Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Design of multi-mission chemical propulsion modules for planetary orbiters. Volume 1: Summary report

Results are presented of a conceptual design and feasibility study of chemical propulsion stages that can serve as modular propulsion units, with little or no modification, on a variety of planetary orbit missions, including orbiters of Mercury, Saturn, and Uranus. Planetary spacecraft of existing design or currently under development, viz., spacecraft of the Pioneer and Mariner families, are assumed as payload vehicles. Thus, operating requirements of spin-stabilized and 3-axis stabilized spacecraft have to be met by the respective propulsion module designs. As launch vehicle for these missions the Shuttle orbiter and interplanetary injection stage, or Tug, plus solid-propellant kick motor was assumed. Accommodation constraints and interfaces involving the payloads and the launch vehicle are considered in the propulsion module design. The applicability and performance advantages were evaluated of the space-storable high-energy bipropellants. The incentive for using this advanced propulsion technology on planetary missions is the much greater performance potential when orbit insertion velocities in excess of 4 km/sec are required, as in the Mercury orbiter. Design analyses and performance tradeoffs regarding earth-storable versus space-storable propulsion systems are included. Cost and development schedules of multi-mission versus custom-designed propulsion modules are examined.

Source record↗

Advanced bipropellant systems for use on planetary orbiters

Planetary orbit mission capabilities will be greatly improved by the advent of space-storable retro-propulsion systems with liquid fluorine/hydrazine as bipropellants, even when the Space Shuttle/Space Tug is used as launch vehicle. With a specific impulse as high as 375 sec, a multimission propulsion module designed for Pioneer or Mariner class spacecraft as payload and using space-storable propellants, can perform Mercury, Saturn and Uranus orbiter missions, and even some comet rendezvous missions. It also can reduce trip times to the outer planets significantly. The paper presents mission requirements, propulsion technology status, system design, performance, development schedules and cost data, based on results of a recent design and feasibility study.

Meissinger, H. F.↗

Coaxial isolator has versatile interface

Approach increases system-packaging flexibility. Isolators are constructed with removable connectors that can be changed to meet user's requirements. Technique reduces development scheduling problems. Isolators can be procured before package design is firm and then readily reconfigured to meet final design requirements. Changes to existing designs to incorporate removable connectors are minimal. Small adapter plates increase size modestly; weight increase is negligible.

Olsson, D. L.↗

Coal gasification systems engineering and analysis. Volume 1: Executive summary

Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.

Source record↗

Satellite services - An added benefit of the space transportation system

It is argued that the greatest economic benefit can be achieved by the Space Shuttle Orbiter's use as a satellite servicing platform if the following conditions are fulfilled: (1) the international user community must build serviceability features into its satellite and orbital platform designs, based on a common set of guidelines; (2) the various tools required for satellite servicing must be developed in a timely manner; and (3) servicing costs must be kept as low as possible, in order to appeal to the greatest number and variety of satellite operators. A three-part program development schedule is proposed, beginning with near-Orbiter servicing in low earth orbit, continuing with servicing at orbital heights between the low and geosynchronous at greater distances from the Orbiter, and culminating in the early 1990's with the use of the Space Operations Center (SOC) platform for servicing at all orbital heights.

Herardian, M. M.↗

Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

Source record↗

The development of aerodynamic uncertainties for the Space Shuttle Orbiter

The methodology involved in developing the ability to reproduce aerodynamic results between various wind tunnel tests and to determine uncertainties due to differences between preflight aerodynamic predictions and flight results derived from analysis of past aircraft programs is presented. The uncertainties were developed for pitching moment, lateral-directional stability, rudder power, and aileron power, and were formulated to yield aerodynamic uncertainties for an orbital, manned first flight. The compressed development schedule required the aerodynamics results from wind tunnel tests be equipped with tolerances, which accounted for reasonable changes in the vehicle configuration. A worst case scenario was decided on, with the results that every prediction included the widest possible aerodynamic margins. Repeatibility was emphasized between wind tunnel model tests, and was achieved with an accuracy of 0.006 with inclusion of Reynolds effects.

Young, J. C.↗

The Delta improved second stage - First flight results

On July 16, 1982 the successful launch of the Landsat-D spacecraft marked a significant step in the evolutionary growth of the Delta launch vehicle. This growth is related to the development of the Improved Second Stage (ISS). The second utilization of the ISS occurred August 26, 1982 with the successful launch of the Canadian Telesat-F communications satellite. Used in conjunction with the PAM third stage, this spacecraft was placed in a geosynchronous transfer orbit with extremely high accuracy. The various steps in the 22-year history of the Delta launch vehicle are briefly examined. In mid-1979 it became apparent that the expendable-to-Shuttle transition time would increase over that previously planned. In connection with this development, it was decided to design the ISS. Attention is given to design details, a system description, the development schedule, aspects of performance capability, first flight results, and future performance improvements.

Grimes, D. W.↗

Space Shuttle payloads - An overview

A review is made of historical developments of NASA-launched payloads as a basis for projecting payload operations configured to fit the Shuttle's capabilities, and the impetus for new spacecraft and applications designs is discussed. Payloads have experienced a growth in size and weight, capacity and lifetime, and have increasingly featured more automation, microminiaturized circuitry, and data processing systems. Launches by the DoD and NASA have averaged about 20/yr. Spacecraft specifically configured for Shuttle launch have had to wait due to development schedule delays. Partial compensation has occurred by the use of the MMS, which fits into both the Delta nose cone and the Orbiter bay. The Landsat-4 and SMM are cited as examples. Successful demonstration of in-orbit servicing of satellites is required in order to attract spacecraft designers who will make full use of the Shuttle's capabilities. Finally, increased standardization of spacecraft shape, interfaces, and components is foreseeen.

Edgecombe, D. S.↗

Shuttle derived vehicle analysis solid booster unmanned launch vehicle concept definition study, volume 2

The technical effort associated with the selection and definition of the recommended SRB-X concept is documented. Included are discussions concerning the trades leading to the selected concept, the analysis that established the concept's basic subsystem characteristics, selected configuration description and performance capabilities, launch site operations and facility needs, development schedule, cost characteristics, risk assessment, and a cursory comparison with other launch systems.

Source record↗

Preliminary design of flight hardware for two-phase fluid research

This study defined the preliminary designs of flight software for the Space Shuttle Orbiter for three two-phase fluid research experiments: (1) liquid reorientation - to study the motion of liquid in tanks subjected to small accelerations; (2) pool boiling - to study low-gravity boiling from horizontal cylinders; and (3) flow boiling - to study low-gravity forced flow boiling heat transfer and flow phenomena in a heated horizontal tube. The study consisted of eight major tasks: reassessment of the existing experiment designs, assessment of the Spacelab facility approach, assessment of the individual carry-on approach, selection of the preferred approach, preliminary design of flight hardware, safety analysis, preparation of a development plan, estimates of detailed design, fabrication and ground testing costs. The most cost effective design approach for the experiments is individual carry-ons in the Orbiter middeck. The experiments were designed to fit into one or two middeck lockers. Development schedules for the detailed design, fabrication and ground testing ranged from 15 1/2 to 18 months. Minimum costs (in 1981 dollars) ranged from $463K for the liquid reorientation experiment to $998K for the pool boiling experiment.

Hustvedt, D. C.↗

Mixing 4D equipped and unequipped aircraft in the terminal area

The problem of mixing four-dimensional (4D) equipped aircraft (aircraft equipped with on-board guidance systems that can predict and control the touchdown-time of an aircraft to an accuracy of a few seconds throughout the descent) with unequipped aircraft in the terminal area has been investigated via a real-time air traffic control simulation study. The objective of this study was to develop scheduling algorithms and operational procedures for various traffic mixes that ranged from 25 percent to 75 percent 4D equipped aircraft. Results indicate substantial reduction in controller workload and an increase in orderliness when more than 25 percent of the aircraft are 4D equipped. Moreover, this is accomplished without increasing the workload or adding delays for the unequipped aircraft.

Tobias, L.↗

Space Technology Experiments Platform (STEP) Status: an In-space Test Facility

Designed for utilization of the space transportation system for technology experiments in space, the space technology experiment platform (STEP) is a shuttle-borne experiment support facility for use primarily for structures, structural dynamics, and control flexible structures technology flight experiments. The STEP concept is discussed as well as shows its relationship to broad NASA goals and objectives. The development chronology is presented and the current system capability in block diagram format is described. The STEP development schedule is included.

Harris, J. E.↗

VESTA Project: Phase 0 report

This report presents the results of technical studies conducted at CNES/PMF/APS between October 1984 and September 1985 on the VESTA project. These preliminary studies were conducted to establish mission feasibility in terms ofthe trajectory and the scientific objectives, and to determine the type of interfaces which will be required with the Soviets and to measure the magnitude of French participation. A joint French-Soviet report recommends that the project enter phase A, and was approved by CNES and INTERCOSMOS in September, 1985. The mission analysis is made for a mid-1991 launch, and a development schedule for an end-1992 launch is suggested. The decision to postpone the mission was made during the course of the study.

Perret, A.↗

Technical aspects of the United States Space Station

The design and development of the Space Station are described. The proposed design of the Station is a dual keel configuration which will include manned facilities and unmanned free flying platforms. The Station is to be utilized as a space-based laboratory for basic research and observations, a depot for repair and servicing of spacecraft, a strorage area, and a manufacturing facility. International participation in the Space Station program and technological developments applicable for the Station are discussed. A diagram of the Space Station configuration and a Space Station development schedule are provided.

Herman, D. H.↗

Space Station initiates permanent space facility development

The proposed development of the Space Station is examined. The functions and advantages of the Space Station are described. The use of a solar array system for power generation on the Station is studied; the capabilities of various other generation systems are also evaluated. The Space Station's development schedule is discussed.

Loftus, Joseph P., Jr.↗