Search NASA⌕ Search

SEARCH · Search NASA

Results for “reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

FY17 Report Summaries of Five Completed Center Innovation Fund (CIF) Projects for the Highlights/Abstract Section of the FY 2018 CIF Annual Report

The Center Innovation Fund Annual Report for FY18 is an annual report for Space Technology Mission Directorate (STMD) Leadership, STMD Principle Technologists, and Center Innovation Fund Management. Attached is the Highlights/Abstract section of this annual report, which is the only section to be shared outside of NASA. Contributors were asked not to include any SBU information for these report summaries.

Sorbent Fiber Materials↗

A Unified Approach for Reporting ARM Measurement Uncertainties Technical Report: Updated in 2016

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility is observationally based, and quantifying the uncertainty of its measurements is critically important. With over 300 widely differing instruments providing over 2,500 datastreams, concise expression of measurement uncertainty is quite challenging. ARM currently provides data and supporting metadata (information about the data or data quality) to its users through several sources. Because the continued success of the ARM Facility depends on the known quality of its measurements, ARM relies on Instrument Mentors and the ARM Data Quality Office to ensure, assess, and report measurement quality. Therefore, an easily accessible, well-articulated estimate of ARM measurement uncertainty is needed. This report is a continuation of the work presented by Campos and Sisterson (2015) and provides additional uncertainty information from instruments not available in their report. As before, a total measurement uncertainty has been calculated as a function of the instrument uncertainty (calibration factors), the field uncertainty (environmental factors), and the retrieval uncertainty (algorithm factors). This study will not expand on methods for computing these uncertainties. As before, it will focus on the practical identification, characterization, and inventory of the measurement uncertainties already available to the ARM community through the ARM Instrument Mentors and their ARM instrument handbooks. This study continues the first steps towards reporting ARM measurement uncertainty as: (1) identifying how the uncertainty of individual ARM measurements is currently expressed, (2) identifying a consistent approach to measurement uncertainty, and then (3) reclassifying ARM instrument measurement uncertainties in a common framework.

47 OTHER INSTRUMENTATION↗

GeoRePORT Case Study Examples: Reporting Using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT): Preprint

The Geothermal Research Portfolio Optimization & Reporting Technique (GeoRePORT) was developed with funding from the United States Department of Energy's Geothermal Technologies Office (GTO) to assist in identifying and pursuing long-term investment strategies through the development of a resource reporting protocol. GeoRePORT provides scientists and non-scientists a comprehensive and quantitative means of reporting: (1) features intrinsic to geothermal sites (project grade) and, (2) maturity of the development (project readiness). Because geothermal feasibility is not determined by any single factor (e.g. temperature, permeability, permitting), a site's project grade and readiness are evaluated on twelve independent attributes pertaining to geological, technical, or socio-economic feasibility. In this paper, we present case studies illustrating how GeoRePORT can be used to compare geological, technical, and socio-economic attributes between geothermal systems. The consistent and objective assessment protocols used in GeoRePORT allow for comparison of project attributes across unique locations and geological settings. GeoRePORT case studies outline the geological, socio-economic and technical features of four individual geothermal sites: Coso, Chena, Dixie Valley, and White Sands Missile Range. The case studies presented herein illustrate the usefulness of GeoRePORT in evaluating project risk/return, identifying gaps in reported data, evaluating R&D impact, and gathering insights on successes/failures as applicable to future projects.

15 GEOTHERMAL ENERGY↗

GeoRePORT Case Study Examples: Reporting Using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT)

The Geothermal Research Portfolio Optimization & Reporting Technique (GeoRePORT) was developed with funding from the United States Department of Energy's Geothermal Technologies Office (GTO) to assist in identifying and pursuing long-term investment strategies through the development of a resource reporting protocol. GeoRePORT provides scientists and non-scientists a comprehensive and quantitative means of reporting: (1) features intrinsic to geothermal sites (project grade) and, (2) maturity of the development (project readiness). Because geothermal feasibility is not determined by any single factor (e.g. temperature, permeability, permitting), a site's project grade and readiness are evaluated on twelve independent attributes pertaining to geological, technical, or socio-economic feasibility. In this paper, we present case studies illustrating how GeoRePORT can be used to compare geological, technical, and socio-economic attributes between geothermal systems. The consistent and objective assessment protocols used in GeoRePORT allow for comparison of project attributes across unique locations and geological settings. GeoRePORT case studies outline the geological, socio-economic and technical features of four individual geothermal sites: Coso, Chena, Dixie Valley, and White Sands Missile Range. The case studies presented herein illustrate the usefulness of GeoRePORT in evaluating project risk/return, identifying gaps in reported data, evaluating R&D impact, and gathering insights on successes/failures as applicable to future projects.

40 EE - Geothermal Technologies Office (EE-4G)↗

Reporting improvements to the annual Savannah River site environmental report - 15313

The Savannah River Site (SRS) began publishing the yearly SRS Environmental Report over 50 years ago. The report was first made available to the public in 1959. SRS has always tried to be very clear about the impact of its operations on neighboring communities. However, environmental reporting depends on public understanding for its success. The scientific nature of environmental information often makes it difficult to communicate information in lay terms and a meaningful manner. Over the past two years, SRS has focused its efforts on improving the readability of these documents using plain language techniques. In the 2013 report and summary, the goals were to: - Organize information so the most important message comes first; - Break complex information into understandable chunks; - Use simple language and define technical terms; and - Use appealing formats, including graphics and ample white space, to engage and hold readers. SRS also used plain language guidelines and techniques such as using short sentences and active voice as suggested by feedback from our readers. Plain language is not a simplified style of writing. It involves more than replacing jargon and complex language with shorter sentences and familiar words. Plain language examines at the whole message - from the reader's point of view. Clear writing, effective organization, and inviting presentation are all keys to creating readable and informative documents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Environmental Report 2023, with Attachment A Site Description and Summary Report

This Nevada National Security Site Environmental Report (NNSSER) summarizes actions taken in 2023 to protect the environment and the public while achieving the NNSA/NFO mission goals. It is prepared for the public and our stakeholders in hopes that it is readily understandable and usable. It is a key component in our efforts to keep the public informed of environmental conditions at the NNSS and its support facilities in Las Vegas, Nevada. The accompanying Attachment A expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2023. Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological settings and the cultural resources of the NNSS. The supplemental Summary report provides an abbreviated version of the full report.

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site Environmental Report 2023: Summary Report

This Nevada National Security Site Environmental Report (NNSSER) summarizes actions taken in 2023 to protect the environment and the public while achieving the NNSA/NFO mission goals. It is prepared for the public and our stakeholders in hopes that it is readily understandable and usable. It is a key component in our efforts to keep the public informed of environmental conditions at the NNSS and its support facilities in Las Vegas, Nevada. The accompanying Attachment A expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2023. Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological settings and the cultural resources of the NNSS. The supplemental Summary report provides an abbreviated version of the full report.

54 ENVIRONMENTAL SCIENCES↗

National Renewable Energy Laboratory Environmental Performance Report for 2009 (Annual Site Environmental Report per DOE Orders 231.1 and 5400.1)

This report presents a summary of NREL's environmental protection programs and activities for CY 2009. It is organized according to the different environmental media (e.g., air, waste, ground water, etc.), and includes a brief summary of how the program is managed in that area, any permitting or notification efforts that have been completed during the reporting period or are ongoing, andactivities that have occurred during the reporting period in that environmental area. A description of the environmental condition and features of NREL's sites is also included to provide a basis for the program overview.

54 ENVIRONMENTAL SCIENCES↗

Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

01 COAL, LIGNITE, AND PEAT↗

Simplified Readability Metric Drives Improvement of Radiology Reports: an Experiment on Ultrasound Reports at a Pediatric Hospital

Highly complex medical documents, including ultrasound reports, are greatly mismatched with patient literacy levels. While improving radiology reports for readability is a longstanding concern, few articles objectively measure the effectiveness of physician training for readability improvement. We hypothesized that writing styles may be evaluated using an objective two-dimensional measure and writing training could improve the writing styles of radiologists. To test it, a simplified “grade vs. length” readability metric is developed based on results from factor analysis of ten readability metrics applied to more than 500,000 radiology reports. To test the short-term effectiveness of a writing workshop, we measured the writing style improvement before and after the training. Statistically significant writing style improvement occurred as a result of the training. Although the degree of improvement varied for different measures, it is evident that targeted training could provide potential benefits to improve readability due to our statistically significant results. The simplified grade vs. length metric enables future clinical decision support systems to quantitatively guide physicians to improve writing styles through writing workshops.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

An Evaluation of Departmental Radiation Oncology Incident Reports: Anticipating a National Reporting System

Purpose: Systems to ensure patient safety are of critical importance. The electronic incident reporting systems (IRS) of 2 large academic radiation oncology departments were evaluated for events that may be suitable for submission to a national reporting system (NRS). Methods and Materials: All events recorded in the combined IRS were evaluated from 2007 through 2010. Incidents were graded for potential severity using the validated French Nuclear Safety Authority (ASN) 5-point scale. These incidents were categorized into 7 groups: (1) human error, (2) software error, (3) hardware error, (4) error in communication between 2 humans, (5) error at the human-software interface, (6) error at the software-hardware interface, and (7) error at the human-hardware interface. Results: Between the 2 systems, 4407 incidents were reported. Of these events, 1507 (34%) were considered to have the potential for clinical consequences. Of these 1507 events, 149 (10%) were rated as having a potential severity of ≥2. Of these 149 events, the committee determined that 79 (53%) of these events would be submittable to a NRS of which the majority was related to human error or to the human-software interface. Conclusions: A significant number of incidents were identified in this analysis. The majority of events in this study were related to human error and to the human-software interface, further supporting the need for a NRS to facilitate field-wide learning and system improvement.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Technical Review Report for the "Justification for Small Gram Quantity Contents" Safety Analysis Report for Packaging Model 9977-96, Addendum 3, S-SARA-G-00006, Revision 4

This Technical Review Report (TRR) summarizes the results of the Staff’s review of the Model 9977-96 Package, Addendum 3, Revision 4 for the Type 4 contents. Type 4 contents may include 238 Pu, 239 Pu, 241 Am, 244 Cm, 252 Cf, 90 Sr, 226 Ra, 137 Cs, 60 Co, 192 Ir with the Special Actinide Isotopes ( 242 mAm, 243 Cm, 245 Cm, 247 Cm, 249 Cf and 251 Cf) limited to a total of 1000 ppm. Type 4 pertains primarily to the Off-Site Source Recovery Project (OSRP). These new contents will be authorized for shipment in the Model 9977-96 Package, supplementing existing Revision 2 to the Safety Analysis Report for Packaging (SARP), once Addendum 3, Justification for Small Gram Quantity (SGQ) Contents, is accepted by the certifying official, EM-40, and the existing Certificate of Compliance (CoC) is revised, reflecting the added contents. Existing Content Envelopes for the Model 9977-96 Package include heat sources in food-pack cans or in radioisotope thermoelectric generators (RTGs), neptunium metal, a beryllium-reflected plutonium ball, plutonium/uranium metal at 25% and 50% maximum 240Pu, respectively, and uranium metal at limits of 95% and 100% 235U, respectively. The percentages are of total radioactive material mass. The Isentropic Compression Experiment (ICE) apparatus is an additional content of the Model 9977-96 Package SARP. The latest content added to the Model 9977-96 Package is Type 5, AGR fuel compacts. Addendum 3 was prepared by Savannah River Packaging Technology, Savannah River National Laboratory, Savannah River Nuclear Solutions, LLC, Savannah River Site, in support of work being performed by LANL. The Model 9977-96 Package is currently certified under two Certificate of Compliance Numbers, i.e., USA/9977/B(M)F-96 (DOE) and USA/9977/B(M)F-96 (DOE-S/T-1), covering transportation and periodic and extended maintenance, respectively. For transportation, the Safety Analysis Report for Packaging is S-SARP-G-0001, Revision 2 (August 2007). Extended maintenance is covered by Addendum 1, Justification for DNDO Contents, S-SARA-G-00003, Revision 2 (October 2008). The new Content Envelope and container configurations will be incorporated into the next revision to the Model 9977-96 Package SARP. This TRR addresses only Type 4 contents; content Types 1, 2, and 3 will be covered under a separate TRR. Content Type 5 has been dealt with in a previous TRR. Hereafter, in this TRR, the Type 4 content may be referred to as Sources.

61 RADIATION PROTECTION AND DOSIMETRY↗

Interim Report on ISO TC 163 Working Group 3 (Annual Progress Report)

This reports cover the initial year efforts of the International Standards Organization (ISO) to develop international standards for rating the energy performance of buildings. The author of this report is a participant in this effort. This report summarizes the activities of the ISO Working Group charged with development of these standards and makes recommendations to the sponsors for future U.S. involvement in this ISO effort.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OES-Environmental 2020 State of the Science Report: Environmental Effects of Marine Renewable Energy Development Around the World. Report for Ocean Energy Systems (OES)

This report summarizes the state of the science related to marine renewable energy devices and their interactions with and effects on the marine environment, the animals that live there, and the habitats that support them. This report serves an update and a complement to the 2016 Annex IV report. https://tethys.pnnl.gov/publications/state-of-the-science-2020

03 NATURAL GAS↗

The Integrated Basin-Scale Opportunity Assessment Initiative, FY 2011 Year-End Report: Deschutes Basin Preliminary Hydropower Opportunity Assessment. Draft Report

This document reports on first-year progress of the Integrated Basin-Scale Opportunity Assessment Initiative, an action item of the March 24, 2010 Sustainable Hydropower Memorandum of Understanding (MOU) between the U.S. Department of Energy (DOE), U.S. Army Corps of Engineers, and the Bureau of Reclamation. As envisioned in the MOU, an integrated basin-scale opportunity assessment would take a system-scale approach to identifying opportunities and actions to both increase hydropower and enhance environmental conditions within the context of existing water uses in river basins of the United States. Assessments are intended to be collaborative processes that work with stakeholders at the basin scale to identify hydropower and environmental opportunity scenarios. Opportunity scenarios are analyzed, again in collaboration with stakeholders, through modeling and visualization software to assess tradeoffs and system-scale effects. Opportunity assessments are not intended to produce decisional documents or substitute for basin planning processes; assessments are instead intended to provide tools, information, and a forum for catalyzing conversation about scenarios where environmental and hydropower gains can both be realized within a given basin. In fiscal year 2011, DOE’s Energy Efficiency and Renewable Energy Water Power Team provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory, and Argonne National Laboratory to develop an assessment approach and toolbox, and carry out an initial pilot opportunity assessment. In February 2011, the Upper Deschutes/Crooked River Basin in central Oregon was selected as the pilot basin. Through establishment of stakeholder working groups, a technical site visit, a series of interviews, a stakeholder workshop, and identification of existing tools and data sets, initial opportunities have been identified and analytical tools selected to explore opportunity scenarios. This report documents project progress to date, describes the opportunity assessment approach, and establishes an agenda for analysis of stakeholder-identified opportunities in fiscal year 2012. Findings presented here are preliminary; the final Deschutes Basin pilot study report will be submitted at the end of fiscal year 2012.

13 HYDRO ENERGY↗

Report of the 2021 U.S. Community Study on the Future of Particle Physics (Snowmass 2021)

In 2019, with the construction of the projects supported by the 2014 P5 process well underway or in an advanced stage of planning, the Division of Particle and Fields (DPF) of the American Physical Society (APS) began to prepare a new community study of U.S. high energy physics (HEP) for the decade of 2025 – 2035, and beyond. This “Snowmass 2021” HEP Community Planning Exercise began formally with a kick-off meeting at the 2020 APS April Meeting and a Community-wide Planning Meeting in October of 2020. The exercise was to conclude in July of 2021 with a workshop in Seattle hosted by the University of Washington. The COVID-19 pandemic severely disrupted these plans. Work was paused from January to September of 2021 to lighten the burden on our younger scientists. We resumed work by September of 2021 and, despite the continuing challenges of COVID-19, our community was well prepared for the Seattle meeting, which had been rescheduled for July 17–26, 2022.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2019 (Final Report)

The PNNL Annual Site Environmental Report is prepared to meet the requirements of DOE Order 231.1B, Environmental, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, assuring that the public is informed of any PNNL Richland Campus or PNNL Sequim Campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur on the PNNL Richland Campus in Richland, Washington, and at the PNNL Sequim Campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification.

54 ENVIRONMENTAL SCIENCES↗