Search NASA⌕ Search

SEARCH · Search NASA

Results for “transit agency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Aerosol Can Fireball Tests: Commodity Hazards in the Transportation Environment Phase 1 Report

This report describes a series of tests performed at Sandia’s burn site to better understand the behavior of aerosol commodities and their hazards in the transportation environment. This comes on the tail of a prior study on the use cases and historical hazards associated with aerosol commodities in the shipping environment (Cambridge Systematics Incorporated, CSI, 2020). It is also mindful of the National Fire Protection Agency NFPA30B standard for safe warehousing of aerosol commodities. Warehousing is different from transit because warehousing typically involves active suppression and mitigation measures not practical or relevant to the shipping environment. Transit also typically involves tighter packing and smaller enclosure spaces. The transportation hazard space has not been heavily studied in prior testing specifically aimed towards the ground, rail, and nautical shipping environments.

54 ENVIRONMENTAL SCIENCES↗

Purpose, Principles, and Challenges of the NASA Engineering and Safety Center

NASA formed the NASA Engineering and Safety Center in 2003 following the Space Shuttle Columbia accident. It is an Agency level, program-independent engineering resource supporting NASA's missions, programs, and projects. It functions to identify, resolve, and communicate engineering issues, risks, and, particularly, alternative technical opinions, to NASA senior management. The goal is to help ensure fully informed, risk-based programmatic and operational decision-making processes. To date, the NASA Engineering and Safety Center (NESC) has conducted or is actively working over 600 technical studies and projects, spread across all NASA Mission Directorates, and for various other U.S. Government and non-governmental agencies and organizations. Since inception, NESC human spaceflight related activities, in particular, have transitioned from Shuttle Return-to-Flight and completion of the International Space Station (ISS) to ISS operations and Orion Multi-purpose Crew Vehicle (MPCV), Space Launch System (SLS), and Commercial Crew Program (CCP) vehicle design, integration, test, and certification. This transition has changed the character of NESC studies. For these development programs, the NESC must operate in a broader, system-level design and certification context as compared to the reactive, time-critical, hardware specific nature of flight operations support.

Gilbert, Michael G.↗

Risk Considerations of Transitioning CO2-EOR Field to CO2 storage Field: Case Study

In the United States (U.S.), carbon dioxide (CO2) injection wells at EOR sites are currently regulated as Class II wells under the U.S. Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) program while dedicated geological CO2 storage (GCS) wells are considered Class VI wells. A CO2-EOR facility considering a transitioning from tertiary oil recovery to injecting CO2 for the primary purpose of long-term storage is required to obtain a Class VI permit where this transition poses an increased risk to underground sources of drinking water. This study considers how transitioning operations from CO2-EOR to storage can impact reservoir plume and pressure transient in the storage envelope, and how these changes could impact area of review and potential unwanted fluid migration. We developed a case study to assess subsurface response and leakage risks associated with a representative, hypothetical operation in a carbonate reservoir. This reservoir transitions from tertiary hydrocarbon recovery to dedicated GCS. Reservoir simulations were run for a set of credible CO2-EOR scenarios to estimate distributions of fluids phases and pressures throughout the model domain after CO2 flooding as well as forecasting the behavior of the reservoir after the transition to a dedicated storage phase. The evolutions from all simulated scenarios were used as the basis for leakage risk quantification using the National Risk Assessment Partnership’s Open-Source Integrated Assessment Model (NRAP-Open-IAM) with a novel reduced-order model to estimate time-dependent leakage of CO2, brine, and hydrocarbon fluids through potentially leaky wells. Results include a description of reservoir response, an estimate of the areal extent that could potentially be impacted by leakage to underground sources of drinking water, and estimates of the magnitude of potential leakage. Considerations for dedicated storage injection well selection, injectivity, and injection scheme performance and potential leakage risk are presented, with implications for risk assessment of well transition discussed. This study presents a risk-based workflow for the Class II to Class VI well transition. Integrating credible numerical simulation of viable CO2-EOR to dedicated CO2 storage with quantitative risk assessment tools, such as the NRAP-Open-IAM, will provide a valuable means to devise operational scenarios and inform decision-making related to storage benefit, leakage risk, and liability. Presented at the SPE/AAPG/SEG Carbon Capture Utilization and Storage Conference in Houston, TX, March 11-13, 2024.

Liu, Guoxiang↗

Resource and environmental surveys from space with the thematic mapper in the 1980's

The selection of observation of vegetation is the primary optimization objective of the thematic mapper. The following are aspects of plans for the thematic mapper: (1) to include an appropriately modified first generation MSS in the thematic mapper mission; (2) to provide assured coverage for a minimum of six years to give agencies and other users an opportunity to justify the necessary commitment of resources for the transition into a completely valid operational phase; (3) to provide for global, direct data read-out, without the necessity for on-board data storage or dependence on foreign receiving stations; (4) to recognize the operational character of the thematic mapper after successful completion of its experimental evaluation; and (5) to combine future experimental packages with compatible orbits as part of the operational LANDSAT follow-on payloads.

Source record↗

IS0 9000 Implementation and Assessment: A Guide to Developing and Evaluating Quality Management Systems

The agency has developed this reference publication to aid NASA organizations and their suppliers in the transition to IS0 9000. This guide focuses on the standard s intent, clarifies its requirements, offers implementation examples and highlights interrelated areas. It can assist anyone developing or evaluating NASA or supplier quality management systems. The IS0 9000 standards contain the basic elements for managing those processes that affect an organization's ability to consistently meet customer requirements. IS0 9000 was developed through the International Organization for Standardization and has been adopted as the US. national standard. These standards define a flexible foundation for customer focused process measurement, management and improvement that is the hallmark of world class enterprises.

Navarro, Robert J.↗

NASA's Vision for Potential Energy Reduction from Future Generations of Propulsion Technology

Through a robust partnership with the aviation industry, over the past 50 years NASA programs have helped foster advances in propulsion technology that enabled substantial reductions in fuel consumption for commercial transports. Emerging global trends and continuing environmental concerns are creating challenges that will very likely transform the face of aviation over the next 20-40 years. In recognition of this development, NASA Aeronautics has established a set of Research Thrusts that will help define the future direction of the agency's research technology efforts. Two of these thrusts, Ultra-Efficient Commercial Vehicles and Transition to Low-Carbon Propulsion, serve as cornerstones for the Advanced Air Transport Technology (AATT) project. The AATT project is exploring and developing high-payoff technologies and concepts that are key to continued improvement in energy efficiency and environmental compatibility for future generations of fixed-wing, subsonic transports. The AATT project is primarily focused on the N+3 timeframe, or 3 generations from current technology levels. As should be expected, many of the propulsion system architectures technologies envisioned for N+3 vary significantly from todays engines. The use of batteries in a hybrid-electric configuration or deploying multiple fans distributed across the airframe to enable higher bypass ratios are just two examples of potential advances that could enable substantial energy reductions over current propulsion systems.

Airbreathing Propulsion↗

An Action Plan for Rail Energy and Emissions Innovation

The Action Plan for Rail Energy and Emissions Innovation proposes actions to reduce and nearly eliminate emissions in the U.S. rail sector, in line with the U.S. economy-wide goal of net-zero greenhouse gas (GHG) emissions by 2050. It also proposes actions to leverage the rail system to reduce emissions from other modes. The national goal of achieving a zero-emission freight system by 2050 draws our attention to the fact that freight transport cannot be addressed simply mode by mode, but it should instead be treated as an interdependent system. This is especially true when pursuing decarbonization. This action plan presents how both rail transport and decarbonization intersect with our national transportation decarbonization blueprint, the decarbonization of the freight system, and national transmission goals. The intended audience of this report is the stakeholders who will advance rail decarbonization in a just and economical way by propelling the suite of actions listed here. This includes government at all levels, rail companies, locomotive manufacturers, labor unions, Amtrak, and more.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Business Intelligence Modeling in Launch Operations

This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.

Bardina, Jorge E.↗

NASA Earth Observation Systems and Applications for Health and Air Quality

There is a growing body of evidence that the environment can affect human health in ways that are both complex and global in scope. To address some of these complexities, NASA maintains a diverse constellation of Earth observing research satellites, and sponsors research in developing satellite data applications across a wide spectrum of areas. These include environmental health; infectious disease; air quality standards, policies, and regulations; and the impact of climate change on health and air quality in a number of interrelated efforts. The Health and Air Quality Applications fosters the use of observations, modeling systems, forecast development, application integration, and the research to operations transition process to address environmental health effects. NASA has been a primary partner with Federal operational agencies over the past nine years in these areas. This talk presents the background of the Health and Air Quality Applications program, recent accomplishments, and a plan for the future.

Omar, Ali H.↗

NASA Health and Air Quality Applications

There is a growing body of evidence that the environment can affect human health in ways that are both complex and global in scope. To address some of these complexities, NASA maintains a diverse constellation of Earth observing research satellites, and sponsors research in developing satellite data applications across a wide spectrum of areas. These include environmental health; infectious disease; air quality standards, policies, and regulations; and the impact of climate change on health and air quality in a number of interrelated efforts. The Health and Air Quality Applications fosters the use of observations, modeling systems, forecast development, application integration, and the research to operations transition process to address environmental health effects. NASA has been a primary partner with Federal operational agencies over the past nine years in these areas. This talk presents the background of the Health and Air Quality Applications program, recent accomplishments, and a plan for the future.

Air Quality Remote Sensing↗

Strategies and Good Practices to Support Robust Stakeholder Engagement in Multi-Sector Energy Transition Planning

This document discusses strategies and good practices to facilitate diverse stakeholder engagement and inclusive decision-making within the context of complex energy system modernization studies and multi-sector energy transition planning, drawing upon the knowledge and expertise of numerous USAID, NREL, and other DOE laboratory practitioners with international and domestic energy planning experience. Examples of multi-sector energy transition analyses from the United States are included in this document to draw out relevant lessons learned and experience for the USAID-NREL Partnership - strategies and good practices will be updated over time as new insights emerge through collaboration with international partners and stakeholders. Considerations included within this document can also be used to support stakeholder engagement at the sector level (e.g., for power, transport, buildings), in addition to integrated approaches.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Fossil Fuel Transitions Framework: Case Studies of the Decision-Making Process for Energy and Economic Development Pathways

Each community is unique, and transitions must be tailored to local and national contexts, with recognition that access to financing is a key differentiator between wealthy and low-to-middle income countries. This analysis examines six community fossil fuel transitions in two different country contexts to provide insights on inclusive processes and decision-making criteria that bring forth positive outcomes for the communities. In both the United States and Chile, a coordination mechanism is established across government agencies and the importance of stakeholder engagement is recognized. In many cases, the government, local community groups, and electric utility or industry players have a critical role in transition planning and support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evolving software reengineering technology for the emerging innovative-competitive era

This paper reports on a multi-tool commercial/military environment combining software Domain Analysis techniques with Reusable Software and Reengineering of Legacy Software. It is based on the development of a military version for the Department of Defense (DOD). The integrated tools in the military version are: Software Specification Assistant (SSA) and Software Reengineering Environment (SRE), developed by Computer Command and Control Company (CCCC) for Naval Surface Warfare Center (NSWC) and Joint Logistics Commanders (JLC), and the Advanced Research Project Agency (ARPA) STARS Software Engineering Environment (SEE) developed by Boeing for NAVAIR PMA 205. The paper describes transitioning these integrated tools to commercial use. There is a critical need for the transition for the following reasons: First, to date, 70 percent of programmers' time is applied to software maintenance. The work of these users has not been facilitated by existing tools. The addition of Software Reengineering will also facilitate software maintenance and upgrading. In fact, the integrated tools will support the entire software life cycle. Second, the integrated tools are essential to Business Process Reengineering, which seeks radical process innovations to achieve breakthrough results. Done well, process reengineering delivers extraordinary gains in process speed, productivity and profitability. Most importantly, it discovers new opportunities for products and services in collaboration with other organizations. Legacy computer software must be changed rapidly to support innovative business processes. The integrated tools will provide commercial organizations important competitive advantages. This, in turn, will increase employment by creating new business opportunities. Third, the integrated system will produce much higher quality software than use of the tools separately. The reason for this is that producing or upgrading software requires keen understanding of extremely complex applications which is facilitated by the integrated tools. The radical savings in the time and cost associated with software, due to use of CASE tools that support combined Reuse of Software and Reengineering of Legacy Code, will add an important impetus to improving the automation of enterprises. This will be reflected in continuing operations, as well as in innovating new business processes. The proposed multi-tool software development is based on state of the art technology, which will be further advanced through the use of open systems for adding new tools and experience in their use.

Hwang, Phillip Q.↗

Transitioning CO2-EOR Field to Dedicated CO2 Storage: Risk Considerations and Quantifications

Presentation slides on “Transitioning CO2-EOR Field to Dedicated CO2 Storage: Risk Considerations and Quantifications” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. CO2 injection wells for enhanced oil recovery (EOR) are currently regulated as Class II wells under the U.S. Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) program, while dedicated geological CO2 storage (GCS) wells are considered Class VI wells. The UIC classification of wells for a transitioning CO2-EOR facility has the potential to substantially impact the feasibility of operations. This paper reports a case study of risk assessment of this transition, including areas review, plume stability and pressure transient and its impacts in dedicated CO2 storage.

carbon storage↗

Design of a Non-PLL Grid-Forming Inverter for Smooth Microgrid Transition Operation

This paper develops a controller for a grid-forming (GFM) inverter that is capable of operating as either a GFM or grid-feeding source that can improve the operation of a microgrid during on-off grid transitions through use of a novel synchronization approach. Furthermore, this controller avoids use of a phase-locked loop (PLL) and the inverter is able to synchronize with the grid with self-generated voltage and frequency. This prevents the inverter from replicating any grid voltage disturbances in its output—a key disadvantage of many grid-connected inverters that use a PLL. To enable fast synchronization, active synchronization control is adopted both during inverter start-up and microgrid reconnection operation and a method of coordinating synchronization of the inverter with a microgrid controller and grid interconnection circuit breaker is presented. Simulation results for multiple microgrid transition operations and unplanned islanding events demonstrate that the developed non-PLL grid-connected GFM inverter controller and synchronization method are effective in synchronizing the inverter and microgrid to the grid, avoiding phase jump during microgrid transition operation, and improving microgrid islanding transients versus a traditional configuration.

27 ARPA - Advanced Research Projects Agency-Energy↗

Mars trajectory options for the Space Exploration Initiative

The Mission Definition Office within the Lunar and Mars Exploration Program Office at the NASA/Johnson Space Center has the responsibility for leading the Space Exploration Initiative mission design activities across the Agency. In support of the Synthesis Group architecture analyses, a mission concept that includes fast one-way transits to and from Mars, a powered flyby abort, and an early return option has been developed. This paper will describe this integrated approach to Mars mission planning.

Soldner, John K.↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As NASA turns 60 and plans to transition the International Space Station (ISS) and other low-Earth orbit (LEO) activities to commercial enterprises, the Agency's human exploration program turns its focus to deep space. With missions planned to send astronauts back to the Moon and to construct a lunar orbiting Gateway for surface access as well as science experiments and technology demonstrations, NASA requires a vehicle with capabilities for launching more mass and volume than is currently commercially available. To that end, NASA and its private sector partners are building the Space Launch System (SLS) super heavy-lift launch vehicle, which will send the new Orion crew capsule, eventually with a complement of four astronauts, to cislunar space for the first time since the Apollo Program in the 1960s and 1970s. NASA Kennedy Space Center's (KSC's) Exploration Ground Systems (EGS) Program has upgraded and refurbished ground and launch facilities to process, assemble and launch NASA's new deep space exploration system, which is managed by the Exploration Systems Development (ESD) organization in the Human Exploration and Operations Mission Directorate (HEOMD). Offering an unmatched combination of power, payload capacity and departure energy, the evolvable SLS features the world's most proven propulsion system: solid rocket boosters and RS-25 main engines with a modified Delta Cryogenic Second Stage (DCSS) cryogenic upper stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) to trans-lunar injection (TLI). The second variant, Block 1B, will deliver at least 34 t to TLI in its crew configuration and at least 40 t to TLI in its cargo configuration. The Block 1 cargo vehicle will fly with an industry-standard 5 m fairing while the Block 1B cargo configuration will accommodate 8 m-diameter fairings in varying lengths. The Block 2 vehicle will incorporate upgraded boosters and possibly larger fairings for launching Mars-class payloads to deep space. Although designed to enable human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with access to deep space. Three flights of the Block 1 vehicle are now planned; the first vehicle, being built for a test flight known as Exploration Mission-1 (EM-1), is nearing completion at NASA and contractor sites across the United States. In fact, hardware for the second mission has also been built. This paper will provide an overview of the SLS vehicle, with a focus on its payload accommodations and the missions enabled by the unprecedented payload volume and departure energy of SLS. This paper also describes the status of the manufacturing and integration for first flight and beyond.

Exploration Mission-1↗

H2@Scale CRADA: CA Research Consort. (Ref. Station, Fueling Perf. Test Device, Station Cap Model)

Heavy-duty (HD) hydrogen stations are an essential part of building a clean energy infrastructure by lowering greenhouse gas emissions and criteria pollutants from the trucking industry. Clean fuel at HD stations also supports energy, environmental, and social justice by preventing pollution near the stations and on truck routes while strengthening U.S. manufacturing and providing pathways to private sector uptake. The goal of the CA Research Consortium is to continue the research partnership between national laboratories, DOE, and California public agencies for the advancement of hydrogen fueling infrastructure for HD vehicles. This cooperative work directly impacts California's transition to Zero Emission Trucks and will provide tools and information that lead to more efficient design, acceptance, and commissioning of these larger capacity, higher flow rate stations serving HD hydrogen trucks such as class 8 trucks in long haul applications.

AMR↗