Deployment hinge using wraparound strips

Aerospatiale developed a new appendage deployment concept called AMEDE (French acronym for improvement of deployment mechanisms) with a view toward increased simplicity and functional reliability. This new concept, applicable to the deployment of any type of spaceborne appendage (in particular to solar arrays), enables deployment without synchronization or speed regulation devices. On the other hand, it requires the use of hinges with low driving or resistive torques. The AMEDE concept is compared with the conventional deployment concept. The conceptual and functional principles for the ADELE hinge are presented, as well as the hinges' main characteristics. The development status of both the AMEDE concept and the ADELE (French acronym for deployment hinge using wraparound strips) hinge are addressed.

Blanc, Eric↗

The solar power satellite concept evaluation program

The paper describes in detail one of the preliminary baseline concepts for the solar power satellite (SPS). A large space freighter with payload capacity of 424 metric tons will deliver the material to a construction base in low earth orbit where the eight modules of the satellite are constructed. Electric thrusters will propel the modules to a smaller geosynchronous base, where the modules are docked and the solar arrays are deployed to form a satellite capable of providing 5 GW power from each of two end-mounted antennas to the two ground rectennas. The solar array is 5.3 km by 21.3 km to provide a total platform area of 113 sq km. The solar array employs silicon solar cells with a concentration ratio of unity. Details on transportation, construction bases, rectenna, and solar array design are given along with material requirements and cost estimates.

Piland, R. O.↗

In-Space Loads Analysis of SLS/Orion

The Space Launch System and Orion spacecraft experience unique load cases during upper stage flight since the Orion must deploy its solar arrays before the upper stage engine fires. The low frequency bending modes of the deployed arrays have the potential to interact with the slosh modes of the upper stage, and with the upper stage flight steady-state accelerations this can induce high loads in the array mechanisms. A time-domain transient response solution is used to evaluate the array mechanism loads, sensitivities are noted, and the final loads are determined to be within the capability of the mechanism. Section loads and accelerations are also recovered and assessed.

SLS↗

In-Space Loads Analysis of SLS/Orion

The Space Launch System and Orion spacecraft experience unique load cases during upper stage flight since the Orion must deploy its solar arrays before the upper stage engine fires. The low frequency bending modes of the deployed arrays have the potential to interact with the slosh modes of the upper stage. In combination with the upper stage flight steady-state accelerations this can induce high loads in the array mechanisms. A time-domain transient response solution is used to evaluate the array mechanism loads, sensitivities are noted, and the final loads are determined to be within the capability of the mechanism. Section loads and accelerations are also recovered and assessed.

SLS↗

High-performance deployable structures for the support of high-concentration ratio solar array modules

A study conducted on high-performance deployable structures for the support of high-concentration ratio solar array modules is discussed. Serious consideration is being given to the use of high-concentration ratio solar array modules or applications such as space stations. These concentrator solar array designs offer the potential of reduced cost, reduced electrical complexity, higher power per unit area, and improved survivability. Arrays of concentrators, such as the miniaturized Cassegrainian concentrator modules, present a serious challenge to the structural design because their mass per unit area (5.7 kg/square meters) is higher than that of flexible solar array blankets, and the requirement for accurate orientation towards the Sun (plus or minus 0.5 degree) requires structures with improved accuracy potentials. In addition, use on a space station requires relatively high structural natural frequencies to avoid deleterious interactions with control systems and other large structural components. The objective here is to identify and evaluate conceptual designs of structures suitable for deploying and accurately supporting high-concentration ratio solar array modules.

Mobrem, M.↗

Efficient structures for geosynchronous spacecraft solar arrays. Phase 1, 2 and 3

Structural concepts for deploying and supporting lightweight solar-array blankets for geosynchronous electrical power are evaluated. It is recommended that the STACBEAM solar-array system should be the object of further study and detailed evaluation. The STACBEAM system provides high stiffness at low mass, and with the use of a low mass deployment mechanism, full structural properties can be maintained throughout deployment. The stowed volume of the STACBEAM is acceptably small, and its linear deployment characteristic allows periodic attachments to the solar-array blanket to be established in the stowed configuration and maintained during deployment.

Adams, L. R.↗

Investigation of the NOAA N' S Search and Rescue Antenna Inadvertent Deployment: Type C Mishap

The NOAA N' Search and Rescue Antenna (SRA) inadvertently deployed during a spacecraft rotation on April 14,2007. This rotation was part of a normal operation to configure the spacecraft for additional antenna and the solar array boom deployments. This procedure (red flag written) had been modified to look for a lost metal washer and a thermal blanket button. The modification to the procedure was reviewed and approved by the Lockheed Martin Missiles and Space (LMMS) Material Review Board (MRB) per standard procedures. The flag to the procedure introduced a counter clockwise rotation before the normal clockwise rotation. The antenna was temporally stowed and held in place via lacing cord. The lacing cord broke and allowed the SRA to inadvertently deploy during the clockwise rotation. The SRA broke through a hard stop bracket and damaged an instrument optical sensor radiator panel. The satellite damage appears to be minimal and there were no injuries to personnel. The damage to the Advanced Microwave Sounding Unit (AMSU)-A1 instrument has not been fully assessed. Based on mishap site visits, interviews and data analysis, the Mishap Investigation Team (MIT) identified the underlying causes of the mishap. Event and causal factor tree diagrams were developed, resulting in the identification of the proximate (or direct) cause and root causes of the mishap.

Sabelhaus, Phil↗

Beamed Energy and Communications Optical Node (BEACON) Demonstrator

Due to long shadow periods (2 weeks or greater) on the south pole, concepts to raise solar arrays to a sufficient height at specific locations have shown the capability to provide power to surface users for much longer periods. Such a tower can also provide a 3rd Generation Partnership Project (3GPP) service for users up to 10 km away, dependent on terrain. An option to deliver power, albeit with low efficiency, using a laser beam coupled with the tower height could provide mobile and fixed users power during darkness, reducing their battery requirements. A demonstration of these technologies in the lunar environment is crucial to support future Artemis campaigns as well as potential emerging lunar infrastructures. A demonstrator design of a 15 m deployed boomon the south pole has been shown to enable both the gathering of kilowatts of power and the provision of 3GPP relay and backhaul given an appropriate lunar location. Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanently shadowed regions (PSR) where solar power is not available. In this work, the Compass team performed a conceptual engineering design study of a near-term laser surface-to-surface power beaming and relay station using a tower to simultaneously carry the power source (Vertical Solar Array Technologies (VSAT)[1]), the 3GPP relay antenna, and the laser telescope.

Lunar Relay↗

Beamed Energy and Communications Optical Node (BEACON) Demonstrator

Due to long shadow periods (2 weeks or greater) on the south pole, concepts to raise solar arrays to a sufficient height at specific locations have shown the capability to provide power to surface users for much longer periods. Such a tower can also provide a 3rd Generation Partnership Project (3GPP) service for users up to 10 km away, dependent on terrain. An option to deliver power, albeit with low efficiency, using a laser beam coupled with the tower height could provide mobile and fixed users power during darkness, reducing their battery requirements. A demonstration of these technologies in the lunar environment is crucial to support future Artemis campaigns as well as potential emerging lunar infrastructures. A demonstrator design of a 15 m deployed boomon the south pole has been shown to enable both the gathering of kilowatts of power and the provision of 3GPP relay and backhaul given an appropriate lunar location. Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanently shadowed regions (PSR) where solar power is not available. In this work, the Compass team performed a conceptual engineering design study of a near-term laser surface-to-surface power beaming and relay station using a tower to simultaneously carry the power source (Vertical Solar Array Technologies (VSAT)[1]), the 3GPP relay antenna, and the laser telescope.

Deployable solar array tower laser beamed power 3G↗

Review of biased solar array - Plasma interaction studies

Possible high voltage surface interactions on the Solar Electric Propulsion System (SEPS) are examined, with particular regard for potential effects on SEPS performance. The SEPS is intended for use for geosynchronous and planetary missions, and derives power from deployed solar cell arrays which are susceptible to collecting ions and electrons from the charged and thermal particle environment of space. The charge exchange plasma which provides the thrust force can also enhance the natural charged particle environment and increase interactions between the thrust system and the biased solar array surface. Tests of small arrays have shown that snapover, where current collection becomes proportional to the panel area, can be avoided by larger cell sizes. Arcing is predicted to diminish with larger array sizes, while the problems of efflux environments are noted to be as yet undefined and require further study.

Stevens, N. J.↗

Deployment and retraction of a cable-driven solar array: Testing and simulation

The paper investigates three critical areas in cable-driven rigid-panel solar arrays: First, the variation of deployment and retraction cable tensions due to friction at the hinges; Second, the change in deployment dynamics associated with different deployment histories; Third, the relationship between the level of pre-tension in the closed contact loops and the synchronization of deployment. A small scale model array has been made and tested, and its behavior has been compared to numerical simulations.

Kumar, P.↗

LANDSAT-D flight segment operations manual, volume 2

Functions, performance capabilities, modes of operation, constraints, redundancy, commands, and telemetry are described for the thematic mapper; the global positioning system; the direct access S-band; the multispectral scanner; the payload correction; the thermal control subsystem; the solar array retention, deployment, and jettison assembly; and the boom antenna retention, deployment, and jettison assembly for LANDSAT 4.

Varhola, J.↗

Extended duration lunar lander

Selenium Technologies has been conducting preliminary design work on a manned lunar lander for use in NASA's First Lunar Outpost (FLO) program. The resulting lander is designed to carry a crew of four astronauts to a prepositioned habitat on the lunar surface, remain on the lunar surface for up to 45 days while the crew is living in the habitat, then return the crew to earth via direct reentry and land recovery. Should the need arise, the crew can manually guide the lander to a safe lunar landing site, and live in the lander for up to ten days on the surface. Also, an abort to earth is available during any segment of the mission. The main propulsion system consists of a cluster of four modified Pratt and Whitney RL10 rocket engines that use liquid methane (LCH4) and liquid oxygen (LOX). Four engines are used to provide redundancy and a satisfactory engine out capability. Differences between the new propulsion system and the original system include slightly smaller engine size and lower thrust per engine, although specific impulse remains the same despite the smaller size. Concerns over nozzle ground clearance and engine reliability, as well as more information from Pratt and Whitney, brought about this change. The power system consists of a combination of regenerative fuel cells and solar arrays. While the lander is in flight to or from the moon, or during the lunar night, fuel cells provide all electrical power. During the lunar day, solar arrays are deployed to provide electrical power for the lander as well as electrolyzers, which separate some water back into hydrogen and oxygen for later use by the fuel cells. Total storage requirements for oxygen, hydrogen, and water are 61 kg, 551 kg, and 360 kg, respectively. The lander is a stage-and-a-half design with descent propellant, cargo, and landing gear contained in the descent stage, and the main propulsion system, ascent propellant, and crew module contained in the ascent stage. The primary structure for both stages is a truss, to which all tanks and components are attached. The crew module is a conical shape similar to that of the Apollo Command Module, but significantly larger with a height and maximum diameter of six meters.

Babic, Nikola↗

INSAT-2A and 2B development mechanisms

The Indian National Satellite (INSAT) 2A and 2B have deployment mechanisms for deploying the solar array, two C/S band antenna reflectors and a coilable lattice boom with sail. The mechanisms have worked flawlessly on both satellites. The configuration details, precautions taken during the design phase, the test philosophy, and some of the critical analysis activities are discussed.

Sathyanarayan, M. N.↗

Hubble Space Telescope EVA Power Ratchet Tool redesign

The Power Ratchet Tool (PRT) is a self contained, power-driven, 3/8 inch drive ratchet wrench which will be used by astronauts during Extravehicular Activities (EVA). This battery-powered tool is controlled by a dedicated electonic controller. The PRT was flown during the Hubble Space Telescope (HST) Deployment Mission STS-31 to deploy the solar arrays if the automatic mechanisms failed. The PRT is currently intended for use during the first HST Servicing Mission STS-61 as a general purpose power tool. The PRT consists of three major components; the wrench, the controller, and the battery module. Fourteen discrete combinations of torque, turns, and speed may be programmed into the controller before the EVA. The crewmember selects the desired parameter profile by a switch mounted on the controller. The tool may also be used in the manual mode as a non-powered ratchet wrench. The power is provided by a silver-zinc battery module, which fits into the controller and is replaceable during an EVA. The original PRT did not meet the design specification of torque output and hours of operation. To increase efficiency and reliability the PRT underwent a redesign effort. The majority of this effort focused on the wrench. The original PRT drive train consisted of a low torque, high speed brushless DC motor, a face gear set, and a planocentric gear assembly. The total gear reduction was 300:1. The new PRT wrench consists of a low speed, high torque brushless DC motor, two planetary gear sets and a bevel gear set. The total gear reduction is now 75:1. A spline clutch has also been added to disengage the drive train in the manual mode. The design changes to the controller will consist of only those modifications necessary to accomodate the redesigned wrench. The battery design will be unaffected.

Richards, Paul W.↗

30th Aerospace Mechanisms Symposium

The proceedings of the 30th Aerospace Mechanisms Symposium are reported. NASA Langley Research Center hosted the proceedings held at the Radisson Hotel in Hampton, Virginia on May 15-17, 1996, and Lockheed Martin Missiles and Space Company, Inc. co-sponsored the symposium. Technological areas covered include bearings and tribology; pointing, solar array, and deployment mechanisms; orbiter/space station; and other mechanisms for spacecraft.

Bradley, Obie H., Jr.↗

Earth Observing System (EOS) Terra Spacecraft 120 Volt Power Subsystem: Requirements, Development and Implementation

Built by the Lockheed-Martin Corporation, the Earth Observing System (EOS) TERRA spacecraft represents the first orbiting application of a 120 Vdc high voltage spacecraft electrical power system implemented by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC). The EOS TERRA spacecraft's launch provided a major contribution to the NASA Mission to Planet Earth program while incorporating many state of the art electrical power system technologies to achieve its mission goals. The EOS TERRA spacecraft was designed around five state-of-the-art scientific instrument packages designed to monitor key parameters associated with the earth's climate. The development focus of the TERRA electrical power system (EPS) resulted from a need for high power distribution to the EOS TERRA spacecraft subsystems and instruments and minimizing mass and parasitic losses. Also important as a design goal of the EPS was maintaining tight regulation on voltage and achieving low conducted bus noise characteristics. This paper outlines the major requirements for the EPS as well as the resulting hardware implementation approach adopted to meet the demands of the EOS TERRA low earth orbit mission. The selected orbit, based on scientific needs, to achieve the EOS TERRA mission goals is a sun-synchronous circular 98.2degree inclination Low Earth Orbit (LEO) with a near circular average altitude of 705 kilometers. The nominal spacecraft orbit is approximately 99 minutes with an average eclipse period of about 34 minutes. The scientific goal of the selected orbit is to maintain a repeated 10:30 a.m. +/- 15 minute descending equatorial crossing which provides a fairly clear view of the earth's surface and relatively low cloud interference for the instrument observation measurements. The major EOS TERRA EPS design requirements are single fault tolerant, average orbit power delivery of 2, 530 watts with a defined minimum lifetime of five years (EOL). To meet these mission requirements, while minimizing mass and parasitic power losses, the EOS TERRA project relies on 36, 096 high efficiency Gallium Arsenide (GaAs) on Germanium solar cells adhered to a deployable flexible solar array designed to provide over 5,000 watts of power at EOL. To meet the eclipse power demands of the spacecraft, EOS TERRA selected an application of two 54-cell series connected Individual Pressure Vessel (IPV) Nickel-Hydrogen (NiH2) 50 Ampere-Hour batteries. All of the spacecraft observatory electrical power is controlled via the TERRA Power Distribution Unit (PDU) which is designed to provide main bus regulation of 120 Vdc +/- -4% at all load interfaces through the implementation of majority voter control of both the spacecraft's solar array sequential shunt unit (SSU) and the two battery bi-directional charge and discharge regulators. This paper will review the major electrical power system requirement drivers for the EOS TERRA mission as well as some of the challenges encountered during the development, testing, and implementation of the power system. In addition, spacecraft test and early on orbit performance results will also be covered.

Keys, Denney J.↗