Search NASA⌕ Search

SEARCH · Search NASA

Results for “site operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Application of a Modified Universal Design Survey for Evaluation of Ares 1 Ground Crew Worksites

Operability is a driving requirement for NASA's Ares 1 launch vehicle. Launch site ground operations include several operator tasks to prepare the vehicle for launch or to perform maintenance. Ensuring that components requiring operator interaction at the launch site are designed for optimal human use is a high priority for operability. To support design evaluation, the Ares 1 Upper Stage (US) element Human Factors Engineering (HFE) group developed a survey based on the Universal Design approach. Universal Design is a process to create products that can be used effectively by as many people as possible. Universal Design per se is not a priority for Ares 1 because launch vehicle processing is a specialized skill and not akin to a consumer product that should be used by all people of all abilities. However, applying principles of Universal Design will increase the probability of an error free and efficient design which is a priority for Ares 1. The Design Quality Evaluation Survey centers on the following seven principles: (1) Equitable use, (2) Flexibility in use, (3) Simple and intuitive use, (4) Perceptible information, (5) Tolerance for error, (6) Low physical effort, (7) Size and space for approach and use. Each principle is associated with multiple evaluation criteria which were rated with the degree to which the statement is true. All statements are phrased in the utmost positive, or the design goal so that the degree to which judgments tend toward "completely agree" directly reflects the degree to which the design is good. The Design Quality Evaluation Survey was employed for several US analyses. The tool was found to be most useful for comparative judgments as opposed to an assessment of a single design option. It provided a useful piece of additional data when assessing possible operator interfaces or worksites for operability

Blume, Jennifer L.↗

Supervisory autonomous local-remote control system design: Near-term and far-term applications

The JPL Supervisory Telerobotics Laboratory (STELER) has developed a unique local-remote robot control architecture which enables management of intermittent bus latencies and communication delays such as those expected for ground-remote operation of Space Station robotic systems via the TDRSS communication platform. At the local site, the operator updates the work site world model using stereo video feedback and a model overlay/fitting algorithm which outputs the location and orientation of the object in free space. That information is relayed to the robot User Macro Interface (UMI) to enable programming of the robot control macros. The operator can then employ either manual teleoperation, shared control, or supervised autonomous control to manipulate the object under any degree of time-delay. The remote site performs the closed loop force/torque control, task monitoring, and reflex action. This paper describes the STELER local-remote robot control system, and further describes the near-term planned Space Station applications, along with potential far-term applications such as telescience, autonomous docking, and Lunar/Mars rovers.

Zimmerman, Wayne↗

Measurement of the Vertical Distribution of Aerosol by Globally Distributed MP Lidar Network Sites

The global distribution of aerosol has an important influence on climate through the scattering and absorption of shortwave radiation and through modification of cloud optical properties. Current satellite and other data already provide a great amount of information on aerosol distribution. However there are critical parameters that can only be obtained by active optical profiling. For aerosol, no passive technique can adequately resolve the height profile of aerosol. The aerosol height distribution is required for any model for aerosol transport and the height resolved radiative heating/cooling effect of aerosol. The Geoscience Laser Altimeter System (GLAS) is an orbital lidar to be launched by 2002. GLAS will provide global measurements of the height distribution of aerosol. The sampling will be limited by nadir only coverage. There is a need for local sites to address sampling, and accuracy factors. Full time measurements of the vertical distribution of aerosol are now being acquired at a number of globally distributed MP (micro pulse) lidar sites. The MP lidar systems provide profiling of all significant cloud and aerosol to the limit of signal attenuation from compact, eye safe instruments. There are currently six sites in operation and over a dozen planned. At all sites there are a complement of passive aerosol and radiation measurements supporting the lidar data. Four of the installations are at Atmospheric Radiation Measurement program sites. The aerosol measurements, retrievals and data products from the network sites will be discussed. The current and planned application of data to supplement satellite aerosol measurements is covered.

Spinhirne, James↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment

An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.

Boor, J. L.↗

Titan III Feasibility for HL-20 Prototype Missions

A set of studies was performed to investigate the feasibility of using the Titan III launch vehicle to launch an unmanned prototype HL-20 personnel launch system and, potentially, operational HL-20 missions. The launch of an HL-20 spacecraft on a Titan III poses a unique set of concerns, primarily because the lifting body vehicle is carried on top of the Titan vehicle without a fairing. The Titan III/HL-20 feasibility study addressed the primary vehicle issues of performance, aerodynamics, loads, control and stability, launch availability, and vehicle configuration for the launch of an unmanned HL-20 prototype vehicle. Titan launch operations, launch site systems, and facilities were assessed to determine HL-20 operations compatibility. Additional studies determined the potential launch opportunity and window capabilities of the Titan III for the operational HL-20 mission and the existing Titan III's reliability. The feasibility study determined that the Titan III system, with minor changes, is compatible with the HL-20 vehicle and mission. It could provide nearly daily launch windows for a rendezvous with Space Station Freedom. Titan III reliability, when combined with the HL-20 launch escape system, provides a sufficiently high probability of crew survival to support its consideration as the primary vehicle for HL-20 operational missions.

Benson, Scott W.↗

Long-term energy capture and the effects of optimizing wind turbine operating strategies

Methods of increasing energy capture without affecting the turbine design were investigated. The emphasis was on optimizing the wind turbine operating strategy. The operating strategy embodies the startup and shutdown algorithm as well as the algorithm for determining when to yaw (rotate) the axis of the turbine more directly into the wind. Using data collected at a number of sites, the time-dependent simulation of a MOD-2 wind turbine using various, site-dependent operating strategies provided evidence that site-specific fine tuning can produce significant increases in long-term energy capture as well as reduce the number of start-stop cycles and yawing maneuvers, which may result in reduced fatigue and subsequent maintenance.

Miller, A. H.↗

Supervised autonomous control, shared control, and teleoperation for space servicing

A local-remote telerobot system for single- and dual-arm supervised autonomy, shared control, and teleoperation has been demonstrated. The system is composed of two distinct parts: the local site, where the operator resides; and the remote site, where the robots reside. The system could be further separated into dual local sites communicating with a common remote site. This is valuable for potential space missions where a space based robotic system may be controlled either by a space based operator or by a ground based operator. Also, multiple modes of control integrated into a common system are valuable for satisfying different servicing scenarios. The remote site single arm control system is described, and its parameterization for different supervised autonomous control, shared control, and teleoperation tasks are given. Experimental results are also given for selected tasks. The tasks include compliant grasping, orbital replacement unit changeout, bolt seating and turning, electronics card removal and insertion, and door opening.

Backes, Paul G.↗

20-mN Variable Specific Impulse (Isp) Colloid Thruster

Busek Company, Inc., has designed and manufactured an electrospray emitter capable of generating 20 mN in a compact package (7x7x1.7 in). The thruster consists of nine porous-surface emitters operating in parallel from a common propellant supply. Each emitter is capable of supporting over 70,000 electrospray emission sites with the plume from each emitter being accelerated through a single aperture, eliminating the need for individual emission site alignment to an extraction grid. The total number of emission sites during operation is expected to approach 700,000. This Phase II project optimized and characterized the thruster fabricated during the Phase I effort. Additional porous emitters also were fabricated for full-scale testing. Propellant is supplied to the thruster via existing feed-system and microvalve technology previously developed by Busek, under the NASA Space Technology 7's Disturbance Reduction System (ST7-DRS) mission and via follow-on electric propulsion programs. This project investigated methods for extending thruster life beyond the previously demonstrated 450 hours. The life-extending capabilities will be demonstrated on a subscale version of the thruster.

Demmons, Nathaniel↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Launch site payload ground support factors in Space Shuttle launch operations

This paper addresses several of the major factors in support of the Space Shuttle payload ground processing operations at the launch site. In particular, the factors of payload facility and transportation capabilities are addressed. The paper begins with an overview of payload ground processing. It discusses the specific facilities which support payload operations and outlines their roles in the activity. The transportation elements which are utilized at the launch site are then discussed. The paper concludes with a number of issues and concerns which impact the support of Shuttle payload ground processing.

Schuiling, Roelof L.↗

Satellite Contamination and Materials Outgassing Knowledgebase - An Interactive Database Reference

The goal of this program is to collect at one site much of the knowledge accumulated about the outgassing properties of aerospace materials based on ground testing, the effects of this outgassing observed on spacecraft in flight, and the broader contamination environment measured by instruments on-orbit. We believe that this Web site will help move contamination a step forward, away from anecdotal folklore toward engineering discipline. Our hope is that once operational, this site will form a nucleus for information exchange, that users will not only take information from our knowledge base, but also provide new information from ground testing and space missions, expanding and increasing the value of this site to all. We urge Government and industry users to endorse this approach that will reduce redundant testing, reduce unnecessary delays, permit uniform comparisons, and permit informed decisions.

Green, D. B.↗

Solar energy system performance evaluation: Seasonal report for fern, Tunkhannock, Pennsylvania

The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system is reported, and technical contributions to the definition of techniques and requirements for solar energy system design are made. The solar energy system was designed to supply space heating and domestic hot water for single-family residences. The system consists of air flat plate collectors, storage tank, pumps, heat exchangers, associated plumbing, and controls.

Source record↗

Solar energy system performance evaluation: Seasonal report for SEMCO, Loxahatchee, Florida

The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis used is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system and the technical contributions to the definition of techniques and requirements solar energy system design are analyzed. The solar energy system was designed to supply domestic hot water for a family of four, single-family residences. It consists of two liquid flat plate collectors, single tank, controls, and transport lines.

Source record↗

NASA UAS Traffic Management National Campaign Operations across Six UAS Test Sites

NASA's Unmanned Aircraft Systems Traffic Management research aims to develop policies, procedures, requirements, and other artifacts to inform the implementation of a future system that enables small drones to access the low altitude airspace. In this endeavor, NASA conducted a geographically diverse flight test in conjunction with the FAA's six unmanned aircraft systems Test Sites. A control center at NASA Ames Research Center autonomously managed the airspace for all participants in eight states as they flew operations (both real and simulated). The system allowed for common situational awareness across all stakeholders, kept traffic procedurally separated, offered messages to inform the participants of activity relevant to their operations. Over the 3- hour test, 102 flight operations connected to the central research platform with 17 different vehicle types and 8 distinct software client implementations while seamlessly interacting with simulated traffic.

UTM↗