Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk prevention”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Perceptions of Climate Risk and Use of Climate Risk Information by Natural Resource Conservation Stakeholders Participating in ADVANCE Projects in Asia and Latin America

Integrating climate risk information into resilience-building activities in the field is important to ensure that adaptation is based on the best available science. Despite this, many challenges exist when developing, communicating, and incorporating climate risk information. There are limited resources on how stakeholders perceive risks, use risk information, and what barriers exist to limit knowledge integration. This paper seeks to define the following: 1) What do conservation stakeholders consider to be the most significant climate risks they face now and possibly in the future? 2) What have been the most significant barriers to their using climate risk information? 3) What sources and types of knowledge would be most useful for these managers to overcome these barriers? A survey was conducted among stakeholders (n = 224) associated with World Wildlife Fund projects in tropical and subtropical countries. A very high proportion of stakeholders used climate risk information and yet faced integration-related challenges, which included too much uncertainty and the lack of a relevant scale for planning. The main factors preventing the use of climate risk information in decision-making were unavailability of climate risk information, no or limited financial or human resources available to respond, lack of organizational mandate or support, and no or limited institutional incentives. Comparing perceived current and future risks revealed a decline in concern for some future climate hazards. Survey respondents identified scientific reports, climate scientists, and online sources as the most useful information sources of climate risk information, while (i) maps and illustrations; (ii) scenarios format; and (iii) data tables, graphs, and charts were identified as user-friendly formats.

Climate risk↗

Inhibition of the eukaryotic initiation factor-2α kinase PERK decreases risk of autoimmune diabetes in mice

Preventing the onset of autoimmune type 1 diabetes (T1D) is feasible through pharmacological interventions that target molecular stress–responsive mechanisms. Cellular stresses, such as nutrient deficiency, viral infection, or unfolded proteins, trigger the integrated stress response (ISR), which curtails protein synthesis by phosphorylating eukaryotic translation initiation factor-2α (eIF2α). In T1D, maladaptive unfolded protein response (UPR) in insulin-producing β cells renders these cells susceptible to autoimmunity. We found that inhibition of the eIF2α kinase PKR-like ER kinase (PERK), a common component of the UPR and ISR, reversed the mRNA translation block in stressed human islets and delayed the onset of diabetes, reduced islet inflammation, and preserved β cell mass in T1D-susceptible mice. Single-cell RNA-Seq of islets from PERK-inhibited mice showed reductions in the UPR and PERK signaling pathways and alterations in antigen-processing and presentation pathways in β cells. Spatial proteomics of islets from these mice showed an increase in the immune checkpoint protein programmed death-ligand 1 (PD-L1) in β cells. Golgi membrane protein 1, whose levels increased following PERK inhibition in human islets and EndoC-βH1 human β cells, interacted with and stabilized PD-L1. Collectively, our studies show that PERK activity enhances β cell immunogenicity and that inhibition of PERK may offer a strategy for preventing or delaying the development of T1D.

Research & Experimental Medicine↗

Identification of Safety Metrics for Airport Surface Operations

A large fraction of safety incidents occurs on the ground during airport surface operations. Although these incidents are mostly non-fatal with a few exceptions, they are high profile incidents that remain a source of concern for the National Transportation Safety Board (NTSB), the Federal Aviation Administration (FAA), major airlines, and other stakeholders of the National Airspace System (NAS). These incidents have historically been mitigated by implementing changes to regulations, policies, and procedures over time. This approach has minimized but not eliminated the risk of occurrence of safety incidents. It is thus important to develop integrated techniques to assess, model, and prevent these incidents by analyzing the risk and likelihood of occurrence and communicating results of the analysis to decision-making personnel who can mitigate and prevent incidents in real time. The work presented in this paper builds on a previously developed architecture for safety, Real-Time Safety Monitoring (RTSM), to enable monitoring and prediction of the safety of the NAS. In the RTSM framework, hazards to flight are translated to safety metrics such as wake vortex encounters or loss of separation, that can be modeled and analyzed offline and also predicted and monitored in real time (online). The intent of this paper is to integrate predictable incidents that occur during surface and ground operations into the safety portfolio of the RTSM project by (i) identifying suitable information sources from which ground incidents can be studied, (ii) developing safety metrics correlated with surface operations, and (iii) recommending suitable data sources that can be quantified and used for the computation of pertinent safety metrics.

safety↗

Lung cancer mortality among construction workers: implications for early detection

Objectives This study examined predictors of lung cancer mortality, beyond age and smoking, among construction workers employed at US Department of Energy (DOE) sites to better define eligibility for low-dose CT (LDCT) lung cancer screening. Methods Predictive models were based on 17 069 workers and 352 lung cancer deaths. Risk factors included age, gender, race/ethnicity, cigarette smoking, years of trade or DOE work, body mass index (BMI), chest X-ray results, spirometry results, respiratory symptoms, beryllium sensitisation and personal history of cancer. Competing risk Cox models were used to obtain HRs and to predict 5-year risks. Results Factors beyond age and smoking included in the final predictive model were chest X-ray changes, abnormal lung function, chronic obstructive pulmonary disease (COPD), respiratory symptoms, BMI, personal history of cancer and having worked 5 or more years at a DOE site or in construction. Risk-based LDCT eligibility demonstrated improved sensitivity, specificity and positive predictive value compared with current US Preventive Services Task Force guidelines. The risk of lung cancer death from 5 years of work in the construction industry or at a DOE site was comparable with the risk from a personal cancer history, a family history of cancer or a diagnosis of COPD. LDCT eligibility criteria used for DOE construction workers, which includes factors beyond age and smoking, identified 86% of participants who eventually would die from lung cancer compared with 51% based on age and smoking alone. Conclusions Results support inclusion of risk from occupational exposures and non-malignant respiratory clinical findings in LDCT clinical guidelines.

Public, Environmental & Occupational Health↗

Deep Sigma Point Processes-Assisted Chance-Constrained Power System Transient Stability Preventive Control

Here this paper proposes a deep sigma point processes (DSPP)-assisted chance-constrained power system transient stability preventive control method to deal with uncertain renewable energy and loads-induced stability risk. The traditional transient stability-constrained preventive control is reformulated as a chance-constrained optimization problem. To deal with the computational bottleneck of the time-domain simulation-based probabilistic transient stability assessment, the DSPP is developed. DSPP is a parametric Bayesian approach that allows us to predict system transient stability with high computational efficiency while accurately quantifying the confidence intervals of the predictions that can be used to inform system instability risk. To this end, with a given preset confidence probability, we embed DSPP into the primal dual interior point method to help solve the chance-constrained preventive control problem, where the corresponding Jacobian and Hessian matrices are derived. Comparison results with other existing methods show that the proposed method can significantly speed up preventive control while maintaining high accuracy and convergence

97 MATHEMATICS AND COMPUTING↗

Software risk estimation and management techniques at JPL

In this talk we will discuss how uncertainty has been incorporated into the JPL software model, probabilistic-based estimates, and how risk is addressed, how cost risk is currently being explored via a variety of approaches, from traditional risk lists, to detailed WBS-based risk estimates to the Defect Detection and Prevention (DDP) tool.

software risk↗

Simple Acceptance Decisions and Acceptance Risk

Acceptance risk may be estimated using cumulative probability distribution functions applied to populations of measurands and test measurement values. “Simple acceptance” is a decision rule that sets the acceptance range of a test result equal to the tolerance range specification. While acceptance risk is comprised of both consumer risk and producer risk, this paper compares the effects of simple acceptance decision rules and guardbanding decision rules on consumer risk. Consumer risk is also known as the probability of false acceptance. The terms describe the risk of accepting test results as passing when the actual values exceed specification limits. False acceptance is only possible when the true value of a measurand is out of tolerance and the test result indicates that the measurand is within tolerance. Metrologists generally have some information about the test uncertainty regarding a specific acceptance test result. Along with a general lack of knowledge regarding the measurand population parameters, the complicated interplay between risk, dispersion, and central values generally prevents calibration laboratories from fully characterizing acceptance probabilities. Organizations that model the measurand populations can reduce consumer risk by avoiding certification of items whose measurand populations are not well centered. The models in this paper present a recurring trend: guardbanding reduces nonnegligible risks of false acceptance when compared to simple acceptance. However, guardbanding is not the most effective means of acceptance risk mitigation. Systematic characterization of measurand populations can provide the information a calibration laboratory needs to reliably control acceptance risk.

42 ENGINEERING↗

Monitoring for Renal Stone Recurrence in Astronauts With History of Stone

After an initial stone episode persons are at increased risk for future stone formation. A systematic approach is required to monitor the efficacy of treatment and preventive measures, and to assess the risk of developing new stones. This is important for persons working in critical jobs or austere environments, such as astronauts. A literature review of the current standards of care for renal stone monitoring and imaging was done. Military and civil aviation standards were also reviewed, as well as the medical precedents from the space program. Additionally, a new, more effective, renal stone ultrasound protocol has been developed. Using this work, a monitoring algorithm was proposed that takes into consideration the unique mission and operational environment of spaceflight. The approach to imaging persons with history of renal stones varies widely in the literature. Imaging is often done yearly or biannually, which may be too long for mission critical personnel. In the proposed algorithm astronauts with a history of renal stone, who may be under consideration for assignment, are imaged by a detailed, physiciandriven, ultrasound protocol. Unassigned personnel are monitored by yearly ultrasound and urine studies. Any positive ultrasound study is then followed by low-dose renal computed tomography scan. Other criteria are also established. The proposed algorithm provides a balanced approach between efficacy and reduced radiation exposure for the monitoring of astronauts with a renal stone history. This may eventually allow a transition from a risk-averse, to a risk-modifying approach that can enable continued service of individuals with history of renal stone that have adequately controlled risk factors.

Reyes, David P.↗

ISS Utilization and Countermeasure Validation: Implementing the Critical Path Roadmap to Reduce Uncertainties of Extended Human Spaceflight Expeditions

Human exploration of space requires the ability to understand and mitigate risks to crews exposed to the conditions associated with such missions. This becomes a greater imperative as we prepare for interplanetary expeditions involving humans who will be subjected to long transit periods in microgravity as they travel to a distant planet such as Mars, embark and live on the planet's surface for an extended time, and finally, return to the 1 g environment of Earth. We need to know, more definitively, what the human health, safety, and performance risks are, and how to prevent or counteract them throughout all phases of a long duration mission. The Johnson Space Center's Space and Life Sciences Directorate along with the National Space Biomedical Research Institute (NSBRI) have been engaged in a strategic planning effort that identifies the most critical risks confronting humans who will venture forth on such missions and the types of research and technology efforts required to mitigate and otherwise reduce the probability and/or severity of those risks. This paper describes the unique approach used to define, assess and prioritize the risks and presents the results of the assessment with an emphasis on the research and technology priorities that will help us to meet the challenge of long duration human spaceflight missions.

Leveton, Lauren B.↗

Protecting Space Travelers from Kidney Stones: Renal Stone Risk During Space Flight

Renal stones, popularly known as kidney or bladder stones, are small rock-like objects formed in the kidneys or urinary tract by deposits of calcium and other minerals. The problem arises when the stones block the drainage of the kidney, resulting in urinary obstruction and pain. Passing these stones can be one of the most painful experiences a person will endure so doctors often prescribe pain relievers to ease the experience. Drinking plenty of fluids, which help flush waste out of the body, and eating a well-balanced diet are the first steps to preventing stones. For individuals at risk, this may not be enough, and a doctor may recommend a special diet and medications. Unfortunately, approximately 60 percent of people who have had a renal stone will experience a recurrence. This is particularly true of men, who are four to five times more likely to develop stones than women. Renal stones do not discriminate based on age; even children are at risk. Astronauts are particularly at risk of developing renal stones because they lose bone and muscle mass; calcium, other minerals, and protein normally used for bone and muscle end up in the bloodstream and then in the kidneys. Without plenty of fluid to wash them away, crystals can form and then grow into stones. This factor compounds the risk for astronauts, since they also perceive that they are less thirsty in space and will drink less than normal during the mission. To minimize all of these factors, doctors must instead treat the stone-forming compounds with medication. This study will use potassium citrate to reduce the risk of stone formation. Renal stones are never convenient, but they are a particular concern for astronauts who have limited access to treatment during flight. Researchers are examining how earthbound preventions for renal stone formation work in flight, ensuring missions are not ended prematurely due to this medical condition. During STS-107, earthbound preventions and treatments become astronauts' gain.

Whitson, Peggy↗

Power System Wildfire Risks and Potential Solutions: A Literature Review & Proposed Metric

Several fire risk evaluation, fire tracking, and fire response resources are available. The risk metrics and fire response programs are sometimes modified to include a power system context. The risk metrics often evaluate the risk of fires causing power system faults or outages, especially on transmission systems. The response programs are modified to ensure the safety of power system equipment and first responders as well as to coordinate power system outages to both ensure safety during an active fire and prevent fire ignition during high risk periods. Although some aspects of wildfire responses have been adapted to include power system concerns, adaptations to power system operations and maintenance to include wildfire risks and responses are still nascent. In particular, a risk metric that evaluates the potential for power system components to ignite wildfires is needed to help guide power system upgrade efforts and power system fire safety measures. This document serves as a brief literature review of wildfire risk metrics and response programs and how they relate to power systems. It also includes a proposed risk metric and structure for describing the risk of a power system component igniting a fire.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Markov Process to Evaluate the Value Proposition of a Risk-Informed Predictive Maintenance Strategy

To achieve high-capacity factors, the nuclear fleet has relied on labor-intensive and time-consuming operation and preventive maintenance programs for plant systems. Manually performed inspection, calibration, testing, and maintenance of plant assets at periodic frequencies, along with time-based replacement of assets irrespective of condition, have resulted in a costly, labor-centric business model. Fortunately, there are technologies that can eliminate unnecessary preventive maintenance activities by deploying risk-informed predictive maintenance, enabling the transition to a technology-centric business model. The technology-centric business model will enable plants to optimize and automate maintenance activities, leading to cost reductions since labor is a rising cost and technology is a declining cost. The implementation of scalable technologies and methodologies across plant systems and across the nuclear fleet is critical for successful deployment of a risk-informed predictive maintenance strategy at commercial nuclear power plants. The work presented in the report is being developed as part of a collaborative research effort between Idaho National Laboratory and Public Service Enterprise Group Nuclear, LLC. This report describes the technical basis using the Markov Process to evaluate the value proposition for the risk-informed predictive maintenance strategy for the circulating water system. The plant process data from the Salem nuclear plant’s circulating water system is utilized to develop a Markov chain risk models and formulation to estimate the loss and gain in revenue based on plant availability. The outcomes presented in this report provides the technical basis for extensive quantitative evaluation of a scalable risk-informed predictive maintenance strategy as part of future research.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Microbial Monitoring of the International Space Station

Humans living and working in the harsh environment of space present many challenges for habitability engineers and microbiologists. Spacecraft must provide an internal environment in which physical (gas composition, pressure, temperature, and humidity), chemical, and biological environmental parameters are maintained at safe levels. Microorganisms are ubiquitous and will accompany all human-occupied spacecraft, but if biological contamination were to reach unacceptable levels, long-term human space flight would be impossible. Prevention of microbiological problems, therefore, must have a high priority. Historically, prevention of infectious disease in the crew has been the highest priority, but experience gained from the NASA-Mir program showed that microbial contamination of vehicle and life-support systems, such as biofouling of water and food, are of equal importance. The major sources of microbiological risk factors for astronauts include food, drinking water, air, surfaces, payloads, research animals, crew members, and personnel in close contact with the astronauts. In our efforts to eliminate or mitigate the negative effects of microorganisms in spacecraft, the National Aeronautics and Space Administration (NASA) implemented comprehensive microbial analyses of the major risk factors. This included the establishment of acceptability requirements for food, water, air, surfaces, and crew members. A robust monitoring program was then implemented to verify that the risks were within acceptable limits. Prevention of microbiological problems is preferred over mitigation of problems during flight, and preventive steps must begin very early in the design phase. Spacecraft development must include requirements to control free water from humidity, condensate, hygiene activities, and other releases. If water is available, microbes are likely to grow because sufficient nutrients are potentially available. Materials selected for the spacecraft must not promote or support microbial growth. Air filtration can dramatically reduce the number of airborne bacteria, fungi, and particulates in spacecraft breathing air. Waterborne bacteria can be reduced to acceptable levels by thermal inactivation of bacteria during water processing, along with a residual biocide, and filtration at the point of use can ensure safety. System design must include onboard capability to achieve recovery of the system from contamination. Robust housekeeping procedures that include periodic cleaning and disinfection will prevent high levels of microbial growth on surfaces. Food for consumption in space must be thoroughly tested for excessive microbial content and pathogens before launch. Thorough preflight examination of flight crews, consumables, payloads, and the environment can greatly reduce pathogens in spacecraft. Many of the lessons learned from the Space Shuttle and previous programs were applied in the early design phase of the International Space Station, resulting in the safest space habitat to date. This presentation describes the monitoring program for the International Space Station and will summarize results from preflight and on-orbit monitoring.

Pierson, Duane L.↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Hierarchically Templated Synthesis of 3D‐Printed Crosslinked Cyclodextrins for Lycopene Harvesting

Abstract Plants produce a wide range of bioactive phytochemicals, such as antioxidants and vitamins, which play crucial roles in aging prevention, inflammation reduction, and reducing the risk of cancer. Selectively harvesting these phytochemicals, such as lycopene, from tomatoes through the adsorption method is cost‐effective and energy efficient. In this work, a templated synthesis of 3D‐printed crosslinked cyclodextrin polymers featuring nanotubular structures for highly selective lycopene harvesting is reported. Polypseudorotaxanes formed by triethoxysilane‐based telechelic polyethylene glycols and α‐cyclodextrins (α‐CDs) are designed as the template to (1) synthetically access urethane‐based nanotubular structures at the molecular level, and (2) construct 3D‐printed architectures with designed macroscale voids. The polypseudorotaxane hydrogels showed good rheological properties for direct ink writing, and the 3D‐printed hydrogels were converted to the desired α‐CD polymer network through a three‐step postprinting transformation. The obtained urethane‐crosslinked α‐CD monoliths possess nanotubular structures and 3D‐printed voids. They selectively adsorb lycopene from raw tomato juice, protecting lycopene from photo‐ or thermo‐degradations. This work highlights the hierarchically templated synthesis approach in developing functional 3D‐printing materials by connecting the bottom‐up molecular assembly and synthesis with the top‐down 3D architecture control and fabrication.

Chemistry↗

Exploring the Complexities of Drug Formulation Selection, Storage, and Shelf-Life for Exploration Spaceflight

Medications have been a part of space travel dating back as far as the Apollo missions. Currently, medical kits aboard the ISS contain medications and supplies to help crew members cope with a variety of possible medical events. NASA reported that 1,867 medical events occurred from 1981 to 1998 on space shuttle flights, STS-1 to STS-89; 498 out of the 508 crewmembers on those flights reported experiencing a medical event other than space motion sickness. In 2000, the Institute of Medicine (IOM) convened a committee of experts, Committee on Creating a Vision for Space Medicine during Travel beyond Earth Orbit, to examine the issues surrounding astronaut health and safety for long duration space missions. The primary theme of the committee’s final report is that there is not enough known about the risks to human health during long-duration missions beyond Earth’s orbit and ways to effectively mitigate those risks in an environment of deep space. In 2014, the IOM convened the Committee on Ethics Principles and Guidelines for Health Standards for Long Duration and Exploration Spaceflights and released a report emphasizing the importance of prevention, mitigation, and treatment of major risks to human health during exploration spaceflight. NASA’s Human Research Program has organized five distinct categories of spaceflight hazards summarized by the acronym “RIDGE” (Space Radiation, Isolation and Confinement, Distance from Earth, Gravity fields, and Hostile/Closed Environments) that astronauts may encounter during exploration spaceflight. From those hazards, NASA further derived 30 of the most critical human health and performance risks, including limits to medical care resulting from pharmaceutical degradation. As we prepare for more distant exploration missions to Mars and beyond, risk management planning for astronaut healthcare should include the assembly of a medication formulary that is comprehensive enough to prevent or treat anticipated medical events, remains safe and chemically stable, and retains sufficient potency to last for the duration of the mission. The present editorial will summarize the current state of knowledge regarding innovative formulary optimization strategies, pharmaceutical stability assessment techniques, and storage and packaging solutions that could enhance drug safety and efficacy for future exploration spaceflight missions.

drug degradation risk assessment↗

Evaluating Failures and Near Misses in Human Spaceflight History for Lessons for Future Human Spaceflight

There have been a number of studies done in the past drawn on lessons learned with regard to human loss-of-life events. Generally, the systemic causes and proximate causes for fatal events have both been examined in considerable detail. However, an examination of near-fatal accidents and failures that narrowly missed being fatal could be equally useful, not only in detecting causes, both proximate and systemic, but also for determining what factors averted disaster, what design decisions and/or operator actions prevented catastrophe. Additionally, review of risk factors for upcoming or future programs will often look at trending statistics, generally focusing on failure/success statistics. Unfortunately, doing so can give a skewed or misleading view of past reliability or a reliability that cannot be presumed to apply to a new program. One reason for this might be that failure/success criteria aren't the same across programs, but also that apparent success can hide systemic faults that, under other circumstances, can be fatal to a program with different parameters. A program with a number of near misses can look more reliable than a consistently healthy program with a single out-of-family failure and provide very misleading data if it is not examined in detail. This is particularly true for a manned space program where failure/success includes more than making a particular orbit. Augmenting reliability evaluations with this near miss data can provide insight and expand on the limitations of a strictly pass/fail evaluation. Even more importantly, a thorough understanding of these near miss events can identify conditions that prevented fatalities. Those conditions may be key to a programs reliability, but, without insight to the repercussions if such conditions were not in place, their importance may not be readily clear. As programs mature and political and fiscal responsibilities come to the fore, often there is considerable incentive to eliminate unnecessary conservatism, design margin, redundancy, operational support, testing, training, or safety oversight. An evaluation that demonstrates how these features and capabilities averted disaster can ensure processes that saved lives or missions are not discarded without appropriate review and understanding. Close examination of accidents that almost were can also highlight differences in design from one program to another, either justifying reliability comparisons or negating them. It can also provide considerable insight into how those saving factors were developed and implemented so that similar methods can be used to ensure appropriate life-saving and mission saving factors can be developed, even for a dissimilar space program. The lessons are appropriate for seasoned manned space programs and agencies, but crucial for untried agencies and organizations that are interested in sending man into space. The large body of publicly available near miss and accident data available provide invaluable insight into programmatic, technical, and even political issues that can be addressed before they impact safety. In this paper, we examine a number of these near misses and accidents and steps a program, agency, or potential spacefaring company might take to improve their chances of success and avoid mission or safety disasters using this data.

Barr, Stephanie↗