Search NASA⌕ Search

SEARCH · Search NASA

Results for “tribes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Sicangu Village Solar Project

The Sicangu Village Solar Project, spearheaded by the Rosebud Sioux Tribe in partnership with GRID Alternatives, aimed to enhance energy sustainability within the community through the installation of a 149 kW community solar Photovoltaic (PV) array and 13 residential rooftop solar PV systems. Located in Todd County, South Dakota, the project addresses longstanding challenges of rising electricity costs and economic disparities faced by the Tribe. By leveraging solar energy production, the project not only reduces electricity expenses for the community, but also serves as a pivotal step towards achieving the Tribe's energy sovereignty goals. Despite encountering interconnection challenges and delays, particularly exacerbated by regulatory and infrastructure complexities, the project has successfully demonstrated the feasibility of solar energy deployment within the community.

14 SOLAR ENERGY↗

Establishment of an Intertribal Technical Energy Providers Network (Final Technical Report)

The Midwest Tribal Energy Resources Association (MTERA) embarked on a 5-year (extended to 7-year) initiative aimed at advancing Tribal energy resilience and sustainability through intertribal collaboration. By bringing together Tribes in Minnesota, Wisconsin, and Michigan (EPA Region 5 Tribes), the project's scope encompassed organizational growth, governance and management formalization and enhancement, and the planning and deployment of energy-related services to Member Tribes. MTERA strategically pursued four key objectives to fulfill its mission: 1. Clearinghouse Development: Creation of a centralized hub offering valuable information, education, and outreach for Tribal communities and their neighbors. 2. Policy Liaison: Serving as a vital link between federal and state agencies to contribute to the formulation of inclusive energy policies that ensure both Tribal and regional energy success. 3. Energy Planning and Research: Providing essential support for energy planning, researching financing opportunities, and exploring effective procurement strategies. 4. Training Support: Facilitating training and apprenticeship initiatives to empower the Tribal workforce and enhance community capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reese Housing Power Project (Final Technical Report)

The Reese Housing Power Project is located on Tribal trust land in Colusa, CA and expands existing medium-voltage distribution to seven new households with the addition of medium-voltage cabling, step down transformers, smart meters, and street lighting for the new development. The Tribe utilized their existing Co-Generation power plant and micro grid to supply the new homes with highly reliable power with fewer interruptions and at a reduced rate compared with the local utility. The project gives the Tribe greater independence from traditional power sources and provides jobs for the community. The project reduces electric energy costs, increases Tribe self-reliance, and provides highly reliable electric power to seven tribal members’ homes. Construction of the project also provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towaoc Housing Solar Initiative

The Towaoc Housing Solar initiative was implemented to install net-metered solar generation systems on twenty-three Tribal buildings in Towoac, CO on the Ute Mountain Ute Reservation. The project was funded 80% by Department of Energy and 20% by the Ute Mountain Ute Tribe. The project and grant are authorized by Ute Mountain Ute Tribal Council Resolution 2020-116. The systems were designed to cumulatively generate 160 direct current (DC) kilowatts on average, translating to 222,585 kilowatt hours per year. The average cost for the generation was calculated at $\$$3.34/watt with a return on investment period anticipated at 22 years for a simple payback of all costs, 11 years for the Tribe’s investment at 50% cost-share. The systems should last for 30 years. The primary goals of the project for the Tribe were identified as the reduction of electricity costs for the twenty three Tribal buildings of the Housing Authority (comprising 22 rental homes and a small apartment building with 11 units) and the reduction of carbon pollution through the transition of energy sources used in the buildings.

14 SOLAR ENERGY↗

Micro-Hydropower and Aquatic Restoration on Lands of the Eastern Band of Cherokee Indians

Rural and Tribal communities in Southern Appalachia face persistent challenges in energy access owing to rugged terrain, dense forest cover, and limited infrastructure. The Eastern Band of Cherokee Indians (EBCI) is a federally recognized Tribe whose ancestral homelands include much of Southern Appalachia. The Tribe’s present-day homeland, termed the Qualla Boundary, lies in the heart of the region, where the extreme ruggedness of the Blue Ridge Mountains exacerbates challenges to energy access. For the EBCI, these challenges also intersect with a deep cultural commitment to stewardship of land and water. The Tribe has explored multiple energy solutions, with hydropower serving as an existing and realized source of energy for the region’s communities. However, the EBCI’s commitment to protecting aquatic systems has led not only to a historical lack of endorsement of new conventional hydropower on Tribal lands but also to ongoing efforts to remove the area’s only existing hydropower facility at Ela Dam.

13 HYDRO ENERGY↗

Rehabilitate Newsome Creek Watershed, 2007-2008 Annual Report.

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridgetop approach. The Nez Perce Tribe (NPT) and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Newsome Creek watershed of the South Fork Clearwater River in 1997. Progress has been made in restoring the watershed through road decommissioning and culvert replacement. Starting in FY 2001 and continuing into the present, a major stream restoration effort on the mainstem of Newsome Creek has been pursued. From completing a watershed assessment to a feasibility study of 4 miles of mainstem rehabilitation to carrying that forward into NEPA and a final design, we will begin the effort of restoring the mainstem channel of Newsome Creek to provide spawning and rearing habitat for anadromous and resident fish species. Roads have been surveyed and prioritized for removal or improvement as well as culverts being prioritized for replacement to accommodate fish passage throughout the watershed.

13 HYDRO ENERGY↗

Protect and Restore Red River Watershed, 2007-2008 Annual Report.

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. The Nez Perce Tribe (NPT) and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Red River Watershed of the South Fork Clearwater River in 2001. Progress has been made in restoring the watershed through road decommissioning and culvert replacement. From completing a watershed assessment to two NEPA efforts and a final stream restoration design, we will begin the effort of restoring the mainstem channel of Red River to provide spawning and rearing habitat for anadromous and resident fish species. Roads have been surveyed and prioritized for removal or improvement as well as culverts being prioritized for replacement to accommodate fish passage throughout the watershed. Another major, and extremely, important component of this project is the Red River Meadow Conservation Easement. We have begun the process of pursuing a conservation easement on approximately 270 acres of prime meadow habitat (Red River runs through this meadow and is prime spawning and rearing habitat).

13 HYDRO ENERGY↗

Snake River Sockeye Salmon Habitat and Limnological Research : 2008 Annual Progress Report.

In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list Snake River sockeye salmon (Oncorhynchus nerka) as endangered. Snake River sockeye salmon were officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991, the Snake River Sockeye Salmon Habitat and Limnological Research Project was implemented. This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of Snake River sockeye salmon. The Shoshone-Bannock Tribal goal for this project is two tiered: the immediate goal is to increase the population of Snake River sockeye salmon while preserving the unique genetic characteristics of the evolutionarily significant unit (ESU). The Tribes long term goal is to maintain a viable population that warrants delisting and provides Tribal harvest opportunities. The Bonneville Power Administration (BPA) provides funding for this interagency Recovery effort. Collaborators in the recovery effort include the National Oceanic and Atmospheric Administration (NOAA), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), and the Shoshone-Bannock Tribes (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 2008 calendar year. Project tasks include: (1) monitor limnological parameters of the Sawtooth Valley lakes to assess lake productivity; (2) conduct lake fertilization in Pettit and Alturas lakes; (3) reduce the number of mature kokanee salmon spawning in Alturas Lake Creek; (4) monitor, enumerate, and evaluate sockeye salmon smolt migration from Pettit and Alturas lakes; (5) monitor spawning kokanee salmon escapement and estimate fry recruitment in Fishhook and Alturas Lake creeks; (6) conduct sockeye and kokanee salmon population surveys; (7) evaluate potential competition and predation between stocked juvenile sockeye salmon and a variety of fish species in Redfish, Pettit, and Alturas lakes; and (8) assist IDFG with captive broodstock production activities.

13 HYDRO ENERGY↗

Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

13 HYDRO ENERGY↗

Siting and Transportation for Consolidated Used Nuclear Fuel Management Facilities: A Proposed Approach for a Regional Initiative to Begin the Dialogue - 13562

The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed in January 2010 to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, and to develop a new national strategy. Over two years, the BRC held dozens of meetings and heard from hundreds of Federal, State, Tribal, and local officials, as well as representatives of trade and labor organizations, technical groups, non-governmental organizations, and other stakeholders. The Commission's final report (issued January 26, 2012) offers a strategy to resolve longstanding challenges to responsible management of the United States' nuclear waste legacy. The Commission recommended Congressional action to rewrite parts of the Nuclear Waste Policy Act (NWPA); however, a comprehensive legislative overhaul will likely take years to fully implement. The nature and characteristics of nuclear waste, the activities that generated it, and the past history of federal efforts to manage the waste make it virtually certain that finding workable solutions will be controversial and difficult. As the BRC report suggests, this difficulty can be made insurmountable if top-down, federally-mandated efforts are forced upon unwilling States, Tribes, and local communities. Decades of effort and billions of ratepayer and taxpayer dollars have been spent attempting to site and operate spent fuel storage and disposal facilities in this manner. The experience thus far indicates that voluntary consent and active partnership of States, Tribes, and local governments in siting, designing, and operating such facilities are critical. Some States, Tribes, and local communities have indicated that, given adequate scientific and technical information, along with appropriate incentives, assurances, and authority, they might be willing to consider hosting facilities for consolidated storage and disposal of spent nuclear fuel. The authors propose a new regional approach to identifying and resolving issues related to the selection of a consolidated storage site. The approach would be characterized by informed discussion and deliberation, bringing together stakeholders from government, the non-governmental (NGO) community, industry, and other sectors. Because site selection would result in regional transportation impacts, the development of the transportation system (e.g., route identification, infrastructure improvements) would be integrated into the issue-resolution process. In addition to laying out the necessary steps and associated timeline, the authors address the challenges of building public trust and confidence in the new waste management program, as well as the difficulty of reaching and sustaining broad-based consensus on a decision to host a consolidated storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Salmon as a Bio-indicator of the Health of the Columbia River at Hanford - 15534

Assessing human, ecological, and cultural health and well-being on- and off-site is an important aspect of managing legacy wastes and environmental remediation on U.S. Department of Energy sites. Such an assessment is especially important at places such as Hanford because the Columbia River runs through the site. The Columbia River is central to the culture and economy of the northwest, especially to the Tribes. While a full range of other bio-indicators are used to determine the health of the river with respect to contaminants, salmon are the iconic, keystone species in the Columbia River of concern to the full range of regulators, managers, Tribes, and the public. A bio-monitoring plan that will assure the public and others that the activities of DOE are not adversely impacting the salmon populations in the Columbia River is critical for long term stewardship, both of the Hanford Site and the River and its resources Numerous factors affect salmon populations, including different life stages, habitat variables, and anthropogenic effects, including hexavalent chromium. Based on a literature review of the factors affecting populations, a conceptual model was developed for effects on salmon population stability. Salmon have a life history that includes laying eggs in gravel (redds) at the river bottom and then spending several life stages in fresh water and maturing in saltwater before they return to their natal streams or rivers to breed. All of these phases are potentially vulnerable to a range of natural and anthropogenic factors. Eggs in redds in the river bottom are vulnerable to water erosion, dewatering, oxygen levels, predators, and contaminants, while juveniles (fry, parr, smolts) are vulnerable to water currents, oxygen levels, predators, contaminants, and negotiating dams. When adults return to the river up to 7 years later, they face these same factors, as well as intense fishing pressures. The major factor affecting salmon populations may well be the fight to swim upstream, around dams, to reach traditional spawning grounds. While the data provided in this study relate to salmon at Hanford, the overall conceptual framework provides a paradigm for evaluating other sensitive indicators at other Department of Energy sites. The framework provides a method to insure the Tribes and public that the health and well-being of an important economic, cultural, and aesthetic species is being adequately addressed, and suggests the types of data needed to address the issue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Step for STEP (Siletz Tribal Energy Program)

The Siletz Tribal Energy Program (STEP), housed in the Tribe’s Planning Department, will hire a data entry coordinator to collect, enter, analyze and store all the current and future energy efficiency and renewable energy data pertaining to administrative structures the tribe owns and operates and for homes in which tribal members live. The proposed data entry coordinator will conduct an energy options analysis in collaboration with the rest of the Siletz Tribal Energy Program and Planning Department staff. An energy options analysis will result in a thorough understanding of tribal energy resources and consumption, if energy efficiency and conservation measures being implemented are having the desired effect, analysis of tribal energy loads (current and future energy consumption), and evaluation of local and commercial energy supply options. A literature search will also be conducted. In order to educate additional tribal members about renewable energy, we will send four tribal members to be trained to install and maintain solar panels, solar hot water heaters, wind turbines and/or micro-hydro.

14 SOLAR ENERGY↗

Heritage plaza parking lots improvement project- Solar PV installation

The Agua Caliente Band of Cahuilla Indians (ACBCI or the “Tribe”) installed a 79.95 kW solar photovoltaic (PV) system to offset the energy usage costs of the Tribal Education and Family Services offices located at the Tribe's Heritage Plaza office building, 90I Tahquitz Way, Palm Springs, CA, 92262 (the "Project"). The installation of the Solar PV system was part of the larger Heritage Plaza Parking Lot Improvements Project and mounted on the two southern carport shade structures. The solar PV system will offset 99% of the approximately 115,000 kWh in electricity delivered annually by Southern California Edison (SCE) to the Tribal Education and Family Services offices at Heritage Plaza, reducing their annual energy costs from approximately $22,000 annually to approximately $200. The total cost of the proposed solar PV system is $240,000.

14 SOLAR ENERGY↗

Final Report - Wind and Hydro Energy Feasibility Study - June 2011

This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.

13 HYDRO ENERGY↗

Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing the Feasibility of Renewable Energy Development and Energy Efficiency Deployment on Tribal Lands

The Keweenaw Bay Indian Community (KBIC) is committed to preserving our natural environment and reducing the amount of fossil fuels consumed while developing "green" business manufacturing jobs on tribal lands. The Tribe's Comprehensive Strategic Plan seeks to diversify the Tribal Economy through the creation of alternative energy businesses, such as wind, solar and bio-mass facilities while protecting the waters of Lake Superior, tribal inland lakes and streams. In addition, the Community desired to utilize clean/green energy resources to promote the self-sufficiency of the Tribal Nation. The objective of the study is to preserve our environment and maintain our cultural goals of using the resources of the land wisely. To reduce our consumption of fossil fuels, mercury and carbon dioxide emissions, which harm our water and land; we have decided to evaluate the opportunities of utilizing wind power. Preliminary projections show that we may eliminate pollution from our land in a cost effective manner. This study will evaluate wind capacity and our current energy consumption while projecting the feasibility of converting to wind power for operations at our major facilities. This project will study the feasibility of wind power at two locations for the purpose of reducing the Tribe's reliance upon fossil fuels and creating business opportunities, jobs and revenue for the community.

17 WIND ENERGY↗

Planning Brings Vision Into Focus (Brochure)

This case study/fact sheet highlights the strategic energy planning process for Tribes that was developed by the DOE Office of Indian Energy. This nine-step process, which is outlined in one of the foundational education courses offered by the Office, enables Tribes to pursue energy projects in a well-planned and strategic manner.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗