Search NASA⌕ Search

SEARCH · Search NASA

Results for “team building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Simulation of a Lunar Surface Base Power Distribution Network for the Constellation Lunar Surface Systems

The Lunar Surface Power Distribution Network Study team worked to define, breadboard, build and test an electrical power distribution system consistent with NASA's goal of providing electrical power to sustain life and power equipment used to explore the lunar surface. A testbed was set up to simulate the connection of different power sources and loads together to form a mini-grid and gain an understanding of how the power systems would interact. Within the power distribution scheme, each power source contributes to the grid in an independent manner without communication among the power sources and without a master-slave scenario. The grid consisted of four separate power sources and the accompanying power conditioning equipment. Overall system design and testing was performed. The tests were performed to observe the output and interaction of the different power sources as some sources are added and others are removed from the grid connection. The loads on the system were also varied from no load to maximum load to observe the power source interactions.

Mintz, Toby↗

Small Rocket/Spacecraft Technology (SMART) Platform

The NASA Goddard Space Flight Center (GSFC) and the Department of Defense Operationally Responsive Space (ORS) Office are exercising a multi-year collaborative agreement focused on a redefinition of the way space missions are designed and implemented. A much faster, leaner and effective approach to space flight requires the concerted effort of a multi-agency team tasked with developing the building blocks, both programmatically and technologically, to ultimately achieve flights within 7-days from mission call-up. For NASA, rapid mission implementations represent an opportunity to find creative ways for reducing mission life-cycle times with the resulting savings in cost. This in tum enables a class of missions catering to a broader audience of science participants, from universities to private and national laboratory researchers. To that end, the SMART (Small Rocket/Spacecraft Technology) micro-spacecraft prototype demonstrates an advanced avionics system with integrated GPS capability, high-speed plug-and-playable interfaces, legacy interfaces, inertial navigation, a modular reconfigurable structure, tunable thermal technology, and a number of instruments for environmental and optical sensing. Although SMART was first launched inside a sounding rocket, it is designed as a free-flyer.

Esper, Jaime↗

VIPER: Mission Design & Development

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence over the long-term, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, substantial logistical complexity and costs could be saved by “living off the land”, wherever possible. The LCROSS, LRO and other missions have confirmed the presence of resources such as volatiles in polar regions, so the next step is to understand the scientific nature and physical distribution of those candidate resources. Those local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss the latest development progress by the VIPER team, following our initial introduction to this mission at IAC2021. The VIPER team has passed both its NASA Preliminary Design Review (PDR) and Critical Design Reviews (CDR), and is now looking to performing significant testing of engineering units representing the design, prior to the team turning its attention to building the flight hardware. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) delivery model with partner, Astrobotic, Inc.

Daniel Andrews↗

Mission Concept Design for Autonomous Space Missions using Mission-Level Modeling and Simulation

NASA’s Europa Lander mission is to search for biosignatures on Europa based on in-situ science using a lander architecture. This mission presents a set of challenges that requires a high level of autonomy on the lander system, leading to the need for a new operational paradigm that supports better collaboration and coordination between the lander and the ground operations team. M\&S is used for both designing the onboard system-level autonomy and the ground operations paradigm that allows effective and efficient collaboration and coordination between the lander and the ground operations team. In this paper, M\&S as applied to the design of new mission and operational concepts will be discussed. At its current early stage of the mission development for Europa Lander, the M\&S is used to explore different mission concepts and gain insights for design (formative) rather than to verify and validate fully designed mission concepts quantitatively (summative). Organically, we established a new approach to mission and operational concept exploration using high-fidelity modeling and simulation. M\&S has been an integral part of the approach of defining constraints and assertions, designing mission concepts, assessing (i.e., simulating them), and discovering insights, which feeds back to the definition an design steps. This organically-established approach provided important benefits to the project at its early phase of the development by enabling the project team to be able to build shared understanding of impacts from design characteristics, constraints, and their interactions on the mission performance.

Ye, Sean↗

The Role of a Multidimensional Concept of Trust in the Performance of Global Virtual Teams

This paper focuses on the concept of trust as an important ingredient of effective global virtual team performance. Definitions of trust and virtual teams are presented. The concept of trust is developed from its unilateral application (trust, absence of trust) to a multidimensional concept including cognitive and affective components. The special challenges of a virtual team are then discussed with particular emphasis on how a multidimensional concept of trust impacts these challenges. Propositions suggesting the multidimensional concept of trust moderates the negative impacts of distance, cross cultural and organizational differences, the effects of electronically mediated communication, reluctance to share information and a lack of hi story/future on the performance of virtual teams are stated. The paper concludes with recommendations and a set of techniques to build both cognitive and affective trust in virtual teams.

Bodensteiner, Nan Muir↗

SERVIR Science Applications for Capacity Building

SERVIR is a regional visualization and monitoring system using Earth observations to support environmental management, climate adaptation, and disaster response in developing countries. SERVIR is jointly sponsored by NASA and the U.S. Agency for International Development (USAID). SERVIR has been instrumental in development of science applications to support the decision-making and capacity building in the developing countries with the help of SERVIR Hubs. In 2011, NASA Research Opportunities in Space and Earth Sciences (ROSES) included a call for proposals to form SERVIR Applied Sciences Team (SERVIR AST) under Applied Sciences Capacity Building Program. Eleven proposals were selected, the Principal Investigators of which comprise the core of the SERVIR AST. The expertise on the Team span several societal benefit areas including agriculture, disasters, public health and air quality, water, climate and terrestrial carbon assessments. This presentation will cover the existing SERVIR science applications, capacity building components, overview of SERVIR AST projects, and anticipated impacts.

Limaye, Ashutosh↗

Preparing for Lunar Exploration: Geology and Field Training for Astronauts

NASA astronauts will soon return to the Moon, this time to the lunar south pole. Astronauts will perform traverses, make geologic observations, and collect samples to return to Earth. Lessons from Apollo show that science returns were optimized because crews were well-trained in both spacewalk operations and field geology. In that spirit, our team of geologists introduced a revised geologic training program for in-coming NASA astronauts that includes classroom activities and fieldwork and is split over 2 years. Year 1 focuses on an introduction to geologic concepts capped by a field exercise. Year two focuses on climate change, the Moon, other planets, and additional fieldwork. Our geology curriculum supports astronaut observations from the ISS and is the foundation for future Artemis geology training, which will include lunar science and increasingly complex field training in planetary-relevant locations. A final piece of our training program provides geology and field mapping experiences for NASA engineers, flight controllers, and managers, to help them understand the principles of fieldwork and relevance to lunar exploration. The Year 1 geology training must be an effective introduction for astronauts who have little or no background in geology. We focus the training around a narrowly defined field problem and use a week of classroom training to prepare the astronauts with the specific skills and background they need to carry out a field exercise on volcanic features, structures, and landforms of the Taos Plateau, New Mexico. Classroom modules are hands-on, using satellite imagery, maps, analog models, and samples, and provide the astronauts with specific and relevant experience in how to make observations and describe what they see, recognize, and interpret patterns, infer processes from products, and analyze relationships to build a story based on evidence from a variety of data sources. At the end of each classroom day, astronauts work in teams to build a preliminary geologic map of the field area, adding new observations and interpretations as they learn about topics in the classroom. Each team’s bucket list of target areas to visit helps shape their investigations during their week in the field. On the final day in the field, each astronaut team presents a geologic map, cross section, and geologic interpretation

Geology↗

2012 Alabama Lunabotics Systems Engineering Paper

Excavation will hold a key role for future lunar missions. NASA has stated that "advances in lunar regolith mining have the potential to significantly contribute to our nation's space vision and NASA space exploration operations." [1]. The Lunabotics Mining Competition is an event hosted by NASA that is meant to encourage "the development of innovative lunar excavation concepts from universities which may result in clever ideas and solutions which could be applied to an actual lunar excavation device or payload." [2]. Teams entering the competition must "design and build a remote controlled or autonomous excavator, called a lunabot, that can collect and deposit a minimum of 10 kilograms of lunar simulant within 10 minutes." [2]. While excavation will play an important part in lunar missions, there will still be many other tasks that would benefit from robotic assistance. An excavator might not be as well suited for these tasks as other types of robots might be. For example a lightweight rover would do well with reconnaissance, and a mobile gripper arm would be fit for manipulation, while an excavator would be comparatively clumsy and slow in both cases. Even within the realm of excavation it would be beneficial to have different types of excavators for different tasks, as there are on Earth. The Alabama Lunabotics Team at the University of Alabama has made it their goal to not only design and build a robot that could compete in the Lunabotics Mining Competition, but would also be a multipurpose tool for future NASA missions. The 2010-2011 resulting robot was named the Modular Omnidirectional Lunar Excavator (MOLE). Using the Systems Engineering process and building off of two years of Lunabotics experience, the 20ll-2012 Alabama Lunabotics team (Team NASACAR) has improved the MOLE 1.0 design and optimized it for the 2012 Lunabotics Competition rules [I]. A CAD model of MOLE 2.0 can be seen below in Fig. 1.

Baker, Justin↗

NASA Centennial Challenge: Three Dimensional (3D) Printed Habitat, Phase 2

The NASA Centennial Challenges: 3D-Printed Habitat Challenge seeks to develop the fundamental technologies necessary to manufacture an off-world habitat using mission recycled materials and/or local indigenous materials. The vision is that autonomous habitat manufacturing machines will someday be deployed to the Moon or Mars to construct shelters for human habitation. NASA and Bradley University, are holding a new US$ 2.5 million competition to design and build a 3-D printed habitat for deep space exploration, including the agency's journey to Mars. The multi-phase 3-D Printed Habitat Challenge, part of NASA's Centennial Challenges program, is designed to advance the additive construction technology needed to create sustainable housing solutions for Earth and beyond. The first phase of the competition ran through Sept. 27, 2015. This phase, a design competition, called on participants to develop state-of-the-art architectural concepts that take advantage of the unique capabilities 3-D printing offers. The top 3 prizes with a prize purse of $40,000 were awarded at the 2015 World Maker Faire in New York. The second phase of the competition is called the Structural Member Competition and it is divided into three levels happening in the spring and summer of 2017. The Compression Test Competition (Level 1) focuses on the fabrication technologies needed to manufacture structural components from a combination of indigenous materials and recyclables, or indigenous materials alone. For Level 1, teams will develop 3D printable materials, build a 3D printing machine, and print two specimens: a truncated cone and a cylinder. The Level 2 Beam Member Competition is the second of three sub-competitions within the overall Structural Member Competition. For Level 2, teams will print a beam that will be tested. The Level 3 Head to Head Competition is the third of three sub-competitions within the overall Structural Member Competition. For Level 3, teams will develop 3D printable materials, use a 3D printing machine, and print three compression specimens of the elected material, three flexural specimens of the elected material, and one dome structure. Tests conducted on the specimens and the dome structure will determine Level 3 scores and awards. On Earth these same habitat manufacturing capabilities could be used to produce housing wherever affordable housing is needed and access to conventional building materials and skills is limited. Terrestrially, it is envisioned that local indigenous materials (dirt, clay, sand, etc.) could be combined with readily available recyclable materials and used to construct semi-permanent shelters against environmental elements for human habitation. The goal of the 3D-Printed Habitat Challenge is to foster the development of new technologies necessary to additively manufacture a habitat using local indigenous materials with, or without, recyclable materials. This paper will summarize the Level 2 results of this NASA Centennial Challenge competition and it will discuss related technology advancement.

3D printing↗

Effective Team Support: From Task and Cognitive Modeling to Software Agents for Time-Critical Complex Work Environments

The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in completing a system for empirical data collection, cognitive modeling, and the building of software agents to support a team's tasks, and in running experiments for the collection of baseline data.

Remington, Roger W.↗

Low Cost Rapid Response Spacecraft, (LCRRS): A Research Project in Low Cost Spacecraft Design and Fabrication in a Rapid Prototyping Environment

The Low Cost Rapid Response Spacecraft (LCRRS) is an ongoing research development project at NASA Ames Research Center (ARC), Moffett Field, California. The prototype spacecraft, called Cost Optimized Test for Spacecraft Avionics and Technologies (COTSAT) is the first of what could potentially be a series of rapidly produced low-cost satellites. COTSAT has a target launch date of March 2009 on a SpaceX Falcon 9 launch vehicle. The LCRRS research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing satellite. The design concept was baselined to support a 0.5 meter Ritchey-Chretien telescope payload. This telescope and camera system is expected to achieve 1.5 meter/pixel resolution. The COTSAT team is investigating the possibility of building a fully functional spacecraft for $500,000 parts and $2,000,000 labor. Cost is dramatically reduced by using a sealed container, housing the bus and payload subsystems. Some electrical and RF designs were improved/upgraded from GeneSat-1 heritage systems. The project began in January 2007 and has yielded two functional test platforms. It is expected that a flight-qualified unit will be finished in December 2008. Flight quality controls are in place on the parts and materials used in this development with the aim of using them to finish a proto-flight satellite. For LEO missions the team is targeting a mission class requiring a minimum of six months lifetime or more. The system architecture incorporates several design features required by high reliability missions. This allows for a true skunk works environment to rapidly progress toward a flight design. Engineering and fabrication is primarily done in-house at NASA Ames with flight certifications on materials. The team currently employs seven Full Time Equivalent employees. The success of COTSATs small team in this effort can be attributed to highly cross trained engineering team. The engineers on the team are capable of functioning in two to three engineering disciplines which allows highly efficient interdisciplinary engineering collaboration. NASA Ames is actively proposing mission concepts to use the COTSAT platform to accomplish science. If the COTSAT team validates this approach, it will allow the possibility for remote sensing missions to produce a high science yield for minimal cost and reduced schedule. Another aim of this approach is to yield an accelerated pathway from a Phase A study to mission launch. Leaders in the aerospace industry have shown interest in this methodology. Several visits and tours have been given in the lab. Although the concept of low-cost development is initially met with skepticism from some within the prohibitive aerospace industry, the project's efforts have been highly praised for the accomplishments met within a limited time and budget. Overall the development has progressed tremendously well and the team is answering critical questions for current and future low-cost small satellite developments. COTSAT subsystems are not limited to a specific weight class and could be adapted to produce smaller platforms and to fit various launch vehicles.

Spremo, Stevan↗

Probabilistic Risk Assessment for Concurrent, Conceptual Design of Space Missions

NASA is expanding its capability to perform PRA. This capability gives insight into the links of a suggested design and drives the refinement of the design by identifying optimal areas for investments. Clearly, it is more viable and less expensive to refine a design at the time that it is being conceived. Hence the utility of conducting PRA at the conceptual design phase. Concurrent engineering teams greatly reduce the design time and costs. However, there is currently no standardized means for building probabilistic risk models to assess risks associated with a design produced by such teams. The capability to produce a consistent and valid risk metric associated with such designs would greatly enhance the value of such design teams. This paper explains the experimental results obtained to date from building probabilistic risk models for sample studies conducted at the concurrent engineering design team at the Jet Propulsion Laboratory (TeamX).

conceptual designs↗

Lunar Wormbot: Design and Development of a Ground Base Robotic Tunneling Worm for Operation in Harsh Environments

From 1969 to 1972, the National Aeronautics and Space Administration (NASA) sent Apollo missions to the moon to conduct various exploration experiment. A few of the missions were directed to the study and sampling of moon soil, otherwise known as lunar regolith. The extent of the sample acquisition was limited due to the astronauts' limited ability to penetrate the moon's surface to a depth greater than three meters. However. the samples obtained were sufficient enough to provide key information pertaining to lunar regolith material properties that would further assist in future exploration endeavors. Analysis of the collected samples showed that the properties of lunar regolith may lead to knowledge of processed materials that will be beneficial for future human exploration or colonization. However, almost 40 years after the last Apollo mission, limited infonnation is known about regions underneath the moon's surface. Future lunar missions will require hardware that possesses the ability to burrow to greater depths in order to collect samples for subsequent analysis. During the summer of 2010, a team (Dr. Jessica Gaskin, Michael Kuhlman. Blaze Sanders, and Lafe Zabowski) from the NASA Robotics Academy at Marshall Space Flight Center (MSFC) was given the task of designing a robot to function as a soil collection and analysis device. Working with the National Space Science and Technology Center (NSSTC), the team was able to propose an initial design, build a prototype, and test the various subsystems of the prototype to be known as the "Lunar Wormbot" (LW). The NASA/NSSTC team then transferred the project to a University of Alabama in Huntsville (UAH) Mechanical and Aerospace Engineering (MAE) senior design class for further development. The UAH team was to utilize the NASA Systems Engineering Engine Design Process in the continuance of the Lunar Wormbot project. This process was implemented in order to coordinate the efforts of the team and guide the design of the project to ensure a high quality product that met requirements within the academic year timeframe. When the transition from the NASA NSSTC team to the UAH team occurred in August 2010, the scope and requirements were provided to the UAH team. The main objective for the UAH team was to design and fabricate a robotic burrowing prototype using peristaltic or earthworm-like motion with the purpose of collecting soil samples. The team was tasked with the design of a sub-system of the LW called the locomotive, or active, segment. Through the design process, the team extensively reviewed the requirements and functions to be performed of the LW, which led to the proposal of a final design. The present paper provides the details of the development of the design up to and including the Critical Design Review (CDR) of the Lunar Wormbot. This document briefly describes thc overall system and its function but primarily focuses on the design and implementation of the locomotive segment. Content presented includes: general design and system functionality, technical drawings, system analysis, manufacturing methods, and general project costs.

Boyles, Charles↗

Effective Team Support: From Modeling to Software Agents

The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and engineers and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in modeling infrastructure and task infrastructure. Work is continuing under a different contract to complete empirical data collection, cognitive modeling, and the building of software agents to support the teams task.

Remington, Roger W.↗

Scheduling System Assessment, and Development and Enhancement of Re-engineered Version of GPSS

The objective of this project is two-fold. First to provide an evaluation of a commercially developed version of the ground processing scheduling system (GPSS) for its applicability to the Kennedy Space Center (KSC) ground processing problem. Second, to work with the KSC GPSS development team and provide enhancement to the existing software. Systems reengineering is required to provide a sustainable system for the users and the software maintenance group. Using the LISP profile prototype code developed by the GPSS reverse reengineering groups as a building block, we have implemented the resource deconfliction portion of GPSS in common LISP using its object oriented features. The prototype corrects and extends some of the deficiencies of the current production version, plus it uses and builds on the classes from the development team's profile prototype.

Loganantharaj, Rasiah↗

Lessons Learned in Launching Ares I-X

The Ares I-X flight test, scheduled for 2009, is the first opportunity for the Constellation Program and Ares Projects to obtain important data on the in-flight loads, first stage recovery, and ground-handling characteristics of the Ares I crew launch vehicle. The flight test vehicle will incorporate a mix of flight and mockup hardware, reflecting an acceptable representation of the mass and outer mold line characteristics of the operational Ares I vehicle. It will be powered by a four-segment solid rocket motor from the Space Shuttle inventory and will include a fifth, inert spacer segment and new forward structures to make it the same shape as the Ares I first stage. The vehicle also includes mass simulators for the upper stage, Orion crew module, and launch abort system to match the outer mold line of Ares I; an active roll control system; and avionics derived from Shuttle and Atlas hardware. This suborbital mission will take the flight test vehicle from stacking in the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC) through liftoff, maximum dynamic pressure, first stage separation, and recovery. Ares I-X presented NASA with unique project management challenges. This presentation will address those unique challenges, including managing a virtual nationwide team under a constrained timeline; designing and building the launch vehicle and ground systems; working concurrently with Space Shuttle activities; and integrating technical and management functions. It also will identify key data collected and lessons learned from the flight that will be applied to future exploration missions.

Davis, Stephan R.↗

Towards Informing an Intuitive Mission Planning Interface for Autonomous Multi-Asset Teams via Image Descriptions

Establishing a basis for certification of autonomous systems using trust and trustworthiness is the focus of Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR). The Human-Machine Interface (HMI) team is working to capture and utilize the multitude of ways in which humans are already comfortable communicating mission goals and translate that into an intuitive mission planning interface. Several input/output modalities (speech/audio, typing/text, touch, and gesture) are being considered and investigated in the context human-machine teaming for the ATTRACTOR design reference mission (DRM) of Search and Rescue or (more generally) intelligence, surveillance, and reconnaissance (ISR). The first of these investigations, the Human Informed Natural-language GANs Evaluation (HINGE) data collection effort, is aimed at building an image description database to train a Generative Adversarial Network (GAN). In addition to building an image description database, the HMI team was interested if, and how, modality (spoken vs. written) affects different aspects of the image description given. The results will be analyzed to better inform the designing of an interface for mission planning.

Generative Adversarial Network (GAN)↗

Structural Verification of the Space Shuttle's External Tank Super LightWeight Design: A Lesson in Innovation

The Super LightWeight Tank (SLWT) team was tasked with a daunting challenge from the outset: boost the payload capability of the Shuttle System by safely removing 7500 lbs. from the existing 65,400 lb. External Tank (ET). Tools they had to work with included a promising new Aluminum Lithium alloy, the concept of a more efficient structural configuration for the Liquid Hydrogen (LH2) tank, and a highly successful, mature Light Weight Tank (LWT) program. The 44 month schedule which the SLWT team was given for the task was ambitious by any measure. During this time the team had to not only design, build, and verify the new tank, but they also had to move a material from the early stages of development to maturity. The aluminum lithium alloy showed great promise, with an approximately 29% increase in yield strength, 15% increase in ultimate strength, 5 deg/O increase in modulus and 5 deg/O decrease in density when compared to the current 2219 alloy. But processes had to be developed and brought under control, manufacturing techniques perfected, properties characterized, and design allowable generated. Because of the schedule constraint, this material development activity had to occur in parallel with design and manufacturing. Initial design was performed using design allowable believed to be achievable with the Aluminum Lithium alloy system, but based on limited test data. Preliminary structural development tests were performed with material still in the process of iteration. This parallel path approach posed obvious challenges and risks, but also allowed a unique opportunity for interaction between the structures and materials disciplines in the formulation of the material.

Otte, Neil↗