Search NASASearch

SEARCH · Search NASA

Results for “software reliability model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

OLTARIS: On-Line Tool for the Assessment of Radiation in Space

The effects of ionizing radiation on humans in space is a major technical challenge for exploration to the moon and beyond. The radiation shielding team at NASA Langley Research Center has been working for over 30 years to develop techniques that can efficiently assist the engineer throughout the entire design process. OLTARIS: On-Line Tool for the Assessment of Radiation in Space is a new NASA website (http://oltaris.larc.nasa.gov) that allows engineers and physicists to access a variety of tools and models to study the effects of ionizing space radiation on humans and shielding materials. The site is intended to be an analysis and design tool for those working radiation issues for current and future manned missions, as well as a research tool for developing advanced material and shielding concepts. The site, along with the analysis tools and models within, have been developed using strict software practices to ensure reliable and reproducible results in a production environment. They have also been developed as a modular system so that models and algorithms can be easily added or updated.

Sandridge, Chris A.

Availability Estimation for Facilities in Extreme Geographical Locations

A value added analysis for the Reliability. Availability and Maintainability of McMurdo Ground Station was developed, which will be a useful tool for system managers in sparing, maintenance planning and determining vital performance metrics needed for readiness assessment of the upgrades to the McMurdo System. Output of this study can also be used as inputs and recommendations for the application of Reliability Centered Maintenance (RCM) for the system. ReliaSoft's BlockSim. a commercial Reliability Analysis software package, has been used to model the availability of the system upgrade to the National Aeronautics and Space Administration (NASA) Near Earth Network (NEN) Ground Station at McMurdo Station in the Antarctica. The logistics challenges due to the closure of access to McMurdo Station during the Antarctic winter was modeled using a weighted composite of four Weibull distributions. one of the possible choices for statistical distributions throughout the software program and usually used to account for failure rates of components supplied by different manufacturers. The inaccessibility of the antenna site on a hill outside McMurdo Station throughout one year due to severe weather was modeled with a Weibull distribution for the repair crew availability. The Weibull distribution is based on an analysis of the available weather data for the antenna site for 2007 in combination with the rules for travel restrictions due to severe weather imposed by the administrating agency, the National Science Foundation (NSF). The simulations resulted in an upper bound for the system availability and allowed for identification of components that would improve availability based on a higher on-site spare count than initially planned.

Fischer, Gerd M.

Software Innovation in a Mission Critical Environment

Operating in mission-critical environments requires trusted solutions, and the preference for "tried and true" approaches presents a potential barrier to infusing innovation into mission-critical systems. This presentation explores opportunities to overcome this barrier in the software domain. It outlines specific areas of innovation in software development achieved by the Johnson Space Center (JSC) Engineering Directorate in support of NASA's major human spaceflight programs, including International Space Station, Multi-Purpose Crew Vehicle (Orion), and Commercial Crew Programs. Software engineering teams at JSC work with hardware developers, mission planners, and system operators to integrate flight vehicles, habitats, robotics, and other spacecraft elements for genuinely mission critical applications. The innovations described, including the use of NASA Core Flight Software and its associated software tool chain, can lead to software that is more affordable, more reliable, better modelled, more flexible, more easily maintained, better tested, and enabling of automation.

Fredrickson, Steven

Design and Development of a Flight Route Modification, Logging, and Communication Network

There is an overwhelming desire to create and enhance communication mechanisms between entities that operate within the National Airspace System. Furthermore, airlines are always extremely interested in increasing the efficiency of their flights. An innovative system prototype was developed and tested that improves collaborative decision making without modifying existing infrastructure or operational procedures within the current Air Traffic Management System. This system enables collaboration between flight crew and airline dispatchers to share and assess optimized flight routes through an Internet connection. Using a sophisticated medium-fidelity flight simulation environment, a rapid-prototyping development, and a unified modeling language, the software was designed to ensure reliability and scalability for future growth and applications. Ensuring safety and security were primary design goals, therefore the software does not interact or interfere with major flight control or safety systems. The system prototype demonstrated an unprecedented use of in-flight Internet to facilitate effective communication with Airline Operations Centers, which may contribute to increased flight efficiency for airlines.

Merlino, Daniel K.

Development of a methodology for assessing the safety of embedded software systems

A Dynamic Flowgraph Methodology (DFM) based on an integrated approach to modeling and analyzing the behavior of software-driven embedded systems for assessing and verifying reliability and safety is discussed. DFM is based on an extension of the Logic Flowgraph Methodology to incorporate state transition models. System models which express the logic of the system in terms of causal relationships between physical variables and temporal characteristics of software modules are analyzed to determine how a certain state can be reached. This is done by developing timed fault trees which take the form of logical combinations of static trees relating the system parameters at different point in time. The resulting information concerning the hardware and software states can be used to eliminate unsafe execution paths and identify testing criteria for safety critical software functions.

Garrett, C. J.

A Predictive Safety Management System Software Package Based on the Continuous Hazard Tracking and Failure Prediction Methodology

The goal of this research was to integrate a previously validated and reliable safety model, called Continuous Hazard Tracking and Failure Prediction Methodology (CHTFPM), into a software application. This led to the development of a safety management information system (PSMIS). This means that the theory or principles of the CHTFPM were incorporated in a software package; hence, the PSMIS is referred to as CHTFPM management information system (CHTFPM MIS). The purpose of the PSMIS is to reduce the time and manpower required to perform predictive studies as well as to facilitate the handling of enormous quantities of information in this type of studies. The CHTFPM theory encompasses the philosophy of looking at the concept of safety engineering from a new perspective: from a proactive, than a reactive, viewpoint. That is, corrective measures are taken before a problem instead of after it happened. That is why the CHTFPM is a predictive safety because it foresees or anticipates accidents, system failures and unacceptable risks; therefore, corrective action can be taken in order to prevent all these unwanted issues. Consequently, safety and reliability of systems or processes can be further improved by taking proactive and timely corrective actions.

Quintana, Rolando

Tutorial: Advanced fault tree applications using HARP

Reliability analysis of fault tolerant computer systems for critical applications is complicated by several factors. These modeling difficulties are discussed and dynamic fault tree modeling techniques for handling them are described and demonstrated. Several advanced fault tolerant computer systems are described, and fault tree models for their analysis are presented. HARP (Hybrid Automated Reliability Predictor) is a software package developed at Duke University and NASA Langley Research Center that is capable of solving the fault tree models presented.

Dugan, Joanne Bechta

Multi-version software reliability through fault-avoidance and fault-tolerance

A number of experimental and theoretical issues associated with the practical use of multi-version software to provide run-time tolerance to software faults were investigated. A specialized tool was developed and evaluated for measuring testing coverage for a variety of metrics. The tool was used to collect information on the relationships between software faults and coverage provided by the testing process as measured by different metrics (including data flow metrics). Considerable correlation was found between coverage provided by some higher metrics and the elimination of faults in the code. Back-to-back testing was continued as an efficient mechanism for removal of un-correlated faults, and common-cause faults of variable span. Software reliability estimation methods was also continued based on non-random sampling, and the relationship between software reliability and code coverage provided through testing. New fault tolerance models were formulated. Simulation studies of the Acceptance Voting and Multi-stage Voting algorithms were finished and it was found that these two schemes for software fault tolerance are superior in many respects to some commonly used schemes. Particularly encouraging are the safety properties of the Acceptance testing scheme.

Vouk, Mladen A.

Multidisciplinary Modeling Software for Analysis, Design, and Optimization of HRRLS Vehicles

The concept for Highly Reliable Reusable Launch Systems (HRRLS) under the NASA Hypersonics project is a two-stage-to-orbit, horizontal-take-off / horizontal-landing, (HTHL) architecture with an air-breathing first stage. The first stage vehicle is a slender body with an air-breathing propulsion system that is highly integrated with the airframe. The light weight slender body will deflect significantly during flight. This global deflection affects the flow over the vehicle and into the engine and thus the loads and moments on the vehicle. High-fidelity multi-disciplinary analyses that accounts for these fluid-structures-thermal interactions are required to accurately predict the vehicle loads and resultant response. These predictions of vehicle response to multi physics loads, calculated with fluid-structural-thermal interaction, are required in order to optimize the vehicle design over its full operating range. This contract with ResearchSouth addresses one of the primary objectives of the Vehicle Technology Integration (VTI) discipline: the development of high-fidelity multi-disciplinary analysis and optimization methods and tools for HRRLS vehicles. The primary goal of this effort is the development of an integrated software system that can be used for full-vehicle optimization. This goal was accomplished by: 1) integrating the master code, FEMAP, into the multidiscipline software network to direct the coupling to assure accurate fluid-structure-thermal interaction solutions; 2) loosely-coupling the Euler flow solver FEFLO to the available and proven aeroelasticity and large deformation (FEAP) code; 3) providing a coupled Euler-boundary layer capability for rapid viscous flow simulation; 4) developing and implementing improved Euler/RANS algorithms into the FEFLO CFD code to provide accurate shock capturing, skin friction, and heat-transfer predictions for HRRLS vehicles in hypersonic flow, 5) performing a Reynolds-averaged Navier-Stokes computation on an HRRLS configuration; 6) integrating the RANS solver with the FEAP code for coupled fluid-structure-thermal capability; and 7) integrating the existing NASA SRGULL propulsion flow path prediction software with the FEFLO software for quasi-3D propulsion flow path predictions, 8) improving and integrating into the network, an existing adjoint-based design optimization code.

Spradley, Lawrence W.

The cleanroom case study in the Software Engineering Laboratory: Project description and early analysis

This case study analyzes the application of the cleanroom software development methodology to the development of production software at the NASA/Goddard Space Flight Center. The cleanroom methodology emphasizes human discipline in program verification to produce reliable software products that are right the first time. Preliminary analysis of the cleanroom case study shows that the method can be applied successfully in the FDD environment and may increase staff productivity and product quality. Compared to typical Software Engineering Laboratory (SEL) activities, there is evidence of lower failure rates, a more complete and consistent set of inline code documentation, a different distribution of phase effort activity, and a different growth profile in terms of lines of code developed. The major goals of the study were to: (1) assess the process used in the SEL cleanroom model with respect to team structure, team activities, and effort distribution; (2) analyze the products of the SEL cleanroom model and determine the impact on measures of interest, including reliability, productivity, overall life-cycle cost, and software quality; and (3) analyze the residual products in the application of the SEL cleanroom model, such as fault distribution, error characteristics, system growth, and computer usage.

Green, Scott

Formulation of consumables management models. Development approach for the mission planning processor working model

The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

Connelly, L. C.

Real-time software failure characterization

A series of studies aimed at characterizing the fundamentals of the software failure process has been undertaken as part of a NASA project on the modeling of a real-time aerospace vehicle software reliability. An overview of these studies is provided, and the current study, an investigation of the reliability of aerospace vehicle guidance and control software, is examined. The study approach provides for the collection of life-cycle process data, and for the retention and evaluation of interim software life-cycle products.

Dunham, Janet R.

Sensor Data Distribution With Robustness and Reliability: Toward Distributed Components Model

In planetary surface exploration mission, sensor data distribution is required in many aspects, for example, in navigation, scheduling, planning, monitoring, diagnostics, and automation of the field tasks. The challenge is to distribute such data in the robust and reliable way so that we can minimize the errors caused by miscalculations, and misjudgments that based on the error data input in the mission. The ad-hoc wireless network on planetary surface is not constantly connected because of the nature of the rough terrain and lack of permanent establishments on the surface. There are some disconnected moments that the computation nodes will re-associate with different repeaters or access points until connections are reestablished. Such a nature requires our sensor data distribution software robust and reliable with ability to tolerant disconnected moments. This paper presents a distributed components model as a framework to accomplish such tasks. The software is written in Java and utilized the available Java Message Services schema and the Boss implementation. The results of field experimentations show that the model is very effective in completing the tasks.

Alena, Richard L.

Software Development Cost: How Much? You Sure? Technical Summary

This slide presentation reports on findings from analyzing a NASA COCOMO 81 dataset with 93 records. The current tool is called COSEEKMO, using a methodology can be applied to any set of cost models and data. The effort was part of a research initiative funded by the NASA Office of Safety and Mission and Assurance (OSMA) aimed at improving software reliability.

software effort estimation

Predicting Software Suitability Using a Bayesian Belief Network

The ability to reliably predict the end quality of software under development presents a significant advantage for a development team. It provides an opportunity to address high risk components earlier in the development life cycle, when their impact is minimized. This research proposes a model that captures the evolution of the quality of a software product, and provides reliable forecasts of the end quality of the software being developed in terms of product suitability. Development team skill, software process maturity, and software problem complexity are hypothesized as driving factors of software product quality. The cause-effect relationships between these factors and the elements of software suitability are modeled using Bayesian Belief Networks, a machine learning method. This research presents a Bayesian Network for software quality, and the techniques used to quantify the factors that influence and represent software quality. The developed model is found to be effective in predicting the end product quality of small-scale software development efforts.

Beaver, Justin M.

Engineering Risk Assessment of Space Thruster Challenge Problem

The Engineering Risk Assessment (ERA) team at NASA Ames Research Center utilizes dynamic models with linked physics-of-failure analyses to produce quantitative risk assessments of space exploration missions. This paper applies the ERA approach to the baseline and extended versions of the PSAM Space Thruster Challenge Problem, which investigates mission risk for a deep space ion propulsion system with time-varying thruster requirements and operations schedules. The dynamic mission is modeled using a combination of discrete and continuous-time reliability elements within the commercially available GoldSim software. Loss-of-mission (LOM) probability results are generated via Monte Carlo sampling performed by the integrated model. Model convergence studies are presented to illustrate the sensitivity of integrated LOM results to the number of Monte Carlo trials. A deterministic risk model was also built for the three baseline and extended missions using the Ames Reliability Tool (ART), and results are compared to the simulation results to evaluate the relative importance of mission dynamics. The ART model did a reasonable job of matching the simulation models for the baseline case, while a hybrid approach using offline dynamic models was required for the extended missions. This study highlighted that state-of-the-art techniques can adequately adapt to a range of dynamic problems.

Assessment

Verification Testing: Meet User Needs Figure of Merit

Verification is the process through which Modeling and Simulation(M&S) software goes to ensure that it has been rigorously tested and debugged for its intended use. Validation confirms that said software accurately models and represents the real world system. Credibility gives an assessment of the development and testing effort that the software has gone through as well as how accurate and reliable test results are. Together, these three components form Verification, Validation, and Credibility(VV&C), the process by which all NASA modeling software is to be tested to ensure that it is ready for implementation. NASA created this process following the CAIB (Columbia Accident Investigation Board) report seeking to understand the reasons the Columbia space shuttle failed during reentry. The reports conclusion was that the accident was fully avoidable, however, among other issues, the necessary data to make an informed decision was not there and the result was complete loss of the shuttle and crew. In an effort to mitigate this problem, NASA put out their Standard for Models and Simulations, currently in version NASA-STD-7009A, in which they detailed their recommendations, requirements and rationale for the different components of VV&C. They did this with the intention that it would allow for people receiving MS software to clearly understand and have data from the past development effort. This in turn would allow the people who had not worked with the MS software before to move forward with greater confidence and efficiency in their work. This particular project looks to perform Verification on several MATLAB (Registered Trademark)(The MathWorks, Inc.) scripts that will be later implemented in a website interface. It seeks to take note and define the limits of operation, the units and significance, and the expected datatype and format of the inputs and outputs of each of the scripts. This is intended to prevent the code from attempting to make incorrect or impossible calculations. Additionally, this project will look at the coding generally and note inconsistencies, redundancies, and other aspects that may become problematic or slow down the codes run time. Certain scripts lacking in documentation also will be commented and cataloged.

validation