Search NASA⌕ Search

SEARCH · Search NASA

Results for “safety planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Navigating Urban Mobility: Evaluating Infrastructure Strategies for Enhanced Energy-Efficient Access for Micromobility

Cities and communities continue to expand pedestrian and bicycle infrastructure as part of their sustainable mobility and post-pandemic recovery plans. However, the emergence of micro-mobility (e.g., electric bicycles) has created new challenges for urban transport planning. As the popularity of micro-mobility modes has grown, so have safety concerns due to rising injuries, thus challenging many cities to come up with regulatory measures that enable efficient access while minimizing negative impacts from micro-mobility. Leveraging the Open-Source Tool (Mobility Energy Productivity metric), powered by an open-source dataset (OpenStreetMap), and enhanced through the incorporation of perceived discomfort (level-of-traffic stress), this research study focuses on evaluating the accessibility implications of infrastructure planning and regulatory measures for micro-mobility. Five scenarios pertaining to level of traffic stress, sidewalk access, traffic calming, and bike lane coverage were tested in the Denver-Aurora region in Colorado. Maximum improvements in energy-efficient access are realized when allowing sidewalks for micro-mobility use. Cities and planning agencies could leverage this information to assess sidewalk use policies for micro-mobility, while ensuring pedestrian safety and ADA access. Results indicate that expansion of bicycle lane coverage yields 11% accessibility benefits for micro-mobility compared to implementing traffic calming measures yielding 3% accessibility improvements. Further, it was observed most of the population in the Denver-Aurora region is experiencing lower accessibility in-part due to presence of a high-stress connections in the network. Although not generalizable, the use of open-source data and access calculation methodology, make this analysis reproducible and transferable to other locations.

ADVANCED PROPULSION SYSTEMS↗

Physical Safety and Security at Electric Vehicle Charging Sites

This help sheet provides an overview of physical safety and security design elements for public EV charging stations and general best practices that can be considered for the safety and comfort of charging station customers.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Automated Ride Hailing - Status, Projections, and Critical Safety Review

Automated ride-hailing services, commonly known as 'robo-taxis' are beginning to proliferate and scale. Currently they are available in four major US cities with another 10 cities planning their implementation in the near future. In the US, automated ride-hailing services are dominated by a single provider, with announcements from several competitors of service offerings by end of calendar year 2025. Internationally, only three companies are currently in commercial operations, with many more planned. The scaling of robo-taxi services appears to be the leading application of automated vehicles (AVs), and provides evidence of their anticipated safety in comparison to conventional vehicles. This presentation will provide an overview of the status of deployments of fully operational AVs in ride-hailing services, projections of the number of trips, vehicles, and vehicle miles traveled for the immediate future, and a critical review of the safety data that has been reported, both in the US as well as internationally.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Challenges and Opportunities for Basic Efficiency Measures in Low-Income Homes: A Southeast Alaska Case Study

Juneau, Alaska is the state's capital city and has a renewable energy goal to reach 80% renewable energy for the space heating and transportation sectors by 2045. In practical terms, this indicates a need to electrify both sectors, to take advantage of the inexpensive hydropower available from the local electric utility, Alaska Energy Light & Power. In an effort to complement and enable electrification, researchers examined the feasibility to deploy storm windows via a case study of installing storm windows in two local low-income homes. Newer models of storm windows provide an extra layer of insulation over existing windows, while preserving operability and views. They can also improve comfort and reduce noise. Researchers worked with the regional housing authority and a local builder to install the storm windows and replace inoperable windows in the two houses in 2021, in addition to conducting pre- and post-installation air leakage tests, energy monitoring, and occupant interviews. The team encountered several challenges, including a lack of egress windows, energy data from a wide variety of heating systems, extremely leaky homes, and installation issues such as windows that were not square. These results point to several barriers to widespread deployment of storm windows in the area, but also open the door to opportunities to design deployment programs that improve safety as well as efficiency.

cold climate↗

Coordinated Natural Gas and Electric Planning: Case Studies of Current Approaches and Practices

This paper examines how natural gas and electric utilities across eight U.S. states and two Canadian provinces are beginning to coordinate historically separate planning processes in response to growing system interdependencies, policy mandates, aging infrastructure, and changing customer energy choices. Electricity planning has long relied on robust integrated resource planning frameworks that weigh numerous objectives, risks, and costs. Natural gas planning, on the other hand, is typically less transparent and more narrowly focused on safety and system integrity. As economic, reliability, and policy drivers place new and shared demands on both systems, jurisdictions and utilities are experimenting with approaches such as coordinated forecasting, non pipeline alternatives, and combined planning pilots. A few have issued regulatory or statutory directives for greater data sharing and methodological alignment. Case studies from British Columbia, California, Colorado, Illinois, Massachusetts, Minnesota, New York, Québec, Rhode Island, and Washington illustrate a wide range of approaches to rethinking siloed planning. The paper identifies several common themes across the jurisdictions examined. It provides observations on the methods, processes, and organizational steps that may be needed in the future to address the challenges being faced by states and utilities. Lastly, it identifies some initial steps that states and utilities can consider if they would like to pursue more integrated, cost-effective, policy-aligned energy system planning.

03 NATURAL GAS↗

Hydrogen applications in airport operations: a review using the Port Authority of New York and New Jersey as an illustrative airport system

Airports combine aircraft propulsion, ground operations, stationary power systems, and fuel logistics in ways that make emissions reduction technically and operationally complex. Existing studies often assess hydrogen applications in these areas separately, limiting understanding of the shared infrastructure, safety, and operational constraints that shape airport deployment. This review evaluates hydrogen across three airport-relevant operational domains: aviation propulsion, ground support equipment and vehicles, and stationary power systems. Within aviation propulsion, the review examines sustainable aviation fuel production and hydrogen-powered aircraft as two distinct hydrogen-relevant pathways. The Port Authority of New York and New Jersey is used as an illustrative airport system to relate the literature to a real operating context. Drawing on peer-reviewed studies, technical reports, demonstration projects, and public operational information, the review also includes screening-level calculations of hydrogen demand and potential CO 2 e reductions for selected applications. The findings show that hydrogen's role is highly application-specific. Near-term opportunities are strongest where hydrogen serves as a low-carbon process input, supports selected high-utilization ground equipment, or contributes to resilient stationary power-system configurations. Hydrogen-powered aircraft remain a longer-term option because storage, fueling infrastructure, certification, cost, and NO x management continue to constrain deployment. Across all domains, infrastructure readiness, fuel logistics, safety requirements, and leakage management emerge as recurring determinants of viability. Future research should focus on cross-domain infrastructure planning, comparative assessment of hydrogen against alternative pathways, improved treatment of leakage and non-CO 2 effects, and clearer safety and regulatory frameworks for airport deployment.

08 HYDROGEN↗

Cross-Code Verification of Neutronics Analysis Tools at INL Applied for 238 Pu Production in the Advanced Test Reactor

Here, analyses are completed for experiments prior to experiment irradiation in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). Various codes are used to qualify all experiments planned for insertion in the reactor, thereby ensuring that all safety and programmatic requirements are satisfied preirradiation. Among the common experiment analysis tools at INL are MCNP5 coupled to ORIGEN2 (MOPY) and MC21. MOPY uses MCNP5 for transport calculations along with calculations for fluxes and select reaction rates, and then ORIGEN2 handles the step-by-step and postirradiation depletion. MC21 handles all in-reactor transport and step-by-step, during-irradiation, depletion calculations, and then ORIGEN (SCALE 6.2.3) is used for decay and dose calculations postirradiation. The MOPY results, along with those obtained via two variations of the MC21 model, were compared in terms of 238 Pu production in the ATR’s H10 position. For the MOPY model, the MC21 model utilizing the HELIOS-based fission product (FP) library, and the MC21 model utilizing the expanded 1300 FP library, the during-cycle irradiation in-core heating results were sufficiently equivalent; however, the MOPY model and the MC21 model with the HELIOS library showed some differences relating to the respective FP libraries. Ultimately, the MC21 model with a 1300 FP library produced the most consistent results throughout the cycle, whereas the MC21 model that utilized the (smaller) HELIOS library was able to handle during-irradiation analysis but lacked certain short-lived FPs that significantly contributed to the total decay heat at shutdown. MOPY, on the other hand, was found to overpredict fission gas production, as a result of limitations in the ORIGEN2 code.

ATR↗

Transient Testing of Nuclear Fuels Performed in the Original Operation of TREAT (First Edition)

This report provides summary information on a selected set of key historic experiment series which were performed in the Transient Reactor Test Facility (TREAT) during its original operation from 1959-1994. The selected experiments are intended to illustrate the diversity in experiments which have been performed, and the range in capabilities of the TREAT reactor. Knowledge of those prior experiments provides a foundation for qualification and safety evaluation of numerous fuel forms already tested in TREAT, planning and designing new future tests, and for future TREAT operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Engineering Study of Svante’s Solid Sorbent Post-Combustion CO 2 Capture Technology at a Linde Steam Methane Reforming H 2 Plant

An initial engineering design study was performed for an advanced post combustion CO 2 capture (PCC) technology to be installed at a commercial-scale steam methane reforming (SMR) hydrogen plant located in the US Gulf Coast. The PCC process integrated the VeloxoTherm™ structured adsorbent technology from Svante for the CO 2 separation and CO 2 compression and purification and balance of plant systems provided by Linde. This pre-FEED equivalent study included following: (1) design basis, (2) basic engineering, including development of process flow diagrams and heat & material balances, (3) inside the battery limit (ISBL) equipment and systems specification, (4) balance of plant outside the battery limit (OSBL) equipment and systems specifications, (5) technology maturation plan, (6) hazard identification (HAZID) review, (7) environmental, health and safety (EH&S) assessment and environmental permitting analysis, (8) constructability review, (9) ISBL and OSBL EPC cost estimation, and (10) commercial-scale techno-economic analysis including capital expenditures (CAPEX) and operating expenditures (OPEX) and CO 2 capture cost estimates.

03 NATURAL GAS↗

Annual Site Environmental Report: 2020 (ASER) for the SLAC National Accelerator Laboratory

To satisfy the requirements of the United States Department of Energy (DOE) SLAC Site Office approved Site Compliance Plan for DOE Order 231.1B (Change 1, 2012, “Environment, Safety and Health Reporting,” the Environment, Safety and Health Division (ES&H) of the SLAC National Accelerator Laboratory prepares an annual report describing its environmental programs and activities. This Annual Site Environmental Report: 2020 summarizes the SLAC National Accelerator Laboratory compliance with standards and requirements, describes the management and monitoring systems in place, and highlights significant accomplishments for the year.

54 ENVIRONMENTAL SCIENCES↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Briefing Human Reliability Analysis Tasks in the KINS-INL Project

Under the SPP with Korea Institute of Nuclear Safety (KINS) (SPP No. 24SP91), INL research team has a plan to visit KINS on December 3, 2024 and have a project meeting with KINS in-person. INL researchers will give this presentation about what we have done on Task 2 under the contract as below. Task 2: Support KINS in the treatment of human actions. INL efforts consist of: Provide technical expertise on recovery analysis based on INL’s methods or recent research Provide technical expertise on dependency analysis based on INL’s methods or recent research Provide technical expertise on analyzing the effects of HSI degradation on operator actions

99 - GENERAL AND MISCELLANEOUS↗

Integrating Immersive Visualization in Molten-Salt Reactor Waste Management for Experimental Design and Planning

The Molten Salt Reactor (MSR) represents a significant innovation in nuclear technology, offering several operational and safety benefits over traditional solid-fuel reactors. However, MSRs face uncertainties in waste management due to their flexible designs and variable waste compositions. To address these challenges, we propose a visualization platform that illustrates solutions and performance predictions for various waste management strategies, enhancing user experience and improving strategy and communication. Immersive visualizations are widely used in the nuclear industry for training, simulation, and safety enhancement. Our project aims to develop a visualization platform incorporating virtual reality (VR) technologies to illustrate MSR characteristics immediately following reactor shutdown. This immersive simulation will allow users to interact, explore, and understand different waste management strategies. The platform will display MSR reactor characterizations, including nuclide decay, salt solidification, and corrosion, which are crucial for assessing and selecting backend management strategies. Using the Meta Quest 3 VR headset with Unity software, our platform will provide real-scale visualizations, enabling users to experience and evaluate designs and plans as if they were physically present. This user-friendly interface will make complex data accessible and understandable for non-domain experts, aiding in decision-making for MSR waste management. Our proposed visualization workflow can be applied to other nuclear reactors, assisting in the design and planning of waste management strategies.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Pressure safety approach for PIP-II cryogenic distribution system and cryomodules

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vesse l relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Pressure safety approach for PIP-II cryogenic distribution system and cryomodules

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

43 PARTICLE ACCELERATORS↗

Safety Margins for the Delineation of the Left Anterior Descending Artery in Patients Treated for Breast Cancer

Cardiac toxicity after breast cancer (BC) radiation therapy is partly due to the large radiation doses to coronary arteries. The left anterior descending artery (LAD) is particularly exposed. A first step in achieving robust dose constraints to the LAD during treatment planning is homogeneous delineation based on guidelines. LAD delineation can be problematic due to heart movements. The aim of the study was to establish a safety margin for delineation of the LAD in patients with BC.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ames National Laboratory Annual Site Environmental Report for CY2021

The primary purpose of this report is to summarize the performance of Ames National Laboratory’s environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2021. This report is a working requirement of Department of Energy Order 231.1B, Environment, Safety and Health Reporting. It includes descriptions of the Laboratory’s site, mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames National Laboratory is located on the campus of Iowa State University (ISU) and occupies 13 buildings owned by the Department of Energy (DOE). See the Laboratory’s Web page for location and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2021, the Laboratory accumulated and disposed of hazardous waste under a U.S. Environmental Protection Agency (EPA) issued generator number. All waste was handled according to applicable EPA, State, and local regulations and DOE Orders. The Laboratory operates as a Small Quantity Generator (SQG) of hazardous waste. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2021 (See U.S. Department of Energy Air Emissions Annual Report in Appendix A.) The Laboratory has an established Environmental Radiological Protection Program (Plan 10200.041) per DOE Order 458.1 requirements. Plans, policies, and procedures are in place to protect the public and the environment against undue risk from radiation associated with DOE radiological activities. As indicated in prior Site Environmental Reports, formal pollution prevention awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2017 with Iowa State University’s shift toward single-stream recycling. Included in recycling efforts are items such as batteries, monitors, corrugated cardboard, lamps, miscellaneous electronic office equipment, mixed paper, newsprint, food/beverage containers, and laboratory glassware. Ames National Laboratory also recycles/reuses salvageable metal, used oil, and foamed polystyrene peanuts, and encourages chemical redistribution and sharing among research groups. Ames National Laboratory reported its contractual performance to DOE-Ames Site Office (AMSO) through the Laboratory’s Performance Evaluation Measurement Plan (PEMP), and a performance level of “B+” was achieved in 2021 for Sustain Excellence and Enhance Effectiveness of Integrated Safety, Health, and Environmental Protection As reported in Site Environmental Reports for prior years, the Laboratory’s Environmental Management System (EMS) has been integrated into the Laboratory’s Integrated Safety Management System (ISMS) since 2005. The integration of EMS into Laboratory business practices allows the Laboratory to systematically review, address and respond to environmental impacts. In addition to DOE-identified objectives and targets, the EMS Steering Committee recommends annual environmental goals for the Laboratory. Due to the COVID-19 pandemic and limited onsite work staff, goals of reducing water usage and travel/commuting to promote the reduction of scope 3 greenhouse gases were achieved. All contract deliverables and environmental compliance activities were still met during this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗