Search NASA⌕ Search

SEARCH · Search NASA

Results for “solar system infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Combining Solar Electric and Chemical Propulsion for Crewed Missions to Mars

This paper documents the results of an investigation of human Mars mission architectures that leverage near-term technology investments and infrastructures resulting from the planned Asteroid Redirect Mission, including high-power Solar Electric Propulsion (SEP) and a human presence in Lunar Distant Retrograde Orbit (LDRO). The architectures investigated use a combination of SEP and chemical propulsion elements. Through this combination of propulsion technologies, these architectures take advantage of the high efficiency SEP propulsion system to deliver cargo, while maintaining the faster trip times afforded by chemical propulsion for crew transport. Evolved configurations of the Asteroid Redirect Vehicle (ARV) are considered for cargo delivery. Sensitivities to SEP system design parameters, including power level and propellant quantity, are presented. For the crew delivery, liquid oxygen and methane stages were designed using engines common to future human Mars landers. Impacts of various Earth departure orbits, Mars loiter orbits, and Earth return strategies are presented. The use of the Space Launch System for delivery of the various architecture elements was also investigated and launch vehicle manifesting, launch scheduling and mission timelines are also discussed. The study results show that viable Mars architecture can be constructed using LDRO and SEP in order to take advantage of investments made in the ARM mission.

Percy, Tom↗

The Wizard Staff: A Mobile Tool Supporting Human Exploration on The Lunar Surface

The Wizard Staff is a rechargeable, battery powered mobile tool with multiple uses for lunar surface exploration. It supports human activity as a surface survey tool, provides external illumination to enhance safety, delivers networking, communications, and navigation features to remote sites, and assists crew rescue with an emergency beacon and rigid splint structure. As a survey tool, it assists crewed geologic field site exploration with external lights, cameras, and LiDAR to illuminate, map, and record the sample collection process. As a relay station, it provides a surface intranet communications and navigation node for extended exploration far from the lander or habitation module. A separately developed Search-and-Rescue (SAR) handheld device can broadcast a signal to the Gandalf Staff containing crew position and biometric data. The staff then formats the message and sends it orbiting satellite(s) for emergency response via the LunaNET on a dedicated frequency similar to terrestrial applications using an Emergency Position-Indicating Radiobeacon (EPIRB). The staff is designed with an upper and lower segment. Components in the upper segment are the LiDAR, external lighting arrays, cameras, communications equipment, intelligence devices, and user interface for crew operations. The lower segment is a set of FeLiPO4 battery cells packed into the 2” diameter carbon fiber tube. When the battery pack is discharged, a spring connector (designed for the dusty lunar environment) easily disconnects the two segments for replacement with another fully charged battery pack. The lower segment can be used for Incapacitated Crew Rescue (ICR) as a rigid splint. As a stand-alone science platform, the Wizard Staff provides infrastructure for instruments and sensors to record the lunar environment over long periods of time. After a crew installs the components on the lunar surface, the platform delivers data to the lunar lander or base station for analysis. The stand-alone mode requires an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could also be used as an electrical recharging station. A working prototype of Wizard Staff has been developed with collaboration between NASA (JSC, MSFC, and GSFC), Texas Space Technology Applications and Research (T STAR), and Texas A&M University (TAMU) using $300k of innovation funding in FY’21 and FY’22. The functional staff weights 36# on Earth (6# on the Moon), stands 2.1m tall and delivers external lighting with an array of 40 LED bulbs generating 1460 Lux at 2m range (near field), or 2 Lux at 50m (far field).

Gandalf Staff↗

Establishing the infrastructure - An integrated Space Transportation System

A discussion is presented concerning the various transfer vehicle/propulsion systems that are currently under consideration within the egis of the NASA Space Exploration Initiative for the establishment of an infrastructure for lunar base construction and Mars exploration. Cryogenically fueled and nuclear propulsion alternatives are considered, as well as such advanced concepts as that employing nuclear-electric propulsion and artificial gravity and a solar-electric propulsion zero-gravity concept. Mars lander and earth-to-LEO launcher concepts are also noted.

Huber, W. G.↗

Artemis: An Overview of NASA’s Activities to Return Humans to the Moon

NASA is well underway in its plans to return humans to the Moon and build long-term infrastructure both in orbit and on the surface. Following the Artemis I and Artemis II flight tests, NASA will begin crewed landings and regular missions to the Moon. Artemis will return value to the American public and the global community, enable groundbreaking scientific discovery, and prepare NASA and its partners for exploration of the solar system. Work on the initial Human Landing System (HLS), procurement activities for future HLS, and work on the initial modules of the lunar-orbiting Gateway are underway. International partnerships are playing a critical role in the planning, development, and execution of these missions. As of December 2021, three international partners have entered agreements to contribute to the Gateway and 14 nations have signed the Artemis accords. A new spacesuit acquisition strategy will stimulate economic growth and meet the growing needs of NASA and emerging customers. Requirements development is underway for an unpressurized lunar surface rover and plans for a pressurized rover, foundation surface habitat, and the Artemis Base Camp are in work. This paper will provide an update on the HLS demonstration missions and the procurement status for HLS services; a comprehensive look at the Gateway’s components and related statuses; a summary of planned surface systems; and an outline of the strategies NASA will use to successfully implement these plans, preparing for humanity's next giant leap: Mars.

Artemis↗

Combining Solar Electric Propulsion and Chemical Propulsion for Crewed Missions to Mars

This paper documents the results of an investigation of human Mars mission architectures that leverage near-term technology investments and infrastructures resulting from the planned Asteroid Redirect Robotic Mission (ARRM), including high-power Solar Electric Propulsion (SEP) and a human presence in Lunar Distant Retrograde Orbit (LDRO). The architectures investigated use a combination of SEP and chemical propulsion elements. Through this combination of propulsion technologies, these architectures take advantage of the high efficiency SEP propulsion system to deliver cargo, while maintaining the faster trip times afforded by chemical propulsion for crew transport. Evolved configurations of the Asteroid Redirect Vehicle (ARV) are considered for cargo delivery. Sensitivities to SEP system design parameters, including power level and propellant quantity, are presented. For the crew delivery, liquid oxygen and methane stages were designed using engines common to future human Mars landers. Impacts of various Earth departure orbits, Mars loiter orbits, and Earth return strategies are presented. The use of the Space Launch System for delivery of the various architecture elements was also investigated and launch vehicle manifesting, launch scheduling and mission timelines are also discussed. The study results show that viable Mars architecture can be constructed using LDRO and SEP in order to take advantage of investments made in the ARRM mission.

Percy, Tom↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

In-space Assembly↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

Lunar Infrastructure↗

Space Solar Power Exploratory Research and Technology (SERT) Technical Interchange Meeting 2 (SERT TIM 2)

The University of Alabama in Huntsville's (UAH) Propulsion Research Center hosted the Space Solar Power Exploratory Research & Technology (SERT) Technical Interchange Meeting TIM) 2 in Huntsville, Alabama December 7-10. 1999 with 126 people in attendance. The SERT program includes both competitively procured activities. which are being implemented through a portfolio of focused R&D investments--with the maximum leveraging of existing resources inside and outside NASA. and guided by these system studies. Axel Roth. Director of the Flight Projects Directorate NASA MSFC, welcomed the SERT TIM 2 participants and challenged them to develop the necessary technologies and demonstrations that will lead to Space Solar Power (SSP) International implementation. Joe Howell, NASA MSFC, reiterated the SERT TIM 2 objectives: 1) Refining and modeling systems approaches for the utilization of SSP concepts and technologies, ranging, from the near-term e.g. for space science, exploration and commercial space applications to the far-term (e. g. SSP for terrestrial markets), including systems concepts, technology, infrastructure (i.g., transportation), and economics. 2) Conducting technology research, development and demonstration activities to produce "proof- of-concept" validation of critical SSP elements for both the nearer and farther-term applications. 3) Initiating partnerships Nationality and Internationally that could be expanded, as appropriate, to pursue later SSP technology and applications (e.g., space science. colonization, etc.). Day one began with the NASA Centers presenting their SERT activities summary since SERT TIM 1 and wound up with a presentation by Masahiro Mori, NASDA titled "NASDA In-house Study for SSP". Demonstration for the Near-Term. Day two began with the SERT Systems Studies and Analysis reports resulting from NRA 8-23 followed by presentations of SERT Technology Demonstrations reports resulting from NRA 8-23. Day two closed with John Mankins presentation on "Technology Roadmapping" and the delivery of the charge to the Work Breakout Sessions. Day three began with the eleven Work Breakout Session which was the major function of this TIM 2 and day three ended with reports by the Chairs of the eleven Work Breakdown Sessions. Day four began with the six Integrated Product Team OPT) meetings and ended with closing plenary panel sessions.

Howell, Joe↗

NASA’s Space Launch System: New Launch Capability for Artemis Lunar and Deep Space Science Missions

With stacking and integration of the initial Block 1 Space Launch System (SLS) expected to begin in 2020, NASA’s powerful new launch vehicle is ready to take center stage in the agency’s Artemis program to return astronauts to the Moon. Combining the highest launch thrust and largest payload capacity ever developed, SLS also enables a new generation of high-C3 science missions to destinations such as the gas and ice giants, the Kuiper Belt, and even beyond the solar system. Block 1 is only the beginning, as the vehicle has a planned evolution path to progressively more powerful variants. In addition to these block upgrades providing increased lift capability, the vehicle can be configured to fly in crew configuration with the Orion spacecraft or in cargo configuration with payload fairings for launching science mission or large infrastructure, providing a flexible launch option. For Artemis I, the first SLS flight, the Block 1 vehicle in the crew configuration will send an uncrewed Orion spacecraft to lunar orbit for a thorough systems checkout before the crewed Artemis II flight. The Block 1 vehicle uses a proven propulsion system consisting of solid rocket boosters and RS-25 engines to lift more than 27 metric tons [t] to trans-lunar injection (TLI). In its cargo configuration, Block 1 can be fitted with a 5 m payload fairing. The second variant, Block 1B, uses a more powerful upper stage to increase payload mass to TLI to 38-42 t, depending on crew or cargo configuration. In the crew configuration, a co-manifested payload of up to 10 t can ride along in the Universal Stage Adapter (USA), which has as much volume for payloads as a 5 m-class payload fairing. The Block 2 evolved variant will lift 43-46 t to TLI, depending on crew or cargo configuration. The Block 1B and Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing, available in 19.1 m and 27.4 m lengths, providing unprecedented volume for payloads. Larger-diameter 10 m fairings may also be an option in the future on the Block 2 vehicle. The unrivalled mass, volume and high-energy launches of SLS can provide significant mission flexibility for payloads and/or additional upper stages to open trade space for a new generation of exploration missions. SLS was designed to meet requirements for launching large-volume infrastructure as outlined in numerous studies of missions to cislunar space or Mars. Mission concept studies from the science community also point toward new possibilities enabled by SLS. Probes with more robust science packages can be sent to the gas giants. Dual spacecraft can be manifested for missions to Uranus and Neptune. Additional third or fourth payload stages can be encapsulated in the payload fairings to achieve missions to the Kuiper Belt or beyond. In addition, the large volume can be used to design and deploy wide-aperture mirrors on future space telescopes and to enable nuclear-thermal propulsion missions. At AIAA Ascend, the SLS Program will provide technical information on vehicle capabilities as well as descriptions of ongoing discussions with mission planners for utilizing the vehicle for an array of deep space missions.

Stephen Creech↗

A lunar venture

As the Earth's space station is in its final stages of design, the dream of a permanent manned space facility is now a reality. Despite this monumental achievement, however, man's quest to extend human habitation further out into space is far from being realized. The next logical step in space exploration must be the construction of a permanent lunar base. This lunar infrastucture can, in turn, be used as a staging ground for further exploration of the remote regions of the solar system. As outlined by the National Aeronautics and Space Administration, the lunar base program consists of three exploratory and implementation phases. In response to the technological and facility requirements of Phase 1 and 2 of this program, the Aerospace Vehicle Design Program of the University of Virgina (UVA) is proud to present a preliminary design for such a lunar infrastructure. This study is a comprehensive evaluation of the mission requirements as well as the design criteria for space vehicles and facilities. The UVA Lunar Venture is a dual system that consists of a lunar space station and a fleet of lunar landers/transporters. With such a design, it is demonstrated that all initial exploratory and construction requirements for the lunar base can be efficiently satisfied. Additionally, the need for such a dual system is justified both from a logistic and economic standpoint.

Lee, Joo Ahn↗

Robotic Asteroid Prospector (RAP)

This report presents the results from the nine-month, Phase 1 investigation for the Robotic Asteroid Prospector (RAP). This project investigated several aspects of developing an asteroid mining mission. It conceived a Space Infrastructure Framework that would create a demand for in space-produced resources. The resources identified as potentially feasible in the near-term were water and platinum group metals. The project's mission design stages spacecraft from an Earth Moon Lagrange (EML) point and returns them to an EML. The spacecraft's distinguishing design feature is its solar thermal propulsion system (STP) that can provide for three functions:propulsive thrust, process heat for mining and mineral processing, and electricity. The preferred propellant is water since this would allow the spacecraft to refuel at an asteroid for its return voyage to Cis-Lunar space thus reducing the mass that must be staged out of the EML point.The spacecraft will rendezvous with an asteroid at its pole, match rotation rate, and attach to begin mining operations. The team conducted an experiment in extracting and distilling water from frozen regolith simulant.

Cohen, Marc↗

Space Science in the Twenty-First Century: Imperatives for the Decades 1995 to 2015

A unified program is outlined for studying the Earth, from its deep interior to its fluid envelopes. A system is proposed for measuring devices involving both space-based and in-situ observations that can accommodate simultaneously a large range of scientific needs. The scientific objectices served by this integrated infrastructure are cased into a framework of four grand themes. In summary these are: to determine the composition, structure, dynamics, and evolution of the Earth's crust and deeper interior; to establish and understand the structure, dynamics, and chemistry of the oceans, atmosphere, and cryosphere, and their interaction with the solid Earth; to characterize the history and dynamics of living organisms and their interaction with the environment; and to monitor and understand the interaction of human activities with the natural environment. A focus on these grand themes will help to understand the origin and fate of the planet, and to place it in the context of the solar system.

Source record↗

Predicted Performance of an X-Ray Navigation System for Future Deep Space and Lunar Missions

In November 2017, the NASA Goddard Space Flight Center (GSFC) Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) experiment successfully demonstrated the feasibility of X-ray Pulsar Navigation (XNAV) as part of the Neutron Star Interior Composition Explorer (NICER) mission, which is an X-ray Astrophysics Mission of Opportunity currently operating onboard the International Space Station (ISS). XNAV provides a GPS-like absolute autonomous navigation and timing capability available anywhere in the Solar System and beyond. While the most significant benefits of XNAV are expected to come in support of very deep-space missions, the absolute autonomous navigation and timing capability also has utility for inner Solar System missions where increased autonomy or backup navigation and timing services are required, e.g., address loss of communication scenarios.The NASA commitment to develop a Gateway to support exploration of the Moon and eventually Mars, as well as current and future robotic missions such as James Webb Space Telescope (JWST), New Horizons, and much more, certainly will tax the existing ground based infrastructure in terms of availability. There- fore, an extended look at the feasibility and potential performance of XNAV for comparable missions is warranted. In this paper, we briefly review the XNAV concept and present case studies of its utility and performance for a Gateway orbit, Sun-Earth libration orbit, and a deep space transit trajectory.

Getchius, Joel↗

SEI rover solar-electrochemical power system options

A trade study of power system technology for proposed lunar vehicles and servicers is presented. A variety of solar-based power systems were selected and analyzed for each. The analysis determined the power system mass, volume, and deployed area. A comparison was made between periodic refueling/recharging systems and onboard power systems to determine the most practical system. The trade study concluded that the power system significantly impacts the physical characteristics of the vehicle. The refueling/recharging systems were lighter and more compact, but dependent on availability of established lunar base infrastructure. Onboard power systems pay a mass penalty for being fully developed systems.

Withrow, Colleen A.↗

SEI rover solar-electrochemical power system options

A trade study of power system technology for proposed lunar vehicles and services is presented. A variety of solar-based power systems were selected and analyzed for each. The analysis determined the power system mass, volume, and deployed area. A comparison was made between periodic refueling/recharging systems and onboard power systems to determine the most practical system. The trade study concluded that the power system significantly impacts the physical characteristics of the vehicle. The refueling/recharging systems were lighter and more compact, but dependent on availability of established lunar base infrastructure. Onboard power systems pay a mass penalty for being fully developed systems.

Withrow, Colleen A.↗

Space Transportation Infrastructure Supported By Propellant Depots

A space transportation infrastructure is described that utilizes propellant depots to support all foreseeable missions in the Earth-Moon vicinity and deep space out to Mars. The infrastructure utilizes current expendable launch vehicles such as the Delta IV Heavy, Atlas V, and Falcon 9, for all crew, cargo, and propellant launches to orbit. Propellant launches are made to a Low-Earth-Orbit (LEO) Depot and an Earth-Moon Lagrange Point 1 (L1) Depot to support new reusable in-space transportation vehicles. The LEO Depot supports missions to Geosynchronous Earth Orbit (GEO) for satellite servicing, and to L1 for L1 Depot missions. The L1 Depot supports Lunar, Earth-Sun L2 (ESL2), Asteroid, and Mars missions. A Mars Orbital Depot is also described to support ongoing Mars missions. New concepts for vehicle designs are presented that can be launched on current 5-meter diameter expendable launch vehicles. These new reusable vehicle concepts include a LEO Depot, L1 Depot, and Mars Orbital Depot based on International Space Station (ISS) heritage hardware. The high-energy depots at L1 and Mars orbit are compatible with, but do not require, electric propulsion tug use for propellant and/or cargo delivery. New reusable in-space crew transportation vehicles include a Crew Transfer Vehicle (CTV) for crew transportation between the LEO Depot and the L1 Depot, a new reusable Lunar Lander for crew transportation between the L1 Depot and the lunar surface, and a Deep Space Habitat (DSH) to support crew missions from the L1 Depot to ESL2, Asteroid, and Mars destinations. A 6 meter diameter Mars lander concept is presented that can be launched without a fairing based on the Delta IV heavy Payload Planners Guide, which indicates feasibility of a 6.5 meter fairing. This lander would evolve to re-usable operations when propellant production is established on Mars. Figure 1 provides a summary of the possible missions this infrastructure can support. Summary mission profiles are presented for each primary mission capability. These profiles are the basis for propellant loads, numbers of vehicles/stages and launches for each mission capability. Data includes the number of launches required for each mission utilizing current expendable launch vehicle systems, and concluding remarks include ideas for reducing the number of launches through incorporation of heavy-lift launch vehicles, solar electric propulsion, and other transportation support concepts.

Smitherman, David↗

In-Space Cryogenic Propellant Depot Potential Commercial and Exploration Applications

The key goals and objectives for an In-Space Cryogenic Propellant Depot are to support a safe, reliable, affordable and effective future human and robotic space exploration initiative. Previous studies have been conducted at the NASA Marshall Space Flight Center to determine technical requirements and feasibility for exploration and commercial potential of an in-space cryogenic propellant depot in low-Earth-orbit (LEO), low-Lunar orbit (LLO) and/or on the lunar surface. Results indicate that in-space cryogenic propellant depots are technically feasible given continued technology development and that there is a substantial growing market that depots could support. Systems studies showed that the most expensive part of transferring payloads to geo-synchronous-orbit (GEO) is the fuel. A cryogenic propellant production and storage depot stationed in LEO could lower the cost of missions to GEO and beyond. Propellant production separates water into hydrogen and oxygen through electrolysis. This process requires large amounts of power which is enabled by Space Solar Power technologies. Recent analysis indicate that in the coming decades there could be a significant demand for water-based propellants from Earth, moon, or asteroid resources if in-space transfer vehicles (upper stages) transitioned to reusable systems using water based propellants. This type of strategic planning move could create a substantial commercial market for space resources development, and ultimately lead toward significant commercial infrastructure development within the Earth-Moon system.

Howell, Joe T.↗

AQUIFER Nano-Electrofuel Energy Economy and Powered Aircraft Operations

The Aqueous, QUick-charging battery Integration For Electric flight Research project is explained and the major subsystems are described, including nano-electric fluid, rim-driven motors, and integration concepts. The nano-electric fluid concept is a new type of aqueous flow battery that could reduce or retire the fire and explosion hazards of conventional batteries and fuel cells. The nano-electric fluid itself could enable energy storage and increased available energy per fuel weight ratios. The rim-driven motor is being developed to improve propulsion system safety and stability and to reduce noise. The rim-driven motor concept could enable motors that are more efficient both electrically and aerodynamically. The Energy Economy of the project concept is presented as a potential renewable or green energy sustainment for utilizing in-place infrastructure. The nano-electric fluid energy charge-use-recharge cycle is presented using renewable energy input from solar, wind, and hydroelectricity. Powered aircraft operations are presented, and the logistics of the new nano-electric fluid technology are explored. Powered aircraft operations topics include weight and balance, fueling, recharging, safety, and derivative considerations.

Lechniak, Jason A.↗