Search NASA⌕ Search

SEARCH · Search NASA

Results for “webb”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

The James Webb Space Telescope

The James Webb Space Telescope (JWST) will extend the discoveries of the Hubble Space Telescope (HST) and the Spitzer Space Telescope (SST) by deploying a large cooled infrared telescope around the Sun-Earth Lagrange point L2. With a 6 m aperture and three instruments covering the wavelength range from 0.6 to 28 microns, it will provide sensitivities orders of magnitude better than any other facilities. It is intended to observe the light from the first galaxies and the first supernovae, the assembly of galaxies, and the formation and evolution of stars and planetary systems. In this talk I will review the scientific objectives and the ability of the system to meet them. I will close with a summary of possible future IR space missions, ranging from the far IR to planet-finding coronagraphs and interferometers

Mather, John C.↗

James Webb Space Telescope Status

The James Webb Space Telescope (JWST) is the first deployable infrared to millimeter wave space telescopes. We will describe the progress on JWST and introduce other speakers in the session. The JWST will operate at the Sun-Earth Lagrange point L2, where radiative cooling lowers the telescope and instrument temperatures to about 35 K. It will have an 18-segment beryllium primary mirror with a 25 m2 area fitting inside a 6.6m circumscribed circle, and will provide spectroscopy and imaging over the wavelength range from 0.6 to 28 microns. It is planned for launch in 2011 on an Ariane 5 rocket. The project is a partnership of NASA, ESA, and CSA, and the prime contractor is Northrop Grumman. See http://www.jwst.nasa.gov for more details on JWST.

Mather, John C.↗

James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) Cryogenic Component Test Facility

Contents include the following: James Webb Space Telescope/Integrated Science Instrument Module (JWST/ISIM) Overview. ISIM Thermal Verification Requirements. Emittance Test Objectives. Cryochamber Design Requirements. Cryochamber Construction. Emittance Test Sample Selection and Configuration. Error Sources and Error Mitigation. Cryochamber Operation. Cryochamber and Emittance Sample Test Results.

Packard, Edward A.↗

Cryo Testing of tbe James Webb Space Telescope's Integrated Science Instrument Module

The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope will be integrated and tested at the Environmental Test Facilities at Goddard Space Flight Center (GSFC). The cryogenic thermal vacuum testing of the ISIM will be the most difficult and problematic portion of the GSFC Integration and Test flow. The test is to validate the coupled interface of the science instruments and the ISIM structure and to sufficiently stress that interface while validating image quality of the science instruments. The instruments and the structure are not made from the same materials and have different CTE. Test objectives and verification rationale are currently being evaluated in Phase B of the project plan. The test program will encounter engineering challenges and limitations, which are derived by cost and technology many of which can be mitigated by facility upgrades, creative GSE, and thorough forethought. The cryogenic testing of the ISIM will involve a number of risks such as the implementation of unique metrology techniques, mechanical, electrical and optical simulators housed within the cryogenic vacuum environment. These potential risks are investigated and possible solutions are proposed.

VanCampen, Julie↗

Line of Sight Stabilization of James Webb Space Telescope

The James Webb Space Telescope (JWST) builds upon the successful flight experience of the Chandra Xray Telescope by incorporating an additional LOS pointing servo to meet the more stringent pointing requirements. The LOS pointing servo, referred to in JWST as the Fine Guidance Control System (FGCS), will utilize a Fine Guidance Sensor (FGS) as the sensor, and a Fine Steering Mirror (FSM) as the actuator. The FSM is a part of the Optical Telescope Element (OTE) and is in the optical path between the tertiary mirror and the instrument focal plane, while the FGS is part of the Integrated Science Instrument Module (ISIM). The basic Chandra spacecraft bus attitude control and determination architecture, utilizing gyros, star trackers/aspect camera, and reaction wheels, is retained for JWST. This system has achieved pointing stability of better than 0.5 arcseconds. To reach the JWST requirements of milli-arcsecond pointing stability with this ACS hardware, the local FGCS loop is added to the optical path. The FGCS bandwidth is about 2.0 Hz and will therefore attenuate much of the spacecraft ACS induced low frequency jitter. In order to attenuate the higher frequency (greatet than 2.0 Hz) disturbances associated with reaction wheel static and dynamic imbalances, as well as bearing run-out, JWST will employ a two-stage passive vibration isolation system consisting of (1) 7.0 Hz reaction wheel isolators between each reaction wheel and the spacecraft bus, and (2) a 1.0 Hz tower isolator between the spacecraft bus and the Optical Telescope Element (OTE). In order to sense and measure the LOS, the FGS behaves much like an autonomous star tracker that has a very small field of view and uses the optics of the telescope. It performs the functions of acquisition, identification and tracking of stars in its 2.5 x 2.5 arcminute field of view (FOV), and provides the centroid and magnitude of the selected star for use in LOS control. However, since only a single star is being tracked at any time within the FGS FOV there is only tip and tilt information; rotation about the FGS LOS will not be sensed. The FGCS uses the FSM to move the guide star within the FGS FOV and place the centroid of the guide star at any desired position within the FGS focal plane. Using this architecture allows the FGCS to correct the low frequency LOS jitter that is induced by the spacecraft ACS in pitch and yaw, and achieve the milli-arcsecond pointing stability required by JWST. The less stringent ISIM FOV roll performance will be provided solely by the ACS, using the spacecraft gyros and star trackers. Since the FSM is in the optical path, the pointing stabilrty of a science object in any of the instruments will be similar to that of the guide star LOS.

Meza, Luis↗

Thermal-Stress Control of Microshutter Arrays in Cryogenic Applications for the James Webb Space Telescope

We report on methods to minimize thermally-induced deformation in a MEMS-based reconfigurable aperture. The device is an enabling component of the Near-Infrared Spectrometer, a principle instrument on NASA's James Webb Space Telescope. The Microshutter Array consists of 384 x 175 individually addressable shutters which can be magnetically rotated 90 deg into the plane of the array and electrostatically latched open. Each shutter is a 100 x 200 micron rectangular membrane suspended by a small neck region and torsion flexure. The primary materials in the shutter are a 5000A Si3N4 layer for mechanical rigidity, 2000A Al for opacity and electrostatic latching, and 2800A CoFe for magnetic actuation. This multi-layer stack presents a challenge due to the operating temperatures required for the device: both room temperature (300K) and cryogenic temperature (35K). Thermal expansion of the materials causes the shutters to bow out of plane excessively, which can prevent actuation of the shutters, cause damage to portions of the array, and allow light leakage around closed shutters. Here we present our investigation of several methods to prevent microshutter bowing including deposition of additional materials on the shutters to create a symmetrical layer stack and replacing the current stack with low-coefficient of thermal expansion materials. Using shutter-size suspended cantilever beams as a rapid-development test bed, we have reduced out-of-plane bowing between 300K and 35K to 10% or better. We are currently applying these results to microshutter arrays to develop shutters that remain flat from room temperature to cryogenic temperature while retaining the required mechanical, optical, and magnetic properties.

Kelly, Daniel P.↗

Finding Acceptable James Webb Space Telescope Mission Orbits From a Fixed Ariane Flight Profile

The James Webb Space Telescope (JWST) will be launched into orbit about the Sun/Earth L2 libration point. Trajectory design was recently completed which included expected separation states from the Ariane launch vehicle, constraints such as eclipses, maximum orbit size, maximum Sun-Vehicle-Earth/Moon angles, and launch opportunities. The results of this trajectory design give a set of possible trajectories for JWST with bounded stray light zones and provide a complete launch window. This data is also used to design the initial trajectory correction maneuver such that a maneuver towards the Sun is not required.

Beckman, Mark↗

Thermal System Verification and Model Validation for NASA's Cryogenic Passively Cooled James Webb Space Telescope (JWST)

A thorough and unique thermal verification and model validation plan has been developed for NASA s James Webb Space Telescope. The JWST observatory consists of a large deployed aperture optical telescope passively cooled to below 50 Kelvin along with a suite of several instruments passively and actively cooled to below 37 Kelvin and 7 Kelvin, respectively. Passive cooling to these extremely low temperatures is made feasible by the use of a large deployed high efficiency sunshield and an orbit location a! !he L2 Lagrange p~in!. Another enabling feature is the scale or size of the observatory that allows for large radiator sizes that are compatible with the expected power dissipation of the instruments and large format Mercury Cadmium Telluride (HgCdTe) detector arrays. This passive cooling concept is simple, reliable, and mission enabling when compared to the alternatives of mechanical coolers and stored cryogens. However, these same large scale observatory features, which make passive cooling viable, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone to most space missions thermal verification plan. JWST is simply too large in its deployed configuration to be properly thermal balance tested in the facilities that currently exist. This reality, when combined with a mission thermal concept with little to no flight heritage, has necessitated the need for a unique and alternative approach to thermal system verification and model validation. This paper describes the thermal verification and model validation plan that has been developed for JWST.

Parrish, Keith↗

Thermal System Verification and Model Validation for NASA's Cryogenic Passively Cooled James Webb Space Telescope

A thorough and unique thermal verification and model validation plan has been developed for NASA s James Webb Space Telescope. The JWST observatory consists of a large deployed aperture optical telescope passively cooled to below 50 Kelvin along with a suite of several instruments passively and actively cooled to below 37 Kelvin and 7 Kelvin, respectively. Passive cooling to these extremely low temperatures is made feasible by the use of a large deployed high efficiency sunshield and an orbit location at the L2 Lagrange point. Another enabling feature is the scale or size of the observatory that allows for large radiator sizes that are compatible with the expected power dissipation of the instruments and large format Mercury Cadmium Telluride (HgCdTe) detector arrays. This passive cooling concept is simple, reliable, and mission enabling when compared to the alternatives of mechanical coolers and stored cryogens. However, these same large scale observatory features, which make passive cooling viable, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone to most space missions thermal verification plan. JWST is simply too large in its deployed configuration to be properly thermal balance tested in the facilities that currently exist. This reality, when combined with a mission thermal concept with little to no flight heritage, has necessitated the need for a unique and alternative approach to thermal system verification and model validation. This paper describes the thermal verification and model validation plan that has been developed for JWST. The plan relies on judicious use of cryogenic and thermal design margin, a completely independent thermal modeling cross check utilizing different analysis teams and software packages, and finally, a comprehensive set of thermal tests that occur at different levels of JWST assembly. After a brief description of the JWST mission and thermal architecture, a detailed description of the three aspects of the thermal verification and model validation plan is presented.

Cleveland, Paul E.↗

James Webb Space Telescope - the "First Light Machine"

Scheduled to begin is 10 year mission in 2011, the James Webb Space Telescope (JWST) will search for the first luminous objects of the Universe to help answer fundamental questions about how the Universe came to look like it does today. At 6.5 meters in diameter, JWST will be the world's largest space telescope. This talk will review science objectives for JWST and how they are driving the JWST architecture, e.g. aperture, wavelength range and operating temperature. Additionally, the talk will include an overview of the JWST primary mirror technology development effort.

Stahl, H. Phil↗

An Overview of the James Webb Space Telescope (JWST) Project

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Sabelhaus, Phillip A.↗

James Webb Space Telescope XML Database: From the Beginning to Today

The James Webb Space Telescope (JWST) Project has been defining, developing, and exercising the use of a common eXtensible Markup Language (XML) for the command and telemetry (C&T) database structure. JWST is the first large NASA space mission to use XML for databases. The JWST project started developing the concepts for the C&T database in 2002. The database will need to last at least 20 years since it will be used beginning with flight software development, continuing through Observatory integration and test (I&T) and through operations. Also, a database tool kit has been provided to the 18 various flight software development laboratories located in the United States, Europe, and Canada that allows the local users to create their own databases. Recently the JWST Project has been working with the Jet Propulsion Laboratory (JPL) and Object Management Group (OMG) XML Telemetry and Command Exchange (XTCE) personnel to provide all the information needed by JWST and JPL for exchanging database information using a XML standard structure. The lack of standardization requires custom ingest scripts for each ground system segment, increasing the cost of the total system. Providing a non-proprietary standard of the telemetry and command database definition formation will allow dissimilar systems to communicate without the need for expensive mission specific database tools and testing of the systems after the database translation. The various ground system components that would benefit from a standardized database are the telemetry and command systems, archives, simulators, and trending tools. JWST has exchanged the XML database with the Eclipse, EPOCH, ASIST ground systems, Portable spacecraft simulator (PSS), a front-end system, and Integrated Trending and Plotting System (ITPS) successfully. This paper will discuss how JWST decided to use XML, the barriers to a new concept, experiences utilizing the XML structure, exchanging databases with other users, and issues that have been experienced in creating databases for the C&T system.

Gal-Edd, Jonathan↗

The James Webb Space Telescope

The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) is described from a systems perspective with emphasis on unique and advanced technology aspects. The ISIM is one of three elements that comprise the JWST space vehicle and is the science instrument payload of the JWST. The major subsystems of this flight element are described including: structure, thermal, command and data handling, and software.

Greenhouse, Matthew↗

Studying Galaxy Formation with the Hubble, Spitzer and James Webb Space Telescopes

The deepest optical to infrared observations of the universe include the Hubble Deep Fields, the Great Observatories Origins Deep Survey and the recent Hubble Ultra-Deep Field. Galaxies are seen in these surveys at redshifts 2-6, less than 1 Gyr after the Big Bang, at the end of a period when light from the galaxies has reionized Hydrogen in the inter-galactic medium. These observations, combined with theoretical understanding, indicate that the first stars and galaxies formed at z>10, beyond the reach of the Hubble and Spitzer Space Telescopes. To observe the first galaxies, NASA is planning the James Webb Space Telescope (JWST), a large (6.5m), cold (50K), infrared-optimized observatory to be launched early in the next decade into orbit around the second Earth- Sun Lagrange point. JWST will have four instruments: The Near-Infrared Camera, the Near-Infrared multi-object Spectrograph, and the Tunable Filter Imager will cover the wavelength range 0.6 to 5 microns, while the Mid-Infrared Instrument will do both imaging and spectroscopy from 5 to 27 microns. In addition to JWST s ability to study the formation and evolution of galaxies, I will also briefly review its expected contributions to studies of the formation of stars and planetary systems.

Gardner, Jonathan F.↗

Science with the James Webb Space Telescope

The scientific capabilities of the James Webb Space Telescope (JWST) fall into four themes. The End of the Dark Ages: First Light and Reionization theme seeks to identify the first luminous sources to form and to determine the ionization history of the universe. The Assembly of Galaxies theme seeks to determine how galaxies and the dark matter, gas, stars, metals, morphological structures, and active nuclei within them evolved from the epoch of reionization to the present. The Birth of Stars and Protoplanetary Systems theme seeks to unravel the birth and early evolution of stars, from infall onto dust-enshrouded protostars, to the genesis of planetary systems. The Planetary Systems and the Origins of Life theme seeks to determine the physical and chemical properties of planetary systems around nearby stars and of our own, and investigate the potential for life in those systems. To enable these for science themes, JWST will be a large (6.5m) cold (50K) telescope launched to the second Earth-Sun Lagrange point early in the next decade. It is the successor to the Hubble Space Telescope, and is a partnership of NASA, ESA and CSA. JWST will have three instruments: The Near-Infrared Camera, and the Near-Infrared multi-object Spectrograph will cover the wavelength range 0.6 to 5 microns, while the Mid-Infrared Instrument will do both imaging and spectroscopy from 5 to 27 microns. I review the status and capabilities of the observatory and instruments in the context of the major scientific goals.

Gardner, Jonathan P.↗

Focus determination for the James Webb Space Telescope Science Instruments: A Survey of Methods

The James Webb Space Telescope (JWST) is a segmented deployable telescope that will require on-orbit alignment using the Near Infrared Camera as a wavefront sensor. The telescope will be aligned by adjusting seven degrees of freedom on each of 18 primary mirror segments and five degrees of freedom on the secondary mirror to optimize the performance of the telescope and camera at a wavelength of 2 microns. With the completion of these adjustments, the telescope focus is set and the optical performance of each of the other science instruments should then be optimal without making further telescope focus adjustments for each individual instrument. This alignment approach requires confocality of the instruments after integration and alignment to the composite metering structure, which will be verified during instrument level testing at Goddard Space Flight Center with a telescope optical simulator. In this paper, we present the results from a study of several analytical approaches to determine the focus for each instrument. The goal of the study is to compare the accuracies obtained for each method, and to select the most feasible for use during optical testing.

Davila, Pamela S.↗

MEMS Microshutter Arrays for James Webb Space Telescope

MEMS microshutter arrays are being developed at NASA Goddard Space Flight Center for use as an aperture array for a Near-Infrared Spectrometer (NirSpec). The instruments will be carried on the James Webb Space Telescope (JWST), the next generation of space telescope after Hubble Space Telescope retires. The microshutter arrays are designed for the selective transmission of light with high efficiency and high contrast, Arrays are close-packed silicon nitride membranes with a pixel size of 100x200 microns. Individual shutters are patterned with a torsion flexure permitting shutters to open 90 degrees with a minimized mechanical stress concentration. Light shields are made on to each shutter for light leak prevention so to enhance optical contrast, Shutters are actuated magnetically, latched and addressed electrostatically. The shutter arrays are fabricated using MEMS technologies.

Li, Mary J.↗