Search NASA⌕ Search

SEARCH · Search NASA

Results for “site selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Drilling on the Moon and Mars: Developing the Science Approach for Subsurface Exploration with Human Crews

DOMEX (Drilling on the Moon and Mars in Human Exploration) is using analog missions to develop the approach for using human crews to perform science activities on the Moon and Mars involving exploration and sampling of the subsurface. Subsurface science is an important activity that may be uniquely enabled by human crews. DOMEX provides an opportunity to plan and execute planetary mission science activities without the expense and overhead of a planetary mission. Objectives: The objective of this first in a series of DOMEX missions were to 1) explore the regional area to understand the geologic context and determine stratigraphy and geologic history of various geologic units in the area. 2) Explore for and characterize sites for deploying a deep (10 m depth) drilling system in a subsequent field season. 3) Perform GPR on candidate drill sites. 4) Select sites that represent different geological units deposited in different epochs and collect soil cores using sterile procedures for mineralogical, organic and biological analysis. 5) Operate the MUM in 3 different sites representing different geological units and soil characteristics. 6) Collect rock and soil samples of sites visited and analyze them at the habitat. Results: At mission start the crew performed a regional survey to identify major geologic units that were correlated to recognized stratigraphy and regional geologic maps. Several candidate drill sites were identified. During the rest of the mission, successful GPR surveys were conducted in four locations. Soil cores were collected in 5 locations representing soils from 4 different geologic units, to depths up to 1m. Soil cores from two locations were analyzed with PCR in the laboratory. The remainder were reserved for subsequent analysis. XRD analysis was performed in the habitat and in the field on 39 samples, to assist with sample characterization, conservation, and archiving. MUM was deployed at 3 field locations and 1 test location (outside the habitat) where it operated autonomously for 2-4 hours at each site. Depths achieved ranged from 15 to 70 cm depending on the soil compressive strength and the presence and depth of subsurface indurated layers. Subsurface samples weighing 0.5 to 1 g were collected at the deepest depth encountered at each of the sites using the MUM automated sample collection system, and subsequently analyzed with XRD. Downhole inspection of holes produced by MUM with the Raman spectrometer was acquired on two of the holes and spectral features associated with selenite were identified in specific soil layers. Previously unreported fossilized remains of vertebrate fauna from the Jurassic era were discovered during our mission. Analysis of mineral biomarkers associated with this discovery are underway.

Stoker, C. R.↗

Constraints, Approach and Present Status for Selecting the Mars Surveyor 2001 Landing Site

There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough, defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities.

Golombek, M.↗

Constraints and Approach for Selecting the Mars Surveyor '01 Landing Site

There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough and defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities.

Golombek, M.↗

CEO Sites Mission Management System (SMMS)

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team uses the SMMS for three general functions - database queries of content and status, individual site creation and updates, and mission planning. The CEO administrator of the science site database is able to create or modify the content of sites and activate or deactivate them based on the requirements of the sponsors. The administrator supports and implements ISS mission planning by assembling, reporting, and activating mission-specific site selections for management; deactivating sites as requirements are met; and creating new sites, such as International Charter sites for disasters, as circumstances warrant. In addition to the above CEO internal uses, when site planning for a specific ISS mission is complete and approved, the SMMS can produce and export those essential site database elements for the mission into XML format for use by onboard Earth-location systems, such as Worldmap. The design, development, and implementation of the SMMS resulted in a superior database management system for CEO science sites by focusing on the functions and applications of the database alone instead of integrating the database with the multipurpose configuration of the AMPS. Unlike the AMPS, it can function and be modified within the existing Windows 7 environment. The functions and applications of the SMMS were expanded to accommodate more database elements, report products, and a streamlined interface for data entry and review. A particularly elegant enhancement in data entry was the integration of the Google Earth application for the visual display and definition of site coordinates for site areas defined by multiple coordinates. Transfer between the SMMS and Google Earth is accomplished with a Keyhole Markup Language (KML) expression of geographic data (see figures 3 and 4). Site coordinates may be entered into the SMMS panel directly for display in Google Earth, or the coordinates may be defined on the Google Earth display as a mouse-controlled polygonal definition and transferred back into the SMMS as KML input. This significantly reduces the possibility of errors in coordinate entries and provides visualization of the scale of the site being defined. CEO now has a powerful tool for managing and defining sites on the Earth's surface for both targets of astronaut photography or other onboard remote sensing systems. It can also record and track results by sponsor, collaborator, or type of study.

Trenchard, Mike↗

Selection of the Mars Pathfinder Landing Site

The Mars Pathfinder spacecraft will land on a depositional fan near the mouth of the catastrophic outflow channel, Ares Vallis (19.5 deg N, 32.8 deg W). This site offers the prospect of analyzing a variety of rock types from the ancient cratered highlands, intermediate-age ridged plains, and reworked channel deposits. Analyses of these rocks by Pathfinder instruments will enable first-order scientific questions to be addressed, such as differentiation of the crust, the development of weathering products, and the nature of the early environment, as well as their subsequent evolution on Mars. Constraints imposed by: (1) spacecraft and rover designs (which are robust), (2) entry, descent, and landing, (3) scientific potential at various sites, and (4) safety were important considerations in site selection. Engineering constraints require a 70 km by 200 km smooth, flat (low slopes) area located between 10 deg and 20 deg N that is below 0 km elevation, with average radar reflectivity, little dust, and moderate rock abundance. Three regions on Mars are between 10 deg and 20 deg N and below 0 km elevation: Chryse, Amazonis, and Isidis-Elysitun. Science considerations favor sites at the mouths of outflow channels (grab bag sites offer an assay of rock types on Mars), highland sites (early crustal differentiation and climate), and sites covered with dark (unoxidized) material. Sites are considered safe if they are clearly below 0 km elevation, appear acceptably free of hazards in high-resolution (less than 50 m/pixel) Viking orbiter images and have acceptable reflectivity and roughness at radar wavelengths, thermal inertia, rock abundance, red to violet ratio, and albedo. Recent 3.5-cm wavelength radar observations were used to verify elevation, reflectivity, and roughness within the landing ellipses. Three sites meet all of these criteria: Ares Vallis, Tritonis Lacus, and Isidis. Although Isidis appears to be safer than Tritonis and Ares, the greater scientific potential at Ares Vallis resulted in its selection. Comparisons of the Grand Coulee (channel) and the depositional Ephrata Fan of the Channeled Scabland in eastern Washington, with Ar-es Vallis and its depositional fan also suggest the Ares Vallis landing site is safe and scientifically interesting.

Golombek, M. P.↗

Candidate locations for SPS rectifying antennas

The feasibility of placing 120 Satellite Power System (SPS) rectifying antenna (rectenna) sites across the U.S. was studied. An initial attempt is made to put two land sites in each state using several land site selection criteria. When only 69 land sites are located, it is decided to put the remaining sites in the sea and sea site selection criteria are identified. An estimated projection of electrical demand distribution for the year 2000 is then used to determine the distribution of these sites along the Pacific, Atlantic, and Gulf Coasts. A methodology for distributing rectenna sites across the country and for fine-tuning exact locations is developed, and recommendations on rectenna design and operations are made.

Eberhardt, A. W.↗

Safe havens: Selecting landing sites for Viking

The involved process by which a landing site on the Martian surface was selected for the Viking lander spacecraft is reviewed. Spacecraft survivability had to be weighed against having the lander touch down in an area of little scientific value. The mission of Mariner 9 is discussed and imagery of Mars generated by this space probe is presented.

Source record↗

Selection of the Apollo 15 landing site

Telescopic studies in the early 1960's pinpointed the future Apollo 15 landing site as a potential exploration site because it included one of the largest lunar sinuous rilles, Rima Hadley, and some of the highest mountains, Montes Apenninus. Additional targets were identified once Apennine-Hadley emerged as a potential landing site. Site selection processes were discussed.

Wilhelms, D. E.↗

Southern Indiana Ecological Conservation: Assessing Canopy Cover Dynamics and Forest Type Groupings in Southern Indiana to Inform Restoration Activities

As human influence continues to negatively impact natural habitats, timely assessment of ecosystem changes and restoration is critical to protect forest health and biodiversity. In our study, we focused on oak-hickory forests in southern Indiana. Oak-hickory forests were the dominant ecosystem dynamic in present-day Indiana for centuries until European colonization, which brought about fire suppression and, eventually, fire exclusion. Anthropogenic fire exclusion in this fire-adapted habitat led to the encroachment of mesic species, such as beech and maple trees. This process, commonly referred to as mesophication, was the focus of our study. Our team performed a feasibility study in using NASA Earth observations to support our end-user partners, Let the Sun Shine In and the US Forest Service, Hoosier National Forest, in their selection of oak-hickory restoration sites. To aid in our analysis of the forest dynamics of southern Indiana, our team used Landsat 5, 8, and 9 imageries, along with other ancillary datasets to create maps to illustrate areas that would most benefit from partners’ forest restoration and management practices. By constructing a Green Vegetation Fraction change map across our 39-year study period (1984-2023) to visualize the change in forest cover and creating a restoration suitability assessment map to reveal sites that met requirements for oak-hickory growth, we provided our partners with suitable site selection for restorative management and found that 3.3% of our entire study area and 4.4% of the Hoosier National Forest were deemed suitable. Our feasibility study benefits southern Indiana restoration by aiding our partners in efficiently selecting sites for prescribed burning, forest thinning, and other restoration management practices.

restoration↗

Last chance at Taurus-Littrow

By the fall of 1971, it was known that only two more Apollos would land on the Moon. Most geoscientists agreed that both should concentrate on the previously neglected terrae (highlands). In June 1991, the Apollo Site Selection Board (ASSB) had chosen Descartes as the site of the Apollo 16 terra landing, scheduled for April 1972. Therefore, we had to assess how many pre-Apollo objectives the first four landings had met, how many Apollo 16 was likely to meet, and how to meet the remaining ones with Apollo 17. Geologists convened at Caltech in November 1971 and formulated a list of major lunar problems. An edited version of the list is presented, and how the remaining problems influenced the Apollo 16 and 17 landing site selection process is discussed with particular emphasis on the selection of Taurus-Littrow as the landing site for Apollo 17. Apollo 17 returned a fine collection from the massifs, bright mantle, Sculptured Hills, subfloor basalt, and dark mantle of Taurus-Littrow. They answered many of 1971's questions, showed others to have been wrongly asked, and left others for us to ponder still today. A brief discussion of the problems solved and the questions raised by the Apollo Program are presented.

Wilhelms, D. E.↗

Influence of Observed Diurnal Cycles of Aerosol Optical Depth on Aerosol Direct Radiative Effect

The diurnal variability of aerosol optical depth (AOD) can be significant, depending on location and dominant aerosol type. However, these diurnal cycles have rarely been taken into account in measurement-based estimates of aerosol direct radiative forcing (ADRF) or aerosol direct radiative effect (ADRE). The objective of our study was to estimate the influence of diurnal aerosol variability at the top of the atmosphere ADRE estimates. By including all the possible AERONET sites, we wanted to assess the influence on global ADRE estimates. While focusing also in more detail on some selected sites of strongest impact, our goal was to also see the possible impact regionally.We calculated ADRE with different assumptions about the daily AOD variability: taking the observed daily AOD cycle into account and assuming diurnally constant AOD. Moreover, we estimated the corresponding differences in ADREs, if the single AOD value for the daily mean was taken from the the Moderate Resolution Imaging Spectroradiometer (MODIS) Terra or Aqua overpass times, instead of accounting for the true observed daily variability. The mean impact of diurnal AOD variability on 24 h ADRE estimates, averaged over all AERONET sites, was rather small and it was relatively small even for the cases when AOD was chosen to correspond to the Terra or Aqua overpass time. This was true on average over all AERONET sites, while clearly there can be much stronger impact in individual sites. Examples of some selected sites demonstrated that the strongest observed AOD variability (the strongest morning afternoon contrast) does not typically result in a significant impact on 24 h ADRE. In those cases, the morning and afternoon AOD patterns are opposite and thus the impact on 24 h ADRE, when integrated over all solar zenith angles, is reduced. The most significant effect on daily ADRE was induced by AOD cycles with either maximum or minimum AOD close to local noon. In these cases, the impact on 24 h ADRE was typically around 0.1-0.2W/sq m (both positive and negative) in absolute values, 5-10% in relative ones.

optical depth↗

MagLifter Site Investigation and Implementation Strategies

MagLifter, as defined here, is an advanced, earth-bound catapult system to provide the initial lift for earth orbiting vehicles to reduce or eliminate the need for multistage propulsion, thus reducing the cost of orbital space flight. It is presumed that magnetic levitation will catapult the vehicle to a desired initial velocity sufficient for reaching orbit with the vehicles own engines. Of necessity, the system must be located on and around a mountain with sufficient relief to allow the catapult to accelerate the launch vehicle to a sufficient speed in the desired direction to allow it to reach orbit. Such a mountain site must meet criteria consistent with current and future space launch needs and conditions. It is the purpose of this report to set forth preliminary criteria for choosing a suitable maglifter site. The report is divided into four major sections: (1) Assumed Launch System and Flight Vehicle Characteristics; (2) Task 1.A - Initial Site Selection Criteria; (3) Conclusions; and (4) Appendix - Phases of the Site Selection Process.

Burke, Pamela↗

Archival of Seasat-A satellite scatterometer data merged with in situ data at selected, illuminated sites over the ocean

A large data base of Seasat-A Satellite Scatterometer (SASS) measurements merged with high-quality surface-truth wind, wave, and temperature data has been documented. The data base was developed for all times when selected in situ measurement sites were within the SASS footprint. Data were obtained from 42 sites located in the coastal waters of North America, Australia, Western Europe, and Japan and were assembled by correlating the SASS and surface-truth measurements in both time and distance. These data have been archived on a set of nine-track 6250 bpi ASCII coded magnetic tapes, which are available from the National Technical Information Service.

Schroeder, Lyle C.↗

Lunar Base Sitting

Speculation with regard to a permanent lunar base has been with us since Robert Goddard was working on the first liquid-fueled rockets in the 1920's. With the infusion of data from the Apollo Moon flights, a once speculative area of space exploration has become an exciting possibility. A Moon base is not only a very real possibility, but is probably a critical element in the continuation of our piloted space program. This article, originally drafted by World Space Foundation volunteers in conjuction with various academic and research groups, examines some of the strategies involved in selecting an appropriate site for such a lunar base. Site selection involves a number of complex variables, including raw materials for possible rocket propellant generation, hot an cold cycles, view of the sky (for astronomical considerations, among others), geological makeup of the region, and more. This article summarizes the key base siting considerations and suggests some alternatives. Availability of specific resources, including energy and certain minerals, is critical to success.

Staehle, Robert L.↗

Global coordinates with centimeter accuracy in the International Terrestrial Reference Frame using GPS

Using 21 days of GPS data from 21 globally distributed receivers operating during early 1991, a 7-parameter transformation between a GPS free-network solution and coordinates of 12 stations listed in the International Terrestrial Reference Frame (ITRF) is solved. Standard errors of GPS coordinates are derived by applying an orthogonal projection operator to the free-network covariance. The weighted rms difference between 33 transformed GPS and ITRF coordinates is 12 mm in the Northern Hemisphere. Best results are obtained by mapping ITRF coordinates to the epoch of this experiment assuming no vertical site motions. Fixing selected sites in the GPS solution to ITRF '90 does not improve the agreement. It is concluded that the use of fiducial constraints is unnecessary for global networks.

Blewitt, Geoffrey↗

Global Light System for JEM-EUSO

The Global Light System (GLS) is a network of ground-based Xenon flash lamps and steered UV lasers to validate the key functions of the JEM-EUSO instrument. These functions include triggering efficiency, the accuracy of intrinsic luminosity measurements, and the reconstructed pointing direction accuracy. GLS units will generate benchmark optical signatures in the atmosphere with similar characteristics to the optical signals of cosmic ray EASs. The lasers will generate tracks and the flashers will generate point flashes. But unlike air showers, the number, energy, precise time, direction (lasers) can be specified. JEM-EUSO will reconstruct the pointing directions of the lasers and the energy of the lasers and flash lamps to monitor the detector's triggers, and accuracy of energy and direction reconstruction. 12 GLS units will be deployed at selected sites around the globe. The JEM-EUSO footprint will pass over a GLS unit on average once per (near) moonless night under clear conditions for appropriately selected sites. The 12 units will be supplemented by campaign style measurements with an airborne unit that will be flown over the open ocean at selected altitudes under JEM-EUSO. A GLS prototype in an airplane will support a high-altitude balloon flight in 2014 of a proto-type JEM-EUSO telescope. We will describe the concept and system design and report on the status of prototyping and the selection process for candidates sites.

Christl, Mark↗

Mars Data Visualization and E/PO with Marsoweb

Marsoweb is a collaborative web environment that has been developed for the Mars research community to better visualize and analyze Mars orbiter data. Its goal is to enable online data discovery by providing an intuitive, interactive interface to data from the Mars Global Surveyor and other orbiters. Recently Marsoweb has served a prominent role as a resource center for the site selection process for the Mars Explorer Rover 2003 missions. In addition to hosting a repository of landing site memoranda and workshop talks, it includes a Java-based interface to a variety of datamaps and images. This interface enables the display and numerical querying of data, and allows data profiles to be rendered from user-drawn cross-sections. High-resolution Mars Orbiter Camera (MOC) images (currently, over 100,000) can be graphically perused; browser-based image processing tools can be used on MOC images of potential landing sites. An automated VRML atlas allows users to construct 'flyovers' of their own regions-of-interest in 3D. These capabilities enable Marsoweb to be used for general global data studies, in addition to those specific to landing site selection. As of September 2002, over 70,000 distinct users from NASA, USGS, academia, and the general public have accessed Marsoweb.

Gulick, V. C.↗

FLARE: The Far Side Lunar Research Expedition. A design of a far side lunar observatory

This document outlines the design completed by members of Lone Star Aerospace, Inc. (L.S.A.) of a lunar observatory on the far side of the Moon. Such a base would not only establish a long term human presence on the Moon, but would also allow more accurate astronomical data to be obtained. A lunar observatory is more desirable than an Earth based observatory for the following reasons: instrument weight is reduced due to the Moon's weaker gravity; near vacuum conditions exist on the Moon; the Moon has slow rotation to reveal the entire sky; and the lunar surface is stable for long baseline instruments. All the conditions listed above are favorable for astronomical data recording. The technical aspects investigated in the completion of this project included site selection, mission scenario, scientific instruments, communication and power systems, habitation and transportation, cargo spacecraft design, thermal systems, robotic systems, and trajectory analysis. The site selection group focused its efforts on finding a suitable location for the observatory. Hertzsprung, a large equatorial crater on the eastern limb, was chosen as the base site.

Bishop, David W.↗