Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Neural nets for aligning optical components in harsh environments: Beam smoothing spatial filter as an example

The goal is to develop an approach to automating the alignment and adjustment of optical measurement, visualization, inspection, and control systems. Classical controls, expert systems, and neural networks are three approaches to automating the alignment of an optical system. Neural networks were chosen for this project and the judgements that led to this decision are presented. Neural networks were used to automate the alignment of the ubiquitous laser-beam-smoothing spatial filter. The results and future plans of the project are presented.

Decker, Arthur J.↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

Risk identification and reduction in integrated product teams

This brief report summarizes research and planning conducted during Summer 1993 for MSFC on the subjects of risk identification, assessment, and management. Research findings are presented, citing useful references. The major output of this work, the AXAF-S Project Risk Management Plan is outlined.

Batson, Robert G.↗

Developing The Organized Village of Kasaan's Strategic Energy Plan

The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribe's blueprint for creating long term energy self sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both supply side options of the development of sustainable energy sources, as well as demand-side options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status and Plans for the WCRP/GEWEX Global Precipitation Climatology Project (GPCP)

The Global Precipitation Climatology Project (GPCP) is an international project under the auspices of the World Climate Research Program (WCRP) and GEWEX (Global Water and Energy Experiment). The GPCP group consists of scientists from agencies and universities in various countries that work together to produce a set of global precipitation analyses at time scales of monthly, pentad, and daily. The status of the current products will be briefly summarized, focusing on the monthly analysis. Global and large regional rainfall variations and possible long-term changes are examined using the 27-year (1 979-2005) monthly dataset. In addition to global patterns associated with phenomena such as ENSO, the data set is explored for evidence of long-term change. Although the global change of precipitation in the data set is near zero, the data set does indicate a small upward change in the Tropics (25s-25N) during the period,. especially over ocean. Techniques are derived to isolate and eliminate variations due to ENS0 and major volcanic eruptions and the significance of the linear change is examined. Plans for a GPCP reprocessing for a Version 3 of products, potentially including a fine-time resolution product will be discussed. Current and future links to IPWG will also be addressed.

Adler, Robert F.↗

NASA Pilot Land Data System

Project development and planning for a Pilot Land Data System (PLDS) are discussed. The PLDS supplies basic information, data management, and data processing capabilities to the land research community. Topics on design and implementation, user requirements, and project management are examined. The scenarios developed thusfar are also included.

Estes, J. E.↗

Thermal Energy Corporation Combined Heat and Power Project

To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power outages. TECO's operation is the largest Chilled Water District Energy System in the United States. The company used DOE's funding to help install a new high efficiency CHP system consisting of a Combustion Turbine and a Heat Recovery Steam Generator. This CHP installation was just part of a larger project undertaken by TECO to ensure that it can continue to meet TMC's growing needs. The complete efficiency overhaul that TECO undertook supported more than 1,000 direct and indirect jobs in manufacturing, engineering, and construction, with approximately 400 of those being jobs directly associated with construction of the combined heat and power plant. This showcase industrial scale CHP project, serving a critical component of the nation's healthcare infrastructure, directly and immediately supported the energy efficiency and job creation goals established by ARRA and DOE. It also provided an unsurpassed model of a district energy CHP application that can be replicated within other energy intensive applications in the industrial, institutional and commercial sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Is the 80 - 20 Principle a Friend or a Foe? Critical Remarks on the Dominant Flat Gradient - 17206

The well-known 80 - 20 principle, also known as the Pareto principle, describes the fact that usually 80 % of the result is achieved by 20 % of the effort, because many probability distributions are caused by a power-law. This principle is valued in the realm of project management and management in general because of the fast progress which generally takes place in the first fifth of the process. If the final result is not exactly specified or resources are spent wisely, 100 % of the planned result will be reached easily. However, in nuclear business safety is a principal parameter. Therefore precision is inevitable. In long-lasting projects the bad end of the Pareto-distribution is dominant: The very shallowly-inclined gradient at the end of the graph means that results at that point come at a very high effort and cost. The graph reaches the 100% only asymptomatically, meaning the initially projected results are never met. Especially if in earlier project phases the Pareto principle is applied very successfully, a lot of work is transferred to the future. For example, in decommissioning projects the waste often is badly characterized causing an enormous effort in the process of characterization and qualification. Especially if funding or time are limited, it is important to be aware of the asymmetric distribution of applied work and result. The 80 - 20 principle is a great advantage, if you start a project and respect the asymmetric distribution of applied resources and results in your project plan. Especially in long-lasting projects with changing perspectives, this asymmetric distribution may cause massive delays and expansion of costs, because small changes near the end cause large/big effort due to consequences on the existing data. If the proper goal of a project is not entirely known in the beginning, it is very probable that the last 5 - 10 % of the result will cause major financial threat and extensions of the estimated time frame. If funding or time are limited, it is almost impossible to readjust a project in the estimated frame of resources. In this case a complete restart of the project may be more reasonable than a long-lasting change management with uncertain results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industrial Program of Waste Management - Cigeo Project - 13033

The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enabling the Next Generation Of Facilities for Particle Physics

The report of the decadal US Particle Physics Community Planning Exercise known as “Snowmass” was released earlier this year. The Snowmass report serves as input for the second phase of planning, the Particle Physics Project Prioritization Panel (P5). P5 will develop a strategic plan for U.S. particle physics that will guide the field for the next decade and set R&D priorities beyond that. A broad range of proposals for future facilities were put forward during the Snowmass process, many requiring beyond state-of-the-art superconducting materials and magnets. This talk will give an overview of some of the collider options and outline elements of an R&D plan for the material and magnet development needed to meet the challenging requirements.

Gourlay, Steve↗

Controls Request Tracker

Controls groups at large accelerators are routinely called upon to build and support controls for virtually all machine systems. While construction projects within the US DOE system are normally carefully planned and tracked by project management professionals, this support ends when construction milestones are met. However, once construction is complete, work continues as the group performs ongoing support and maintenance while also implementing requested system improvements and upgrades. With customers from virtually every accelerator and experiment group, the demands on the group often exceed the capacity of available resources. This type of diverse workload needs to be well organized and managed in order set proper priorities and ensure efficient use of resources. At SNS, we have collaborated with Cosylab to develop Controls Request Tracker (CRT), which is adapted from the Cosylab Project Manager (CPM) software. The resulting system not only provides standard request tracking features, but is interfaced to the SNS Logbook and work control system. This paper will discuss CRT and how we use it to manage the work of our controls group.

project management controls↗

Making Progress toward Net Zero Sites in the Army Reserve through Analysis of Multiple Scenarios

The U.S. Army Reserve (USAR) prioritized achieving net zero as part of its Sustainability Program in 2013, and developed a pilot that investigated net zero energy, water, and waste at 10 sites. Pilot sites were selected based on mission requirements for energy and water resilience and the likelihood of achieving the technical and economic thresholds for net zero. USAR owns and operates hundreds of sites that typically consist of between 2 and 10 buildings. The pilot sites were intentionally dispersed across the U.S. and its territories to provide a range of geographic characteristics where the net zero potential could be analyzed and solutions could be developed. For the Army, changes to operations must support the mission and enhance readiness, which includes increasing efficiency and resiliency. To facilitate alignment of project prioritization with different goals and site-specific needs, a net zero roadmap outlined three scenarios for project implementation: (1) cost-effective measures, (2) net zero measures, and (3) recommended measures. Each scenario included the same measures for some sites, while others had three different outcomes. USAR has used these roadmaps to plan and execute projects and move toward net zero at multiple sites since 2014, with the primary focus on the cost-effective and recommended scenarios. As conditions and costs change, additional measures required to achieve net zero are considered. This paper describes the methodology deployed for analyzing net zero for the USAR and discusses the benefits of working toward net zero under three distinct scenarios.

Net Zero↗

cerf: A Python package to evaluate the feasibility and costs of power plant siting for alternative futures

Long-term electric power sector planning and capacity expansion is a key area of interest to stakeholders across a wide range of organizations because it helps in making informed decisions about investments in infrastructure within the context of potential future vulnerabilities under various natural and human stressors. Future power plant siting costs will depend on a number of factors including the characteristics of the electricity capacity expansion and electricity demand (e.g., fuel mix of future electric power capacity, and the magnitude and geographic distribution of electricity demand growth) as well as the geographic location of power plants. Electricity technology capacity expansion plans modeled to represent alternate future conditions meeting a set of scenario assumptions are traditionally compared against historical trends which may not be consistent with current and future conditions. We present the `cerf` Python package (a.k.a., the Capacity Expansion Regional Feasibility model) which helps evaluate the feasibility and structure of future, scenario-driven electricity capacity expansion plans by siting power plants in areas that have been deemed the least cost option while considering dynamic future conditions. We can use `cerf` to gain insight to research topics such as: 1) under what conditions future projected electricity expansion plans from models such as GCAM-USA are possible to achieve, 2) where and which on-the-ground barriers to siting (e.g., protected areas, cooling water availability) may influence our ability to achieve certain expansions, and 3) how electricity infrastructure build-outs and value may evolve into the future when considering locational marginal pricing (LMP) based on the supply and demand of electricity from a grid operations model.

20 FOSSIL-FUELED POWER PLANTS↗

Flexible Electrostatic Technology for Capture and Handling Project

To NASA unfunded & planned missions: This new capability to sense proximity, flexibly align to, and attractively grip and capture practically any object in space without any pre-designed physical features or added sensors or actuators will enable or enhance many of MSFC's strategic emphasis areas in space transportation, and space systems such as: 1. A Flexible Electrostatic gripper can enable the capture, gripping and releasing of an extraterrestrial sample of different minerals or a sample canister (metallic or composite) without requiring a handle or grapple fixture.(B) 2. Flexible self-aligning in-space capture/soft docking or berthing of ISS resupply vehicles, pressurized modules, or nodes for in-space assembly and shielding, radiator, and solar Array deployment for space habitats (C) 3. The flexible electrostatic gripper when combined with a simple steerable extendible boom can grip, position, and release objects of various shapes and materials with low mass and power without any prior handles or physical accommodations or surface contamination for ISS experiment experiments and in-situ repair.(F)(G) 4. The Dexterous Docking concept previously proposed to allow simple commercial resupply ships to station-keep and capture either ISS or an Exploration vehicle for supply or fluid transfer lacked a self-sensing, compliant, soft capture gripper like FETCH that could retract and attach to a CBM. (I) 5. To enable a soft capture and de-orbit of a piece of orbital debris will require self-aligning gripping and holding an object wherever possible (thermal coverings or shields of various materials, radiators, solar arrays, antenna dishes) with little or no residual power while adding either drag or active low level thrust.(K) 6. With the scalability of the FETCH technology, small satellites can be captured and handled or can incorporate FETCH gripper to dock to and handle other small vehicles and larger objects for de-orbiting or mitigating Orbital debris (L) 7. Many of previous MSFC and NASA proposals or concepts can now be realized or simplified by the development of the this initial and future FETCH grippers including commercial resupply, Exploration vehicle assembly, Satellite servicing, and orbital debris removal since a major part of these missions is to align to and capture some handle. Completed Project (2013 - 2014) Flexible Electrostatic Technology for Capture & Handling Project Center Innovation Fund: MSFC CIF Program | Space Technology Mission Directorate (STMD) For more information visit techport.nasa.gov Some NASA technology projects are smaller (for example SBIR/STTR, NIAC and Center Innovation Fund), and will have less content than other, larger projects. Newly created projects may not sensors or injection of permanent adhesives. With gripping forces estimated between 0.5 and 2.5 pounds per square inch or 70-300 lb./sq. ft. of surface contact, the FETCH can turn-on and turn-off rapidly and repeatedly to enable sample handling, soft docking, in-space assembly, and precision relocation for accurate anchor adhesion.

Keys, Andrew↗

Interior Athabascan Energy Capacity Building Network (Final Report)

Tanana Chiefs Conference (TCC) is the traditional tribal consortium for the 37 federally recognized Tribes and villages of Interior Alaska. TCC is based on a belief in tribal self-determination and the need for regional Native unity. TCC is a nonprofit organization that works toward meeting the needs and challenges for more than 10,000 Alaska Natives (mostly Alaskan Athabaskans) in Interior Alaska. With support from DOE-OIE’s Inter-Tribal Technical Assistance grant, TCC’s goal was to expand and build on the solid foundation of work that the existing TCC Energy Program established through the creation of the Interior Athabascan Energy Network (IAEN). More specifically, the IAEN was designed to create a network of village-based energy champions across the interior and hold quarterly teleconferences and annual inperson meetings. Among the greatest impacts of the IAEN were the creation and support of realistic, communitybased energy projects that produced tangible results such as fuel savings and skills and capacity development among local staff as well as establishment of an energy team that included TCC staff, Tribal participants, technical consultants, and support agencies. The DOE-TA funding allowed us to provide technical assistance to our Tribal communities to develop energy projects, and to foster a network consisting of Tribal community members and energy experts that has strengthened the ability in the region to troubleshoot energy issues, develop meaningful projects, envision a clean energy future, and to share project successes and challenges. The funding from DOE was a catalyst for growth, has created opportunities for learning and knowledge sharing, and has led to the development of cost saving energy projects. Most importantly, the DOE project allowed energy champions around the region to share their knowledge, experiences, and expertise to create place-based solutions and has forged inter-Tribal relationships that will continue to be an asset for years to come. Through information exchange that occurred at out IAEN annual meetings and other events, this technical assistance grant award has spurred a spinoff project that is focused on establishing a collaborative of independent utilities that work together to solve energy problems and share services to operate and maintain their electric utilities. We have indentified at least 10 and possibly 12 communities that are interested in collaborating in managing their utilities to reduce costs and increase reliability. As well, by identifying and supporting Community Energy Champions in the Interior villages and adding capacity to the TCC Energy Program, we were able to create actionable community energy plans, develop specific projects, and increase local capacity, skills, and literacy around clean energy initiatives.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Storage in Local Zoning Ordinances

Increasing policy support and declining prices for battery energy storage systems (BESS) are driving rapid growth in the installation of these systems in the United States and around the world. Because a BESS is modular in nature and has limited infrastructure requirements, it can be built in close proximity to existing uses, which creates the potential for conflict. As the use of BESS grows, local planning and zoning staff are increasingly being asked to determine where the systems can be built and how their impacts on surrounding uses can be mitigated. While a large-scale BESS offers significant electric grid and societal benefits, it can also pose safety, visual, auditory, and environmental impacts on the community in which it is located. While these are material impacts, current safety codes for energy storage systems and land use frameworks provide planners with the necessary tools and processes to mitigate those impacts and ensure that their communities safely receive the benefits of energy storage systems. This report provides an overview of BESS from a land use perspective and describes their implications for zoning and project permitting. It concludes with an analysis of current energy storage zoning standards adopted by local jurisdictions in the U.S. Its intent is to objectively inform land use decisions for energy storage projects by equipping planning officials with relevant information about these technologies and knowledge of what questions to ask during review processes, so that energy storage projects can move forward in ways that will benefit electric systems while not unduly affecting host communities.

25 ENERGY STORAGE↗

Kotzebue Strategic Energy Plan

The Kotzebue Strategic Energy Plan outlines a community-driven roadmap to reduce reliance on imported diesel, lower energy costs, and build a resilient energy future for Kotzebue, Alaska. Developed in 2024-2025 through the U.S. Department of Energy’s Energy Technology Innovation Partnership Project (ETIPP), the plan was led by the Native Village of Kotzebue in collaboration with Kotzebue Electric Association, the City of Kotzebue, the Northwest Arctic Borough, NANA Regional Corporation, and regional partners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CubeSat Initiatives at KSC

Even though the Small PayLoad Integrated Testing Services or SPLITS line of business is newly established, KSC has been involved in a variety of CubeSat projects and programs. CubeSat development projects have been initiated through educational outreach partnerships with schools and universities, commercial partnerships and internal training initiatives. KSC has also been involved in CubeSat deployment through programs to find launch opportunities to fly CubeSats as auxiliary payloads on previously planned missions and involvement in the development of new launch capabilities for small satellites. This overview will highlight the CubeSat accomplishments at KSC and discuss planning for future projects and opportunities.

CubeSat↗