Search NASA⌕ Search

SEARCH · Search NASA

Results for “utilization plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Advancing Understanding of Geothermal Representation in the Power Sector to Accelerate Deployment

Driven mostly by decarbonization goals, geothermal interest in the US power sector has grown considerably, gradually evolving from being considered a niche technology, to being recognized as a viable source of clean, baseload, grid-balancing power, and renewable electric power generation. Furthermore, recent technical advances that could greatly accelerate deployment in the near future, and US federal incentives for low-carbon generation technologies, including geothermal, can enable opportunities for integrating geothermal into utilities resource planning portfolios. However, in general, utilities do not have in-house expertise to evaluate geothermal technologies and its potential role in helping decarbonize the grid as well as help them achieve their individual decarbonization goals. To date, geothermal is rarely included in Capacity Expansion Models (CEM) which utilities use in their planning activities and resource/technologies prioritization. To this end, EPRI and NREL are working together in a DOE-GTO funded research project to improve geothermal understanding (opportunities, value, risks) among the power industry to help accelerate geothermal deployment. In the present paper we describe the approach and preliminary findings of this work, focused on two topics: 1) Expand the degree of understanding on the value, opportunity, and risk of geothermal technologies among utilities and related companies/groups, specifically around geothermal for power generation. 2) Improve representation of geothermal power technologies in capacity expansion models (CEM).

capacity expansion models↗

The Relevance of Mars Samples to Planning for Potential Future In-Situ Resource Utilization

Considerable recent planning has focused on the potential importance of Mars in-situ resources to support future human missions. While atmospheric CO2 provides a source of oxygen, the regolith offers other potential resources. The most significant surface asset is water, which could be used for propellant generation, life support, habitat sustainment, and agriculture. In regard to the latter, the regolith could also provide a source of nutrients to supplement terrestrial fertilizers and/or act as a substrate to buffer plant roots. Local material could also be used as feedstock for construction, including for structures, roads, and additive manufacturing. Native salts (e.g. perchlorates or chlorides) in the Martian regolith could be used as water absorbents for closed loop life support systems or for capture of the limited atmospheric water.

Source record↗

Distribution System Plan Template and Guide for Electric Utilities for Adaptation by States and Utilities [Slides]

LBNL researchers developed a template and companion guide for structuring distribution system plans. The template covers 10 key sections in utility distribution system plans and underlying topics: -Executive Summary -Planning Objectives -Current Distribution System -Planning Approach -Asst Management, Reliability and Resilience -O&M Expenses -Capacity Expansion Planning -Solution Identification -Cost-effectiveness -Implementation For each section in the template, the companion guide provides: a description of the topics covered and their importance; the type of content to include in the plan; an example utility approach; and references to other utility plans that serve as models for the topic.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fifteen-foot diameter modular space station Kennedy Space Center launch site support definition (space station program Phase B extension definition)

This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.

Bjorn, L. C.↗

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market↗

NASA's Space Launch System: Enabling Exploration and Discovery

As NASA's new Space Launch System (SLS) launch vehicle continues to mature toward its first flight and beyond, so too do the agency's plans for utilization of the rocket. Substantial progress has been made toward the production of the vehicle for the first flight of SLS - an initial "Block 1" configuration capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). That vehicle will be used for an uncrewed integrated test flight, propelling NASA's Orion spacecraft into lunar orbit before it returns safely to Earth. Flight hardware for that launch is being manufactured at facilities around the United States, and, in the case of Orion's service module, beyond. At the same time, production has already begun on the vehicle for the second SLS flight, a more powerful Block 1B configuration capable of delivering more than 105 t to LEO. This configuration will be used for crewed launches of Orion, sending astronauts farther into space than anyone has previously ventured. The 1B configuration will introduce an Exploration Upper Stage, capable of both ascent and in-space propulsion, as well as a Universal Stage Adapter - a payload bay allowing the flight of exploration hardware with Orion - and unprecedentedly large payload fairings that will enable currently impossible spacecraft and mission profiles on uncrewed launches. The Block 1B vehicle will also expand on the initial configuration's ability to deploy CubeSat secondary payloads, creating new opportunities for low-cost access to deep space. Development work is also underway on future upgrades to SLS, which will culminate in about a decade in the Block 2 configuration, capable of delivering 130 t to LEO via the addition of advanced boosters. As the first SLS draws closer to launch, NASA continues to refine plans for the human deep-space exploration it will enable. Planning currently focuses on use of the vehicle to assemble a Deep Space Gateway, which would comprise a habitat in the lunar vicinity allowing astronauts to gain experience living and working in deep space, a testbed for new systems and capabilities needed for exploration beyond, and a departure point for NASA and partners to send missions to other destinations. Assembly of the Gateway would be followed by a Deep Space Transport, which would be a vehicle capable of carrying astronauts farther into our solar system and eventually to Mars. This paper will give an overview of SLS' current status and its capabilities, and discuss current utilization planning.

Schorr, Andrew↗

NASA's Space Launch System: Enabling Exploration and Discovery

As NASA's new Space Launch System (SLS) launch vehicle continues to mature toward its first flight and beyond, so too do the agency's plans for utilization of the rocket. Substantial progress has been made toward the production of the vehicle for the first flight of SLS - an initial "Block 1" configuration capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). That vehicle will be used for an uncrewed integrated test flight, propelling NASA's Orion spacecraft into lunar orbit before it returns safely to Earth. Flight hardware for that launch is being manufactured at facilities around the United States, and, in the case of Orion's service module, beyond. At the same time, production has already begun on the vehicle for the second SLS flight, a more powerful Block 1B configuration capable of delivering more than 105 metric tons to LEO. This configuration will be used for crewed launches of Orion, sending astronauts farther into space than anyone has previously ventured. The 1B configuration will introduce an Exploration Upper Stage, capable of both ascent and in-space propulsion, as well as a Universal Stage Adapter - a payload bay allowing the flight of exploration hardware with Orion - and unprecedentedly large payload fairings that will enable currently impossible spacecraft and mission profiles on uncrewed launches. The Block 1B vehicle will also expand on the initial configuration's ability to deploy CubeSat secondary payloads, creating new opportunities for low-cost access to deep space. Development work is also underway on future upgrades to SLS, which will culminate in about a decade in the Block 2 configuration, capable of delivering 130 metric tons to LEO via the addition of advanced boosters. As the first SLS draws closer to launch, NASA continues to refine plans for the human deep-space exploration it will enable. Planning currently focuses on use of the vehicle to assemble a Deep Space Gateway, which would comprise a habitat in the lunar vicinity allowing astronauts to gain experience living and working in deep space, a testbed for new systems and capabilities needed for exploration beyond, and a departure point for NASA and partners to send missions to other destinations. Assembly of the Gateway would be followed by a Deep Space Transport, which would be a vehicle capable of carrying astronauts farther into our solar system and eventually to Mars. This paper will give an overview of SLS' current status and its capabilities, and discuss current utilization planning.

Robinson, Kimberly F.↗

Review of Literature and Utility Commission Proceedings Relevant to Integrated System Planning: Annotated Bibliography Prepared to Support the Washington Utilities and Transportation Commission

In 2024 the Washington State Legislature passed the Decarbonization Act for Large Combination Utilities (Engrossed Substitute House Bill 1589 – the Act). The Act requires a large combination electric and gas utility to conduct integrated system planning supporting electrification and gas system decarbonization, including a reduction in the gas rate base. The utility is required to submit the first integrated system plan (ISP) by January 1, 2027. The requirements are to be developed and adopted by the Washington Utilities and Transportation Commission (UTC) by July 1, 2025. In October 2024 Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) began providing technical assistance to the UTC to support the ISP rulemaking. PNNL and LBNL have prepared this annotated bibliography of research and reports, and state examples of coordinated gas and electric planning, future of gas, and future of heat proceedings in other U.S. States and one Canadian Province. The items described here have been selected by the authors for their potential relevance to the UTC’s integrated system planning rule discussions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Expected Utility Distributions for Flexible, Contingent Execution

This paper presents a method for using expected utility distributions in the execution of flexible, contingent plans. A utility distribution maps the possible start times of an action to the expected utility of the plan suffix starting with that action. The contingent plan encodes a tree of possible courses of action and includes flexible temporal constraints and resource constraints. When execution reaches a branch point, the eligible option with the highest expected utility at that point in time is selected. The utility distributions make this selection sensitive to the runtime context, yet still efficient. Our approach uses predictions of action duration uncertainty as well as expectations of resource usage and availability to determine when an action can execute and with what probability. Execution windows and probabilities inevitably change as execution proceeds, but such changes do not invalidate the cached utility distributions, thus, dynamic updating of utility information is minimized.

Bresina, John L.↗

Payload crew utilization for spacelab missions

Planned payload crew utilization on Spacelab mission are analyzed to establish trends and guidelines. The study included missions that have flow to date as well as those in planning. Available data were analyzed on the basis of four major timeline iterations that occur during mission design. Data were categorized and assessed by crewmember, flight day, and mission. Based on the results of this analysis, it was recommended that for the Requirements Review and Preliminary Design Review iterations the maximum utilization per shift should be 75 percent for the Payload Specialist (PS) and 65 percent for the Mission Specialist (MS); and for the basic and final iterations, the maximum utilization shift should be 85 percent for the PS and 75 percent for the MS. Additional recommendations include limiting the amount of activity during the first two shifts whenever possible and establishing a common set of guidelines for the calculations of crew utilization.

Ibrahim, K. Y.↗

Power Effects on High Lift, Stability and Control Characteristics of the TCA Model Tested in the LaRC 14 x 22 Ft Wind Tunnel

The TCA-2 wind-tunnel test was the second in a series of planned tests utilizing the 5% Technology Concept Airplane (TCA) model. Each of the tests was planned to utilize the unique capabilities of the NASA Langley 14'x22' and the NASA Ames 12' test facilities, in order to assess specific aspects of the high lift and stability and control characteristics of the TCA configuration. However, shortly after the completion of the TCA-1 test, an early projection of the Technology Configuration (TC) identified the need for several significant changes to the baseline TCA configuration. These changes were necessary in order to meet more stringent noise certification levels, as well as, to provide a means to control dynamic structural modes. The projected changes included a change to the outboard wing (increased aspect ratio and lower sweep) and a reconfiguration of the longitudinal control surfaces to include a medium size canard and a reduced horizontal tail. The impact of these proposed changes did not affect the TCA-2 test, because it was specifically planned to address power effects on the empennage and a smaller horizontal tail was in the plan to be tested. However, the focus of future tests was reevaluated and the emphasis was shifted away from assessment of TCA specific configurations to a more general assessment of configurations that encompass the projected design space for the TC.

Glessner, Paul T.↗

Risk-controlled Expansion Planning with Distributed Resources (REPAIR) v1.0

The Risk-controlled Expansion Planning with Distributed Resources (REPAIR) is an innovative tool to support decisions around utility grid planning to prevent and mitigate the impact of outages caused by routine equipment failures (reliability) or by extreme events (resilience), such as storms, earthquakes or wildfires that long term interruption of service. REPAIR is a risk-based optimization and decision-making model allowing informed and transparent "cost vs risk" decisions regarding infrastructural planning of electric utilities. The model considers long-term resilience and reliability planning strategies that rely on traditional infrastructure upgrade (e.g. circuit hardening, reinforcement, new substations, etc.) or new investment alternatives, such as DERs.

Heleno, Miguel [Lawrence Berkeley National Laborat↗

Generative large language models for predictive maintenance planning

Maintenance planning and the generation of necessary components for tasks can prove time-consuming and complex. Automating the creation of recurring or similar tasks by leveraging previous planning packages and data, while uncovering insights to automate planning package generation, presents an opportunity to conserve valuable time and resources. This work aims to harness the textual and probabilistic capabilities of large language models (LLMs) to automate the generation of planning packages. Utilizing diverse data sources ranging from raw data to handwritten text, both singular and collaborative LLMs are trained and tested. Results demonstrate their capability to generate essential planning package components, effectively replicating the statistical patterns in the data. This demonstrates the use of these tools inside a digital asset for automated planning. This work outlines a methodology for constructing datasets, a training suite, and evaluation methods for LLM-based textual and conversational planning tools utilized in an asset digital twin. Results indicate that the fine-tuned models generate estimated planning information within the statistical ranges observed in real maintenance data. The models achieve high accuracy (>90%) in document question-answering and instruction generation tasks. Furthermore, the conversational retrieval-augmented generation (RAG) assistant system achieves 100% document retrieval accuracy, while conversational information capture exceeds 98% across the majority of work-package assistant modules.

97 MATHEMATICS AND COMPUTING↗

Technology planning for long range utilization of Space Station Freedom

A system is described with specific examples for identifying and selecting advanced technologies for use with the Space Station Freedom (SSF) that positively impact capabilities and costs. Emerging advanced technologies should be compared with SSF technological needs and selected according to an optimal combination of readiness, development risks/costs, performance requirements, and crew safety. The selected technologies should be planned to the extent that the technology continues advancing to the point of readiness in a manner consistent with the objectives and timeframe of the SSF program. An SSF Advanced Studies component is described that worked to advance critical emergent technologies including advanced heat rejection, closed air-loops, high-efficiency space-power systems, and advanced power storage. The efforts can lead to the identification of crucial parameters such as performance degradation, lifetime, growth, and area that are relevant to the SSF overall objectives.

Ahlf, P.↗

Strategic planning for the International Space Station

The concept for utilization and operations planning for the International Space Station Freedom was developed in a NASA Space Station Operations Task Force in 1986. Since that time the concept has been further refined to definitize the process and products required to integrate the needs of the international user community with the operational capabilities of the Station in its evolving configuration. The keystone to the process is the development of individual plans by the partners, with the parameters and formats common to the degree that electronic communications techniques can be effectively utilized, while maintaining the proper level and location of configuration control. The integration, evaluation, and verification of the integrated plan, called the Consolidated Operations and Utilization Plan (COUP), is being tested in a multilateral environment to prove out the parameters, interfaces, and process details necessary to produce the first COUP for Space Station in 1991. This paper will describe the concept, process, and the status of the multilateral test case.

Griner, Carolyn S.↗