Search NASA⌕ Search

SEARCH · Search NASA

Results for “propulsive maneuvers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The Mars Reconnaissance Orbiter Mission: 10 Years of Exploration from Mars Orbit

The Mars Reconnaissance Orbiter ( MRO ) entered Mars orbit on March 10, 2006. After five months of aerobraking, a series of propulsive maneuvers were used to establish the desired low -altitude science orbit. The spacecraft has been on station in its 255 x 320 k m, sun -synchronous (approximately 3 am -pm ), primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. This paper will provide a summary of the major achievements of the mission to date and the major flight activities planned for the remainder of its third Extended Mission (EM3). Some of the major flight challenges the flight team has faced are also discussed.

MRO↗

Mars Reconnaissance Orbiter Navigation Strategy for the Comet Siding Spring Encounter

Comet Siding Spring encountered Mars on October 19, 2014 at a distance of about 140,500 km - the nearest comet flyby of a planet in recorded history. Mars Reconnaissance Orbiter (MRO) was able to detect the comet, gather science data, and capture images of the comet as it approached Mars. To help protect MRO from the incoming comet particles, two propulsive maneuvers were performed to position the spacecraft behind Mars at the arrival time of the expected peak particle fluency. This paper documents the strategy that the MRO Navigation Team executed to mitigate risk from the comet particles while allowing scientific observations of the comet flyby.

maneuvers↗

Use of Shuttle Heritage Hardware in Space Launch System (SLS) Application-Structural Assessment

NASA is moving forward with the development of the next generation system of human spaceflight to meet the Nation's goals of human space exploration. To meet these goals, NASA is aggressively pursuing the development of an integrated architecture and capabilities for safe crewed and cargo missions beyond low-Earth orbit. Two important tenets critical to the achievement of NASA's strategic objectives are Affordability and Safety. The Space Launch System (SLS) is a heavy-lift launch vehicle being designed/developed to meet these goals. The SLS Block 1 configuration (Figure 1) will be used for the first Exploration Mission (EM-1). It utilizes existing hardware from the Space Shuttle inventory, as much as possible, to save cost and expedite the schedule. SLS Block 1 Elements include the Core Stage, "Heritage" Boosters, Heritage Engines, and the Integrated Spacecraft and Payload Element (ISPE) consisting of the Launch Vehicle Stage Adapter (LVSA), the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA), and an Interim Cryogenic Propulsion Stage (ICPS) for Earth orbit escape and beyond-Earth orbit in-space propulsive maneuvers. When heritage hardware is used in a new application, it requires a systematic evaluation of its qualification. In addition, there are previously-documented Lessons Learned (Table -1) in this area cautioning the need of a rigorous evaluation in any new application. This paper will exemplify the systematic qualification/assessment efforts made to qualify the application of Heritage Solid Rocket Booster (SRB) hardware in SLS. This paper describes the testing and structural assessment performed to ensure the application is acceptable for intended use without having any adverse impact to Safety. It will further address elements such as Loads, Material Properties and Manufacturing, Testing, Analysis, Failure Criterion and Factor of Safety (FS) considerations made to reach the conclusion and recommendation.

Aggarwal, Pravin↗

Improvements to the Copernicus Trajectory Design and Optimization System for Complex Space Trajectories

The purpose of this assessment was to develop updates and new features for the NASA Copernicus Spacecraft Trajectory Design and Optimization analysis tool (version 5.0) for application to NASA programs and projects. These updates will significantly improve the ability to design and optimize complex trajectories over multiple trajectory phases; will allow the use of unique vehicle-specific guidance, control, and trajectory strategies and constraints; and the creation of an almost unlimited number of unique user-defined capabilities. The primary stakeholders for this assessment are the trajectory design and optimization analysts and engineers, and the chief engineers and project managers for existing programs, projects, and/or tasks that involve impulsive, finite burn, and/or continuous thrust trajectories (e.g., Sun, planet, comet, asteroid, halo orbit, Lagrange point, and distant retrograde orbit). The breadth of application spans the preliminary engineering and mission design concepts and optimization, to the development of candidate reference missions and integrated mission design for vehicle system design and operation, to the design and development of flight trajectories and associated propulsive maneuvers for real-time operations.

Murri, Daniel G.↗

The Mars Reconnaissance Orbiter Mission: 10 Years of Exploration from Mars Orbit

The Mars Reconnaissance Orbiter (MRO) entered Mars orbit on March 10, 2006. After five months of aerobraking, a series of propulsive maneuvers were used to establish the desired low-altitude science orbit. The spacecraft has been on station in its 255 x 320 km, sun-synchronous (~3 am-pm), primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. This paper will provide a summary of the major achievements of the mission to date and the major flight activities planned for the remainder of its third Extended Mission (EM3). Some of the major flight challenges the flight team has faced are also discussed.

MRO↗

Trajectory design for the Mars Reconnaissance Orbiter Mission

This paper describes the analysis and design evolution of the Mars Reconnaissance Orbiter trajectory from launch to end-of-mission. The mission uses a combination of propulsive maneuvers and aerobraking techniques to deliver the orbiter to a low-altitude frozen orbit at Mars. The launch/arrival space for the 2005 Earth-Mars opportunity will be described as well as the particular launch strategy chosen for this mission. Details of the aerobraking profile will be provided. Finally, the Primary Science Orbit will be examined, and the trade-offs between science objectives and orbiter capability will be presented.

Mars↗

Mars Global Surveyor: Aerobraking Mission Overview

The Mars Global Surveyor spacecraft was launched on November 6, 1996 and was captured into a highly elliptical, 45 hour orbit around Mars with a 973 m/s propulsive maneuver on September 12, 1997.

aerobraking↗

Navigation for the Mars PREMIER netlander delivery

This paper presents covariance and propulsive maneuver analyses performed to determine the impact on navigation performance of parameters such as: the addition of deltaDOR measurements, tracking data schedule, and maneuver execution errors.

approach↗

Mars Reconnaissance Orbiter navigation strategy for support of InSight lander's entry, descent, and landing sequence

The Mars Reconnaissance Orbiter (MRO) provided primary relay support for surface operations of the InSight mission immediately after it landed on Mars on November26,2018. To position MRO for relay support during InSight Entry, Descent and Landing (EDL), two propulsive maneuvers were performed in August and October 2018. This paper documents the maneuver strategy employed by the MRO Navigation Team to support the InSight EDL sequence.

Criddle, Kevin E.↗

Mars Reconnaissance Orbiter Navigation Strategy for the ExoMars Schiaparelli EDM Lander Mission

The Mars Reconnaissance Orbiter (MRO) had planned to provide surface relay support for the brief mission of the ExoMars Schiaparelli EDM lander on Mars in October 2016. Launched with the Trace Gas Orbiter (TGO) in March 2016, Schiaparelli and TGO composed the first part of the ExoMars program. To place MRO directly overhead on its third overflight of the Schiaparelli landing site, two propulsive maneuvers were performed starting three months prior to Shiaparelli’s arrival at Mars. This paper documents the maneuver strategy employed by the MRO Navigation Team to support the Schiaparelli overflight campaign.

Schulze, William B.↗

Satellite Constellation Orbit Design to Enable a Space-Based Radio Interferometer

Two different design methods for a networked constellation of N small satellites are presented. In the first method, the (linear) Clohessy-Wilthsire equations are used as an initial design tool, followed by conversion to a two-body model. Discrepancies between the linear and nonlinear solutions are minimized in the conversion process. The second method utilizes invariant manifold theory, by perturbing a reference trajectory in different directions along the center eigenvectors. Both methods require 5N parameters to fully define a constellation. In a relative, rotating frame of the reference path, the spacecraft appear as periodic ellipses of varying sizes. Deployment, reconfiguration using propulsive maneuvers, and station keeping costs for an example mission scenario are addressed.

Chien, Steve A.↗

Mars Reconnaissance Orbiter Landing Site Reconnaissance Capability

The Mars Reconnaissance Orbiter (MRO) entered into orbit about Mars on March 10, 2006. After a series of aerobraking and propulsive maneuvers, the spacecraft has been in its sun-synchronous primary science orbit since September 2006 performing both scientific and Mars programmatic support roles. In addition to MRO’s scientific investigations of Mars, NASA has tasked MRO to provide reconnaissance of potential landing sites for ongoing and future Mars missions. This paper covers the mission design and analysis process to characterize MRO’s landing site coverage capability for all global locations, with special focus on potential sites for future missions: Gale Crater, Mawrth Vallis, and Noachis Human Exploration Zone.

Johnston, M. Daniel↗

Final Cassini Propulsion System In-Flight Characterization

Cassini plunged into Saturn’s atmosphere on September 15, 2017, the culmination of two decades of incredible planetary exploration. The Cassini propulsion system performed spectacularly during this lengthy mission, executing 360 propulsive maneuvers successfully. R-4D performance was impeccable during 183 main-engine burns, ranging from 1.3 seconds to 96 minutes in duration. Pressure transducer drift was negligible, latch valve back-pressure relief was nominal, and pressurization system performance was flawless, except for hard-seat prime regulator leakage early in the mission. System health checks based on helium mass calculations (helium mass budgets) demonstrated no discernible helium pressurant or propellant leakage. Premature degradation of prime MR-103H RCS thrusters was noted, but back-up RCS thrusters completed the mission successfully. Final usable propellant margins were about 25% for hydrazine and less than 1% for bipropellant.

Barber, Todd J.↗

Mars Reconnaissance Orbiter Navigation Strategy for Support of Mars 2020 Mission's Entry, Descent and Landing Sequence

The Mars Reconnaissance Orbiter provided primary relay support during the Mars 2020 mission’s entry, descent, and landing sequence on February 18, 2021. To position the orbiter for relay support during this sequence, two propulsive maneuvers were performed: the first on September 2, 2020 and the second on January 20, 2021. This paper documents the maneuver strategy developed by the navigation team for positioning the Mars Reconnaissance Orbiter to within phasing requirements to support the Mars 2020 mission during landing and provides details on how well those phasing requirements were met.

Woollands, Robyn M.↗

Geoscience Laser Altimetry System (GLAS) Loop Heat Pipe Anomaly and On Orbit Testing

The Geoscience Laser Altimetry System (GLAS) is the sole instrument on the ICESat Satellite. On day 230 of 2003, the GLAS Component Loop Heat Pipe (CLHP) entered a slow circulation mode that resulted in the main electronics box reaching its hot safing temperature, after which the entire instrument was turned off. The CLHP had a propylene working fluid and was actively temperature controlled via a heater on the compensation chamber. The slow circulation mode happened right after a planned propulsive yaw maneuver with the spacecraft. It took several days to recover the CLHP and ensure that it was still operational. The recovery occurred after the entire instrument was cooled to survival temperatures and the CLHP compensation chamber cycled on a survival heater. There are several theories as to why this slow circulation mode exhibited itself, including: accumulation of Non-Condensible Gas (NCG), the secondary wick being under designed or improperly implemented, or an expanded (post-launch) leak across the primary wick. Each of these is discussed in turn, and the secondary wick performance is identified as the most likely source of the anomalous behavior. After the anomaly, the CLHP was controlled to colder temperatures to improve its performance (as the surface tension increases with lower temperature, as does the volume of liquid in the compensation chamber) and only precursor pulses occurred later in the mission. After GLAS s last laser failed, in late 2009, a decision was made to conduct engineering tests of both LHPs to try and duplicate this flight anomaly. The engineering tests consisted of control setpoint changes, sink changes, and one similar propulsive Yaw maneuver. The only test that showed any similar anomaly precursors on the CLHP was the propulsive maneuver followed by a setpoint increase. The ICESat Satellite was placed in a decaying orbit and ended its mission on August 30, 2010 in Barents Sea.

Baker, Charles↗

A review of research and development on the microwave-plasma electrothermal rocket

The microwave-plasma electrothermal rocket (MWPETR) shows promise for spacecraft propulsion and maneuvering, without some of the drawbacks of competitive electric propulsion systems. In the MWPETR, the electric power is first converted to microwave-frequency radiation. In a specially-designed microwave cavity system, the electromagnetic energy of the radiation is transferred to the electrons in a plasma sustained in the working fluid. The resulting high-energy electrons transfer their energy to the atoms and molecules of the working fluid by collisions. The working fluid, thus heated, expands through a nozzle to generate thrust. In the MWPETR, no electrodes are in contact with the working fluid, the energy is transferred into the working fluid by nonthermal mechanisms, and the main requirement for the materials of construction is that the walls of the plasma chamber be insulating and transparent to microwave radiation at operating conditions. In this survey of work on the MWPETR, several experimental configurations are described and compared. Diagnostic methods used in the study are described and compared, including titration, spectroscopy, calorimetry, electric field measurements, gas-dynamic methods, and thrust measurements. Measured and estimated performance efficiencies are reported. Results of computer modeling of the plasma and of the gas flowing from the plasma are summarized.

Hawley, Martin C.↗