Search NASA⌕ Search

SEARCH · Search NASA

Results for “static testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

BWR Spent Nuclear Fuel Interfacial Bonding Efficiency Study

The objective of this project is to perform a systematic study of spent nuclear fuel (SNF, also known as “used nuclear fuel” [UNF]) integrity under simulated transportation environments using the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) hot-cell testing technology developed at Oak Ridge National Laboratory (ORNL) in August 2013. Under Nuclear Regulatory Commission (NRC) sponsorship, ORNL completed four benchmark tests, four static tests, and twelve dynamic or cycle tests on H. B. Robinson (HBR) high burn-up (HBU) fuel. The clad of the HBR fuels was made of Zircaloy-4. Testing was continued in fiscal year (FY) 2014 using Department of Energy (DOE) funds. Additional CIRFT testing was conducted on three HBR rods; two specimens failed, and one specimen was tested to over 2.23 × 10 7 cycles without failing. The data analysis on all the HBR SNF rods demonstrated that it is necessary to characterize the fatigue life of the SNF rods in terms of (1) the curvature amplitude and (2) the maximum absolute of curvature extremes. The maximum extremes are significant because they signify the maximum tensile stress for the outer fiber of the bending rod. CIRFT testing has also addressed a large variation in hydrogen content on the HBR rods. While the load amplitude is the dominant factor that controls the fatigue life of bending rods, the hydrogen content also has an important effect on the lifetime attained at each load range tested. In FY 15, eleven SNF rod segments from the Limerick BWR were tested using the ORNL CIRFT equipment; one test under static conditions and ten tests under dynamic loading conditions. Under static unidirectional loading, a moment of 85 N·m was obtained at a maximum curvature of 4.0 m -1 . The specimen did not show any sign of failure during three repeated loading cycles to a similar maximum curvature. Ten cyclic tests were conducted with amplitudes varying from 15.2 to 7.1 N·m. Failure was observed in nine of the tested rod specimens. The cycles-to-failure ranged from 1.22 × 10 5 to 4.70 × 10 6 , and the amplitudes varied from 15.2 to 7.6 N·m. The measurements at the interrupts indicated a range of flexural rigidity from 30 to 50 N·m 2 . Online monitoring revealed that the flexural rigidity was slightly lower due to the higher loading, from 25 to 42 N·m 2 . Generally, no substantial change of rigidity was observed based on the online monitoring during the cyclic fatigue testing process. Overall, the decreasing trend of sample lifetime with increasing amplitude is well defined.

interface bonding efficiency↗

Technical Evaluation Motor no. 5 (TEM-5)

Technical Evaluation Motor No. 5 (TEM-5) was static test fired at the Thiokol Corporation Static Test Bay T-97. TEM-5 was a full scale, full duration static test fire of a high performance motor (HPM) configuration solid rocket motor (SRM). The primary purpose of TEM static tests is to recover SRM case and nozzle hardware for use in the redesigned solid rocket motor (RSRM) flight program. Inspection and instrumentation data indicate that the TEM-5 static test firing was successful. The ambient temperature during the test was 41 F and the propellant mean bulk temperature (PMBT) was 72 F. Ballistics performance values were within the specified requirements. The overall performance of the TEM-5 components and test equipment was nominal. Dissembly inspection revealed that joint putty was in contact with the inner groove of the inner primary seal of the ignitor adapter-to-forward dome (inner) joint gasket; this condition had not occurred on any previous static test motor or flight RSRM. While no qualification issues were addressed on TEM-5, two significant component changes were evaluated. Those changes were a new vented assembly process for the case-to-nozzle joint and the installation of two redesigned field joint protection systems. Performance of the vented case-to-nozzle joint assembly was successful, and the assembly/performance differences between the two field joint protection system (FJPS) configurations were compared.

Cook, M.↗

SU-F-T-456: Tomotherapy MLC Synchronization and Leaf Open Time Measurements Using ArcCheck

Purpose: To develop a practical method for routine QA of the MLC of a Tomotherapy unit using ArcCheck. Methods: Two standard test plans were used in this study. One was a helical test, in which the central leaves No. 32 and 33 opened simultaneously for 277.8ms at projections centered at 0°, 120° and 240° gantry angles. The other test plan was a static test with the gantry angle set at 0°, 45°, 90° and 135° respectively and leaves No. 32 and 33 opened sequentially for total 20s which was further divided into eleven or ten segments at each beam angle. The ArcCheck was isocentrically set up and adjusted for couch sag. Movie files which took a snapshot exposure every 50ms were recorded. The start/stop time of leaf open was decided by the ramp-up/ramp-down of the detectors. Results: The percentage differences between measured and planned leaf open time were calculated to be within 0.5% in all the tests. In static test, if leaves are synchronized perfectly, the sum of the two detectors’ signals after normalization should equal one when the leaves are in transition. Our results showed mean values of 0.982, 0.983, 0.978 and 0.995 at static gantry angle 0°, 45°, 90° and 135° respectively. Conclusion: A method for estimating the Tomotherapy binary MLC leaf open time using ArcCheck is proposed and proved to be precise enough to verify the planned leaf open time as small as 277.8ms. This method also makes the observation and quantification of the synchronization of leaves possible.

60 APPLIED LIFE SCIENCES↗

Space Shuttle Flight Support Motor no. 1 (FSM-1)

Space Shuttle Flight Support Motor No. 1 (FSM-1) was static test fired on 15 Aug. 1990 at the Thiokol Corporation Static Test Bay T-24. FSM-1 was a full-scale, full-duration static test fire of a redesigned solid rocket motor. FSM-1 was the first of seven flight support motors which will be static test fired. The Flight Support Motor program validates components, materials, and manufacturing processes. In addition, FSM-1 was the full-scale motor for qualification of Western Electrochemical Corporation ammonium perchlorate. This motor was subjected to all controls and documentation requirements CTP-0171, Revision A. Inspection and instrumentation data indicate that the FSM-1 static test firing was successful. The ambient temperature during the test was 87 F and the propellant mean bulk temperature was 82 F. Ballistics performance values were within the specified requirements. The overall performance of the FSM-1 components and test equipment was nominal.

Hughes, Phil D.↗

Summary of static load test of the Mod-0 blade

A static load test was performed on the spare Mod-0 wind turbine blade to define load transfer at the root end of the blade, and to validate stress analysis of this particular type of blade construction (frame and stringer). Analysis of the load transfer from the airfoil skin to the shank tube predicted a step change in spanwise stress in the airfoil skin at station 81.5 inches (STA 81.5). For flatwise bending a 40% reduction in spanwise stress was predicted, and for edgewise bending a 6% reduction. Experimental results verified the 40% reduction for flatwise bending, but indicated about a 30% reduction for edgewise bending.

Miller, D. R.↗

Ares Launch Vehicles Development Awakens Historic Test Stands at NASA's Marshall Space Flight Center

This paper chronicles the rebirth of two national rocket testing assets located at NASA's Marshall Space Flight Center: the Dynamic Test Stand (also known as the Ground Vibration Test Stand) and the Static Test Stand (also known as the Main Propulsion Test Stand). It will touch on the historical significance of these special facilities, while introducing the requirements driving modifications for testing a new generation space transportation system, which is set to come on line after the Space Shuttle is retired in 2010. In many ways, America's journey to explore the Moon begins at the Marshall Center, which is developing the Ares I crew launch vehicle and the Ares V cargo launch vehicle, along with managing the Lunar Precursor Robotic Program and leading the Lunar Lander descent stage work, among other Constellation Program assignments. An important component of this work is housed in Marshall's Engineering Directorate, which manages more than 40 facilities capable of a full spectrum of rocket and space transportation technology testing - from small components to full-up engine systems. The engineers and technicians who operate these test facilities have more than a thousand years of combined experience in this highly specialized field. Marshall has one of the few government test groups in the United States with responsibility for the overall performance of a test program from conception to completion. The Test Laboratory has facilities dating back to the early 1960s, when the test stands needed for the Apollo Program and other scientific endeavors were commissioned and built along the Marshall Center's southern boundary, with logistics access by air, railroad, and barge or boat on the Tennessee River. NASA and its industry partners are designing and developing a new human-rated system based on the requirements for safe, reliable, and cost-effective transportation solutions. Given below are summaries of the Dynamic Test Stand and the Static Test Stand capabilities, along with an introduction to the new missions that these sleeping giants will be fulfilling as NASA readies the Ares I for service in the 2015 timeframe, and plans the development work for fielding the Ares V late next decade (fig. 1). Validating modern computer design models and techniques requires the sorts of data that can only be generated by these one-of-a-kind facilities.

Dumbacher, Daniel L.↗

Static Torsion Testing and Modeling of a Variable Thickness Hybrid Composite Bull Gear

Torsional strength of a variable thickness hybrid gear web was measured by performing static testing on the part in a large torsion test frame. The outer rim of the hybrid gear web was fixed to the bottom of the test frame and loading was applied to the web through a shaft. The test setup included the installation of digital image correlation (DIC) systems to obtain deformation and strain measurements from the surfaces of the hybrid gear web and the mechanical test equipment to ensure reliability of the test. The results indicated that the variable thickness hybrid gear web achieved approximately twice the torsional strength compared to that of previous hybrid gear designs. The DIC analysis showed significantly more straining of the loading shaft than the actual test article. Additionally, the results demonstrated the importance and affect that the metallic, lobed interlock features had on the principal strain and out-of-plane displacement fields. The analysis revealed that the fixed outer rim was in fact rotating and a rigid body motion compensation (RBMC) function was computed to determine the actual rotation of the hub and composite web relative to the outer rim. Modeling simulations were performed for the variable thickness hybrid gear web and correlated well with the RBMC rotational deformation seen in the DIC analysis. In addition to benchmarking the load capacity of the hybrid gear web, measuring its strength is useful information to define the parameters needed for dynamic, endurance, and other testing of the part.

Johnston, Joel P.↗

Multiple Changes to Reusable Solid Rocket Motors, Identifying Hidden Risks

The Space Shuttle Reusable Solid Rocket Motor (RSRM) baseline is subject to various changes. Changes are necessary due to safety and quality improvements, environmental considerations, vendor changes, obsolescence issues, etc. The RSRM program has a goal to test changes on full-scale static test motors prior to flight due to the unique RSRM operating environment. Each static test motor incorporates several significant changes and numerous minor changes. Flight motors often implement multiple changes simultaneously. While each change is individually verified and assessed, the potential for changes to interact constitutes additional hidden risk. Mitigating this risk depends upon identification of potential interactions. Therefore, the ATK Thiokol Propulsion System Safety organization initiated the use of a risk interaction matrix to identify potential interactions that compound risk. Identifying risk interactions supports flight and test motor decisions. Uncovering hidden risks of a full-scale static test motor gives a broader perspective of the changes being tested. This broader perspective compels the program to focus on solutions for implementing RSRM changes with minimal/mitigated risk. This paper discusses use of a change risk interaction matrix to identify test challenges and uncover hidden risks to the RSRM program.

Greenhalgh, Phillip O.↗

Vectoring Single Expansion Ramp Nozzle (VSERN) static model test program

A variable throat-area, side-vectoring single expansion ramp nozzle (VSERN) concept's internal performance characteristics are studied with a view to controlling the bypass flow of an unmixed turbofan engine. Static tests have been conducted on VSERN at NASA-Langley using a variety of parametric models giving attention to the effects of upstream bend angle, ramp geometry, area ratio, and nozzle pressure ratio on static thrust and flow performance. Advantages of VSERN over the conventional vectoring axisymmetric convergent side-nozzles typified by those of the Harrier's Pegasus engine.

Eames, D. J. H.↗

Static coefficient test method and apparatus

The static coefficient of friction between contacting surfaces of a plurality of bodies is determined by applying a load to the bodies in a direction normal to the contacting surfaces. Opposite ends of a flexible filament are connected to a load cell and the first of the bodies. A motor continuously moves the second of the bodies away from the load cell at constant velocity at right angles to the force of the normal load so that the first body moves intermittently relative to the second body across a contact surface between them. The load on the surfaces, the nature of the surfaces, and the speed of the first body relative to the load cell are such that the filament is alternately and cyclically tensioned and relaxed as the movement occurs. The maximum tension occurs at the incipient stages of movement of the first body relative to the second body. The load cell derives a series of measurements which are coupled to an x-y recorder, from which the maximum forces of the filament are determined to enable the static coefficient of friction to be determined. From the maximum forces and the normal force, the coefficient is determined. For determining coefficients of friction where there are large compression loads, the normal load is applied with a calibrated compression spring that is deflected by a predetermined amount determined by a spring load vs. deflection calibration curve.

Haehner, C. L.↗

Fan inlet disturbances and their effect on static acoustic data

There is evidence that measurements of fan-rotor inlet noise taken during static test situations are at variance with aircraft engine flight data. In particular, static tests generally yield a significantly higher tone at blade passing frequency than that measured during flight. An experimental program was carried out to investigate this discrepancy. Inlet ground vortices and large-scale inlet turbulence were generated intentionally in an anechoic test chamber. Far-field acoustic measurements and inlet flow field hot film mappings of a fan rotor were then carried out to study the influence of such inlet disturbances at a static test facility. Experimental results indicate that the acoustic effect of such disturbances appears to be less severe for supersonic than for subsonic tip speeds. Further, a reverse flow that occurs on the exterior cowl in static test facilities appears to be an additional prime candidate for creating inlet disturbances and causing variance between flight and static acoustic data.

Bekofske, K. L.↗

Wind-tunnel free-flight investigation of a model of a spin-resistant fighter configuration

An investigation was conducted to provide some insight into the features affecting the high-angle-of-attack characteristics of a high-performance twin-engine fighter airplane which in operation has exhibited excellent stall characteristics with a general resistance to spinning. Various techniques employed in the study included wind-tunnel free-flight tests, flow-visualization tests, static force tests, and dynamic (forced-oscillation) tests. In addition to tests conducted on the basic configuration tests were made with the wing planform and the fuselage nose modified. The results of the study showed that the model exhibited good dynamic stability characteristics at angles of attack well beyond that for wing stall. The directional stability of the model was provided by the vertical tail at low and moderate angles of attack and by the fuselage forebody at high angles of attack. The wing planform was found to have little effect on the stability characteristics at high angles of attack. The tests also showed that although the fuselage forebody produced beneficial contributions to static directional stability at high angles of attack, it also produced unstable values of damping in yaw. Nose strakes located in a position which eliminated the beneficial nose contributions produced a severe directional divergence.

Grafton, S. B.↗

Structural Model Tuning Tool: User's Reference Manual

This report presents an efficient approach for tuning finite element models to match the measured ground vibration test and static test data. Frequencies, mode shapes, total weight, location of the center of gravity, and static deformation computed from the finite element model are matched to the measured data. The model tuning procedure used in this work is based on solving an optimization problem in which the errors for the considered metrics, between the finite element prediction and the measured data, are minimized. Analytical sensitivity values of performance indices are computed using the NASTRAN-generated sensitivity values together with the in-house computer codes, which allow for faster computational time and the use of gradient-based optimizers. The method is applied to the Aerostructures Test Wing IV model. The study shows that the military standard and the National Aeronautics and Space Administration standard for comparing analytical and experimental modal data are all satisfied. The final finite element model correlates well with the test data. The flutter speed decreases by 8.91 percent after model tuning compared with the original Aerostructures Test Wing IV design.

Chan-gi Pak↗

Static Loads Testing of a High Aspect Ratio Tow-Steered Wingbox

Static loads testing was performed on a 39-foot, high-aspect-ratio wingbox comprising carbon fiber tow-steered wing skins that were tailored for aircraft fuel efficiency under aeroelastic loads. The test article was designated the Passive Aeroelastic Tailored (PAT) wing. To date, the PAT wing, which has an aspect ratio of 13.5, is the largest wingbox designed and built to employ variably oriented carbon fibers along the span of the wing. During testing, distributed point loads were applied to the wingbox to simulate both -1g and 2.5g maneuver loads. To determine the wingbox’s flexural axis location, individual point loads were applied. The global response of the wing (displacement and rotation measurements) showed similar trends compared to the finite element model predictions, though discrepancies of up to 17% were observed when comparing actual values between model and test. It was concluded that the boundary conditions and nonstructural features of the wingbox were the likely cause of the inconsistencies. The local response of the wingbox (strain measurements), which was much less affected by factors unrelated to tow-steering, exhibited good agreement with the model predictions, validating the modelling techniques employed for tow-steered composites.

Tow-steered composites↗