MER : from landing to six wheels on Mars ... twice

Application of the Pathfinder landing system design to enclose the much larger Mars Exploration Rover required a variety of Rover deployments to achieve the surface driving configuration. The project schedule demanded that software design, engineering model test, and flight hardware build to be accomplished in parallel. This challenge was met through (a) bounding unknown environments against which to design and test, (b) early mechanical prototype testing, (c) constraining the scope of on-board autonomy to survival-critical deployments, (d) executing a balance of nominal and off-nominal test cases, (e) developing off-nominal event mitigation techniques before landing, (f) flexible replanning in response to surprises during operations. Here is discussed several specific events encountered during initial MER surface operations.

Mars Exploration Rover (MER)

Three Years of Global Positioning System Experience on International Space Station

The International Space Station global positioning system (GPS) receiver was activated in April 2002. Since that time, numerous software anomalies surfaced that had to be worked around. Some of the software problems required waivers, such as the time function, while others required extensive operator intervention, such as numerous power cycles. Eventually enough anomalies surfaced that the three pieces of code included in the GPS unit have been re-written and the GPS units upgraded. The technical aspects of the problems are discussed, as well as the underlying causes that led to the delivery of a product that has had so many problems. The technical aspects of the problems included physical phenomena that were not well understood, such as the affect that the ionosphere would have on the GPS measurements. The underlying causes were traced to inappropriate use of legacy software, changing requirements, inadequate software processes, unrealistic schedules, incorrect contract type, and unclear ownership responsibilities..

Gomez, Susan

Three Years of Global Positioning System Experience on International Space Station

The International Space Station global positioning systems (GPS) receiver was activated in April 2002. Since that time, numerous software anomalies surfaced that had to be worked around. Some of the software problems required waivers, such as the time function, while others required extensive operator intervention, such as numerous power cycles. Eventually, enough anomalies surfaced that the three pieces of code included in the GPS unit have been re-written and the GPS units were upgraded. The technical aspects of the problems are discussed, as well as the underlying causes that led to the delivery of a product that has had numerous problems. The technical aspects of the problems included physical phenomena that were not well understood, such as the affect that the ionosphere would have on the GPS measurements. The underlying causes were traced to inappropriate use of legacy software, changing requirements, inadequate software processes, unrealistic schedules, incorrect contract type, and unclear ownership responsibilities.

Gomez, Susan

Science Operations with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will be a powerful space observatory whose four science instruments will deliver rich imaging and multiplexed spectroscopic datasets to the astronomical and planetary science communities. The ground segment for JWST, now being designed and built, will carry out JWST's science operations. The ground segment includes: (1) software that the scientific community will use to propose and specify new observations; (2) software that will schedule both science and calibration observations in a way that optimizes observing efficiency while managing the accumulation of momentum; (3) the infrastructure to regularly measure and maintain the telescope's wavefront; (4) orbit determination, ranging, and tracking; (5) communication via the Deep Space Network to command the observatory and retrieve scientific data; (6) onboard scripts that execute each observing program in an event-driven fashion, with occasional interruptions for targets of opportunity or time-critical observations; and (7) a system that processes and calibrates the data into science ready products, automatically recalibrates when calibrations improve, and archives the data for timely access by the principal investigator and later worldwide access by the scientific community. This ground system builds on experience from operating the Hubble Space Telescope, while solving challenges that are unique to the James Webb Space Telescope. In this paper, we describe the elements of the JWST ground system, how it will work operationally from the perspective of the observatory itself, and how a typical user will interact with the system to turn his/her idea into scientific discovery.

Rigby, Jane

LASS: LADEE Activity Scheduling System Fact Sheet

This factsheet briefly describes the role of the LADEE Activity Scheduling System (LASS) software in science activity planning for theLunar Atmosphere And Dust Environment Explorer (LADEE) mission.

LADEE

A PI’s Guide to Analog Research

Congratulation on being awarded a grant to conduct research in a spaceflight analog! NASA funded research in a Human Research Program (HRP) managed analog environment is very different from research in a traditional laboratory. This presentation will provide a guide to help investigators successfully plan studies for integration and implementation in an HRP analog platform. There are many things to consider when planning a study for implementation in an analog facility and campaign or mission. How do you get from grant approval to data analysis? This is where HRP’s Research Operations and Integration (ROI) team comes in. The ROI team works with sponsoring HRP elements and PI teams to capture requirements and help the PI teams through the phases of research complement development, integration and implementation. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a noninterference basis for implementation. Properly defining and documenting requirements and study needs is crucial in successful integration and implementation. This presentation will outline and provide the information needed for PI teams to understand the integration process and the role of the ROI team in the successful integration and implementation of their study. Topics to be discussed will include but not be limited to science requirement definition and documentation, NASA IRB submissions, subject recruitment, screening and selection, study integration process, efficiency in data collection and data sharing, daily crew schedules, hardware and software shipping, receipt and checkout, biological sample collection, mission support, data management and receipt of data.

B. Caldwell

Cost and schedule estimation study report

This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

Condon, Steve

Promoting Crew Autonomy in a Human Spaceflight Earth Analog Mission through Self-Scheduling

Deep space exploration missions face the challenge of communication transmission latencies between ground stations and astronaut crews due to increasing distance between the Earth and spacecraft in transit. To address this, research at NASA has aimed toward supporting crew autonomy by enabling astronauts to schedule their own timelines with minimal oversight from Mission Control. While self-scheduling has been shown to be feasible, it is yet to be studied as an integral part of autonomous crew operations. The current paper reviews the operationalization of self-scheduling and a number of related objectives during Campaign 6 of HERA, a Human Exploration Research Analog. Research objectives include studying the effects of phasic autonomy over the course of a 45-day mission, evaluating differences in scheduling performance produced by software interface aids, and deploying a novel measure of crew attitudes toward self-scheduling and plan execution.

crew autonomy

Promoting Crew Autonomy in a Human Spaceflight Earth Analog Mission through Self-Scheduling

Deep space exploration missions face the challenge of communication transmission latencies between ground stations and astronaut crews due to increasing distance between the Earth and spacecraft in transit. To address this, research at NASA has aimed toward supporting crew autonomy by enabling astronauts to schedule their own timelines with minimal oversight from Mission Control. While self-scheduling has been shown to be feasible, it is yet to be studied as an integral part of autonomous crew operations. The current paper reviews the operationalization of self-scheduling and a number of related objectives during Campaign 6 of HERA, a Human Exploration Research Analog. Research objectives include studying the effects of phasic autonomy over the course of a 45-day mission, evaluating differences in scheduling performance produced by software interface aids, and deploying a novel measure of crew attitudes toward self-scheduling and plan execution.

crew autonomy

aiida-flux-scheduler

AiiDA is a workflow management software that is capable of accelerating simulations on HPC machines. Currently, there is no scheduler plugin for flux. The current code that is being submitted to be released is the initial alpha version. The code will be hosted on the external LLNL github group.

Keilbart, Nathan [Lawrence Livermore National Labo

Integrating payload design, planning, and control in the Dutch Utilisation Centre

Spacecraft payload design, experiment planning and scheduling, and payload control are traditionally separate areas of activity. This paper describes the development of a prototype software tool--the Activity Scheduling System (ASS)--which integrates these activity areas. ASS is part of a larger project to build a Dutch Utilisation Centre (DUC), intended eventually to support all space utilization activities in The Netherlands. ASS has been tested on the High Performance Capillary Electrophoresis payload. The paper outlines the integrated preparation and operations concept embodied in ASS. It describes the ASS prototype, including a typical session. The results of testing are summarized. Possible enhancement of ASS, including integration into DUC, is sketched.

Grant, T. J.

Integrated Planning and Scheduling for NASA’s Deep Space Network – from Forecasting to Real-time

Over a period of several years, the software systems that plan and schedule the use of NASA’s Deep Space Network (DSN) for the projects it serves have been upgraded from a disparate set of decades-old software components, to an integrated suite covering long-range planning and forecasting, all the way to real-time scheduling. The most recent component of this suite is known as LAPS, for Loading Analysis and Planning Software, and is responsible for long-term planning and forecasting, including studies and analysis of new missions, changed mission requirements, downtime, and new or changed antenna capabilities. This paper discusses the architecture of LAPS and its interfaces with other elements of DSN planning and scheduling, its user interfaces, and some lessons learned from development and deployment.

Lad, Jigna

Metrics

A development status evaluation is presented for practical software performance measurement, or 'metrics', in which major innovations have recently occurred. Metrics address such aspects of software performance as whether a software project is on schedule, how many errors can be expected from it, whether the methodology being used is effective and the relative quality of the software employed. Metrics may be characterized as explicit, analytical, and subjective. Attention is given to the bases for standards and the conduct of metrics research.

Mcgarry, Frank

A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

Mizell, Carolyn

A dataflow analysis tool for parallel processing of algorithms

A graph-theoretic design process and software tool is presented for selecting a multiprocessing scheduling solution for a class of computational problems. The problems of interest are those that can be described using a dataflow graph and are intended to be executed repetitively on a set of identical parallel processors. Typical applications include signal processing and control law problems. Graph analysis techniques are introduced and shown to effectively determine performance bounds, scheduling constraints, and resource requirements. The software tool is shown to facilitate the application of the design process to a given problem.

Jones, Robert L., III

Design and implementation of an experiment scheduling system for the ACTS satellite

The Advanced Communication Technology Satellite (ACTS) was launched on the 12th of September 1993 aboard STS-51. All events since that time have proceeded as planned with user operations commencing on December 6th, 1993. ACTS is a geosynchronous satellite designed to extend the state of the art in communication satellite design and is available to experimenters on a 'time/bandwidth available' basis. The ACTS satellite requires the advance scheduling of experimental activities based upon a complex set of resource, state, and activity constraints in order to ensure smooth operations. This paper describes the software system developed to schedule experiments for ACTS.

Ringer, Mark J.

Inferring Collaboration Strategies and Usability from Remote Observations in a Spaceflight Analog Environment

Collecting usability and user evaluations of novel software in spaceflight analog missions is challenging. For one such analog mission, we collected audio recordings of crew members as they completed their assigned self-scheduling task using novel software. Conversation analysis provided insight about collaborative nature of task and potential new evaluation measures.

human computer interaction

Optimum-AIV: A planning and scheduling system for spacecraft AIV

A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

Arentoft, M. M.