Grid-Connected Modular Soft-Switching Solid State Transformers (M-S4T)

The objective of this project is to develop and verify the concept of a flexible and modular soft-switching solid-state transformer (M-S4T) for direct grid-connected applications. The ability to directly connect power electronics converters to the medium voltage grid (4 kV – 13 kV), and to potentially replace the passive and bulky, but ubiquitous 60 hertz service transformer in the 25 kVA to 100 kVA range, with a more flexible and controllable device, has been regarded as the ‘holy grail’ in grid control. However, this has proven to be extremely difficult. This project has developed the solutions to several key challenges of the direct grid-connected power electronics and realized a 7.2 kV M-S4T prototype. First, a protection method to protect the M-S4T from the high voltages (110 kV for the 13 kV system) that occur on the grid due to transients and lightning strikes have been developed and experimentally verified. Second, the realization and the operation of the M-S4T based on high-voltage SiC devices (>3.3 kV) and a medium-frequency medium-voltage low-leakage transformer in a single-stage solid-state transformer with zero-voltage switching, low dv/dt, and low electromagnetic interference has been successfully demonstrated up to 7.5 kV peak. Third, an oil-cooling system and stable communication and distributed control system for converter module voltage sharing have been developed and experimentally verified. The developed M-S4T has realized a modular universal high-performance power conversion system. This conversion system is scalable to different voltage and power levels and adaptable to four-quadrant bidirectional operation. Moreover, the use of passive cooling techniques meets the equipment life requirements, and the lightning protection scheme fulfills the basic insulation level specifications for direct grid connection. Such power conversion system opens up near-term opportunities, including energy storage, solar PV, or electric vehicle charging with significant cost and footprint savings. In the longer term, the possibility of replacing the utility distribution transformer with an M-S4T will be transformative for future distribution grids with a compact footprint and full controllability to enable high renewable energy and storage penetration. In addition to the main project, this report expands on the Plus-Up projected including as part of the main award. This project developed and demonstrated the technology for autonomous collaborative inverters that can be connected in an ad hoc manner to the grid. The aim of the project was to: (1) evaluate the existing techniques for grid-connected inverters and find their limitations; (2) develop detailed requirements for grid-connected inverters in the modern grid with millions of active nodes; (3) design a unified control strategy that brings more autonomy and intelligence to grid-connected inverters, and addresses parts of the issues with the existing techniques. The proposed technique, called UniCon, enables inverters to 1) connect/disconnect to/from the grid in an ad hoc manner; (2) work based on local sensing. Slow communication could be used for a more optimized behavior; (3) work automatically in both grid-forming/grid-following mode; (4) handle large disturbances, e.g., big load step and fault, in an oscillation-free manner; (5) work collaboratively with other inverters in steady-state and during transients. UniCon can be implemented in the middle-level control; hence it is agnostic to the vendor and to the implementation of the inner voltage/current and protection loops. Furthermore, a new synchronization scheme, based on deep learning, was developed that can extract the grid voltage phase and amplitude in a stable manner. The method is cheap to implement can improve the dynamic performance of the grid-connected inverters during fast transients, e.g., fault. The proposed control scheme was validated by (1) MATLAB/Simulink; (2) hardware-in-the-loop results, and; (3) experimental results using three inverters that form a microgrid in a down-scaled feeder. Lastly, both the M-S4T and UniCon have achieved promising tangible paths to markets. In the case of the M-S4T, the underlying technology — the Soft Switching Solid State Transformer (S4T) developed at the Georgia Tech Center for Distributed Energy (GT-CDE) has been licensed by GridBlock from the Georgia Tech Research Corporation, and GridBlock has been working with manufacturing partner Jabil (one of the largest US-based contract manufacturers) and system integrator Power Secure (largest deployer of microgrids in the US with 4.7 GW under management), to meet the strong initial demand. Similarly, GridBlock has an exclusive license to the UniCon technology, developed under this award by GT-CDE. The UniCon provides an intermediate control layer that enables the implementation of the higher-level ‘transactive’ control commands for the system. The architecture of the system - slow communications with the cloud for system optimization and setpoints, and the use of locally measured quantities for real-time control, provide a very robust and secure way of implementing a real-time must-run grid that is also secure and stable. This is a brand-new functionality that is critical for the future grid and key to GridBlock’s business model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Low-cost Manufacturing of Semitransparent CdTe PV for Building Integration

Solar has been demonstrated to be a robust renewable energy source, constituting a significant portion of the United States’ renewable energy portfolio. Despite its growth across residential, commercial, and utility sectors over the past decades, it remains a small fraction of the overall energy infrastructure. Challenges persist in fully harnessing solar power to meet the nation's escalating energy demands. Among these challenges lies the hurdle of efficiently distributing large quantities of solar-generated electricity to densely populated regions with the highest energy needs and costs. Traditional utility-scale arrays demand extensive land, a luxury often unavailable in metropolitan areas. Consequently, installations must be situated at a distance, necessitating additional infrastructure for electricity transmission to service areas. While metropolitan landscapes lack sprawling open spaces suitable for conventional utility-scale solar deployment, they offer a different resource: windows. Semitransparent photovoltaic window technology has the potential to not only bolster the grid's energy capacity, but to also provide HVAC and economic advantages to building owners. However, commercial availability of building-integrated photovoltaic windows remains limited. Silicon based photovoltaics currently dominate the solar market but adapting them for use in windows poses a variety of engineering and economic challenges such as relatively low power density, high costs associated with custom manufacturing, and aesthetic considerations. Addressing these challenges, this project explored the use of laser ablation patterning to manufacture cost-effective, high-efficiency, semitransparent Cadmium Telluride photovoltaic modules. Results showcased the potential of this methodology in developing photovoltaic windows and other innovative semitransparent PV applications. The ablation manufacturing technique demonstrated great versatility in achieving different patterns and levels of visible light transmission, and the power loss due to ablation was nearly directly proportional to the amount of material removed. Furthermore, the manufacturing process for Cadmium Telluride modules already has established advantages in material and energy efficiency, and the conversion of a standard submodule to semitransparent essentially requires a single additional process step, ensuring scalability. It is important to note that during this work, Toledo Solar experienced substantial organizational upheaval stemming from a lawsuit with First Solar. An external investigation led the board of directors to remove and replace the previous management team, and several other members of the staff elected to depart as well, including the then acting Principle Investigator on this project. The remaining Toledo Solar team attempted to recover from the disruption and deliver on the remaining tasks, but upon its own review, the Department of Energy ruled the project in default and terminated the contract in December 2023.

14 SOLAR ENERGY↗

Establishing a Technical Assistance Network to Build Capacity in Southwest Alaska (Southwest Alaska Energy Network - Final Report)

The Southwest Alaska Municipal Conference (SWAMC) is a non-profit regional membership economic development organization that represents the Aleutian/Pribilof Islands, Bristol Bay, and Kodiak regions of southwest Alaska. SWAMC applied for the DOE-OIE Establishment of an Inter-Tribal Technical Assistance Energy Providers Network grant FOA to work with our partners to provide energy planning and project development technical assistance. The project team was made up of SWAMC, three regional organizations, a management consulting firm, and a panel of technical consultants. SWAMC sub-contracted with the three Alaska Native regional non-profit organizations – Aleutian Pribilof Islands Association (APIA), Bristol Bay Native Association (BBNA), and Kodiak Area Native Association (KANA) – to fund full or partial Regional Energy Coordinator (REC) positions. The project period ran from September 2016 to March 2020. The project goal was to help southwest Alaska regional tribal partners and communities to develop efficient and financially sustainable structures for identifying and developing energy projects that enhance community resiliency and energy sustainability. This project established energy coordinators and management structures in the Aleutian, Bristol Bay, and Kodiak regions to expand technical assistance capacity of regional residents; demonstrate this capacity by advancing energy efficiency, heat, and power supply projects; and secure long-term funding commitments to establish a sustained technical assistance structure. The project team expanded technical assistance capacity of energy coordinators and regional stakeholders in several ways: by providing funding for the SWAMC project manager to attend three Office of Indian Energy trainings; for energy coordinators to attend numerous energy conferences; for utility clerks from several villages to receive one-on-one reporting training on Alaska’s Power Cost Equalization electric subsidy program; and for the Kodiak REC to complete the Arctic Remote Energy Networks Academy and NREL’s Executive Energy Leadership Academy. The energy coordinators demonstrated and shared their increased capacity by hosting several public events: SWAMC hosted two full-day energy workshops in February 2017 and 2018; the Kodiak REC hosted seven Energy Committee meetings for Kodiak stakeholders and gave several presentations at other events; and SWAMC and BBNA organized a Bristol Bay Regional Energy Visioning Session in May 2019. The project team created platforms to both share and request information to involve energy stakeholders in this project, including an energy website, a Facebook group, a periodic newsletter, surveys, mass emails, and paper mailers. An increase in regional capacity was demonstrated through several grant awards, including a $1.2 million USDA grant for Akhiok for an electric distribution infrastructure replacement; an AHFC Kickstarter grant for Aleknagik to audit 2 Tribal and 3 City buildings; and installation of an Air Source Heat Pump demonstration project in Atka. Two communities and one region – Ouzinkie (May 2017), Ugashik (July 2017), and the Bristol Bay region (May 2019) – utilized DOE’s technical assistance services to hold Strategic Energy Planning sessions with NREL and DOE facilitation assistance. And in early 2018, SWAMC established a parallel program, funded through a USDA Energy Audit and Renewable Energy Development grant to provide subsidized energy audits for small businesses in the region. SWAMC and partners have now completed energy audits of over 60 businesses (buildings and fishing vessels) and are currently operating a third round of the USDA program. Fifteen of those business owners have now received additional grant funding to cover 25% of the cost of the energy efficiency upgrades identified in the audit. This technical assistance structure will be sustained beyond DOE grant funding in several forms. As a sign of increased grant writing and project management capacity, the Kodiak Regional Energy Coordinator applied for and received a USDA Community Facilities Technical Assistance and Training grant to continue work begun under this program. Energy coordination tasks have been folded into existing economic development positions at SWAMC and at BBNA, ensuring long-term outreach and support in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗