Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Flow Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Integrated System Planning: Emerging Software Requirements in the Power Industry

Power system planning software remains fragmented across organizational boundaries, with specialized tools for capacity expansion, production cost modeling, power flow, and dynamic analysis operating on incompatible data models and assumptions. This article argues that the fragmentation is not merely a technical problem but a predictable consequence of Conway's law: software architectures mirror the departmental structures within which they are developed. Regulatory milestones like Federal Energy Regulatory Commission (FERC) Order 888 formalized these divisions, but the roots trace back to the distinct engineering disciplines-mechanical, chemical, and electrical-that staffed generation and transmission planning departments in vertically integrated utilities. As the industry moves toward integrated system planning (ISP) that coordinates generation, transmission, and distribution investment decisions, the software ecosystem must evolve accordingly. We identify five categories of software requirements to enable this transition: coherent data inputs decoupled from individual applications, unified and extensible data schemas, modular component representations that support multiple abstraction levels, lifecycle management of planning datasets, and well-defined application programming interface (API) contracts that separate data exchange from algorithmic control. We examine how these requirements interact with three common workflow patterns-serial gate clearing, sequential multiapplication, and convergence oriented-and discuss the interface design principles each demands. We then outline a vision for platform-based planning architectures where specialized analytical services compose through standardized interfaces and where artificial intelligence (AI)/machine learning (ML) tools augment decision support within a disciplined software infrastructure. The practices proposed here offer a path from today's siloed tool collections toward collaborative planning ecosystems capable of handling the complexity of modern power system transformation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Digital I and C system upgrade integration technique

This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A solid review can assure the quality of the digital I and C system replacement. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Impact of velocity correlation and distribution on transport in fractured media: Field evidence and theoretical model

Flow and transport through fractured geologic media often leads to anomalous (non-Fickian) transport behavior, the origin of which remains a matter of debate: whether it arises from variability in fracture permeability (velocity distribution), connectedness in the flow paths through fractures (velocity correlation), or interaction between fractures and matrix. Here we show that this uncertainty of distribution- versus correlation-controlled transport can be resolved by combining convergent and push-pull tracer tests because flow reversibility is strongly dependent on velocity correlation, whereas late-time scaling of breakthrough curves is mainly controlled by velocity distribution. We build on this insight, and propose a Lagrangian statistical model that takes the form of a continuous time random walk (CTRW) with correlated particle velocities. In this framework, velocity distribution and velocity correlation are quantified by a Markov process of particle transition times that is characterized by a distribution function and a transition probability. Our transport model accurately captures the anomalous behavior in the breakthrough curves for both push-pull and convergent flow geometries, with the same set of parameters. Thus, the proposed correlated CTRW modeling approach provides a simple yet powerful framework for characterizing the impact of velocity distribution and correlation on transport in fractured media.

58 GEOSCIENCES↗

Triode for Magnetic Flux Quanta

In an electronic triode, the electron current emanating from the cathode is regulated by the electric potential on a grid between the cathode and the anode. Here we demonstrate a triode for single quantum magnetic field carriers, where the flow of individual magnetic vortices in a superconducting film is regulated by the magnetic potential of striae of soft magnetic strips deposited on the film surface. By rotating an applied in-plane field, the magnetic strip potential can be varied due to changes in the magnetic charges at the strip edges, allowing accelerated or retarded motion of magnetic vortices inside the superconductor. Scaling down our design and reducing the gap width between the magnetic stripes will enable controlled manipulation of individual vortices and creation of single flux quantum circuitry for novel high-speed low-power superconducting electronics.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

An Energy Efficient Ethernet Strategy Based on Traffic Prediction and Shaping

Recently, different communities in computer science, telecommunication, and control systems have devoted a huge effort towards the design of energy efficient solutions for data transmission and network management. This paper collocates along this research line and presents a novel energy efficient strategy conceived for Ethernet networks. The proposed strategy, which exploits the opportunities offered by the IEEE 802.3az amendment to the Ethernet standard (known as energy efficient Ethernet) is based on the possibility of predicting the future traffic from the analysis of the current data flow. In agreement with the results of such a dynamic prediction, Ethernet links can be forced into a low power consumption state for variable intervals. Theoretical bounds are derived to detail how the performance figures depend on the parameters of the designed strategy and scale with respect to traffic load. Furthermore, simulation results carried out with both real and synthetic traffic traces are presented to prove the effectiveness of the strategy, which leads to considerable energy savings at the cost of only a limited bounded delay in data delivery.

Cenedese, Angelo (ORCID:0000000322495094)↗

NSRL Extraction Bump Control in the Booster

Due to inadequacies in the user interface of the booster orbit control system, a number of new tools were developed. The first priority was an accurate calculation of the winding currents given specific displacements at each extraction septa. Next, the physical limits of the power supplies (±600 amps) needed to be taken into account. In light of this limit, a system is developed that indicates to the user what the allowed values of one bump parameter are once the other two have been specified. Finally, techniques are developed to account for the orbit behavior once power supplies are requested to exceed their ±600 amp limit. This includes a recalculation of bump parameters and a calculation of the amplitude of the residuals. Following this, possible areas for further development are outlined. These techniques were computationally developed in Mathematica and tested in the Methodical Accelerator Design (MAD) program before they were implemented into the control system. At the end, a description of the implementation of these techniques in a new interface is described. This includes a depiction of the appearance and functionality of the graphical user interface, a description of the input and output flow, and an outline of how each important calculation is performed.

43 PARTICLE ACCELERATORS↗

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Spatio-temporal evolution of the H → L back transition

Since ITER will operate close to threshold and with limited control, the H → L back transition is a topic important for machine operations as well as physics. Using a reduced mesoscale model [Miki et al., Phys. Plasmas 19, 092306 (2012)], we investigate ELM-free H → L back transition dynamics in order to isolate transport physics effects. Model studies indicate that turbulence spreading is the key process which triggers the back transition. The transition involves a feedback loop linking turbulence and profiles. The I-phase appears during the back transition following a slow power ramp down, while fast ramp-downs reveal a single burst of zonal flow during the back transition. The I-phase nucleates at the pedestal shoulder, as this is the site of the residual turbulence in H-mode. Hysteresis in the profile gradient scale length is characterized by the Nusselt number, where Nu=χ{sub i,turb}/χ{sub i,neo}. Relative hysteresis of temperature gradient vs density gradient is sensitive to the pedestal Prandtl number, where Pr{sub ped}=D{sub ped}/χ{sub i,neo}. We expect the H-mode to be somewhat more resilient in density than in temperature.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SOLPS analysis of the necessary conditions for detachment cliff

SOLPS modeling including full cross-filed drifts is used, for the first time, to reproduce the step-like detachment onset observed in the DIII-D tokamak previously simulated with UEDGE [Jaervinen A. E. et al., 2018 Phys. Rev. Lett.121 075001], and to further investigate the underlying physics processes. The SOLPS analysis reveals a strong interplay between the E×B drift-driven flows and carbon radiation in DIII-D. The modeling shows that the high confinement H-mode facilitates the formation of such a detachment cliff due to the narrow SOL width and hence steep radial gradients near the separatrix, which enhances the poloidal E×B drift. Furthermore, the SOLPS modeling indicates that carbon radiation also plays a key role in the formation of the detachment cliff in DIII-D without additional impurity seeding. These findings may have significant implications for the control and maintenance of divertor detachment for the steady-state operation of high-power fusion devices.

Physics - Plasma physics↗

Frequency Support Enhancement of a Permanent Magnet-Based Adjustable-Speed Pumped Hydropower Plant

When a permanent magnet (PM) -based adjustable-speed pumped storage hydropower (AS-PSH) plant delivers frequency response via the full-scaled power converter, there is power imbalance at the PM generator during the initial stage of the frequency response. This is because the AS-PSH has the different time constants between the power converter and wicket gate in the governor valve. Thus, this imbalance causes a sudden reduction of the rotational speed of the machine during the frequency response. As a result, a voltage deficit arises at the generator terminal in proportion to the decrement in the rotational speed, and thereby it is promising that the current flow at the converter will reach its limit when attempting to inject the commanded active power at a reduced voltage level. Thus, this causes the degradation of the frequency response of the AS-PSH due to the self-demagnetization at a reduced rotational speed. This paper proposes a frequency support scheme of a PM-based AS-PSH to enhance the frequency response by bridging the gap between the different time constants. To achieve this, the frequency support scheme includes a gate opening adjustment in the governor and a dynamic ramp-down in converter controller of the AS-PSH.

13 HYDRO ENERGY↗

Hydropower and environmental flow management: System-level trade-offs at Glen Canyon Dam

The research focuses on the Colorado River Basin, specifically examining the Glen Canyon Dam (GCD) and its influence on surrounding aquatic ecosystems. This area is crucial due to its role in hydropower production and its impact on downstream environments, including the Grand Canyon National Park. This study explores the integration of environmental factors into hydro dispatch modeling at GCD to tackle ecological challenges posed by the invasive smallmouth bass (SMB). Utilizing the GTMax SL and SERM models, the research assesses the effects of SMB control experiments on hydropower generation, economic value, and grid stability. The study examines the financial and economic impacts of bypass flows designed to release colder water to prevent SMB spawning, which can significantly reduce hydropower output and increase costs. The research identifies that declining reservoir levels and rising water temperatures in Lake Powell have facilitated SMB spawning, posing a threat to native fish populations like the endangered humpback chub. The findings highlight the importance of adaptive management strategies to balance ecological preservation with hydropower generation amid long-term weather-related challenges. The study underscores the need for comprehensive assessments of flow options to prevent SMB establishment below GCD, considering the broader implications for sediment dynamics and ecological interactions.

Ecological impact assessment↗

Scalability of Real-time Distribution Models

This work will focus on developing the capabilities and validating the models for a sub transmission network with multiple feeders and microgrids. To achieve this scale of Hardware-in-the-loop (HitL) simulation, it is necessary to federate and collaborate. The work aims to design the large-scale feeder models to allow federation with complementary testbeds in the future. The feeder would be designed to be reconfigurable to put the system into a variety of modes. Aggregators models will be included in each distribution network’s federate to take control actions and interact with the management systems. Lastly, the feeder model will support large scale resilience studies involving complex Distributed Energy Resources (DER) controls, microgrid studies and emulation of complex data flows in future grid architectures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Computational design of microarchitected porous electrodes for redox flow batteries

Porous electrodes are used as the core reactive component across electrochemical technologies. In flowing systems, controlling the fluid distribution, species transport, and reactive environment is critical to attaining high performance. However, conventional electrode materials like felts and papers provide few opportunities for precise engineering of the electrode and its microstructure. To address these limitations, architected electrodes composed of unit cells with spatially varying geometry determined via computational optimization are proposed. Resolved simulation is employed to develop a homogenized description of the constituent unit cells. These effective properties serve as inputs to a continuum model for the electrode when used in the negative half-cell of a vanadium redox flow battery. Porosity distributions minimizing power loss are then determined via computational design optimization to generate architected porosity electrodes. The architected electrodes are compared to bulk, uniform porosity electrodes and found to lead to increased power efficiency across operating flow rates and currents. The design methodology is further used to generate a scaled-up electrode with comparable power efficiency to the bench-scale systems. Finally, the variable porosity architecture and computational design methodology presented here thus offers a novel pathway for automatically generating spatially engineered electrode structures with improved power performance.

25 ENERGY STORAGE↗

Light water detritiation

Hundreds of thousands of tons of tritiated light water have been accumulating from the enterprises of nuclear fuel cycles around the world. The Dual-Temperature Water-Hydrogen (DTWH) process looks like the only practical alternative to Combined Electrolysis and Catalytic Exchange (CECE). In DTWH power-consuming lower reflux device (electrolytic cell) is replaced by a so-called 'hot tower' (LPCE column operating at conditions which ensure relatively small value of elementary separation factor α(hot)). In the upper, cold tower, the tritium transfers from hydrogen to water while in the lower, hot tower - in the opposite direction - from water to hydrogen. The DTWH process is much more complicated compared to CECE; it must be thoroughly computed and strictly controlled by an automatic control system. The use of a simulation code for DTWH is absolutely important. The simulation code EVIO-5 deals with 3 flows inside a column (hydrogen gas, water vapour and liquid water) and 2 simultaneous isotope exchange sub-processes (counter-current phase exchange and co-current catalytic exchange). EVIO-5 takes into account the strong dependence of process performance on given conditions (temperature and pressure). It calculates steady-state isotope concentration profiles considering a full set of reversible exchange reactions between different isotope modifications of water and hydrogen (12 molecular species). So the code can be used for simulation of LPCE column operation for detritiation of hydrogen and water feed, which contains H and D not only at low concentrations but above 10 at.% also. EVIO-5 code is used to model a Tritium Removal Facility with a throughput capacity of about 400 m{sup 3}/day. Simulation results show that a huge amount of wet-proofed catalyst is required (about 6000 m{sup 3}), mainly (90%) in the first stage. One reason for these large expenses (apart from a big scale of the problem itself) is the relatively high tritium separation factor in the hot tower. The introduction of some quantity of deuterium into the gaseous flow before the hot tower lowers the tritium separation factor in that column. One possible variant of deuterium introduction to the hot tower of the first stage was modelled. The decontamination capacity increases by a 2.5 factor.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design of a Continuous Electrochemical Purification Reactor for Corrosion Mitigation in Molten Chloride Salt Systems

The utility of molten chloride salts in concentrating solar power (CSP) is dependent on the ability to maintain low corrosive impurities. Without proper purification, the corrosion rates of containment alloys exceed the industry standard of corrosion—under 20 μm/year. An extensive body of literature focuses on the initial purification stage of molten chloride salts. However, occurrences such as maintenance, leaks, and so forth expose the salt to the atmosphere and reintroduce impurities. Therefore, it is critical to develop a purification strategy that can control impurity levels during CSP plant operation. Here we present the design and fabrication of a purification vessel to continuously remove impurities out of flowing molten salt.

Witteman, Liam↗

Sensor Characteristics Reference Guide

The purpose of the guide is to inform building owners and operators of the current status, capabilities, and limitations of sensor technologies. It is hoped that this guide will aid in the design and procurement process and result in successful implementation of building sensor and control systems. DOE will also use this guide to identify research priorities, develop future specifications for potential market adoption, and provide market clarity through unbiased information.

Acoustic Energy Generators↗