Search NASA⌕ Search

SEARCH · Search NASA

Results for “umbilical”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

STS-121: Discovery Spacewalk Overview Briefing

The briefing began with the introduction of Tomas Gonzalez-Torres (Lead Extra Vehicular Activity Officer). The spacewalk team included Pierce Sellers (EV-1), Mike Fossum (EV-2) and Mark Kelly (coordinator and pilot). Three new EMU's (space suits) were provided with hardware upgrades (warning systems). The 1st EVA would take place on flight day 5 and would include the exchange of the 3 EMU's. The 1st task was the installation of the blade locker, a device used to prevent severing of cables. The team will also install the Interface Umbilical System (IUS) which is an extension cord for the mobile transporter. EVA-2 task will be to replace the old Trailing Umbilical System (TUS) with a new one.

Source record↗

Proposed Schematics and Modeling Results for a Lunar Portable Life Support System

The Constellation Space Suit Element (CSSE) is an integrated assembly made up of primarily a Pressure Garment System (PGS) and a Portable Life Support System (PLSS). The PLSS is further composed of an oxygen (O2) subsystem, a ventilation subsystem, and a thermal subsystem. This paper baselines a detailed schematic of the CSSE PLSS to provide a basis for current and future CSSE PLSS development efforts. Both context diagrams and detailed schematics describe the hardware components and overall functions for all three of the PLSS subsystems. Additionally, PLSS functions are presented for multiple operational scenarios as follows: 1) Nominal Extravehicular Activity (EVA) Mode; 2) Umbilical Modes; a) No Recharge, b) With Recharge; 3) Decompression Sickness (DCS) Treatment Mode; 4) Buddy Mode; 5) Secondary O2 Modes; a) Helmet Purge; b) Suit Purge; c) Operational; and 5) PLSS Removed Umbilical Mode. A performance modeling effort is being performed to provide a preliminary confirmation of this layout and the current state of the thermal hydraulic modeling efforts being conducted for the PLSS is presented. The goal of these efforts is to provide realistic simulations of the PLSS under various modes of operation. Modeling approaches and assumptions are discussed as well as component model descriptions. Results from the models are included that show PLSS operations at steady-state and transient conditions. Finally, conclusions and recommendations are offered that summarize results, identify PLSS design weaknesses uncovered during review of the analysis results, and propose areas for improvement to increase model fidelity and accuracy.

Conger, Bruce↗

SSV Launch Monitoring Strategies: HGDS Design Implementation Through System Maturity

With over 500,000 gallons of liquid hydrogen and liquid oxygen, it is of vital importance to monitor the space shuttle vehicle (SSV) from external tank (ET) load through launch. The Hazardous Gas Detection System (HGDS) was installed as the primary system responsible for monitoring fuel leaks within the orbiter and ET. The HGDS was designed to obtain the lowest possible detection limits with the best resolution while monitoring the SSV for any hydrogen, helium, oxygen, or argon as the main requirement. The HGDS is a redundant mass spectrometer used for real-time monitoring during Power Reactant Storage and Distribution (PRSD) load and ET load through launch or scrub. This system also performs SSV processing leak checks of the Tail Service Mast (TSM) umbilical quick disconnects (QD's), Ground Umbilical Carrier Plate (GUCP) QD's and supports auxiliary power unit (APU) system tests. From design to initial implementation and operations, the HGDS has evolved into a mature and reliable launch support system. This paper will discuss the operational challenges and lessons learned from facing design deficiencies, validation and maintenance efforts, life cycle issues, and evolving requirements

Shoemaker, Marc D.↗

Brief, Why the Launch Equipment Test Facility Needs a Laser Tracker

The NASA Kennedy Space Center Launch Equipment Test Facility (LETF) supports a wide spectrum of testing and development activities. This capability was originally established in the 1970's to allow full-scale qualification of Space Shuttle umbilicals and T-O release mechanisms. The LETF has leveraged these unique test capabilities to evolve into a versatile test and development area that supports the entire spectrum of operational programs at KSC. These capabilities are historically Aerospace related, but can certainly can be adapted for other industries. One of the more unique test fixtures is the Vehicle Motion Simulator or the VMS. The VMS simulates all of the motions that a launch vehicle will experience from the time of its roll-out to the launch pad, through roughly the first X second of launch. The VMS enables the development and qualification testing of umbilical systems in both pre-launch and launch environments. The VMS can be used to verify operations procedures, clearances, disconnect systems performance &margins, and vehicle loads through processing flow motion excursions.

Yue, Shiu H.↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Architecture Trade Study

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability for Orion. The EVAs will involve a two-person crew for approximately four hours. Currently, two EVAs are planned with one contingency EVA in reserve. Providing this EVA capability is very challenging due to system level constraints and a new and unknown environment. The goal of the EVA architecture for ARCM is one that builds upon previously developed technologies and lessons learned, and that accomplishes the ARCM mission while providing a stepping stone to future missions and destinations. The primary system level constraints are to 1) minimize system mass and volume and 2) minimize the interfacing impacts to the baseline Orion design. In order to minimize the interfacing impacts and to not perturb the baseline Orion schedule, the concept of adding "kits" to the baseline system is proposed. These kits consist of: an EVA kit (converts LEA suit to EVA suit), EVA Servicing and Recharge Kit (provides suit consumables), the EVA Tools, Translation Aids & Sample Container Kit (the tools and mobility aids to complete the tasks), the EVA Communications Kit (interface between the EVA radio and the MPCV), and the Cabin Repress Kit (represses the MPCV between EVAs). This paper will focus on the trade space, analysis, and testing regarding the space suit (pressure garment and life support system). Historical approaches and lessons learned from all past EVA operations were researched. Previous and current, successfully operated EVA hardware and high technology readiness level (TRL) hardware were evaluated, and a trade study was conducted for all possible pressure garment and life support options. Testing and analysis was conducted and a recommended EVA system architecture was proposed. Pressure garment options that were considered for this mission include the currently in-use ISS EVA Mobility Unit (EMU), all variations of the Advanced Crew Escape Suit (ACES), and the Exploration Z-suit. For this mission, the pressure garment that was selected is the Modified ACES (MACES) with EVA enhancements. Life support options that were considered included short closed-loop umbilicals, long open-loop umbilicals, the currently in-use ISS EMU Portable Life Support System (PLSS), and the currently in development Exploration PLSS. For this mission, the life support option that was selected is the Exploration PLSS. The greatest risk in the proposed architecture is viewed to be the comfort and mobility of the baseline MACES and the delicate balance between adding more mobility features while not compromising landing safety. Feasibility testing was accomplished in low fidelity analogs and in the JSC Neutral Buoyancy Laboratory (NBL) to validate the concept before a final recommendation on the architecture was made. The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work and further definition of the remaining kits will be conducted in government fiscal year 14.

Blanco, Raul A.↗

Evaluation of Transient Pin-Stress Requirements for Spacecraft Launching in Lightning Environments. Pain Free Analysis to Alleviate Those Pin Stress Headaches

Spacecraft are generally protected from direct lightning attachment by encapsulation within the payload fairing of a launch vehicle and the ground structures that exist at the launch site. Regardless of where lightning strikes, potentially damaging indirect effects prevail from the coupling of electromagnetic fields into a loop created by outer shield of the payload umbilical. The energy coupled into individual spacecraft circuits is dependent on the umbilical current drive, the cable transfer impedance and the source/ load circuitry, and the reference potential used. Lightning induced transient susceptibility of the spacecraft avionics needs to be fully understood in order to define realistic re-test criteria in the event of a lightning occurrence during the launch campaign. Use of standards such as RTCA/DO-160 & SAE 5412 has some applicability but do not represent the indirect environment adequately. This paper evaluates the launch pad environments, the measurement data available, and computer simulations to provide pain-free analysis to alleviate the transient pin-stress headaches for spacecraft launching in Lightning environments.

Induced Transient↗

Experimental Characterization of the Space Launch System Block 1B Liftoff and Transition Environment

A wind tunnel test was conducted at the NASA Langley Research Center 14- by 22-Foot Subsonic Tunnel to evaluate the liftoff and transition flow environment of the Space Launch System Block 1B launch vehicles and tower interference effects with the newly designed Mobile Launcher 2. This test leveraged several unique diagnostic capabilities, including eight distributed force and moment measurements on the launch tower tiers, new umbilical and crew access arm configurations, and unsteady pressure acquisition on the rocket nose in the cargo configuration. The tower loading revealed a strong impact of the SLS vehicle height on force coefficients for individual tiers. Although the umbilicals produced weak influence on the loading on both vehicle and launch tower, unsteady pressure measurements revealed a slight increase in fundamental pressure oscillation frequency at specific wind azimuth directions. Multimodal flow states were observed in the gap flow between the vehicle and solid rocket boosters, producing different load profiles along the vehicle that are now incorporated in the vehicle database. This phenomenon was investigated using time-series measurements of forces as well as tufts and smoke flow visualization.

Lee J Mears↗

Experimental Characterization of the Space Launch System Block 1B Liftoff and Transition Environment

A wind tunnel test was conducted at the NASA Langley Research Center 14- by 22-Foot Subsonic Tunnel to evaluate the liftoff and transition flow environment of the Space Launch System Block 1B launch vehicles and tower interference effects with the newly designed Mobile Launcher 2. This test leveraged several unique diagnostic capabilities, including eight distributed force and moment measurements on the launch tower tiers, new umbilical and crew access arm configurations, and unsteady pressure acquisition on the rocket nose in the cargo configuration. The tower loading revealed a strong impact of the SLS vehicle height on force coefficients for individual tiers. Although the umbilicals produced weak influence on the loading on both vehicle and launch tower, unsteady pressure measurements revealed a slight increase in fundamental pressure oscillation frequency at specific wind azimuth directions. Multimodal flow states were observed in the gap flow between the vehicle and solid rocket boosters, producing different load profiles along the vehicle that are now incorporated in the vehicle database. This phenomenon was investigated using time-series measurements of forces as well as tufts and smoke flow visualization.

SLS↗

Exploration Extravehicular Mobility Unit (xEMU) 11 Foot Vacuum Chamber Upgrades Test Results

The Exploration Extravehicular Mobility Unit (xEMU) uncrewed 11 foot vacuum chamber testing evaluated the capabilities of the 11 foot vacuum chamber facility to support advanced spacesuit testing. The government reference design xEMU spacesuit provided a high-fidelity test article to demonstrate 11 foot vacuum chamber capabilities which included: gas loading of the chamber at varying simulated metabolic rates and open loop suit abort operations, Intravehicular Activity (IVA) vacuum access, consumables recharge, IVA vehicle-provided thermal loop cooling, and IVA vehicle-provided power. To demonstrate the xEMU airlock operations transitioning from IVA to EVA conditions without a test subject in the suit, test support equipment was developed to remotely actuate both the Exploration, Servicing, and Cooling Umbilical (ESCU) and the vacuum access umbilical. This test also evaluated the performance of the Exploration Portable Life Support System (xPLSS) at vacuum conditions. Data was collected and analyzed for carbon dioxide (CO2) scrubbing performance of the Rapid Cycle Amine (RCA) swingbed, for thermal regulation performance of the Suit Water Membrane Evaporator (SWME), and for sensor performance across the xPLSS. This paper will detail the findings of the testing performed with these upgrades which discussed previously laid out in ICES-2025-342.

Robert F Marsch↗

Exploration Extravehicular Mobility Unit 11 Foot Vacuum Chamber Upgrades Test Results

The Exploration Extravehicular Mobility Unit (xEMU) uncrewed 11 foot vacuum chamber testing evaluated the capabilities of the 11 foot vacuum chamber facility to support advanced spacesuit testing. The government reference design xEMU spacesuit provided a high-fidelity test article to demonstrate 11 foot vacuum chamber capabilities which included: gas loading of the chamber at varying simulated metabolic rates and open loop suit abort operations, Intravehicular Activity (IVA) vacuum access, consumables recharge, IVA vehicle-provided thermal loop cooling, and IVA vehicle-provided power. To demonstrate the xEMU airlock operations transitioning from IVA to EVA conditions without a test subject in the suit, test support equipment was developed to remotely actuate both the Exploration, Servicing, and Cooling Umbilical (ESCU) and the vacuum access umbilical. This test also evaluated the performance of the Exploration Portable Life Support System (xPLSS) at vacuum conditions. Data was collected and analyzed for carbon dioxide (CO2) scrubbing performance of the Rapid Cycle Amine (RCA) swingbed, for thermal regulation performance of the Suit Water Membrane Evaporator (SWME), and for sensor performance across the xPLSS. This paper will detail the findings of the testing performed with these upgrades which discussed previously laid out in ICES-2025-342.

Robert Marsch↗

Mariner Mars 1964 flight dynamic data

Telemetry data in and around Mars spacecraft area analyzed for Mariner III and IV space probes by data from vibration transducers on payload and microphones on umbilical tower

TELEMETRY↗

Quick-disconnect at countdown.

Umbilical carriers and quick-disconnect facilities of Saturn V ground support equipment noting location, ejecting methods, etc

UMBILICAL TOWER↗