Search NASA⌕ Search

SEARCH · Search NASA

Results for “replacement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of High Temperature Plastics as a Ceramic Replacement

This report describes the 2015-2017 fiscal year research efforts to evaluate high temperature plastics as replacement materials for ceramics in electrical contact assemblies. The main objective of this work was to assess the feasibility of replacing existing high-price ceramic inserts with a polymeric material. Current ceramic parts are expensive due to machining costs and can suffer brittle failure. Therefore, replacing the ceramic with a more cost-effective material — in this case a plastic — is highly desirable. Not only are plastics easier to process, but they can also eliminate final tooling and are less brittle than ceramics. This effort used a three-phase approach: selection of appropriate materials determined by a comprehensive literature review, performance of an initial thermal stability screening, understanding of aging behavior under normal and off-normal conditions, and evaluation of performance at elevated temperatures. Two polymers were determined to meet the desired criteria: polybenzimidazole, and Vespel® SP-1 polyimide. Polymer derived ceramics may also be useful but will require further development of molding capabilities that were beyond the scope of this program.

36 MATERIALS SCIENCE↗

Steps toward FNCL Cell Replacement (FY2021 Mid-Year Annual Report)

Evaluate compact replacement cells for the Fast Neutron Collar (FNCL). The current cells are 4x4x4 in 3 of EJ-309 instrumented with 8” tall PMTs, and the replacements are 4x4x3 in 3 cells instrumented with 1” tall SiPM arrays. The replacement cell materials are stilbene (organic crystal), EJ-309 (liquid scintillator), and EJ-299-33M (PSD-capable plastic).

42 ENGINEERING↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 8 to Technical Area 22 Natural Gas Line Replacement Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction that crosses through upper Pajarito Canyon and upper Starmer Canyon from Technical Area (TA) 8 to TA-22 at Los Alamos National Laboratory (LANL). The project proposes to install a new 12 inch natural gas line to replace the existing 70+ year old natural gas line. Replacement will prevent loss of service to several LANL TAs and Bandelier National Monument. The project activities within the 100- year floodplains include 1) new natural gas line installation to replace and existing aging gas line, 2) relocating a section of fence and 3) three construction equipment and materials storage areas. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

End-Use Savings Shapes Measure Documentation: Boiler Replacement with Air-Source Heat Pump Boiler and Electric Boiler Backup

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock TM and ComStock TM models over the past three years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility measure applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each timestep. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual sub hourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on a single end-use savings shape measure—boiler replacement by air-source heat pump boiler. This measure replaces space heating natural gas boilers by air-source heat pump boilers when applicable and helps quantify the decarbonization as well as the energy savings potential from the replacement. The measure resulted higher savings in natural gas consumption compared to the increase in electricity consumption, with a ratio of 2.9. The total natural gas energy consumption was reduced by 20%, whereas the total electricity consumption was increased by 2.5%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-Use Savings Shapes Measure Documentation: Boiler Replacement with Air-Source Heat Pump Boiler and Natural Gas Boiler Backup

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock (™) and ComStock (™) models over the past three years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility measure applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each timestep. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on a single end-use savings shape measure - boiler replacement with air-source heat pump boiler with natural gas boiler backup. This measure replaces natural gas boilers for HVAC application by air-source heat pump boilers when applicable and use natural gas boiler backup when the heat pump boiler could not operate due to outdoor air conditions which are below its cutoff temperature. This measure helps to quantify the decarbonization as well as the energy savings potential from the replacement. The measure resulted higher savings in natural gas consumption compared to the increase in electricity consumption, with a ratio of 3. The total natural gas energy consumption was reduced by 41%, whereas the total electricity consumption was increased by 5.3%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Build-to-Replace: A New Paradigm for Reducing Advanced Reactor O&M Costs

Nuclear energy is a carbon free source of reliable, resilient, and dispatchable energy that has the potential to feature prominently in a future energy mix. To this end, many new reactor designs are being developed to help reduce cost and improve safety. Operating and maintenance (O&M) costs can make up a significant portion of lifecycle costs. Traditional approaches for nuclear plant design O&M is to perform significant inspections and testing of plant equipment to extend the life of equipment as long as possible. This is contrasted with approaches used in other industries where equipment is replaced when it is no longer functional in lieu of spending time and resources on maintenance. This research investigated the “build-to-replace” approach for new nuclear power plants. A methodology was developed to evaluate the effectiveness of the “build-to-replace” approach. Several scenarios were developed and analyzed using the approach. Modest reductions in O&M costs were obtained in some cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The role of mock-ups in the development of Orbital Replaceable Units (ORU)

Orbital Replaceable Units (ORU) is defined as any unit designed for replacement while in orbit. Two types are given. The number of ORU and the ratio of types is given as a function of the particular spacecraft. The purpose of the study is to develop and validate hardware design and operations for on orbit replacement of large modular ORU's. Two types of of testing are outlined; 1-G tests and neutral buoyancy tests.

Johnson, G. A.↗

Astronaut tool development: An orbital replaceable unit-portable handhold

A tool to be used during astronaut Extra-Vehicular Activity (EVA) replacement of spent or defective electrical/electronic component boxes is described. The generation of requirements and design philosophies are detailed, as well as specifics relating to mechanical development, interface verifications, testing, and astronaut feedback. Findings are presented in the form of: (1) a design which is universally applicable to spacecraft component replacement, and (2) guidelines that the designer of orbital replacement units might incorporate to enhance spacecraft on-orbit maintainability and EVA mission safety.

Redmon, John W., Jr.↗

Replacement bearing for Rocketdyne SSME HPOTPs using alternate self-lubricating retainer materials

Research was conducted to develop replacement bearings for the Rocketdyne Space Shuttle main engine (SSME) high pressure oxidizer turbopumps (HPOTPs). The replacement bearings consisted of standard balls and races with a special Battelle Self-Lubricating Insert Configuration (BASIC) retainer. The BASIC retainer consists of a phosphor bronze housing with inserts consisting of a polytetrafluoretheylene (PTFE) and bronze compound. The PTFE contacts the balls and the land guiding surface on the outer race. A PTFE transfer film is formed on balls and races, which lubricates the critical interfaces. The BASIC retainer is a one-to-one replacement for the current Armalon retainer, but has superior lubricating properties and is stronger over the broad temperature range anticipated for the HPOTP bearings. As a part of the project 40 sets of balls and races (two sizes) and 52 BASIC retainers were shipped to NASA/MSFC.

Gleeson, J.↗

Replacement of ozone depleting and toxic chemicals in gravimetric analysis of non-volatile residue

The standard tests for determining nonvolatile residue accretion on spacecraft surfaces and in clean processing facilities rely on the use of halogenated solvents that are targeted for elimination because of their toxic or ozone-depleting natures. This paper presents a literature-based screening survey for candidate replacement solvents. Potential replacements were evaluated for their vapor pressure, toxicity, and solvent properties. Three likely candidates were identified: ethyl acetate, methyl acetate, and acetone. Laboratory tests are presented that evaluate the suitability of these candidate replacement solvents.

Arnold, G. S.↗

NARC Rayon Replacement Program for the Space Shuttle Reusable Solid Rocket Motor Nozzle: Screening Summary

Thiokol Corporation and NASA MSFC are jointly developing a replacement for North American Rayon Corporation (NARC) Aerospace Grade Rayon (1650/720 continuous filament), the precursor for the Carbon Cloth Phenolic (CCP) ablatives used in the Space Shuttle Reusable Solid Rocket Motor (RSRM) Nozzles. NARC discontinued production of Aerospace Grade Rayon in September 1997. NASA maintains a stockpile of NARC Rayon to support RSRM production through the summer of 2005. The program plan for selection and qualification of a replacement for NARC rayon was approved in August 1998. Screening activities began in February 1999. The intent of this paper is to provide a summary of the data generated during the screening phase of the NARC Rayon Replacement Program. Twelve cellulose based fibers (rayon and lyocell) were evaluated. These fibers were supplied by three independent vendors. Many of these fibers were carbonized by two independent carbonizers. Each candidate was tested according to standard acceptance test methods at each step of the manufacturing process. Additional testing was performed with the candidate CCPS, including hot fire tests, Process studies and mechanical and thermal characterization. Six of the twelve fiber candidates tested were dropped at the conclusion of Phase 1. The reasons for the elimination of these candidates included; difficulties in processing the material in the whitegoods, carbon and CCP forms; poor composite mechanical performance; and future availability concerns. The remaining six fibers demonstrated enough promise to merit continued evaluation and optimization of the CCP fabrication process. Note: Certain CCP data falls under the restrictions of US export laws, (ITAR, etc.) and will not be included in this paper.

Cook, R. V.↗

NiH2 Reliability Impact Upon Hubble Space Telescope Battery Replacement

The NASA Hubble Space Telescope (HST) was designed to be deployed and later serviced for maintenance and upgrades, as required, by the space shuttle fleet, with a Goodyear mission life for the batteries. HST was deployed 380 miles above the Earth, from Space Shuttle Discovery, on April 25, 1990. Four servicing missions, (SM1, SM2, SM3A, AND SM3B) have been performed. Astronauts have replaced or modified optics, solar arrays, a power control unit, and various science packages. A fifth Servicing Mission, SM4 scheduled for early 2004, is planned to replace the batteries for the first time. The HST is powered by solar array wings and nickel hydrogen (NiH2) Duracell batteries, which are grouped into two parallel battery modules of three parallel batteries each. With a design life of 7 years at launch, these batteries have surpassed 12 years in orbit, which gives HST the highest number of charge/discharge cycles of any NiH2 battery currently in low earth orbit (LEO) application. Being in a LEO orbit, HST has a 45-minute umbra period, during which spacecraft power requirements normally force the batteries into discharge, and a 60-minute sun period, which is available for battery recharge. The intent of this paper is to address the issue of NiH2 battery reliability and how battery capacity degradation can impact scheduling of a Servicing Mission to bring replacement batteries to HST, and extend mission life till deployment of Next Generation Space Telescope (NGST), planned for 2008 at the earliest.

Rao, Gopalakrishna M.↗

Cobra Probes Containing Replaceable Thermocouples

A modification of the basic design of cobra probes provides for relatively easy replacement of broken thermocouples. Cobra probes are standard tube-type pressure probes that may also contain thermocouples and that are routinely used in wind tunnels and aeronautical hardware. They are so named because in side views, they resemble a cobra poised to attack. Heretofore, there has been no easy way to replace a broken thermocouple in a cobra probe: instead, it has been necessary to break the probe apart and then rebuild it, typically at a cost between $2,000 and $4,000 (2004 prices). The modified design makes it possible to replace the thermocouple, in minimal time and at relatively low cost, by inserting new thermocouple wire in a tube.

Jones, John↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

A PROTOTYPE FOUR INCH SHORT HYDRIDE (FISH) BED AS A REPLACEMENT TRITIUM STORAGE BED

The Savannah River Site (SRS) tritium facilities have used 1st generation (Gen1) metal hydride storage bed assemblies with process vessels (PVs) fabricated from 3 inch nominal pipe size (NPS) pipe to hold up to 12.6 kg of LaNi{sub 4.25}Al{sub 0.75} metal hydride for tritium gas absorption, storage, and desorption for over 15 years. The 2nd generation (Gen2) of the bed design used the same NPS for the PV, but the added internal components produced a bed nominally 1.2 m long, and presented a significant challenge for heater cartridge replacement in a footprint limited glove-box. A prototype 3rd generation (Gen3) metal hydride storage bed has been designed and fabricated as a replacement candidate for the Gen2 storage bed. The prototype Gen3 bed uses a PV pipe diameter of 4 inch NPS so the bed length can be reduced below 0.7 m to facilitate heater cartridge replacement. For the Gen3 prototype bed, modeling results show increased absorption rates when using hydrides with lower absorption pressures. To improve absorption performance compared to the Gen2 beds, a LaNi{sub 4.15}Al{sub 0.85} material was procured and processed to obtain the desired pressure-composition-temperature (PCT) properties. Other bed design improvements are also presented.

07 ISOTOPE AND RADIATION SOURCES↗