Search NASA⌕ Search

SEARCH · Search NASA

Results for “site assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Introduction

Remediation of Legacy Hazardous and Nuclear Industrial Sites provides an overview of the key elements involved in remediating complex waste sites using the Hanford nuclear site as a case study. Hanford is one of the most complex waste sites in the world and has examples of most, if not all, characteristics of the complex waste sites that exist globally. This book is aimed at a non-technical audience and describes the stages of remediation based on general RCRA/CERCLA processes, from establishing a strategy that includes all stakeholders to site assessment, waste treatment and disposal, and long-term monitoring.

Arm, Stuart T. [BATTELLE (PACIFIC NW LAB)]↗

Defense Technical Assistance - Infographic 4/24/25

Defense Technical Assistance (TA) Infographic designed to inform potential pilot partnerships with military installation about the TA opportunities available. - Secure and reliable energy is crucial for the operational readiness and resilience of military installations. The Department of Energy’s Grid Deployment Office has funded a new initiative at Idaho National Laboratory to conduct technical, on-site assessments that aim to secure the power infrastructure of military bases reliant on civilian utilities for their operations, both CONUS and OCONUS. Including how the assessments work and INL capabilities, partnership model as well as outcomes.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Traffic Management Advisor: Iterative Field Development and Assessment at Multiple Sites

Previous studies have demonstrated the necessity of involving users in the development of automation aids, especially for complex domains such as air traffic control (ATC). Traditional development only demanded a single field test to validate a completed system, but a more iterative combination of development and assessment ensures that the technology meets the requirements of its application domain. Exposure across an adequate spectrum of field users is also required during development, and the use of multiple development sites provides an opportunity to consider individual facility cultures as they relate to implementation strategies. The development of the Center/TRACON Automation System (CTAS) Traffic Management Advisor (TMA) at the Denver and Dallas ATC facilities demonstrates successful iterative development and assessment at multiple field sites. The use of field development changes the nature of assessment. As development progresses, periodic assessments are required to validate that system development is progressing along an appropriate track. In the development of the TMA, assessments were performed based on software in the field, and input from traffic managers was analyzed and incorporated into subsequent releases of the TMA, to be reassessed in the field. This has led to a tool with operational suitability and broad user acceptance. Assessment at multiple sites provides a more generalizable perspective that allows the production of a system that is both generic enough to be used at different sites and tailored enough to be of use at any site. In addition to providing a better understanding of specific facility requirements, the use of multiple assessment sites in the development of TMA has provided an opportunity to consider individual facility operations, procedures and cultures as they relate to development and implementation strategies.

Sanford, Beverly D.↗

Site-wide occupancy assessment using camera traps for seven mammalian species at Los Alamos National Laboratory

Los Alamos National Laboratory (LANL or Laboratory) is committed to solving national security challenges through scientific excellence and has been serving the nation and northern New Mexico for over 70 years. Being located on the Pajarito Plateau in the eastern flanks of the Jemez Mountains, the Laboratory is surrounded by a rich diversity of plants and animals. It is common to see many different species of wildlife on Laboratory property; however, sometimes interactions with wildlife can be negative. Vehicle accidents with wildlife have become a common occurrence. With the current and ongoing expansion of the Laboratory on the Pajarito Plateau, it has the potential to further impact wildlife movement including large game species. Local agencies and tribal Pueblos rely on large game species and do not want these species to be restricted from moving across property boundaries. Temporal and spatial aspects of where wildlife occur on the site is a phenomena that is either not well understood in uncommon species or needs periodic reevaluation for common species. Estimating the distribution of multiple species across the landscape provides wildlife biologists with crucial information for monitoring and conserving animal populations in a particular area. Utilizing motion activated wildlife cameras, also known as camera traps, to monitor wildlife populations has become an essential tool for biologists. Camera traps are non-invasive and cost-effective and can document multiple elusive or uncommon wildlife species, such as carnivores, simultaneously. Occupancy modeling provides a flexible framework for the analysis of the distribution for multiple wildlife species. It explicitly recognizes whether a species is spatially common or rare (occupancy = ψ) and if that species is easy or hard to detect (detection probability = p ). Multispecies and multi-season occupancy models can detect trends in species occupancy because individual species may vary in seasonal movements, detection probability, and transition rates between habitats. In this study, we assessed the site as a whole to ascertain when and where medium and large mammal species are present. Understanding wildlife patterns at the Laboratory will better inform future management decisions regarding land use and development strategies. We placed motion activated wildlife cameras in a random systematic sampling design and used these data to create occupancy models. We tested for differences in single-species occupancy and detection probability by season of mammal species captured on 20 camera traps placed across the Laboratory in a 40 mi² (103 km²) area. We focus the interpretation of our findings on seven mammal species found during this study. They are Rocky Mountain elk ( Cervus canadensis nelsoni ; hereafter “elk”), mule deer ( Odocoileus hemionus ; hereafter “deer”), mountain lion ( Puma concolor ; hereafter “lion”), American black bear ( Ursus americanus ; hereafter “bear”), coyote ( Canis latrans ), bobcat ( Lynx rufus ), and gray fox ( Urocyon cinereoargenteus ; hereafter “fox”).

59 BASIC BIOLOGICAL SCIENCES↗

Assessment of launch site accommodations versus Spacelab payload requirements

The Kennedy launch site capability for accommodating spacelab payload operations was assessed. Anomalies between facility accommodations and requirements for the Spacelab III (Strawman), OA Mission 83-2, Dedicated Life Sciences, and Combined Astronomy missions are noted. Recommendations for revision of the accommodations handbook are summarized.

Source record↗

Availability of state-level climate change projection resources for use in site-level risk assessment

In recent years, incorporating climate change considerations has become an important focus of organizations’ resilience planning and risk assessment efforts, including United States federal agencies. This has led to an increasing demand for higher-resolution and higher-quality climate projection information that is easy to understand for non-expert users. In particular, there is a demand for information about how climate change may affect high-impact, low-frequency (HILF) hazards that are central to risk assessments focused on infrastructure. While national-level resources like the National Climate Assessment provide information on climate impacts for different sectors and regions in the United States, downscaled information with location-specific context is often required for site-level resilience planning. As higher-resolution and higher-quality climate resources continue to be developed at the state level, it is imperative to understand ongoing and planned efforts, as well as key drivers for developing these state-level resources. Based primarily on stakeholder input from climate experts from 31 states, we identify key state-level climate resources, as well as drivers accelerating the development of these resources. We assess the availability of climate change resources, specifically those with information about HILF events that have been developed at the state level and can support users in conducting site-level resilience planning. We identify three key drivers or predictors for the development of climate change resources at the state level: (1) existence of state laws, mandates, Executive Orders, and other state policies, (2) existence of university partnerships; and (3) the makeup of the stakeholder groups (in terms of dominant discipline/expertise) participating in the effort. The diverse state strategies and resources surveyed in this study could support the incorporation of higher-resolution climate information into site-level planning.

54 ENVIRONMENTAL SCIENCES↗

Environmental projects, volume 11. Environmental assessment: Addition to operations building, Mars site

An Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.

Source record↗

Establishment of an Industrial Assessment Center (IAC) site at Arizona State University (ASU)

In this document we report the overall accomplishments of the IAC site at ASU. The report is organized in three different areas: conduct industrial assessments; provide training, research, and educational opportunities to IAC students; and other activities. The report includes those assessments made between September 2016 to August 2021.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wabash CarbonSAFE (Subtask 3.1 - Application of the NRAP Tools to the Wabash CarbonSAFE Site for Risk Assessment Associated with Geologic Carbon Storage Activities)

This report documents a risk assessment of CO 2 containment loss and induced shear failure due to geologic carbon storage at the Wabash CarbonSAFE site. The operator, Wabash Valley Resources, has proposed adapting the onsite integrated gasification combined cycle (IGCC) facilities to produce hydrogen and injecting the byproduct CO 2 stream into the subsurface Potosi dolomite formation. The purpose of this study is to assess (1) CO 2 sequestration performance relative to the CarbonSAFE goals of storing 50 Mt over 30 years, (2) the risk of containment loss due to leakage along a wellbore and into an overlying aquifer, and (3) the state of stress and risk of reactivating existing fractures. This study relied upon the initial site characterization work performed by the Illinois State Geologic Survey (ISGS) along with analogue data collected from other carbon sequestration projects in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Selection and Assessment of Predictions of the Mars Pathfinder Landing Site

The successful landing of the Mars Pathfinder spacecraft on Mars allows the review of the process of selecting the landing site and assessing predictions made for the site based on Viking and Earth-based data. Selection of the landing site for Mars Pathfinder was a two-phase process. The first phase took place from October 1993 to June 1994 and involved: initial identification of engineering constraints, definition of environmental conditions at the site for spacecraft design, and evaluation of the scientific potential of different landing sites. This phase culminated with the first "Mars Pathfinder Landing Site Workshop", held at the Lunar and Planetary Institute in Houston, Texas on April 18-19, 1994, in which suggested approaches and landing sites were solicited from the entire scientific community. A preliminary site was selected by the project for design purposes in June 1994. The second phase took place from July 1994 to March 1996 and involved: developing criteria for evaluating site safety using images and remote sensing data, testing of the spacecraft and landing subsystems (with design improvements) to establish quantitative engineering constraints on landing site characteristics, evaluating all potential landing sites on Mars, and certification of the site by the project. This phase included a second open workshop, "Mars Pathfinder Landing Site Workshop II: Characteristics of the Ares Vallis Region and Field Trips in the Channeled Scabland, Washington" held in Spokane and Moses Lake September 24-30, 1995 and formal acceptance of the site by NASA Headquarters. Engineering constraints on Pathfinder landing sites were developed from the initial design of the spacecraft and the entry, descent and landing scenario. The site must be within 5 degrees of the subsolar latitude at the time of landing (15N for maximum solar power and flexible communications with Earth. It also must be below 0 km elevation to enable enough time for the parachute to bring the lander to the proper terminal velocity for landing. The entire landing ellipse, which is 70 km by 200 km due to navigational, ephemeris and atmospheric uncertainties, must be free of steep slopes, scarps and obvious hazards in Viking orbiter images, have acceptable radar reflectivity, moderate rock abundances and have little or no dust. Scientific considerations of the Mars Pathfinder payload and mission indicate that analyses of "grab bag" samples at the mouths of outflow channels can offer a first order assessment of a variety of rock types on Mars. Highland sites offer the advantage of in situ analysis of ancient rocks on Mars that record crustal differentiation and the nature of the early environment. Dark gray sites offer the potential of analyzing unweathered and unoxidized materials. Following a general assessment of the safety of different sites, a preliminary selection of a "grab bag" site was made. This site, Ares Vallis, is near the mouth of an outflow channel that may contain ancient Noachian terrain, Hesperian ridged plains, and reworked channel materials. All potential landing sites on Mars that met basic safety criteria were analyzed in detail. Sites (100 by 200 km target ellipses) were considered safe if they were below 0 km elevation, were free of obvious hazards (high relief surface features) in high-resolution (< 50 m/pixel) Viking orbiter images and had acceptable reflectivity and roughness at radar wavelengths, high thermal inertia, moderate rock abundance, low red to violet ratio, and low albedo. Only 4 sites on Mars met all the above criteria, which included 1995 opposition 3.5 cm delay-Doppler radar data. Complete data were evaluated for 7 sites and the Viking landing sites for comparison for all the above criteria as well as crater abundance, hill and mesa abundance, slopes over meter to kilometer scales, low altitude winds (from global circulation models and slopes), the size-frequency distribution of large rocks, as well as rover trafficability and science potential. Discussion of potential hazards at Ares Vallis using a variety of data sets (including radar) at a second open workshop, indicated this site cannot be shown to be any more hazardous than the Viking landing sites. Field trips to the Channeled Scabland and the Ephrata Fan, analogs for Ares Vallis and the landing site, respectively, provided valuable insight into possible geologic processes and potential surface characteristics. Three sites met all the data requirements and safety criteria for landing Pathfinder. Ares Vallis was selected by the project because it appeared acceptably safe (although it appeared to have greater rock abundances than other sites, its elevation was likely the best known) and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which would enable addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early martian environment and its subsequent evolution. The selection was reviewed by an external board at a number of meetings and accepted, and the site was approved by NASA Headquarters. Data gathered by the Pathfinder lander' and rover provides the opportunity to test the predictions made for the site in the selection process based on remote observations from Earth, orbit, and the surface. The discussion below is taken from Golombek et al. to which the reader is referred for a more complete discussion and a complete list of references, which are omitted here for brevity. Many characteristics of the landing site are consistent with its being shaped and deposited by the Ares and Tiu catastrophic floods. The rocky surface is consistent a depositional plain comprising semi-rounded pebbles, cobbles and tabular boulders (some of which appear imbricated and/or inclined in the direction of flow) that appear similar to depositional plains in terrestrial catastrophic floods. The Twin Peaks appear to be streamlined hills in lander images, which is consistent with interpretations of larger hills in Viking orbiter images of the region that suggest the lander is on the flank of a broad, gentle ridge trending northeast from Twin Peaks. This ridge, which is the rise to the north of the lander, is aligned in the downstream direction from the Ares and Tiu Valles floods, and may be a debris tail deposited in the wake of the Twin Peaks. Channels visible throughout the scene may be a result of late stage drainage. As predicted by delay-Doppler radar measurements and tracking results, the average elevation of the center of the site was about the same as Viking Lander I relative to the 6.1 mbar geoid. The Doppler tracking and two-way ranging estimate for the elevation of the spacecraft is only 45 in lower than the Viking I Lander and within 100 in of that expected, which is within the uncertainties of the measurements. After landing, surface pressures and winds (5-10 m/s) were found to be similar to expectations based on Viking data, although temperatures were about 10 K warmer. The temperature profile below 50 km was also roughly 20 K warmer. As a result, predicted densities were 5% higher near the surface and up to 40% lower at 50 km but within the entry, descent and landing design margins. The populations of craters and small hills and the slopes of the hills measured in high-resolution (38 m/pixel) Viking orbiter images and the radar derived slopes of the landing site are all consistent with observations of these properties in the lander images. A rocky surface was expected from Viking Infra-Red Thermal Mapper (IRTM) observations and comparisons with the Viking landing sites. The observed cumulative fraction of area covered by rocks with diameters greater than 3 cm and heights greater than 0.5 in (potentially hazardous to landing) at Ares is similar to that predicted by IRTM observations and models of Viking lander and Earth analog rock size-frequency distributions. The IRTM prediction postulated an effective thermal inertia of 30 (10(exp -3) cgs units - cal/cubic cm/s(exp 0.5)/K) for the rock population, but we obtain a slightly different effective thermal inertia for the actual rock population. The validity of interpretations of radar echoes prior to landing are supported by a simple radar echo model, an estimate of the reflectivity of the soil from its bulk density, and the fraction of area covered by rocks. In the calculations, the soil produces the quasi-specular echo and the rocks produce the diffuse echo. The derived quasispecular cross section is comparable to the cross-sections and reflectivities reported for 3.5-cm wavelength observations. The model yields a diffuse echo that is modestly larger than the polarized diffuse echo reported for 3.5-cm wavelength observations. At 12.5-cm wavelength, similar rock populations at Ares and the Viking I site were expected because the diffuse echoes are comparable, but the large normal reflectivities suggests that bulk densities of the soils at depth are greater than those at the surface. We also obtain a fine-component inertia near 8.4 which agrees with the fine-component inertia of 8.7 (in 10(exp -3) cgs units) estimated from thermal observations from orbit by the IRTM; for this estimate, we used a bulk thermal inertia of 10.4 for the landing site, an effective thermal inertia near 40 (10(exp -3) cgs units) for the rock population, and a graphical representation of Kieffer's model. Color and albedo data for Ares suggested surfaces of materials at Ares Vallis would be relatively dust free or unweathered prior to landing compared with the materials at the Viking landing sites. This suggestion is supported by the abundance of relatively dark-gray rocks at Ares and their relative rarity at the Viking landing sites, where rocks are commonly coated with bright red dust. Finally, the 40 km long Ephrata Fan of the Channeled Scabland in Washington state, which was deposited where c

Golombek, M. P.↗

Ground Ice at the Phoenix Landing Site: A Preflight Assessment

One of the objectives of the Mars Scout mission, Phoenix, is to characterize the present state of water in the martian environment, in a location where water may play a significant role in the present and past habitability of Mars. Given the generally dry and cold climate of Mars today any substantial amount of water is expected to occur in the form of ground ice (subsurface ice) within the regolith. The Mars Odyssey Gamma Ray Spectrometer has indicated abundant subsurface hydrogen and inferred ground ice at high latitudes. Therefore, the Phoenix mission will be targeted to land in the northern high latitudes (approximately 65 degrees N - 75 degrees N) where ground ice is expected to be abundantly available for analysis. The lander will be capable of excavating, sampling, and analyzing, dry and water-rich/icy soils. The location and depth of excavation necessary to achieve the goals of sampling and analysis of icy material become important parameters to assess. In the present work we ask two key questions: 1) At what depth within the regolith do we expect to find ice? 2) How might this depth vary over the region of potential landing sites? Numerous lines of evidence can be employed to provide an indication of the presence or absence of shallow ground ice at the potential landing sites. For example geomorphology, neutrons, gamma rays, and theory each contribute clues to an overall understanding of the distribution of ice. Orbital observations provide information on a variety of spatial scales, typically 10 s of meters (patterned ground) to 100 s of kilometers (gamma rays). While information on all of these scales are important, of particular interest is how the presence and depth of ground ice might vary on spatial scales comparable to the lander and its work area. While ground ice may be stable (and present) on a regional scale, local-scale slopes and changes in the physical characteristics of soils can result in significant variations in the distribution of ice.

Mellon, M. T.↗

Intensity measure adequacy assessment for nonlinear site response using Information Theory

Nonlinear site response modeling is a crucial aspect of Probabilistic Seismic Hazard Analysis. Site amplification models routinely rely on a rock intensity measure to characterize the strength of the bedrock motion. However, the adequacy of such intensity measures towards predicting amplifications across the oscillator period range has not been investigated in the literature. This paper analyzes the adequacy of rock intensity measures using state of the art criterion established in Performance-Based Earthquake Engineering and techniques from Information Theory. The efficiency and the sufficiency of several rock intensity measure are assessed. It was found that spectral accelerations at low periods usually are adequate for predicting amplifications across the period range. This supports the current practice of using Peak Ground Acceleration in Ground Motion Models. However, for extremely soft sites, which demonstrate nonlinear effects well into the period range, it is better practice to ensure that amplification and spectral acceleration share the same oscillator period. Lastly, for predicting the peak shear strain (an important parameter that controls nonlinearity of site response), Peak Ground Velocity is generally adequate, and this conclusion is in line with the definition of proxy shear strain.

42 ENGINEERING↗

Assessing the suitability of sites near Pine Island Glacier for subglacial bedrock drilling aimed at detecting Holocene retreat–readvance

Abstract. Unambiguous identification of past episodes of ice sheet thinning below the modern surface and grounding line retreat inboard of present requires recovery and exposure dating of subglacial bedrock. Such efforts are needed to understand the significance and potential future reversibility of ongoing and projected change in Antarctica. Here we evaluate the suitability for subglacial bedrock drilling of sites in the Hudson Mountains, which are located in the Amundsen Sea sector of West Antarctica. We use an ice sheet model and field data – geological observations, glaciological observations and bedrock samples from nunataks, and ground-penetrating radar from subglacial ridges – to rate each site against four key criteria: (i) presence of ridges extending below the ice sheet, (ii) likelihood of increased exposure of those ridges if the grounding line was inboard of present, (iii) suitability of bedrock for drilling and geochemical analysis, and (iv) accessibility for aircraft and drilling operations. Our results demonstrate that although no site in the Hudson Mountains is perfect for this study when assessed against all criteria, the accessibility, N–S orientation and basaltic bedrock lithology of Winkie Nunatak's southernmost ridge (74.86° S, 99.77° W) make it a feasible site both for drilling and subsequent cosmogenic nuclide analysis. Furthermore, the ridge is strewn with glacial erratics at all elevations, providing valuable constraints on its early Holocene deglacial history. Based on our experiences during this study, we conclude with a series of recommendations for assessing site suitability for future bedrock drilling campaigns. We emphasise the importance of consulting a range of expertise prior to drilling and ensuring that sufficient field reconnaissance is undertaken (including obtaining detailed grids of radar survey data and bedrock samples).

58 GEOSCIENCES↗

Lunar Reconnaissance Orbiter Camera Observations Relating to Science and Landing Site Selection in South Pole-Aitken Basin for a Robotic Sample Return Mission

The Moon's South Pole-Aitken basin (SPA) is a high priority target for Solar System exploration, and sample return from SPA is a specific objective in NASA's New Frontiers program. Samples returned from SPA will improve our understanding of early lunar and Solar System events, mainly by placing firm timing constraints on SPA formation and the post-SPA late-heavy bombardment (LHB). Lunar Reconnaissance Orbiter Camera (LROC) images and topographic data, especially Narrow Angle Camera (NAC) scale (1-3 mpp) morphology and digital terrain model (DTM) data are critical for selecting landing sites and assessing landing hazards. Rock components in regolith at a given landing site should include (1) original SPA impact-melt rocks and breccia (to determine the age of the impact event and what materials were incorporated into the melt); (2) impact-melt rocks and breccia from large craters and basins (other than SPA) that represent the post-SPA LHB interval; (3) volcanic basalts derived from the sub-SPA mantle; and (4) older, "cryptomare" (ancient buried volcanics excavated by impact craters, to determine the volcanic history of SPA basin). All of these rock types are sought for sample return. The ancient SPA-derived impact-melt rocks and later-formed melt rocks are needed to determine chronology, and thus address questions of early Solar System dynamics, lunar history, and effects of giant impacts. Surface compositions from remote sensing are consistent with mixtures of SPA impactite and volcanic materials, and near infrared spectral data distinguish areas with variable volcanic contents vs. excavated SPA substrate. Estimating proportions of these rock types in the regolith requires knowledge of the surface deposits, evaluated via morphology, slopes, and terrain ruggedness. These data allow determination of mare-cryptomare-nonmare deposit interfaces in combination with compositional and mineralogical remote sensing to establish the types and relative proportions of materials expected at a given site. Remote sensing compositions, e.g., FeO, also constrain the relative abundances of components. Landing-site assessments use crater and boulder distributions, and slope and terrain rugge

Jolliff, B. L.↗

Evaluation of obstacle modelling approaches for resource assessment and small wind turbine siting: case study in the northern Netherlands

Abstract. Growth in adoption of distributed wind turbines for energy generation is significantly impacted by challenges associated with siting and accurate estimation of the wind resource. Small turbines, at hub heights of 40 m or less, are greatly impacted by terrestrial obstacles such as built structures and vegetation that can cause complex wake effects. While some progress in high-fidelity complex fluid dynamics (CFD) models has increased the potential accuracy for modelling the impacts of obstacles on turbulent wind flow, these models are too computationally expensive for practical siting and resource assessment applications. To understand the efficacy of available models in situ, this study evaluates classic and commonly used methods alongside new state-of-the-art lower-order models derived from CFD simulations and machine learning approaches. This evaluation is conducted using a subset of an extensive original dataset of measurements from more than 300 operational wind turbines in the northern Netherlands. The results show that data-driven methods (e.g. machine learning and statistical modelling) are most effective at predicting production at real sites with an average error in annual energy production of 2.5 %. When sufficient data may not be available de novo to support these data-driven approaches, models derived from high-fidelity simulations show promise and reliably outperform classic methods. On average these models have 6.3 %–11.5 % error compared with 26 % for classic methods and 27 % baseline error for reanalysis data without obstacle correction. While more performant on average, these methods are also sensitive to the quality of obstacle descriptions and reanalysis inputs.

17 WIND ENERGY↗

Integrated Land Suitability Assessment for Depots Siting in a Sustainable Biomass Supply Chain

A sustainable biomass supply chain would require not only an effective and fluid transportation system with a reduced carbon footprint and costs, but also good soil characteristics ensuring durable biomass feedstock presence. Unlike existing approaches that fail to account for ecological factors, this work integrates ecological as well as economic factors for developing sustainable supply chain development. For feedstock to be sustainably supplied, it necessitates adequate environmental conditions, which need to be captured in supply chain analysis. Using geospatial data and heuristics, we present an integrated framework that models biomass production suitability, capturing the economic aspect via transportation network analysis and the environmental aspect via ecological indicators. Production suitability is estimated using scores, considering both ecological factors and road transportation networks. These factors include land cover/crop rotation, slope, soil properties (productivity, soil texture, and erodibility factor) and water availability. This scoring determines the spatial distribution of depots with priority to fields scoring the highest. Two methods for depot selection are presented using graph theory and a clustering algorithm to benefit from contextualized insights from both and potentially gain a more comprehensive understanding of biomass supply chain designs. Graph theory, via the clustering coefficient, helps determine dense areas in the network and indicate the most appropriate location for a depot. Clustering algorithm, via K-means, helps form clusters and determine the depot location at the center of these clusters. An application of this innovative concept is performed on a case study in the US South Atlantic, in the Piedmont region, determining distance traveled and depot locations, with implications on supply chain design. The findings from this study show that a more decentralized depot-based supply chain design with 3depots, obtained using the graph theory method, can be more economical and environmentally friendly compared to a design obtained from the clustering algorithm method with 2 depots. In the former, the distance from fields to depots totals 801,031,476 miles, while in the latter, it adds up to 1,037,606,072 miles, which represents about 30% more distance covered for feedstock transportation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Overview of the Mars Pathfinder mission and assessment of landing site predictions

Chemical analyses returned by Mars Pathfinder indicate that some rocks may be high in silica, implying differentiated parent materials. Rounded pebbles and cobbles and a possible conglomerate suggest fluvial processes that imply liquid water in equilibrium with the atmosphere and thus a warmer and wetter past. The moment of inertia indicates a central metallic core of 1300 to 2000 kilometers in radius. Composite airborne dust particles appear magnetized by freeze-dried maghemite stain or cement that may have been leached from crustal materials by an active hydrologic cycle. Remote-sensing data at a scale of generally greater than approximately 1 kilometer and an Earth analog correctly predicted a rocky plain safe for landing and roving with a variety of rocks deposited by catastrophic floods that are relatively dust-free.

unmanned↗