Other encapsulants, such as coextruded EPE (EVA/POE/EVA), are also recommended to be investigated. The potential public benefit of the proposed project is to present the strengths and weaknesses of glass/glass modules, so an informed procurement decision can be made.

14 SOLAR ENERGY↗

Real Time and Forecasted DLR: Use Cases

This document contains two use cases for the utilization of dynamic line ratings in operational practices. These use cases were developed in support of the Transmission Optimization and Grid Enhancing Technology (TOGETS) task force aimed at facilitating the deployment of dynamic line rating and power flow technologies across the United States. The project included a demonstration of the technology on the Idaho National Laboratory system. The procurement documents, tests scripts, and field-validated results from multiple vendors will be published to improve industry’s familiarity with the products. Because of the urgency in performing this work and INL’s unique test setup, the Task Force identified a need for additional public information on the information exchanges required for operationalizing DLR (i.e. integrating DLR’s within actual system operations). As such, this use case document and an accompanying interoperability profile have been developed with input from the Task Force and various vendors whose systems would ultimately support the functionality described. The use case and interoperability profile support two distinct functionalities with different purposes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solution-Space Screening of a Hypersonic Endurance Demonstrator

This report documents a parametric sizing study performed to develop a program strategy for research and development and procurement of a feasible next-generation hypersonic air-breathing endurance demonstrator. Overall project focus has been on complementing technical and managerial decision-making during the earliest conceptual design phase towards minimization of operational, technical, and managerial risks.

Chudoba, Bernd↗

Issues in NASA program and project management. Special Report: 1993 conference

This volume is the seventh in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1993 Conference: perspectives in NASA program/project management; the best job in aerospace; improvements in project management at NASA; strategic planning...mapping the way to NASA's future; new NASA procurement initiatives; international cooperation; and industry, government and university partnership. A section on resources for NASA managers rounds out the publication.

Hoffman, ED↗