Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Support for Astronaut's View of Mexican/ Central American Fires and on-Line Earth Observations Training Manual

A small project to compile remote sensing and in-site data to review the processes leading to the May 1998 Mexican/Central American fires was undertaken. A web page based on this project was assembled. The second project initiated involved an interactive and on-line program that will replace the paper version of the Earth Observations Preflight Training Manual. Technical support was provided to Prof. Marvin Glasser as needed.

Kaminski, Charles F., Jr.↗

System Configuration Evaluation for Process Settling of Hanford Waste Solid Particles

Direct Feed High-Level Waste (DFHLW) is a potential flowsheet operations approach to initiating high-level waste (HLW) vitrification prior to completion of the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility. A settle/decant process has been proposed to concentrate solids prior to delivery to the WTP HLW Facility during DFHLW operations, wherein the solids in a settled layer would be remixed with the supernatant liquid remaining after decanting operations to provide the feed at required solids concentrations. Settling would be used in lieu of purpose-built filtration or other solids separation equipment. Pacific Northwest National Laboratory (PNNL) is providing baseline technical support to the Washington River Protection Solutions (WRPS) Flowsheet Integration group. To support planning for DFHLW, WRPS previously requested that PNNL evaluate the current data set available to predict the time needed for HLW solids to settle and the solids concentration and strength of that settled layer, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling times. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers. In addition to the data gaps, an overarching observation was made that there is significant variation in behavior of settling rate and settled layer data. The settling time required to concentrate solids via a settle/decant process was determined from the limited data to have a difference of potentially more than a factor of 5,000 in the estimated settling times, varying from 0.2 to 1,060 days for example depending on process vessel depth and final sediment solids concentration. In contrast, successful processes of liquid-forward output streams resulting from in-tank settling and decanting forward liquid have been reported for operations conducted at the Hanford Site. The purpose of this current report is to further support DFHLW planning by evaluating double-shell tank (DST) and alternate vessel equipment and operational configurations to enable optimization of the settle/decant process to concentrate solids. Hanford waste processing behavior specific to liquid feed availability following a slurry transfer in a DST is summarized, including process stream characteristics and process equipment configurations. The performance of DST process equipment configurations is evaluated for possible improvements using computational fluid dynamics (CFD) and simple analytical models. Potential new vessel design(s) specific to enabling effective settle/decant processes, and cursory summary of other separate and inline solids separations processes, are also provided. The CFD results indicated that improvement in outflow solids concentration was promoted by a reduction in the slurry flow rate, angling the distributor nozzles downward, and lifting the transfer pump. The solid-liquid analysis evaluating particle trajectory confirmed that the potential for particle ingestion (in the transfer pump) was decreased with increased radial separation between the inlet and outlet (transfer pump inlet), decreased inlet flow, and decreased liquid density and viscosity for a neutrally buoyant inlet flow. An assessment was also made of the potential for inflow configuration changes to result in the discrete mounding or piling of solids within the tank. Based on the characterization of the settled waste to date, HLW sediments will be unlikely to sustain a substantial angle of repose to facilitate significant variations in the elevation of the settled solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Tools to Provide Support for State Energy Programs [Slides]

This "Overview of Tools to Provide Support for State Energy Programs?" is a resource to support technical assistance programs, specifically motivated by the State Energy Program Direct TA program under SCEP at the Department of Energy. It provides a general description of seven unique tools - six by NREL, one by Argonne National Lab - which may be used to benefit state energy offices either through direct use (by state offices) or through contracted support (by national lab staff via TA programs).

97 MATHEMATICS AND COMPUTING↗

Analysis of the Frequency of Extreme Precipitation Events at Los Alamos National Laboratory

The Environmental Protection and Compliance (EPC) Storm Water Permitting and Compliance Program is currently updating its stormwater compliance standards for the Los Alamos National Laboratory (LANL) Engineering Standards Manual (2015) and is addressing the required current meteorological data needed for storm water applications. Information on the frequency of extreme precipitation events at LANL is needed. In response to this request, LANL Meteorology & Air Quality (MAQ) was tasked to estimate the frequency of extreme precipitation events. An earlier study by Foley (2012) which estimated extreme precipitation rates at LANL for a set of duration periods and average recurrence intervals (return periods) was evaluated. However, it was determined that this study would not be helpful since its technical support documentation was unavailable and the meteorological data and the methodology employed were not well understood. This led to the need to develop a new peer-reviewed methodology. This report documents the development of the new methodology and the application of a temporally representative precipitation dataset from February 1990 through December 2018, monitored at the official LANL meteorological station, Technical Area (TA)-6, to develop the frequency of extreme precipitation events.

54 ENVIRONMENTAL SCIENCES↗

Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Powering Progress: Increasing capacity for State Agency participation in the development of solar guidelines

This project supported State Fish and Wildlife Agencies (SFWAs) in their participation in an industry-led process to develop nationwide utility scale solar energy wildlife guidelines intended to mitigate the impacts of large-scale solar development on wildlife and natural habitats. Led by the Association of Fish and Wildlife Agencies (AFWA), the project focused on documenting and communicating SFWA priorities, providing logistical and technical support for state engagement, and disseminating early outcomes to promote adoption and use.

14 SOLAR ENERGY↗

The Role of NASA Engineering & Safety Center (NESC) in Advancing NASA's Earth Science Missions (Past, Present, and Future)

The NASA Engineering & Safety Center (NESC) was established in 2003 to provide an independent technical resource for the resolution of challenging technical problems (through the use of studies, analysis, tests, etc.). Since its inception, NESC has completed nearly 1000 technical assessments for NASA’s Human Exploration and Operation Mission Directorate (HEOMD), Science Mission Directorate (SMD), Space Technology Mission Directorate (STMD), and Aeronautics Research Mission Directorate (ARMD). Of the SMD related assessments, several were for the resolution of technical problems, analysis, or studies related to NASA’s Earth science missions in various phases of the project from design to operation. Some of the recent examples of NESC technical support for NASA (or NOAA) Earth science missions have been for: Soil Moisture Active Passive (SMAP), Deep Space Climate Observatory (DSCOVR), Cyclone Global Navigation Satellite System (CYGNSS), Ice, Cloud, and Land Elevation Satellite (ICESat-II), Joint Polar Satellite System (JPSS), and the soon to be launched collaboration mission with India, NASA-ISRO Synthetic Aperture Radar (NISAR). In this paper, we outline some of the technical challenges faced by these Earth science missions and describe how NESC contributed to their resolution. The case studies cover a wide range of disciplines involving space lidars, radars, electronics, attitude control systems, as well as Micrometeoroid Orbital Debris (MMOD) risk assessment impact to NASA missions. The efforts include strategies for risk mitigation, technical resolution of challenging problems, and failure root cause investigations combined with lessons learned reports to advance discipline knowledge, enhance NASA capabilities, and avoid future problems.

NASA↗

Future NTP Development Synergy Leveraged from Current J-2X Engine Development

This paper is a discussion of how the many long-lead development elements required for the realization of a future nuclear thermal propulsion (NTP) system can be effectively leveraged from the ongoing work being conducted on the J-2X engine program for the Constellation Program. Development studies conducted to date for NTP forward planning have identified a number of technical areas that will require advancement to acceptable technology readiness levels (TRLs) before they can be utilized in NTP system development. These include high-temperature, high-area ratio nozzle extension; long-life, low-NPSP. turbomachinery; and low-boiloff propellant management; and a qualified nuclear fuel element. The current J-2X program is working many of these areas that can be leveraged to support NTP development in a highly compatible and synergistic fashion. In addition to supporting technical development, there are other programmatic issues being worked in the J-2X program that can be leveraged by a future NTP development program. These include compliance with recently-evolved space system requirements such as human-rating, fault tolerance and fracture control. These and other similar mandatory system requirements have been adopted by NASA and can result in a significant technical impact beyond elevation of the root technologies required by NTP. Finally, the exploitation of experience, methodologies, and procedures developed by the J-2X program in the areas of verification, qualification, certification, altitude simulation testing, and facility definition will be especially applicable to a future NTP system. The similarities in system mission (in-space propulsion) and operational environment (vacuum, zero-gee) between J-2X and NTP make this highly synergistic. Thus, it can be $hown that the collective benefit of leveraging experience and technologies developed during the J-2X program can result in significant savings in development cost and schedule for NTP.

Ballard, Richard O.↗

Preliminary Analysis of ISS Maintenance History and Implications for Supportability of Future Missions

The International Space Station (ISS) enables the study of supportability issues associated with long-duration human spaceflight. The ISS is a large, complex spacecraft that must be maintained by its crew. In contrast to the Space Shuttle Orbiter vehicle, but similar to spacecraft that will be component elements of future missions beyond low-Earth orbit, ISS does not return to the ground for servicing and provisioning of spares is severely constrained by transportation limits. Although significant technical support is provided by ground personnel, all hands-on maintenance tasks are performed by the crew. It is expected that future missions to distant destinations will be further limited by lack of resupply opportunities and will, eventually, become largely independent of ground support. ISS provides an opportunity to begin learning lessons that will enable future missions to be successful. Data accumulated over the first several years of ISS operations have been analyzed to gain a better understanding of maintenance-related workload. This analysis addresses both preventive and corrective maintenance and includes all U.S segment core systems. Systems and tasks that are major contributors to workload are identified. As further experience accrues, lessons will be learned that will influence future system designs so that they require less maintenance and, when maintenance is required, it can be performed more efficiently. By heeding the lessons of ISS it will be possible to identify system designs that should be more robust and point towards advances in both technology and design that will offer the greatest return on investment.

Watson, Kevin J.↗

Advanced composite fuselage technology

Boeing's ATCAS program has completed its third year and continues to progress towards a goal to demonstrate composite fuselage technology with cost and weight advantages over aluminum. Work on this program is performed by an integrated team that includes several groups within The Boeing Company, industrial and university subcontractors, and technical support from NASA. During the course of the program, the ATCAS team has continued to perform a critical review of composite developments by recognizing advances in metal fuselage technology. Despite recent material, structural design, and manufacturing advancements for metals, polymeric matrix composite designs studied in ATCAS still project significant cost and weight advantages for future applications. A critical path to demonstrating technology readiness for composite transport fuselage structures was created to summarize ATCAS tasks for Phases A, B, and C. This includes a global schedule and list of technical issues which will be addressed throughout the course of studies. Work performed in ATCAS since the last ACT conference is also summarized. Most activities relate to crown quadrant manufacturing scaleup and performance verification. The former was highlighted by fabricating a curved, 7 ft. by 10 ft. panel, with cocured hat-stiffeners and cobonded J-frames. In building to this scale, process developments were achieved for tow-placed skins, drape formed stiffeners, braided/RTM frames, and panel cure tooling. Over 700 tests and supporting analyses have been performed for crown material and design evaluation, including structural tests that demonstrated limit load requirements for severed stiffener/skin failsafe damage conditions. Analysis of tests for tow-placed hybrid laminates with large damage indicates a tensile fracture toughness that is higher than that observed for advanced aluminum alloys. Additional recent ATCAS achievements include crown supporting technology, keel quadrant design evaluation, and sandwich process development.

Ilcewicz, Larry B.↗

Test, Control and Monitor System (TCMS) operations plan

The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

Macfarlane, C. K.↗

A strawman SLR program plan for the 1990s

A series of programmatic and technical goals for the satellite laser ranging (SLR) network are presented. They are: (1) standardize the performance of the global SLR network; (2) improve the geographic distribution of stations; (3) reduce costs of field operations and data processing; (4) expand the 24 hour temporal coverage to better serve the growing constellation of satellites; (5) improve absolute range accuracy to 2 mm at key stations; (6) improve satellite force, radiative propagation, and station motion models and investigate alternative geodetic analysis techniques; (7) support technical intercomparison and the Terrestrial Reference Frame through global collocations; (8) investigate potential synergisms between GPS and SLR.

Degnan, John J.↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges and opportunities for alternative fuels in the maritime sector

Amidst a period of historic transformation, the marine shipping sector faces uncertainty regarding its ability to reliably fuel while remaining compliant with new international environmental regulations and targets. Increasingly stringent environmental standards, and heightened regulatory focus on maritime decarbonization are driving infrastructural and technical development for alternative fuels and mixtures, engine concepts, and operating practices. However, the transition to alternative fueling is highly complex and requires both a global outlook that spans diverse stakeholder demographics and coordination with multiple actors across the value chain. To aid stakeholders involved in decision making and research related to the transition, a scoping study was conducted with the goal of outlining the barriers, uncertainties, and possibilities in the short and long term for the transition. Synthesis of these results provides strategic decision support, technical direction, and a set of R&D priorities for maritime stakeholders and the scientific community.

09 BIOMASS FUELS↗

Deer Isle and Stonington Energy Reliability Opportunities

The towns of Deer Isle and Stonington, located on the island of Deer Isle in Maine, partnered with the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to examine options to enhance energy resilience, reduce dependence on imported fuels, and mitigate high energy costs. With technical support from the National Laboratory of the Rockies (NLR), Lawrence Berkeley National Laboratory (LBNL), and regional partner the Island Institute, the project focused on evaluation of the local electricity distribution infrastructure, examination of ongoing activities to reduce the frequency of outages, review of the applicable policy and regulatory environment, and identification of potential on-site energy solutions. Key findings revealed the island's reliance on a single distribution line, and limited hosting capacity for additional distributed energy resources. Solar photovoltaics (PV) technology, with and without battery storage, was found to be the most viable technology given economic, technical, and social considerations. While also technically feasible, wind energy faces more difficult siting and less public acceptance compared to PV. Marine energy technologies were determined to be infeasible due to technology immaturity and lengthy permitting timelines. Modeling of potential building-scale PV plus storage systems resulted in successful grant applications for installations at two local facilities. Analysis of community scale energy generation and storage options resulted the local utility, Versant, submitting a grant application for a proposed community-scale battery storage system to increase grid resilience and hosting capacity. This initiative has strengthened the communities' energy planning capabilities and laid the groundwork for future clean energy development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integration of the White Sands Complex into a Wide Area Network

The NASA White Sands Complex (WSC) satellite communications facility consists of two main ground stations, an auxiliary ground station, a technical support facility, and a power plant building located on White Sands Missile Range. When constructed, terrestrial communication access to these facilities was limited to copper telephone circuits. There was no local or wide area communications network capability. This project incorporated a baseband local area network (LAN) topology at WSC and connected it to NASA's wide area network using the Program Support Communications Network-Internet (PSCN-I). A campus-style LAN is configured in conformance with the International Standards Organization (ISO) Open Systems Interconnect (ISO) model. Ethernet provides the physical and data link layers. Transmission Control Protocol and Internet Protocol (TCP/IP) are used for the network and transport layers. The session, presentation, and application layers employ commercial software packages. Copper-based Ethernet collision domains are constructed in each of the primary facilities and these are interconnected by routers over optical fiber links. The network and each of its collision domains are shown to meet IEEE technical configuration guidelines. The optical fiber links are analyzed for the optical power budget and bandwidth allocation and are found to provide sufficient margin for this application. Personal computers and work stations attached to the LAN communicate with and apply a wide variety of local and remote administrative software tools. The Internet connection provides wide area network (WAN) electronic access to other NASA centers and the world wide web (WWW). The WSC network reduces and simplifies the administrative workload while providing enhanced and advanced inter-communications capabilities among White Sands Complex departments and with other NASA centers.

Boucher, Phillip Larry↗

Scheduling Accessory Assists Patients with Cognitive Disorders

Recom Technologies Inc. received initial funding from NASA to research the commercial potential of an artificially intelligent planning reaction model to serve as a tool to help individuals suffering from various forms and levels of brain impairment. In 1993, the chief of the Artificial Intelligence Research Branch at Ames Research Center suggested collaborative research with Santa Clara Valley Medical Center. This partnership led to further development of the technology and funding to support clinical research from the U.S. Department of Education's National Institute on Disability and Rehabilitation Research. In 1996, Attention Control Systems Inc. was founded to market the finished device, called the Planning and Execution Assistant and Trainer (PEAT). PEAT is a pocket-sized PDA-like device with a graphical display, touchscreen controls, an electronic calendar, an address book, and a built-in phone, that cues users to start or stop scheduled activities, monitors their progress, and adjusts schedules as necessary in response to delays or calendar changes. It uses an automatic planning model developed for NASA to adjust daily plans when a situation changes. PEAT is sold as a complete system that includes software, hardware, documentation, and technical support. In addition to the flagship Pocket PEAT device, there is PEAT Phone, PC PEAT, and PEAT Link. Clinical studies of PEAT continue at Santa Clara Valley Medical Center

Source record↗

TEAMER: Supporting model output files for Environmental Compliance Framework for Floating Tidal Turbines, Cook Inlet, AK

Orbital Marine Power (Orbital) is seeking to deploy their floating tidal technology in US waters and has considered the possibility of deploying in temperate waters including the Pacific Northwest (PNW) and the Western Passage, Maine. It has become apparent that some of the most promising tidal sites in the US are located in high latitudes, within the State of Alaska. Within the state, the most likely sites for grid-scale tidal energy are in Cook Inlet, with the largest city (Anchorage) located on the shores, ready and able to absorb the electrical output of a commercial scale tidal development. Through the TEAMER project, Pacific Northwest National Laboratory (PNNL) developed a framework to select environmentally compliant sites partially based on hydrodynamic model output. This uploaded dataset summarizes the key hydrodynamic model output files discussed in the TEAMER project report. Please unzip the file to see actual data files and the ReadMe file. This project is part of the TEAMER RFTS 4 (request for technical support) program.

16 TIDAL AND WAVE POWER↗