Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Determining the Effects of Neutron Irradiation on the Structural Integrity of Additively Manufactured Heat Exchangers for Very Small Modular Reactor Applications, DOE Final Report (Project # 19-16980)

Auburn University (AU) teamed with the University of Missouri Research Reactor (MURR) and Kansas State University (KSU) to determine how to best use laser-powder bed fusion (L-PBF) additive manufacturing (AM) methods for generating radiation resistant nickel-based superalloys, Inconel alloy 625 and 718, for special purpose reactor (SPR) or very small modular reactor (vSMR) heat-exchangers (HeXs). Compact, conformal, and durable HeXs that are tolerant of extreme environments are needed for supporting the technical maturity of next-generation, portable compact reactors. AM is an enabler for realizing this new wave of HeXs – providing a means to make customizable hot and cold stream architectures with novel flow path geometries (e.g., tortuous channels with non-uniform, asymmetric cross-sections) and reduced layer-to-layer contact resistance (i.e., no separate bonding procedure required). AM further enables a more time/cost efficient means for fabricating SPRs by reducing the number of suppliers required for HeX assembly and allowing for on-site HeX fabrication. The project aim has been to better understand how neutron irradiation affects the microstructure and properties of additively manufactured nickel-based superalloys, to accelerate their safe, reliable use in the modular reactor industry. The major objective was to qualify/quantify the microstructure and microhardness of nickel-based superalloys (including Inconel 718 and 625) additively manufactured via the L-PBF process in the neutron-dosed (irradiated) and non-irradiated states over a course of 3 years. Effects of build orientation during L-PBF and post-AM heat treatments on neutron resistance, microstructure and mechanical properties were also investigated. Neutron damage mechanisms via hardening were characterized. This project combined subject-matter experts in AM, mechanical/microstructure metallic part characterization, and neutron irradiation, as well as unique assets and capabilities at AU and MURR at MU, to ensure project results translated to effectively addressing known gaps in nuclear science and engineering. Parts were fabricated using L-PBF systems readily available at AU. Specimens were then irradiated using MURR facilities; a manipulator equipped hot cell was also used to measure material hardness after dosing. MURR, a 10 MW, light-water nuclear reactor, is the largest, highest powered, highest-flux university owned research reactor in the U.S. The major findings in this project provide evidence that AM can serve as an alternative way to build structural components for future advanced small modular reactors using advanced materials like Inconel 625 (IN625) or Inconel 718 (IN718). After full spectrum neutron irradiation, vertically as-built AM IN625 samples were observed to display better resistance towards radiation-induced-hardening defects relative to traditionally machined metals. A Vickers microhardness tester, using settings of 1 kgf and dwell time of 15 seconds per indentation, was used to measure hardness in this study. The as-built, vertically printed samples experienced 1.2% of radiation hardening vs. 5.25% radiation hardening observed in wrought IN625. Another set of IN625 and IN718 samples were exposed to fast neutron irradiation. It was observed that IN718 showed more resistance towards radiation hardening compared to IN625 samples indicating IN718 had a better performance. Results showed that the IN718 samples experienced less change (-2.5 to 3.24 %) in microhardness. On the other hand, IN625 samples underwent more (0.9 to 7.21%) change in microhardness after fast neutron irradiation. AM IN625 samples were irradiated using an ion (proton) beam in cyclotron. The mechanical properties of AM samples post irradiation were compared with wrought samples. The irradiated region on the samples were tested using nano-hardness indention. It was observed that the beam current and time used in this study generated an annealing effect and thus reduced the hardness of the samples. The sum of the project results provide precious insight into how one may minimize radiation hardening in AM materials while maintaining material property constraints. Results should assist engineers in selecting an appropriate heat treatment for AM nickel-based superalloys for increased radiation resistance. Results should increase confidence levels for adopting AM for building nuclear reactor components which perform the same or better than conventionally manufactured components. Fast neutron irradiation testing provided an accelerated means of obtaining radiation effects without making materials radioactive and difficult to handle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

BOTTLE 7 - Industry Projects & Engagement

One of BOTTLE's primary goals is to work with industry to catalyze new technologies towards our overall vision and mission using a centralized industry engagement plan which aims to 1) solve real-world problems in plastics upcycling via targeted, company-funded projects; 2) promote industrial engagement via streamlined access to BOTTLE partners and technologies; and 3) collaborate with companies to scale and deploy BOTTLE technologies into the economy. Our approach follows a 5-stage model: prospecting, initial engagement, knowledge sharing, proposal and contracting, and opportunity won. Since FY21, BOTTLE has onboarded a full-time Chief Technology Officer to spearhead industry engagement and lead industrially-funded research projects. To date, BOTTLE has engaged with >150 companies, executed 6 industrial funds-in CRADAs, completed 2 industry projects successfully, extended 2 CRADAs with follow-on funds, and submitted over 30 patent applications. Industry projects span the Deconstruction, Upcycling, and Redesign tasks, harness the capabilities of the cross-cutting tasks, and take advantage of the broad IP portfolio developed through DOE funding. BOTTLE partners have an inventory of innovations that can inform the design of industry-specific collaborative projects with the highest probability of producing novel IP. Engaging with a diverse set of companies has also directly informed our R&D portfolio towards maximizing impact and utility of BOTTLE innovations.

BIOMASS FUELS↗

UP2 400 High Activity Oxide Legacy Waste Retrieval Project Scope and Progress-13048

The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to allow for construction which is scheduled to being during the first semester of 2013. The elaboration of the final waste package is still undergoing and expected to be completed by then end of 2013, following some final elements of R and D required to demonstrate the full compatibility of the package with deep geological repository. The HAO legacy waste retrieval project is so far the largest such project entering operational phase on the site of La Hague. It is on schedule, under budget, and in conformity with the delivery requirements set by the French Safety Authority, as well as other stakeholders. This project paves the way for the successful completion of AREVA La Hague other legacy waste retrieval projects, which are currently being drafted or already in active R and D phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of Active Ventilation Systems in a Nuclear R and D Facility to Prepare for Building Demolition (Whiteshell Laboratories Decommissioning Project, Canada) - 13073

Whiteshell Laboratories (WL) is a nuclear research establishment owned by the Canadian government and operated by Atomic Energy of Canada Limited (AECL) since the early 1960's. WL is currently under a decommissioning license and the mandate is to remediate the nuclear legacy liabilities in a safe and cost effective manner. The WL Project is the first major nuclear decommissioning project in Canada. A major initiative underway is to decommission and demolish the main R and D Laboratory complex. The Building 300 R and D complex was constructed to accommodate laboratories and offices which were mainly used for research and development associated with organic-cooled reactors, nuclear fuel waste management, reactor safety, advanced fuel cycles and other applications of nuclear energy. Building 300 is a three storey structure of approximately 16,000 m{sup 2}. In order to proceed with building demolition, the contaminated systems inside the building have to be characterized, removed, and the waste managed. There is a significant focus on volume reduction of radioactive waste for the WL project. The active ventilation system is one of the significant contaminated systems in Building 300 that requires decommissioning and removal. The active ventilation system was designed to manage hazardous fumes and radioactivity from ventilation devices (e.g., fume hoods, snorkels and glove boxes) and to prevent the escape of airborne hazardous material outside of the laboratory boundary in the event of an upset condition. The system includes over 200 ventilation devices and 32 active exhaust fan units and high efficiency particulate air (HEPA) filters. The strategy to remove the ventilation system was to work from the laboratory end back to the fan/filter system. Each ventilation duct was radiologically characterized. Fogging was used to minimize loose contamination. Sections of the duct were removed by various cutting methods and bagged for temporary storage prior to disposition. Maintenance of building heating, ventilation and air conditioning (HVAC) balancing was critical to ensure proper airflow and worker safety. Approximately 103 m{sup 3} of equipment and materials were recovered or generated by the project. Low level waste accounted for approximately 37.4 m{sup 3}. Where possible, ducting was free released for metal recycling. Contaminated ducts were compacted into B-1000 containers and stored in a Shielded Modular Above-Ground Storage Facility (SMAGS) on the WL site awaiting final disposition. The project is divided into three significant phases, with Phases 1 and 2 completed. Lessons learned during the execution of Phases 1 and 2 have been incorporated into the current ventilation removal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise the PRACLAY gallery equipped to simulate a disposal gallery for heat-generating high-level waste evaluating fibre-optic based sensing techniques, including distributed sensing for thermal distribution and long-term reliability in harsh conditions. It also includes the potential to improve the treatment of signals from micro-seismic monitoring to enable enhanced understanding of the evolution around the gallery following its excavation due to ventilation, saturation and heating, and to image a water-bearing concretion layer. HADES URL will also be used to test wireless techniques to transmit monitoring data from the underground to the surface. The main focus of this contribution is to evaluate magneto-inductive data transmission; and to optimise energy usage. At the Bure underground facility in France, monitoring systems have been developed and will be embedded into the steel liner for the mock-up high-level waste disposal tunnel. The aim of this programme is to establish the capacity to conduct integrated monitoring activities inside the disposal cell, on the cell liner and in the near-field and to assess the capability of the monitoring to withstand construction and liner emplacement procedures. These projects, which are supported by focused development and testing of the monitoring systems, will allow the testing of both the effectiveness of these techniques applied to disposal situations and to understand the limits of these monitoring technologies. This approach should also enhance the confidence of key stakeholders in the ability to understand/confirm the changes occurring within a disposal cell. In addition, remote or 'non-intrusive' monitoring technologies are evaluated to provide a means of enhancing understanding of what is occurring in an isolated disposal cell. The projects also test solutions for embedded monitoring systems in challenging (risk of damage) situations. The outputs from this work will lead to improved understanding of these state-of-the-art techniques and allow focused development of those techniques beneficial to future monitoring programmes. It is also planned, as part of the MoDeRn programme of stakeholder engagement to show some of these monitoring demonstrations to lay stakeholders in order to receive their feed-back on the approach taken and their views on the value of this work. This feedback will help improve our understanding of how this work and future work on monitoring can be more effectively communicated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Decommissioning Success using the Tool of Virtual Reality; Increasing Worker Safety and Project Schedule Stability - 17193

operations, especially underwater, is essential. Equally essential is a precise game plan for disassembly which focuses attention on the skilled remote handling operators who must produce the results. Project success is based on clean, efficient cuts and take-aways, prepared paths for waste placement and containment, programmed return paths; and practice, practice, practice on the part of the operators. Recently, our Partner, WAK Ruackbau- und Entsorgungs- GmbH (Decommissioning and Waste Management Company) was tasked with dismantling and decommissioning the Karlsruhe Reprocessing Plant. The most difficult task in this project is the dismantling of the vitrification plant. Waelischmiller was selected to address this high-consequence project. Together, WAK and Waelischmiller determined that development of a virtual reality suite, where management and operators could create a virtual vitrification layout and subsequently map and rehearse their dismantling plan was essential. This approach, using Virtual Reality (VR) as a tool in streamlining operations and rehearsing difficult moves and cuts, will be a game changer for this and future projects. It will be a first-of-a-kind in Germany. The VR suite is contained in a room at the Karlsruhe facility with a large screen, control cabinet, simulation computer, a Waelischmiller Joyarm and Masterarm. To support the dismantling of the vitrification plant, WAK/HWM will conduct interactive feasibility studies for each dismantling step. All movements; cuts, take-aways and vessel segment insertion into transportation and disposal casks will be established, programed and practiced within virtual test suite. This allows savings in cost-intensive and complex construction of test rigs. Operating personnel can be trained in the VR suite, without taking the risk of damaging expensive remote handling equipment.While the operators are working on the operating element, they stand in front of a wide screen. Instead of a real TELBOT{sup R}, a virtual TELBOT{sup R} is moving on the screen in virtual reality. While practicing, the operators cannot damage the arm and the equipment, which is a big advantage. Moreover an interactive feasibility study can be realized without building a real test rig (mock-up). Consequently significant cost-expenses can be reduced. This paper will describe the virtual suite used by the WAK in Karlsruhe and the advantages of this new and innovative approach, which is unique in decommissioning of nuclear facilities. The viewpoint of each (WAK and HWM), and the decisions and benefits realized along the project path will be detailed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory testing options for FUSRAP projects - 15462

Remediation projects within the Formerly Used Sites Remedial Action Program (FUSRAP) have many options to consider when evaluating their analytical testing needs. Factors that should be considered in determination of a project's analytical testing needs include which parameter results are considered time-critical, the potential savings in reduction of construction-related delays when time-critical samples are analyzed onsite (including screening) instead of offsite, control of data quality for onsite versus offsite data, and the value of additional knowledge gained by programs such as FUSRAP by employing onsite laboratories. The most important factor turned out to be reduction in construction-related delays. We considered development of an optimum combination of onsite lab/offsite lab capability. This depends on: i. Time critical parameters and the methods required; ii. Estimated Cost for onsite lab construction or facility rental, maintenance, labor, chemicals (reagents and standards), and certification (if desired and deemed necessary) iii. Ability, flexibility, and cost of offsite lab sample testing using project-desired TATs and methods that will meet project action levels iv. Willingness of stakeholders, in particular regulators, in accepting some combination of onsite and offsite testing (for example, onsite screening followed by offsite confirmatory testing for certain parameters) Due to the significant costs in construction of an onsite lab and development of sample testing capability and all which that entails, the recommendations made in this paper will aid other FUSRAP projects in finding an acceptable combination of onsite and offsite testing that is acceptable to all stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Processing Projects in the PRC - 16551

EnergySolutions continues to provide waste treatment solutions in the Peoples Republic of China (PRC). In 2015 ES had completed installation of systems at two different Nuclear power sites (Haiyang, an AP-1000{sup TM} site and Yangjiang, a CPR1000 site). This paper discusses progress on these two projects, and provides new information regarding the operation of the systems. The Yangjiang project became operational in the fall of 2015 while the Haiyang project will be done is nearly done with commissioning and is waiting for reactor operations. Haiyang Project: In the Shandong Province on China's northeast coast, EnergySolutions, as part of a consortium with China Power Investment (CPI) and Yuanda Environmental Protection Engineering Company (a PRC state-owned company), has designed and constructed the site's Site Rad Waste Treatment Facility (SRTF). The SRTF provides solid waste processing services for up to 8 AP-1000s{sup TM}. The SRTF performs the following functions: 1. Five year storage for HICs containing spent resin and filters from the nuclear power plants' waste liquid systems (WLS); 2. Sorting and Compaction System for solid waste generated from Nuclear Power Plant (NPP) operations. This system implements: a) Real time radiography to screen 200 liter waste drums for prohibited items, b) Pre-compaction, c) High Resolution Gamma Spectrophotometry (HRGS) for waste characterization, d) Supercompaction, e) Solidification of compacted drums inside overpack drums which are filled with 60 MPa compressive strength grout, and f) Automatic drum lidding which crimps the drum lid to the drum body. 3. Laundry services for NPP anti-contamination clothing. 4. At the nuclear islands, EnergySolutions is providing mobile liquid waste processing systems that utilize EnergySolutions Advanced Liquid Processing System ALPS{sup TM}/Advanced Injection Method System AIM{sup TM} processing systems to supplement the NPP's WLS system when radionuclide concentrations exceed release criteria. The spent resins and filters from the nuclear power plants are placed in EnergySolutions supplied HICs, dewatered using EnergySolutions Self Engaging Dewatering System (SEDS{sup TM}), and then placed in EnergySolutions 8-120B Type B cask for the transport of the HIC between the NPP and the SRTF and, ultimately, to a disposal site once it is ready for operations Yangjiang Project: EnergySolutions is providing liquid waste treatment system (TEU) and solid waste treatment system (TES) for Yangjiang units 3 and 4 for the China Nuclear Power Engineering Company (CNPEC). The Yangjiang site is located approximately 300 kilometers west of Hong Kong. The TEU system processes floor drain, chemical drain, and process drain tanks liquids to achieve a release concentration less than 37 Bq/l. The TES system receives spent resin and filters into HIC containers which are dewatered and subsequently transported to the Yangjiang sites QT building where they are stored for a period of up to 5 years or until a disposal site are available. TEU (Liquid waste treatment) consists of the following unit operations: - ALPS{sup TM}/AIM{sup TM} system, which includes two separate 8 vessel water treatment systems that consist of granular activated carbon (GAC), cation, anion ion and mixed bed media ion exchange (IX) columns; and: - A reverse osmosis system for final polishing, - TES (solid waste system), - SEDS (Self Engaging Dewatering System), - Shielding for the loading and storage of HICs, - Shielded transport container for the transfer of HIC to the QT building for storage, - Shielded transfer bell for the transport of spent filters from the NPP operating area to HIC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Encapsulation and Storage Facility Stabilization and Ventilation Project-18121

Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is responsible for the safe and compliant operation of the Waste Encapsulation and Storage Facility (WESF), a nuclear materials storage facility at Hanford containing 1,936 highly radioactive capsules containing cesium and strontium. The capsules are currently stored under approximately 4 m (13 ft) of water. The water shields workers from radiation and helps cool the capsules. WESF is a large, concrete structure nominally 48 m (160 ft) long, 30 m (98 ft) wide and 12 m (40 ft) high with the pool cells being approximately 4 m (13 ft) below grade level. It is a robust facility with walls ranging from 0.3 m to 1 m (1 ft to 3 ft) thick. While the capsules are currently in a safe configuration, WESF is an aging facility, and DOE and CH2M are modifying the facility to ensure continued safe and compliant operations and to support the eventual transfer of capsules to dry storage. Dry storage would eliminate the possibility of a release of radioactive material in the unlikely event of a major earthquake that might result in loss of pool storage water and overheating and breach of one or more capsules. The project was divided into two major deliverables: 1) Ventilation: replacement of the existing ventilation system which included a below-grade high efficiency particulate air (HEPA) filter pit with an above grade HEPA filter skid and new fans and ducting. 2) Stabilization: grouting deactivated facility hot cells and other void spaces to the maximum extent practical to reduce material at risk from legacy contamination. The aging ventilation system relied on HEPA filters that exceeded their operational life. Due to the high levels of radionuclide contamination, replacing the filters was impractical and highly hazardous. CH2M installed a new ventilation system to provide safe and compliant ventilation for future operations. The project used an existing, unused ventilation skid that was designed for another project. Repurposing the unused skid presented additional technical challenges to modify the system for the project specific requirements. The new system is above ground, easier to maintain and is built to current standards. New connections inside the facility were installed to allow the new ventilation to operate effectively. The stabilization project is unique in that core drilling and grouting was performed in an operating Hazard Category 2 nuclear facility, which brought forth safety basis and environmental regulatory challenges. The hot cells were isolated from all existing support utilities including electrical, process chemicals, manipulator ports, instrument air, etc. to seal the hot cells and prevent highly contaminated supernate or grout from leaking into adjacent galleries. A high flow grout was used to maximize the distance between injection ports. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Port Granby Project: Effectiveness of the Radiation Protection Program - 18595

The Port Granby Project is large remediation project currently underway. It is approximately 50% complete. A comprehensive and effective radiation protection program has been developed and implemented for the Port Granby Project. The potential radiation hazards associated with this project include: external (gamma) radiation, radon, inhalation, contamination and ingestion. The radiation protection program is highly effective and has succeeded in managing the significant radiation hazards associated with this remediation project. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Leveraging 3D CAD and Virtual Reality in Design of the Calcine Disposition Project - 20512

Fluor Idaho's Calcine Disposition Project (CDP) is leveraging the power of three-dimensional (3D) visualization, light detection and ranging (Lidar), and virtual reality to improve designs and worker safety. With the use of computer-aided design (CAD) modeling software, the CDP has created 3D models of the facility and systems to aid in the design, development, and operation of its retrieval and transfer system. This by itself is nothing new and has been done in industry for years. The CDP project however is taking this a few steps farther with the use of Lidar and virtual reality software. The CRP is tasked with removing a radioactive granular material from stainless steel bins located in concrete vaults that were constructed in the late 1950's and early 1960's. While construction drawings are available, it is not certain that the drawings are as-built or how accurate they truly are. Part of the project requires precise placement of equipment on to bins around multiple pipe, electrical lines, and bin stiffeners. Relying solely on the existing drawings and models created from these drawings is highly risky and prone to failure. The first step to determine the precise location and orientation of all obstructions in the vault the project will use a Lidar system to scan the vault structure and precisely locate all vault and bin components. Once this information is obtained, the data will be integrated into the CAD model. The model will then be verified, and a true as-built model developed. Precise component location, size, and orientation will be used for final design and placement of retrieval components. The second step will be to take the verified 3D model and scan data and import it into virtual reality software creating a virtual world. While some work on the project requires all work to be completed remotely due to high radiation fields, some areas have low enough radiation levels that personnel can enter and perform work. With the use of a virtual reality headset, operators and technicians will be able to enter our virtual world and become familiar with the surroundings and perform work prior to ever entering the radiation environment. This training is expected to pay dividends by improving worker efficiency, reducing errors, and improving confidence that the work can be performed as expected. It will play a key aspect in as low as reasonably achievable (ALARA) principles. An additional aspect in using the Lidar scans and virtual environment, is that it will give engineers and managers an opportunity to revisit the facility, especially radiation areas, at any time to obtain design information and measurements that may be costly or impossible to obtain once the facility transitions into radiation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploring Professor Motivations and Implementations of a Real-World Problem-Solving Project: A Case Study in Preparing Students for the Emerging Building Science Industry: Preprint

Engineering education literature offers a variety of theoretical and conceptual frameworks for project-based learning. This study explores the implementation of real-world problem-solving projects in engineering education. The research team analyzed the motivations and methods behind professors' adoption of such projects through exploratory qualitative interviews with seven professor participants who integrated a nation-wide student competition into their courses. We analyzed the resulting data using a constructivist grounded theory approach to identify key themes of professor practices. Findings reveal that the real-world aspect of the projects and alignment with values and research interests were primary motivators for implementation. While implementation methods varied significantly based on context (i.e., university setting, course type), we found that these projects could be effectively integrated into various classroom settings. The findings support the recommendation for non-academic institutions to develop and manage competitions that can be integrated into classrooms and which offer a point of engagement that is available to professors from a wide range of disciplines.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

01 COAL, LIGNITE, AND PEAT↗

Modeling Success in FLOSS Project Groups

A significant challenge in software engineering is accurately modeling projects in order to correctly forecast success or failure. The primary difficulty is that software development efforts are complex in terms of both the technical and social aspects of the engineering environment. This is compounded by the lack of real data that captures both the measures of success in performing a process, and the measures that reflect a group s social dynamics. This research focuses on the development of a model for predicting software project success that leverages the wealth of available open source project data in order to accurately model the behavior of those software engineering groups. Our model accounts for both the technical elements of software engineering as well as the social elements that drive the decisions of individual developers. We use agent-based simulations to represent the complexity of the group interactions, and base the behavior of the agents on the real software engineering data acquired. For four of the five project success measures, our results indicate that the developed model represents the underlying data well and provides accurate predictions of open source project success indicators.

97 MATHEMATICS AND COMPUTING↗

Offsite source recovery project - ten years of sealed source recovery and disposal

The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) has been recovering excess and unwanted radioactive sealed sources for ten years. In January 2009, GTRI announced that the project had recovered 20,000 sealed radioactive sources (this number has since increased to more than 23,000). This project grew out of early efforts at Los Alamos National Laboratory (LANL) to recover and disposition excess Plutonium-239 (Pu-239) sealed sources that were distributed in the 1960s and 1970s under the Atoms for Peace Program. Decades later, these sources began to exceed their special form certifications or fall out of regular use. As OSRP has collected and stored sealed sources, initially using 'No Path Forward' waste exemptions for storage within the Department of Energy (DOE) complex, it has consistently worked to create disposal pathways for the material it has recovered. The project was initially restricted to recovering sealed sources that would meet the definition of Greater-than-Class-C (GTCC) low-level radioactive waste, assisting DOE in meeting its obligations under the Low-level Radioactive Waste Policy Act Amendments (PL 99-240) to provide disposal for this type of waste. After being transferred from DOE-Environmental Management (EM) to the U.S. National Nuclear Security Administration (NNSA) to be part of GTRI, OSRP's mission was expanded to include not only material that would be classified as GTCC when it became waste, but also any other materials that might constitute a 'national security consideration.' It was recognized at the time that the GTCC category was a waste designation having to do with environmental consequence, rather than the threat posed by deliberate or accidental misuse. The project faces barriers to recovery in many areas, but disposal continues to be one of the more difficult to overcome. This paper discusses OSRP's disposal efforts over its 10-year history. For sources meeting the DOE definition of 'transuranic,' OSRP has achieved many milestones, including defense determinations for various isotopes, a WIPP RCRA permit modification to accommodate headspace gas sampling requirements, and approval of a peer-reviewed non-assay radiological characterization methodology. For non-transuranic sources, which OSRP began to recover in 2004, OSRP has achieved NEP A coverage for storage and implemented consolidated storage at both DOE and commercial locations, as well as completing several specific disposal operations. The closure of the Barnwell low-level waste disposal site in 2008 has left 36 states with absolutely no commercial disposal pathway for most sealed sources, increasing the demands on OSRP. This and other current challenges and future work will also be discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

10 years and 20,000 sources: the offsite source recovery project

The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) has been recovering excess and unwanted sealed sources for ten years. In January 2009, GTRI announced that the project had recovered 20,000 sealed radioactive sources. This project grew out of early efforts at Los Alamos National Laboratory (LANL) to recover and disposition excess Plutonium-239 (Pu-239) sealed sources that were distributed in the 1960s and 1970s under the Atoms for Peace Program. Sealed source recovery was initially considered a waste management activity, as evidenced by its initial organization under the Department of Energy's (DOE's) Environmental Management (EM) program. After the terrorist attacks of 2001, however, the interagency community began to recognize the threat posed by excess and unwanted radiological material, particularly those that could not be disposed at the end of their useful life. After being transferred to the National Nuclear Security Administration (NNSA) to be part of GTRI, OSRP's mission was expanded to include not only material that would be classified as Greater-than-Class-C (GTCC) when it became waste, but also any other materials that might be a 'national security consideration.' This paper discusses OSRP's history, recovery operations, expansion to accept high-activity beta-gamma-emitting sealed sources and devices and foreign-possessed sources, and more recent efforts such as cooperative projects with the Council on Radiation Control Program Directors (CRCPD) and involvement in GTRI's Search and Secure project. Current challenges and future work will also be discussed.

99 GENERAL AND MISCELLANEOUS↗

High‐Resolution Dynamical Downscaling Ensemble Projections of Future Extreme Temperature Distributions for the United States

Abstract The aim of this study is to examine projections of extreme temperatures over the continental United States (CONUS) for the 21st century using an ensemble of high spatial resolution dynamically downscaled model simulations with different boundary conditions. The downscaling uses the Weather Research and Forecast model at a spatial resolution of 12 km along with outputs from three different Coupled Model Intercomparison Project Phase 5 global climate models that provide boundary conditions under two different future greenhouse gas (GHG) concentration trajectories. The results from two decadal‐length time slices (2045–2054 and 2085–2094) are compared with a historical decade (1995–2004). Probability density functions of daily maximum/minimum temperatures are analyzed over seven climatologically cohesive regions of the CONUS. The impacts of different boundary conditions as well as future GHG concentrations on extreme events such as heat waves and days with temperature higher than 95°F are also investigated. The results show that the intensity of extreme warm temperature in future summer is significantly increased, while the frequency of extreme cold temperature in future winter decreases. The distribution of summer daily maximum temperature experiences a significant warm‐side shift and increased variability, while the distribution of winter daily minimum temperature is projected to have a less significant warm‐side shift with decreased variability. Using “business‐as‐usual” scenario, 5‐day heat waves are projected to occur at least 5–10 times per year in most CONUS and ≥95°F days will increase by 1–2 months by the end of the century.

54 ENVIRONMENTAL SCIENCES↗

Climate Change Projection in the Twenty-First Century Simulated by NIMS-KMA CMIP6 Model Based on New GHGs Concentration Pathways

Abstract The National Institute of Meteorological Sciences-Korea Meteorological Administration (NIMS-KMA) has participated in the Coupled Model Inter-comparison Project (CMIP) and provided long-term simulations using the coupled climate model. The NIMS-KMA produces new future projections using the ensemble mean of KMA Advanced Community Earth system model (K-ACE) and UK Earth System Model version1 (UKESM1) simulations to provide scientific information of future climate changes. In this study, we analyze four experiments those conducted following the new shared socioeconomic pathway (SSP) based scenarios to examine projected climate change in the twenty-first century. Present day (PD) simulations show high performance skill in both climate mean and variability, which provide a reliability of the climate models and reduces the uncertainty in response to future forcing. In future projections, global temperature increases from 1.92 °C to 5.20 °C relative to the PD level (1995–2014). Global mean precipitation increases from 5.1% to 10.1% and sea ice extent decreases from 19% to 62% in the Arctic and from 18% to 54% in the Antarctic. In addition, climate changes are accelerating toward the late twenty-first century. Our CMIP6 simulations are released to the public through the Earth System Grid Federation (ESGF) international data sharing portal and are used to support the establishment of the national adaptation plan for climate change in South Korea.

54 ENVIRONMENTAL SCIENCES↗